CN204571296U - A kind of cantilevered structure formwork bracing system - Google Patents

A kind of cantilevered structure formwork bracing system Download PDF

Info

Publication number
CN204571296U
CN204571296U CN201520207415.6U CN201520207415U CN204571296U CN 204571296 U CN204571296 U CN 204571296U CN 201520207415 U CN201520207415 U CN 201520207415U CN 204571296 U CN204571296 U CN 204571296U
Authority
CN
China
Prior art keywords
cantilevered structure
wire rope
bracing system
falsework
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520207415.6U
Other languages
Chinese (zh)
Inventor
肖建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Times Architectural Design Institute Co Ltd
Original Assignee
China Railway Times Architectural Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Times Architectural Design Institute Co Ltd filed Critical China Railway Times Architectural Design Institute Co Ltd
Priority to CN201520207415.6U priority Critical patent/CN204571296U/en
Application granted granted Critical
Publication of CN204571296U publication Critical patent/CN204571296U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of cantilevered structure formwork bracing system, comprise side and be arranged on cantilevered structure on body of wall, formwork bracing system is for supporting cantilevered structure, be arranged on the below of cantilevered structure, formwork bracing system comprises the wall-connecting piece of falsework, falsework and body of wall, wire rope and anchor ring; Anchor ring anchors on body of wall; Wire rope is plane splayed, and in same level, wire rope need be symmetrical arranged; Wire rope inclined-pulling angle is at 45 ° ~ 60 °, and the bolt tensioning that what one end and wire rope adapted be arranged on falsework, the other end and anchor ring carry out level and socket.The utility model is applicable to the design and construction of building operations temporary support structure, be applicable to depth-width ratio be greater than 3 and three limits without the stable safety measure of the reliable newly placed concrete engineering cantilevered structure falsework connected, its simple structure, economical rationality, convenient construction, the stability of newly placed concrete falsework in building operations can be strengthened, reduce construction safety hidden danger.

