- cantilevered structure
- wire rope
- bracing system
- falsework
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model relates to a kind of cantilevered structure formwork bracing system, comprise side and be arranged on cantilevered structure on body of wall, formwork bracing system is for supporting cantilevered structure, be arranged on the below of cantilevered structure, formwork bracing system comprises the wall-connecting piece of falsework, falsework and body of wall, wire rope and anchor ring; Anchor ring anchors on body of wall; Wire rope is plane splayed, and in same level, wire rope need be symmetrical arranged; Wire rope inclined-pulling angle is at 45 ° ~ 60 °, and the bolt tensioning that what one end and wire rope adapted be arranged on falsework, the other end and anchor ring carry out level and socket.The utility model is applicable to the design and construction of building operations temporary support structure, be applicable to depth-width ratio be greater than 3 and three limits without the stable safety measure of the reliable newly placed concrete engineering cantilevered structure falsework connected, its simple structure, economical rationality, convenient construction, the stability of newly placed concrete falsework in building operations can be strengthened, reduce construction safety hidden danger.
Description
Technical field
The utility model is applicable to the construction of building operations temporary support structure, be specifically applicable to strengthen depth-width ratio and be greater than 3, and three limits is without the reliable cantilevered structure formwork bracing system connected.
Background technology
According to the feature of China's building operations, in the contingent security incident of building-site, formwork bracing system unstability cave-in accident odds is comparatively large, and the personnel's injury caused, property loss, operating environment destroy the most serious, have been listed in the significant risk factor of construction work.
Occur for formwork bracing system unstability cave-in accident, counter-measure conventional at present mainly contains following several method:
(1) reliable connection is done with existing structure.
(2) control support structure height is not more than 3 times of braced structures transverse width.
(3) cable wind rope of lower end and earth anchor drawknot is symmetrical arranged on the support structure.
(4) throwing support is symmetrical arranged on the support structure.
But there is following problem in above-mentioned several method:
1, for newly placed concrete cantilevered structure, because falsework three limit is without reliable connection, measure (1) is also inapplicable.
2, in order to meet the requirement that falsework depth-width ratio is not more than 3, need increase the scope on support body transverse width and support post basis, foundation soil should carry out cure process simultaneously.Which is for newly placed concrete cantilevered structure, and when cantilever span is less than 2.7m, when support structure height is more than 15 meters, the increase of measure 2 cost is higher.
3, in order to meet the requirement that falsework depth-width ratio is not more than 3, when taking to reduce falsework height, in the described lower floor of newly watering cantilevered structure, overhang steel platform need be set and carry out support shuttering support.The method complex structure, calculate loaded down with trivial details, be inconvenient to construct, if the inconsiderate impact that can cause crack on agent structure.
4, measure (3), measure (4) are comparatively applicable to the high-order braced structures of independence of ward.
Utility model content
The utility model object provides a kind of cantilevered structure formwork bracing system to overcome the deficiencies in the prior art, its simple structure, economical rationality, convenient construction, and the stability of newly placed concrete falsework in building operations can be strengthened, reduce construction safety hidden danger.
For achieving the above object, the technical solution adopted in the utility model is: a kind of cantilevered structure formwork bracing system, comprise side and be arranged on cantilevered structure on body of wall, described formwork bracing system is for supporting cantilevered structure, be arranged on the below of cantilevered structure, described formwork bracing system comprises the wall-connecting piece of falsework, falsework and body of wall, wire rope and anchor ring; Described anchor ring anchors on body of wall; Described wire rope is plane splayed, and in same level, wire rope need be symmetrical arranged; Described wire rope inclined-pulling angle is at 45 ° ~ 60 °, and the bolt tensioning that what one end and wire rope adapted be arranged on falsework, the other end and described anchor ring carry out level and socket.
Improve further as the utility model, described falsework comprises vertical bridging and horizontal cross brace, and surrounding has and is reliably connected with body of wall, and its excess-three limit is connected without reliable with body of wall.
Improve further as the utility model, described cantilevered structure length is 1.0 ~ 2.7m, encorbelments highly more than 15m.
Improve further as the utility model, when cantilevered structure height is more than 20m, splayed horizontal oblique pull wire rope and anchor ring should arrange two-layer, and levels interval should not be greater than 2 story heights.
Improve further as the utility model, described wire rope selects diameter to be less than 15.5mm.
Improve further as the utility model, described anchor ring adopts the HPB300 round steel of diameter 20mm.
Due to the utilization of technique scheme, the utility model compared with prior art has following advantages:
The utility model cantilevered structure formwork bracing system, be applicable to the design and construction of building operations temporary support structure, be applicable to depth-width ratio be greater than 3 and three limits without the stable safety measure of the reliable newly placed concrete engineering cantilevered structure falsework connected, its simple structure, economical rationality, convenient construction, the stability of newly placed concrete falsework in building operations can be strengthened, reduce construction safety hidden danger.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, technical solutions of the utility model are described further:
Accompanying drawing 1 is the newly placed concrete cantilevered structure floor map of the utility model cantilevered structure formwork bracing system;
Accompanying drawing 2 is falsework floor map in cantilevered structure shuttering supporting system of the present utility model;
Accompanying drawing 3 is the A-A cross-sectional view shown in accompanying drawing 2.
Wherein: 1, cantilevered structure; 2, formwork bracing system; 3, wire rope; 4, anchor ring; 5, vertical bridging; 6, horizontal cross brace; 7, wall-connecting piece.
Detailed description of the invention
Below in conjunction with drawings and the specific embodiments, the utility model is described in further detail.
A kind of cantilevered structure formwork bracing system as shown in accompanying drawing 1,2,3, comprise side and be arranged on cantilevered structure 1 on body of wall, described formwork bracing system 2 is for supporting cantilevered structure 1, be arranged on the below of cantilevered structure 1, described formwork bracing system 2 comprises the wall-connecting piece 7 of falsework, falsework and body of wall, wire rope 3 and anchor ring 4; Described anchor ring 4 anchors on body of wall; Described wire rope 3 is in plane splayed, and in same level, wire rope 3 need be symmetrical arranged; Described wire rope 3 oblique pull angle is at 45 ° ~ 60 °, and the bolt tensioning that what one end and wire rope 3 adapted be arranged on falsework, the other end and described anchor ring 4 carry out level and socket.
As shown in Figure 2, falsework comprises vertical bridging 5 and horizontal cross brace 6, and surrounding has and is reliably connected with body of wall, and its excess-three limit is connected without reliable with body of wall.
As shown in Figure 1, cantilevered structure 1 is fixing, and three limits reinforced concrete structure freely, its length is 1.0m-2.7m, encorbelments highly more than 15m.
When cantilevered structure 1 is highly more than 20m, splayed horizontal oblique pull wire rope 3 and anchor ring 4 should arrange two-layer, and levels interval should not be greater than 2 story heights.
Wire rope 3 selects diameter to be less than 15.5mm.
Described anchor ring 4 adopts the HPB300 round steel of diameter 20mm.
Below be only embody rule example of the present utility model, protection domain of the present utility model is not constituted any limitation.The technical scheme that all employing equivalents or equivalence are replaced and formed, all drops within the utility model rights protection scope.
Claims (6)
1. a cantilevered structure formwork bracing system, comprise side and be arranged on cantilevered structure on body of wall, described formwork bracing system is for supporting cantilevered structure, be arranged on the below of cantilevered structure, it is characterized in that: described formwork bracing system comprises the wall-connecting piece of falsework, falsework and body of wall, wire rope and anchor ring; Described anchor ring anchors on body of wall; Described wire rope is plane splayed, and in same level, wire rope need be symmetrical arranged; Described wire rope inclined-pulling angle is at 45 ° ~ 60 °, and the bolt tensioning that what one end and wire rope adapted be arranged on falsework, the other end and described anchor ring carry out level and socket.
2. cantilevered structure formwork bracing system according to claim 1, is characterized in that: described falsework comprises vertical bridging and horizontal cross brace, and surrounding has and is reliably connected with body of wall, and its excess-three limit is connected without reliable with body of wall.
3. cantilevered structure formwork bracing system according to claim 1 and 2, is characterized in that: described cantilevered structure length is 1.0 ~ 2.7m, encorbelments highly more than 15m.
4. cantilevered structure formwork bracing system according to claim 3, is characterized in that: when cantilevered structure height is more than 20m, and splayed horizontal oblique pull wire rope and anchor ring should arrange two-layer, and levels interval should not be greater than 2 story heights.
5. cantilevered structure formwork bracing system according to claim 4, is characterized in that: described wire rope selects diameter to be less than 15.5mm.
6. cantilevered structure formwork bracing system according to claim 4, is characterized in that: described anchor ring adopts the HPB300 round steel of diameter 20mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520207415.6U CN204571296U (en) | 2015-04-07 | 2015-04-07 | A kind of cantilevered structure formwork bracing system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520207415.6U CN204571296U (en) | 2015-04-07 | 2015-04-07 | A kind of cantilevered structure formwork bracing system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204571296U true CN204571296U (en) | 2015-08-19 |
Family
ID=53863955
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520207415.6U Active CN204571296U (en) | 2015-04-07 | 2015-04-07 | A kind of cantilevered structure formwork bracing system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204571296U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109680963A (en) * | 2019-01-21 | 2019-04-26 | 中国华冶科工集团有限公司 | High-wall wall surface colorful method of plate installation and colored steel mounting bracket |
-
2015
- 2015-04-07 CN CN201520207415.6U patent/CN204571296U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109680963A (en) * | 2019-01-21 | 2019-04-26 | 中国华冶科工集团有限公司 | High-wall wall surface colorful method of plate installation and colored steel mounting bracket |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108643544B (en) | High-altitude overhanging construction platform support system and construction method | |
CN107152160A (en) | A kind of shuttering supporting builder's jack operation platform erection method | |
CN102535845A (en) | Construction method of bearing frame of corridor structure | |
CN103993735A (en) | Support system of roof inclined beam and slab cantilever structure and construction method of support system | |
CN204152188U (en) | A kind of scaffold cat ladder | |
CN203867181U (en) | Supporting system for roof inclined beam and slab cantilever structure | |
CN113550578A (en) | High-altitude overhanging structure formwork support and upper protection system construction method | |
CN102168484B (en) | External hanging scaffold and application method thereof | |
CN203113793U (en) | Large formwork installation system of oblique structure | |
CN202483154U (en) | High bearing capacity suspending scaffold | |
CN205116768U (en) | Superelevation layer instrument formula protection platform of encorbelmenting | |
CN102392532B (en) | Construction method for built-in hanging scaffold of high-rise building | |
CN204571296U (en) | A kind of cantilevered structure formwork bracing system | |
CN203487767U (en) | Cross plate scaffold | |
CN204343642U (en) | Builder's jack corner support frame | |
CN203654754U (en) | Double-layered overhanging type discharging platform | |
CN203891442U (en) | High-rise elevator shaft template supporting platform | |
CN203547125U (en) | Column type overall steel platform hydraulic creeping formwork | |
CN205134921U (en) | Building outer wall concrete constructional column hangs construction platform | |
CN202047581U (en) | Wall connecting piece for scaffold | |
CN204343647U (en) | A kind of the shaped steel suspension scaffolding bracing frame | |
CN107675892A (en) | A kind of glass curtain wall monorail hoisting structure | |
CN203769341U (en) | Anti-falling grating plate of steel platform | |
CN202658868U (en) | Operating platform for super-high elevator shaft | |
CN202658874U (en) | Flexible wall connecting piece device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |