CN204386138U - Wall construction is connected between building scaffold platform - Google Patents

Wall construction is connected between building scaffold platform Download PDF

Info

Publication number
CN204386138U
CN204386138U CN201420756196.2U CN201420756196U CN204386138U CN 204386138 U CN204386138 U CN 204386138U CN 201420756196 U CN201420756196 U CN 201420756196U CN 204386138 U CN204386138 U CN 204386138U
Authority
CN
China
Prior art keywords
connecting rod
scaffold
tube connector
shaped tube
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420756196.2U
Other languages
Chinese (zh)
Inventor
衣慧琳
谢元新
陈瑶
于鑫
邓春明
陆文龙
王鹤
康卿豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420756196.2U priority Critical patent/CN204386138U/en
Application granted granted Critical
Publication of CN204386138U publication Critical patent/CN204386138U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model discloses between a kind of building scaffold platform and connect wall construction, the vertical distance being vertically highly less than adjacent two scaffolding platform in scaffold of Z-shaped tube connector, level is partly embedded in walls concrete structure, the upper horizontal tube of Z-shaped tube connector exposes a STH of walls concrete structure, one end of connecting rod I is inserted in upper horizontal tube by open pore level, and fixed by pretension bolt, the other end of connecting rod I is fixedly connected with scaffold by buckle; The inclined tube of Z-shaped tube connector and the perforate of lower horizontal tube infall, one end of connecting rod II is inserted in lower horizontal tube by open pore level, and is fixed by pretension bolt, and the other end of connecting rod II is fixedly connected with scaffold by buckle; On the scaffold of the position fixed of connecting rod I and connecting rod II other end all between adjacent two scaffolding platform.The utility model effectively resists support body horizontal distortion, while improving security performance, guarantees main body construction, and improves the efficiency of construction.

Description

Wall construction is connected between building scaffold platform
Technical field
The utility model relates to a kind of wall-connecting device of scaffold, specifically connects wall construction between a kind of building scaffold platform, belongs to building trade technical field of auxiliary equipment.
Background technology
In existing building site, the connection between scaffold and construction wall is one of important step in building safety facility always.The structure of wall attaching parts many employings built-in pipe of present most scaffold, and must reserved opening when building a wall, inserts vertical tube and tube connector, and is fixed by snaply connected with scaffold.Said structure has following shortcoming: leave larger space between above-mentioned connected mode and body of wall, and when scaffold is stressed, this device is easy to distortion, easily outwards or inwardly topples, brings potential safety hazard.The palpus reserved opening when building a wall, the later stage shutoff cost in wall hole is higher, and effect is bad, even causes wall leakage, hinders integral construction, reduce efficiency of construction, and structure must be assigned at ad-hoc location, increase the difficulty of construction of constructor.
Summary of the invention
For above-mentioned prior art Problems existing, the utility model provides between a kind of building scaffold platform and connects wall construction, and effectively opposing support body horizontal distortion, while improving security performance, without the need to reserved opening, guarantees main body construction, and improves the efficiency of construction.
To achieve these goals, the utility model comprises walls concrete structure, scaffold and scaffolding platform; All be connected and fixed by connecting rod I, connecting rod II and Z-shaped tube connector between adjacent two scaffolding platform in walls concrete structure and scaffold; Wherein, the vertical distance being vertically highly less than adjacent two scaffolding platform in scaffold of Z-shaped tube connector, and level is partly embedded in walls concrete structure in the scope of its horizontal range, the upper horizontal tube of Z-shaped tube connector exposes a STH of walls concrete structure, one end of connecting rod I is inserted in upper horizontal tube by open pore level, and fixed by pretension bolt, the other end of connecting rod I is fixedly connected with scaffold by buckle; The inclined tube of Z-shaped tube connector and the perforate of lower horizontal tube infall, one end of connecting rod II is inserted in lower horizontal tube by open pore level, and is fixed by pretension bolt, and the other end of connecting rod II is fixedly connected with scaffold by buckle; Wherein, on the scaffold of the position fixed of connecting rod I and connecting rod II other end all between adjacent two scaffolding platform.
Further, in the vertical aspect ratio scaffold of described Z-shaped tube connector, adjacent two scaffolding platform is vertical apart from little 40mm-80mm.
Further, connecting rod II is vertically welded with a steel bar, described steel bar is vertically provided with a horizontal measuring instrument.
Further, the material of pretension bolt, connecting rod I, connecting rod II and Z-shaped tube connector all uses stainless steel for material.
Further, layer protective layer is provided with, described topping tail rubber layer or flannelette napped fabric layer between the space that connecting rod I and connecting rod II are inserted into the horizontal tube up and down of Z-shaped tube connector.
Compared with existing structure, the utility model employs the mode that connecting rod I, connecting rod II and Z-shaped tube connector are connected and fixed in this connection, and wherein, Z-shaped tube connector is embedded in walls concrete structure, utilizes Z-shaped structure, guarantees integrally-built stable; Between adjacent two scaffolding platform, connecting rod I and connecting rod II are set, a three-legged structure is formed with Z-shaped tube connector, further enhancing the connection between scaffold and body of wall, ensure that the stable of scaffold, and then ensure that the safety of constructor and carrying out smoothly of whole engineering.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure: 1, walls concrete structure, 2, Z-shaped tube connector, 3, pretension bolt, 4, connecting rod I, 5, scaffold, 6, scaffolding platform, 7, steel bar, 8, horizontal measuring instrument, 9, connecting rod II.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
As shown in Figure 1, between a kind of building scaffold platform, connect wall construction, be all connected and fixed by connecting rod I 4, connecting rod II 9 and Z-shaped tube connector 2 between adjacent two scaffolding platform 6 in walls concrete structure 1 and scaffold 5.
Wherein, the vertical distance being vertically highly less than adjacent two scaffolding platform 6 in scaffold 5 of described Z-shaped tube connector 2, and level is partly embedded in walls concrete structure 1 in the scope of its horizontal range, the upper horizontal tube of Z-shaped tube connector 2 exposes a STH of walls concrete structure 1, one end of connecting rod I 4 is inserted in upper horizontal tube by open pore level, and fixed by pretension bolt 3, the other end of connecting rod I 4 is fixedly connected with scaffold 5 by buckle; The inclined tube of Z-shaped tube connector 2 and the perforate of lower horizontal tube infall, one end of connecting rod II 9 is inserted in lower horizontal tube by open pore level, and is fixed by pretension bolt 3, and the other end of connecting rod II 9 is fixedly connected with scaffold 5 by buckle; Wherein, on the scaffold 5 of the position fixed of connecting rod I 4 and connecting rod II 9 other end all between adjacent two scaffolding platform 6.
Further, in the vertical aspect ratio scaffold 5 of described Z-shaped tube connector 2, adjacent two scaffolding platform 6 is vertical apart from little 40mm-80mm.
Further, connecting rod II 9 is vertically welded with a steel bar 7), described steel bar 7) on a horizontal measuring instrument 8 is vertically installed, for observing at any time
Further, the material of pretension bolt 3, connecting rod I 4, connecting rod II 9 and Z-shaped tube connector 2 all uses stainless steel for material.
Further, layer protective layer is provided with, described topping tail rubber layer or flannelette napped fabric layer between the space that connecting rod I 4 and connecting rod II 9 are inserted into the horizontal tube up and down of Z-shaped tube connector 2.
Compared with existing structure, the utility model employs the mode that connecting rod I, connecting rod II and Z-shaped tube connector are connected and fixed in this connection, and wherein, Z-shaped tube connector is embedded in walls concrete structure, utilizes Z-shaped structure, guarantees integrally-built stable; Between adjacent two scaffolding platform, connecting rod I and connecting rod II are set, a three-legged structure is formed with Z-shaped tube connector, further enhancing the connection between scaffold and body of wall, ensure that the stable of scaffold, and then ensure that the safety of constructor and carrying out smoothly of whole engineering.

Claims (5)

1. connect a wall construction between building scaffold platform, it is characterized in that, comprise walls concrete structure (1), scaffold (5) and scaffolding platform (6);
It is characterized in that, be all connected and fixed by connecting rod I (4), connecting rod II (9) and Z-shaped tube connector (2) between adjacent two scaffolding platform (6) in described walls concrete structure (1) and scaffold (5);
Wherein, the vertical distance being vertically highly less than adjacent two scaffolding platform (6) in scaffold (5) of described Z-shaped tube connector (2), and level is partly embedded in walls concrete structure (1) in the scope of its horizontal range, the upper horizontal tube of Z-shaped tube connector (2) exposes a STH of walls concrete structure (1), one end of connecting rod I (4) is inserted in upper horizontal tube by open pore level, and fixed by pretension bolt (3), the other end of connecting rod I (4) is fixedly connected with scaffold (5) by buckle; The inclined tube of Z-shaped tube connector (2) and the perforate of lower horizontal tube infall, one end of connecting rod II (9) is inserted in lower horizontal tube by open pore level, and fixed by pretension bolt (3), the other end of connecting rod II (9) is fixedly connected with scaffold (5) by buckle; Wherein, on the scaffold (5) of the position that connecting rod I (4) and connecting rod II (9) other end are fixing all between adjacent two scaffolding platform (6).
2. connect wall construction between a kind of building scaffold platform according to claim 1, it is characterized in that, in the vertical aspect ratio scaffold (5) of described described Z-shaped tube connector (2), adjacent two scaffolding platform (6) is vertical apart from little 40mm-80mm.
3. connect wall construction between a kind of building scaffold platform according to claim 1, it is characterized in that, described connecting rod II (9) is vertically welded with a steel bar (7), described steel bar (7) is vertically provided with a horizontal measuring instrument (8).
4. connect wall construction between a kind of building scaffold platform according to claim 1, it is characterized in that, the material of described pretension bolt (3), connecting rod I (4), connecting rod II (9) and Z-shaped tube connector (2) all uses stainless steel for material.
5. connect wall construction between a kind of building scaffold platform according to claim 1; it is characterized in that; be provided with layer protective layer between the space that described connecting rod I (4) and connecting rod II (9) are inserted into the horizontal tube up and down of Z-shaped tube connector (2), described topping is rubber layer or flannelette napped fabric layer.
CN201420756196.2U 2014-12-05 2014-12-05 Wall construction is connected between building scaffold platform Expired - Fee Related CN204386138U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420756196.2U CN204386138U (en) 2014-12-05 2014-12-05 Wall construction is connected between building scaffold platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420756196.2U CN204386138U (en) 2014-12-05 2014-12-05 Wall construction is connected between building scaffold platform

Publications (1)

Publication Number Publication Date
CN204386138U true CN204386138U (en) 2015-06-10

Family

ID=53358870

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420756196.2U Expired - Fee Related CN204386138U (en) 2014-12-05 2014-12-05 Wall construction is connected between building scaffold platform

Country Status (1)

Country Link
CN (1) CN204386138U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592957A (en) * 2016-12-21 2017-04-26 浙江海洋大学 Scaffold wall-connecting element
CN114457993A (en) * 2021-12-14 2022-05-10 深圳中铁二局工程有限公司 A whole movable operation platform for open caisson construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592957A (en) * 2016-12-21 2017-04-26 浙江海洋大学 Scaffold wall-connecting element
CN114457993A (en) * 2021-12-14 2022-05-10 深圳中铁二局工程有限公司 A whole movable operation platform for open caisson construction

Similar Documents

Publication Publication Date Title
CN204386138U (en) Wall construction is connected between building scaffold platform
CN203794504U (en) Internal-climbing plug-in tower crane support structure
CN204826702U (en) Hard protector of folded cascade elevartor shaft
CN104372923B (en) Scaffolding
CN203441069U (en) Outer wall dangling working platform capable of overturning
CN103866985A (en) Butt joint method and device for construction elevator and creeping formwork frame body
CN204532415U (en) A kind of fast-escape pipe with deixis
CN203531345U (en) Movable cantilever frame
CN202969895U (en) L-type flat iron wall connector for fastening scaffold
CN202047581U (en) Wall connecting piece for scaffold
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN204645586U (en) Civil engineering scaffold U-shaped wall attaching parts
CN204326486U (en) Outrigger oblique pull wire rope fixing device
CN204920171U (en) Elevartor shaft is platform for safety protection
CN203755712U (en) Multifunctional high-rise building border protection steel pipe fixing device
CN204040510U (en) A kind of safety protective door for elevator hoistways
CN204571296U (en) A kind of cantilevered structure formwork bracing system
CN204266570U (en) Scaffold W shape for building connects wall construction
CN104372935A (en) Scaffold
CN204626931U (en) In a kind of inside-climbing tower crane well hole, suspension type is from climbing operation platform
CN204001673U (en) Expanded metal lath fastening devices
CN204163358U (en) Scaffold
CN204238220U (en) The concrete construction passage that vertically puts in storage
CN204571150U (en) A kind of assemble guard bar
CN202834564U (en) Self-control reinforced pipeline blind plate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150610

Termination date: 20151205