Description

A kind of cantilevered structure formwork bracing system
Technical field
The utility model is applicable to the construction of building operations temporary support structure, be specifically applicable to strengthen depth-width ratio and be greater than 3, and three limits is without the reliable cantilevered structure formwork bracing system connected.
Background technology
According to the feature of China's building operations, in the contingent security incident of building-site, formwork bracing system unstability cave-in accident odds is comparatively large, and the personnel's injury caused, property loss, operating environment destroy the most serious, have been listed in the significant risk factor of construction work.
Occur for formwork bracing system unstability cave-in accident, counter-measure conventional at present mainly contains following several method:
(1) reliable connection is done with existing structure.
(2) control support structure height is not more than 3 times of braced structures transverse width.
(3) cable wind rope of lower end and earth anchor drawknot is symmetrical arranged on the support structure.
(4) throwing support is symmetrical arranged on the support structure.
But there is following problem in above-mentioned several method:
1, for newly placed concrete cantilevered structure, because falsework three limit is without reliable connection, measure (1) is also inapplicable.
2, in order to meet the requirement that falsework depth-width ratio is not more than 3, need increase the scope on support body transverse width and support post basis, foundation soil should carry out cure process simultaneously.Which is for newly placed concrete cantilevered structure, and when cantilever span is less than 2.7m, when support structure height is more than 15 meters, the increase of measure 2 cost is higher.
3, in order to meet the requirement that falsework depth-width ratio is not more than 3, when taking to reduce falsework height, in the described lower floor of newly watering cantilevered structure, overhang steel platform need be set and carry out support shuttering support.The method complex structure, calculate loaded down with trivial details, be inconvenient to construct, if the inconsiderate impact that can cause crack on agent structure.
4, measure (3), measure (4) are comparatively applicable to the high-order braced structures of independence of ward.
Utility model content
The utility model object provides a kind of cantilevered structure formwork bracing system to overcome the deficiencies in the prior art, its simple structure, economical rationality, convenient construction, and the stability of newly placed concrete falsework in building operations can be strengthened, reduce construction safety hidden danger.
For achieving the above object, the technical solution adopted in the utility model is: a kind of cantilevered structure formwork bracing system, comprise side and be arranged on cantilevered structure on body of wall, described formwork bracing system is for supporting cantilevered structure, be arranged on the below of cantilevered structure, described formwork bracing system comprises the wall-connecting piece of falsework, falsework and body of wall, wire rope and anchor ring; Described anchor ring anchors on body of wall; Described wire rope is plane splayed, and in same level, wire rope need be symmetrical arranged; Described wire rope inclined-pulling angle is at 45 ° ~ 60 °, and the bolt tensioning that what one end and wire rope adapted be arranged on falsework, the other end and described anchor ring carry out level and socket.
Improve further as the utility model, described falsework comprises vertical bridging and horizontal cross brace, and surrounding has and is reliably connected with body of wall, and its excess-three limit is connected without reliable with body of wall.
Improve further as the utility model, described cantilevered structure length is 1.0 ~ 2.7m, encorbelments highly more than 15m.
Improve further as the utility model, when cantilevered structure height is more than 20m, splayed horizontal oblique pull wire rope and anchor ring should arrange two-layer, and levels interval should not be greater than 2 story heights.
Improve further as the utility model, described wire rope selects diameter to be less than 15.5mm.
Improve further as the utility model, described anchor ring adopts the HPB300 round steel of diameter 20mm.
Due to the utilization of technique scheme, the utility model compared with prior art has following advantages:
The utility model cantilevered structure formwork bracing system, be applicable to the design and construction of building operations temporary support structure, be applicable to depth-width ratio be greater than 3 and three limits without the stable safety measure of the reliable newly placed concrete engineering cantilevered structure falsework connected, its simple structure, economical rationality, convenient construction, the stability of newly placed concrete falsework in building operations can be strengthened, reduce construction safety hidden danger.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, technical solutions of the utility model are described further:
Accompanying drawing 1 is the newly placed concrete cantilevered structure floor map of the utility model cantilevered structure formwork bracing system;
Accompanying drawing 2 is falsework floor map in cantilevered structure shuttering supporting system of the present utility model;
Accompanying drawing 3 is the A-A cross-sectional view shown in accompanying drawing 2.
Wherein: 1, cantilevered structure; 2, formwork bracing system; 3, wire rope; 4, anchor ring; 5, vertical bridging; 6, horizontal cross brace; 7, wall-connecting piece.
Detailed description of the invention
Below in conjunction with drawings and the specific embodiments, the utility model is described in further detail.
A kind of cantilevered structure formwork bracing system as shown in accompanying drawing 1,2,3, comprise side and be arranged on cantilevered structure 1 on body of wall, described formwork bracing system 2 is for supporting cantilevered structure 1, be arranged on the below of cantilevered structure 1, described formwork bracing system 2 comprises the wall-connecting piece 7 of falsework, falsework and body of wall, wire rope 3 and anchor ring 4; Described anchor ring 4 anchors on body of wall; Described wire rope 3 is in plane splayed, and in same level, wire rope 3 need be symmetrical arranged; Described wire rope 3 oblique pull angle is at 45 ° ~ 60 °, and the bolt tensioning that what one end and wire rope 3 adapted be arranged on falsework, the other end and described anchor ring 4 carry out level and socket.
As shown in Figure 2, falsework comprises vertical bridging 5 and horizontal cross brace 6, and surrounding has and is reliably connected with body of wall, and its excess-three limit is connected without reliable with body of wall.
As shown in Figure 1, cantilevered structure 1 is fixing, and three limits reinforced concrete structure freely, its length is 1.0m-2.7m, encorbelments highly more than 15m.
When cantilevered structure 1 is highly more than 20m, splayed horizontal oblique pull wire rope 3 and anchor ring 4 should arrange two-layer, and levels interval should not be greater than 2 story heights.
Wire rope 3 selects diameter to be less than 15.5mm.
Described anchor ring 4 adopts the HPB300 round steel of diameter 20mm.
Below be only embody rule example of the present utility model, protection domain of the present utility model is not constituted any limitation.The technical scheme that all employing equivalents or equivalence are replaced and formed, all drops within the utility model rights protection scope.

Claims (6)

1. a cantilevered structure formwork bracing system, comprise side and be arranged on cantilevered structure on body of wall, described formwork bracing system is for supporting cantilevered structure, be arranged on the below of cantilevered structure, it is characterized in that: described formwork bracing system comprises the wall-connecting piece of falsework, falsework and body of wall, wire rope and anchor ring; Described anchor ring anchors on body of wall; Described wire rope is plane splayed, and in same level, wire rope need be symmetrical arranged; Described wire rope inclined-pulling angle is at 45 ° ~ 60 °, and the bolt tensioning that what one end and wire rope adapted be arranged on falsework, the other end and described anchor ring carry out level and socket.
2. cantilevered structure formwork bracing system according to claim 1, is characterized in that: described falsework comprises vertical bridging and horizontal cross brace, and surrounding has and is reliably connected with body of wall, and its excess-three limit is connected without reliable with body of wall.
3. cantilevered structure formwork bracing system according to claim 1 and 2, is characterized in that: described cantilevered structure length is 1.0 ~ 2.7m, encorbelments highly more than 15m.
4. cantilevered structure formwork bracing system according to claim 3, is characterized in that: when cantilevered structure height is more than 20m, and splayed horizontal oblique pull wire rope and anchor ring should arrange two-layer, and levels interval should not be greater than 2 story heights.
5. cantilevered structure formwork bracing system according to claim 4, is characterized in that: described wire rope selects diameter to be less than 15.5mm.
6. cantilevered structure formwork bracing system according to claim 4, is characterized in that: described anchor ring adopts the HPB300 round steel of diameter 20mm.
CN201520207415.6U 2015-04-07 2015-04-07 A kind of cantilevered structure formwork bracing system Active CN204571296U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520207415.6U CN204571296U (en) 2015-04-07 2015-04-07 A kind of cantilevered structure formwork bracing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520207415.6U CN204571296U (en) 2015-04-07 2015-04-07 A kind of cantilevered structure formwork bracing system

Publications (1)

Publication Number Publication Date
CN204571296U true CN204571296U (en) 2015-08-19

Family

ID=53863955

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520207415.6U Active CN204571296U (en) 2015-04-07 2015-04-07 A kind of cantilevered structure formwork bracing system

Country Status (1)

Country Link
CN (1) CN204571296U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680963A (en) * 2019-01-21 2019-04-26 中国华冶科工集团有限公司 High-wall wall surface colorful method of plate installation and colored steel mounting bracket

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680963A (en) * 2019-01-21 2019-04-26 中国华冶科工集团有限公司 High-wall wall surface colorful method of plate installation and colored steel mounting bracket

Similar Documents

Publication Publication Date Title
CN108643544B (en) High-altitude overhanging construction platform support system and construction method
CN107152160A (en) A kind of shuttering supporting builder's jack operation platform erection method
CN102535845A (en) Construction method of bearing frame of corridor structure
CN103993735A (en) Support system of roof inclined beam and slab cantilever structure and construction method of support system
CN204152188U (en) A kind of scaffold cat ladder
CN203867181U (en) Supporting system for roof inclined beam and slab cantilever structure
CN113550578A (en) High-altitude overhanging structure formwork support and upper protection system construction method
CN102168484B (en) External hanging scaffold and application method thereof
CN203113793U (en) Large formwork installation system of oblique structure
CN202483154U (en) High bearing capacity suspending scaffold
CN205116768U (en) Superelevation layer instrument formula protection platform of encorbelmenting
CN102392532B (en) Construction method for built-in hanging scaffold of high-rise building
CN204571296U (en) A kind of cantilevered structure formwork bracing system
CN203487767U (en) Cross plate scaffold
CN204343642U (en) Builder's jack corner support frame
CN203654754U (en) Double-layered overhanging type discharging platform
CN203891442U (en) High-rise elevator shaft template supporting platform
CN203547125U (en) Column type overall steel platform hydraulic creeping formwork
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN202047581U (en) Wall connecting piece for scaffold
CN204343647U (en) A kind of the shaped steel suspension scaffolding bracing frame
CN107675892A (en) A kind of glass curtain wall monorail hoisting structure
CN203769341U (en) Anti-falling grating plate of steel platform
CN202658868U (en) Operating platform for super-high elevator shaft
CN202658874U (en) Flexible wall connecting piece device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant