CN204386138U - Wall construction is connected between building scaffold platform - Google Patents
Wall construction is connected between building scaffold platform Download PDFInfo
- Publication number
- CN204386138U CN204386138U CN201420756196.2U CN201420756196U CN204386138U CN 204386138 U CN204386138 U CN 204386138U CN 201420756196 U CN201420756196 U CN 201420756196U CN 204386138 U CN204386138 U CN 204386138U
- Authority
- CN
- China
- Prior art keywords
- connecting rod
- scaffold
- tube connector
- shaped tube
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
The utility model discloses between a kind of building scaffold platform and connect wall construction, the vertical distance being vertically highly less than adjacent two scaffolding platform in scaffold of Z-shaped tube connector, level is partly embedded in walls concrete structure, the upper horizontal tube of Z-shaped tube connector exposes a STH of walls concrete structure, one end of connecting rod I is inserted in upper horizontal tube by open pore level, and fixed by pretension bolt, the other end of connecting rod I is fixedly connected with scaffold by buckle; The inclined tube of Z-shaped tube connector and the perforate of lower horizontal tube infall, one end of connecting rod II is inserted in lower horizontal tube by open pore level, and is fixed by pretension bolt, and the other end of connecting rod II is fixedly connected with scaffold by buckle; On the scaffold of the position fixed of connecting rod I and connecting rod II other end all between adjacent two scaffolding platform.The utility model effectively resists support body horizontal distortion, while improving security performance, guarantees main body construction, and improves the efficiency of construction.
Description
Technical field
The utility model relates to a kind of wall-connecting device of scaffold, specifically connects wall construction between a kind of building scaffold platform, belongs to building trade technical field of auxiliary equipment.
Background technology
In existing building site, the connection between scaffold and construction wall is one of important step in building safety facility always.The structure of wall attaching parts many employings built-in pipe of present most scaffold, and must reserved opening when building a wall, inserts vertical tube and tube connector, and is fixed by snaply connected with scaffold.Said structure has following shortcoming: leave larger space between above-mentioned connected mode and body of wall, and when scaffold is stressed, this device is easy to distortion, easily outwards or inwardly topples, brings potential safety hazard.The palpus reserved opening when building a wall, the later stage shutoff cost in wall hole is higher, and effect is bad, even causes wall leakage, hinders integral construction, reduce efficiency of construction, and structure must be assigned at ad-hoc location, increase the difficulty of construction of constructor.
Summary of the invention
For above-mentioned prior art Problems existing, the utility model provides between a kind of building scaffold platform and connects wall construction, and effectively opposing support body horizontal distortion, while improving security performance, without the need to reserved opening, guarantees main body construction, and improves the efficiency of construction.
To achieve these goals, the utility model comprises walls concrete structure, scaffold and scaffolding platform; All be connected and fixed by connecting rod I, connecting rod II and Z-shaped tube connector between adjacent two scaffolding platform in walls concrete structure and scaffold; Wherein, the vertical distance being vertically highly less than adjacent two scaffolding platform in scaffold of Z-shaped tube connector, and level is partly embedded in walls concrete structure in the scope of its horizontal range, the upper horizontal tube of Z-shaped tube connector exposes a STH of walls concrete structure, one end of connecting rod I is inserted in upper horizontal tube by open pore level, and fixed by pretension bolt, the other end of connecting rod I is fixedly connected with scaffold by buckle; The inclined tube of Z-shaped tube connector and the perforate of lower horizontal tube infall, one end of connecting rod II is inserted in lower horizontal tube by open pore level, and is fixed by pretension bolt, and the other end of connecting rod II is fixedly connected with scaffold by buckle; Wherein, on the scaffold of the position fixed of connecting rod I and connecting rod II other end all between adjacent two scaffolding platform.
Further, in the vertical aspect ratio scaffold of described Z-shaped tube connector, adjacent two scaffolding platform is vertical apart from little 40mm-80mm.
Further, connecting rod II is vertically welded with a steel bar, described steel bar is vertically provided with a horizontal measuring instrument.
Further, the material of pretension bolt, connecting rod I, connecting rod II and Z-shaped tube connector all uses stainless steel for material.
Further, layer protective layer is provided with, described topping tail rubber layer or flannelette napped fabric layer between the space that connecting rod I and connecting rod II are inserted into the horizontal tube up and down of Z-shaped tube connector.
Compared with existing structure, the utility model employs the mode that connecting rod I, connecting rod II and Z-shaped tube connector are connected and fixed in this connection, and wherein, Z-shaped tube connector is embedded in walls concrete structure, utilizes Z-shaped structure, guarantees integrally-built stable; Between adjacent two scaffolding platform, connecting rod I and connecting rod II are set, a three-legged structure is formed with Z-shaped tube connector, further enhancing the connection between scaffold and body of wall, ensure that the stable of scaffold, and then ensure that the safety of constructor and carrying out smoothly of whole engineering.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure: 1, walls concrete structure, 2, Z-shaped tube connector, 3, pretension bolt, 4, connecting rod I, 5, scaffold, 6, scaffolding platform, 7, steel bar, 8, horizontal measuring instrument, 9, connecting rod II.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
As shown in Figure 1, between a kind of building scaffold platform, connect wall construction, be all connected and fixed by connecting rod I 4, connecting rod II 9 and Z-shaped tube connector 2 between adjacent two scaffolding platform 6 in walls concrete structure 1 and scaffold 5.
Wherein, the vertical distance being vertically highly less than adjacent two scaffolding platform 6 in scaffold 5 of described Z-shaped tube connector 2, and level is partly embedded in walls concrete structure 1 in the scope of its horizontal range, the upper horizontal tube of Z-shaped tube connector 2 exposes a STH of walls concrete structure 1, one end of connecting rod I 4 is inserted in upper horizontal tube by open pore level, and fixed by pretension bolt 3, the other end of connecting rod I 4 is fixedly connected with scaffold 5 by buckle; The inclined tube of Z-shaped tube connector 2 and the perforate of lower horizontal tube infall, one end of connecting rod II 9 is inserted in lower horizontal tube by open pore level, and is fixed by pretension bolt 3, and the other end of connecting rod II 9 is fixedly connected with scaffold 5 by buckle; Wherein, on the scaffold 5 of the position fixed of connecting rod I 4 and connecting rod II 9 other end all between adjacent two scaffolding platform 6.
Further, in the vertical aspect ratio scaffold 5 of described Z-shaped tube connector 2, adjacent two scaffolding platform 6 is vertical apart from little 40mm-80mm.
Further, connecting rod II 9 is vertically welded with a steel bar 7), described steel bar 7) on a horizontal measuring instrument 8 is vertically installed, for observing at any time
Further, the material of pretension bolt 3, connecting rod I 4, connecting rod II 9 and Z-shaped tube connector 2 all uses stainless steel for material.
Further, layer protective layer is provided with, described topping tail rubber layer or flannelette napped fabric layer between the space that connecting rod I 4 and connecting rod II 9 are inserted into the horizontal tube up and down of Z-shaped tube connector 2.
Compared with existing structure, the utility model employs the mode that connecting rod I, connecting rod II and Z-shaped tube connector are connected and fixed in this connection, and wherein, Z-shaped tube connector is embedded in walls concrete structure, utilizes Z-shaped structure, guarantees integrally-built stable; Between adjacent two scaffolding platform, connecting rod I and connecting rod II are set, a three-legged structure is formed with Z-shaped tube connector, further enhancing the connection between scaffold and body of wall, ensure that the stable of scaffold, and then ensure that the safety of constructor and carrying out smoothly of whole engineering.
Claims (5)
1. connect a wall construction between building scaffold platform, it is characterized in that, comprise walls concrete structure (1), scaffold (5) and scaffolding platform (6);
It is characterized in that, be all connected and fixed by connecting rod I (4), connecting rod II (9) and Z-shaped tube connector (2) between adjacent two scaffolding platform (6) in described walls concrete structure (1) and scaffold (5);
Wherein, the vertical distance being vertically highly less than adjacent two scaffolding platform (6) in scaffold (5) of described Z-shaped tube connector (2), and level is partly embedded in walls concrete structure (1) in the scope of its horizontal range, the upper horizontal tube of Z-shaped tube connector (2) exposes a STH of walls concrete structure (1), one end of connecting rod I (4) is inserted in upper horizontal tube by open pore level, and fixed by pretension bolt (3), the other end of connecting rod I (4) is fixedly connected with scaffold (5) by buckle; The inclined tube of Z-shaped tube connector (2) and the perforate of lower horizontal tube infall, one end of connecting rod II (9) is inserted in lower horizontal tube by open pore level, and fixed by pretension bolt (3), the other end of connecting rod II (9) is fixedly connected with scaffold (5) by buckle; Wherein, on the scaffold (5) of the position that connecting rod I (4) and connecting rod II (9) other end are fixing all between adjacent two scaffolding platform (6).
2. connect wall construction between a kind of building scaffold platform according to claim 1, it is characterized in that, in the vertical aspect ratio scaffold (5) of described described Z-shaped tube connector (2), adjacent two scaffolding platform (6) is vertical apart from little 40mm-80mm.
3. connect wall construction between a kind of building scaffold platform according to claim 1, it is characterized in that, described connecting rod II (9) is vertically welded with a steel bar (7), described steel bar (7) is vertically provided with a horizontal measuring instrument (8).
4. connect wall construction between a kind of building scaffold platform according to claim 1, it is characterized in that, the material of described pretension bolt (3), connecting rod I (4), connecting rod II (9) and Z-shaped tube connector (2) all uses stainless steel for material.
5. connect wall construction between a kind of building scaffold platform according to claim 1; it is characterized in that; be provided with layer protective layer between the space that described connecting rod I (4) and connecting rod II (9) are inserted into the horizontal tube up and down of Z-shaped tube connector (2), described topping is rubber layer or flannelette napped fabric layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420756196.2U CN204386138U (en) | 2014-12-05 | 2014-12-05 | Wall construction is connected between building scaffold platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420756196.2U CN204386138U (en) | 2014-12-05 | 2014-12-05 | Wall construction is connected between building scaffold platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204386138U true CN204386138U (en) | 2015-06-10 |
Family
ID=53358870
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420756196.2U Expired - Fee Related CN204386138U (en) | 2014-12-05 | 2014-12-05 | Wall construction is connected between building scaffold platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204386138U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106592957A (en) * | 2016-12-21 | 2017-04-26 | 浙江海洋大学 | Scaffold wall-connecting element |
CN114457993A (en) * | 2021-12-14 | 2022-05-10 | 深圳中铁二局工程有限公司 | A whole movable operation platform for open caisson construction |
-
2014
- 2014-12-05 CN CN201420756196.2U patent/CN204386138U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106592957A (en) * | 2016-12-21 | 2017-04-26 | 浙江海洋大学 | Scaffold wall-connecting element |
CN114457993A (en) * | 2021-12-14 | 2022-05-10 | 深圳中铁二局工程有限公司 | A whole movable operation platform for open caisson construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204386138U (en) | Wall construction is connected between building scaffold platform | |
CN203794504U (en) | Internal-climbing plug-in tower crane support structure | |
CN204826702U (en) | Hard protector of folded cascade elevartor shaft | |
CN104372923B (en) | Scaffolding | |
CN203441069U (en) | Outer wall dangling working platform capable of overturning | |
CN103866985A (en) | Butt joint method and device for construction elevator and creeping formwork frame body | |
CN204532415U (en) | A kind of fast-escape pipe with deixis | |
CN203531345U (en) | Movable cantilever frame | |
CN202969895U (en) | L-type flat iron wall connector for fastening scaffold | |
CN202047581U (en) | Wall connecting piece for scaffold | |
CN205134921U (en) | Building outer wall concrete constructional column hangs construction platform | |
CN204645586U (en) | Civil engineering scaffold U-shaped wall attaching parts | |
CN204326486U (en) | Outrigger oblique pull wire rope fixing device | |
CN204920171U (en) | Elevartor shaft is platform for safety protection | |
CN203755712U (en) | Multifunctional high-rise building border protection steel pipe fixing device | |
CN204040510U (en) | A kind of safety protective door for elevator hoistways | |
CN204571296U (en) | A kind of cantilevered structure formwork bracing system | |
CN204266570U (en) | Scaffold W shape for building connects wall construction | |
CN104372935A (en) | Scaffold | |
CN204626931U (en) | In a kind of inside-climbing tower crane well hole, suspension type is from climbing operation platform | |
CN204001673U (en) | Expanded metal lath fastening devices | |
CN204163358U (en) | Scaffold | |
CN204238220U (en) | The concrete construction passage that vertically puts in storage | |
CN204571150U (en) | A kind of assemble guard bar | |
CN202834564U (en) | Self-control reinforced pipeline blind plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150610 Termination date: 20151205 |
|
EXPY | Termination of patent right or utility model |