CN107152160A - A kind of shuttering supporting builder's jack operation platform erection method - Google Patents
A kind of shuttering supporting builder's jack operation platform erection method Download PDFInfo
- Publication number
- CN107152160A CN107152160A CN201710482698.9A CN201710482698A CN107152160A CN 107152160 A CN107152160 A CN 107152160A CN 201710482698 A CN201710482698 A CN 201710482698A CN 107152160 A CN107152160 A CN 107152160A
- Authority
- CN
- China
- Prior art keywords
- scaffold
- wall
- bar
- shear wall
- connecting piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/18—Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by cantilevers or other provisions mounted in openings in the building, e.g. window openings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
- E04G5/046—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明提供了一种模板支撑悬挑脚手架施工平台搭设方法,属于建筑工程技术领域,用于在剪力墙的外侧搭设脚手架,本模板支撑悬挑脚手架施工平台搭设方法包括安装悬挑支撑件步骤、悬挑支撑件上设置生根点步骤、安装脚手架步骤、安装连墙件步骤、安装模板顶托步骤、安装斜撑件步骤和安装防护栏杆步骤,本方法操作方便,搭设速度快,大大提高了施工效率,降低了施工费用,本脚手架结构稳固可靠,钢丝绳的悬拉设置和防护栏杆的设置大大提高了脚手架的安全性能,而且该脚手架拆装方便,材料可重复利用,节约了成本。
The invention provides a method for erecting a construction platform of a formwork-supported cantilevered scaffold, which belongs to the technical field of construction engineering and is used for erecting a scaffold outside a shear wall. The method for erecting a construction platform of a formwork-supported cantilevered scaffold includes the step of installing a cantilever support , the steps of setting rooting points on the cantilever support, the steps of installing scaffolding, the steps of installing wall parts, the steps of installing formwork jacking, the steps of installing diagonal braces and the steps of installing protective railings. This method is easy to operate, fast in erection speed, and greatly improves The construction efficiency reduces the construction cost. The structure of the scaffold is stable and reliable. The suspension setting of the steel wire rope and the setting of the protective railing greatly improve the safety performance of the scaffold. Moreover, the scaffold is easy to disassemble and assemble, and the materials can be reused, saving costs.
Description
技术领域technical field
本发明涉及建筑工程技术领域,具体而言,涉及一种模板支撑悬挑脚手架施工平台搭设方法。The invention relates to the technical field of construction engineering, in particular to a method for erecting a formwork-supported cantilevered scaffolding construction platform.
背景技术Background technique
一般超高层建筑施工中,由于建筑物的楼层越高,施工环境越复杂,施工难度也越大,在结构施工和外观装饰施工部分往往需要施工人员在建筑外部搭设脚手架来进行施工。但是现有的脚手架搭设方法操作不方便,搭设效率低,安全性较差Generally, in the construction of super high-rise buildings, the higher the floor of the building, the more complex the construction environment and the greater the difficulty of construction. In the structural construction and exterior decoration construction, construction personnel often need to build scaffolding outside the building for construction. However, the existing scaffold erection method is inconvenient to operate, low in erection efficiency and poor in safety
发明内容Contents of the invention
本发明实施方式的目的在于提供一种模板支撑悬挑脚手架施工平台搭设方法,能够较好的改善上述问题。The object of the embodiments of the present invention is to provide a method for erecting a construction platform of a formwork-supported cantilevered scaffold, which can better improve the above-mentioned problems.
本发明的实施方式是这样实现的:The embodiment of the present invention is realized like this:
本发明的实施方式提供了一种模板支撑悬挑脚手架施工平台搭设方法,用于在剪力墙的外侧搭设脚手架,剪力墙上预埋有木盒和PVC管,所述木盒上设有通孔,本模板支撑悬挑脚手架施工平台搭设方法包括以下步骤:Embodiments of the present invention provide a method for erecting a formwork-supported cantilevered scaffolding construction platform, which is used to erect a scaffold on the outside of a shear wall, where a wooden box and a PVC pipe are pre-embedded on the shear wall, and the wooden box is provided with Through holes, the formwork supports the cantilevered scaffolding construction platform and the erection method includes the following steps:
安装悬挑支撑件:在待安装脚手架位置处,将悬挑支撑件从木盒的通孔处穿入剪力墙,所述悬挑支撑件的位于剪力墙的外侧的部分为第一部分,所述第一部分悬空,所述悬挑支撑件的位于剪力墙的内侧的部分为第二部分,所述第二部分固定于梁板钢筋上;Install the cantilever support: At the position of the scaffold to be installed, pass the cantilever support through the through hole of the wooden box into the shear wall, the part of the cantilever support located on the outside of the shear wall is the first part, The first part is suspended in the air, and the part of the cantilever support located on the inner side of the shear wall is the second part, and the second part is fixed on the steel bar of the beam plate;
悬挑支撑件上设置生根点:在所述悬挑支撑件的第一部分的上表面设置定位钢筋作为脚手架的生根点,相邻两根所述定位钢筋的间距为 1000-1050mm;Set up rooting points on the cantilever support: set positioning reinforcement on the upper surface of the first part of the suspension support as the rooting point of the scaffold, and the distance between two adjacent positioning reinforcements is 1000-1050mm;
安装脚手架:在所述定位钢筋处设置立杆,将纵向扫地杆和横向扫地杆分别固定于所述立杆,所述纵向扫地杆和所述横向扫地杆与所述悬挑支撑件的间距为180-200mm,将纵向水平杆和横向水平杆固定于所述立杆构成脚手架,在所述脚手架的下端设置脚手板,所述脚手架具有横向方向、纵向方向和竖直方向;Scaffold installation: install a vertical pole at the positioning steel bar, fix the longitudinal sweeping rod and the horizontal sweeping rod to the vertical rod respectively, and the distance between the longitudinal sweeping rod and the horizontal sweeping rod and the cantilevered support is: 180-200mm, the vertical horizontal bar and the horizontal horizontal bar are fixed on the vertical bar to form a scaffold, and a scaffold board is arranged at the lower end of the scaffold, and the scaffold has a horizontal direction, a longitudinal direction and a vertical direction;
安装连墙件:在剪力墙的内外侧靠近PVC管的位置处分别设置一根连接件,将所述连墙件的一端从PVC管内穿过且与两根连接件连接,所述连墙件的另一端位于剪力墙的外侧且与所述脚手架连接,在竖直方向上,所述脚手架的上端和下端各设有一根连墙件,在纵向方向上,每隔三跨设置一根连墙件;Install the wall fittings: set a connecting piece on the inside and outside of the shear wall near the PVC pipe, pass one end of the connecting wall piece through the PVC pipe and connect with the two connecting pieces, the connecting wall The other end of the piece is located on the outside of the shear wall and connected to the scaffold. In the vertical direction, the upper and lower ends of the scaffold are each provided with a wall piece. In the longitudinal direction, a piece is provided every three spans. even wall pieces;
安装模板顶托:在所述脚手架的横向方向上,靠近剪力墙的立杆为里立杆,在所述里立杆的顶部设置模板顶托用于支撑模板;Install formwork jacking: in the transverse direction of the scaffold, the vertical pole close to the shear wall is the inner pole, and the formwork jacking is set on the top of the inner pole for supporting the formwork;
安装斜撑件:所述脚手架的上端的连墙件为加长连墙件,将斜撑件设置于加长连墙件与悬挑支撑件之间,所述斜撑件的一端与所述悬挑支撑件抵接且靠近所述悬挑支撑件的部分与所述脚手架连接,另一端与所述加长连墙件的远离剪力墙的一端连接;Install the diagonal brace: the wall connecting piece at the upper end of the scaffold is an extended wall connecting piece, the diagonal brace is arranged between the lengthening connecting wall piece and the cantilever support, one end of the diagonal brace is connected to the cantilever The part of the supporting member abutting against and close to the cantilever supporting member is connected to the scaffold, and the other end is connected to the end of the extended wall connecting member away from the shear wall;
安装防护栏杆:在所述加长连墙件的上侧距离待浇筑悬挑梁的外侧 200-220mm处设置第一防护栏杆,在加长连墙件的远离剪力墙的一端设置第二防护栏杆。Install the protective railing: set the first protective railing at the upper side of the lengthened wall part 200-220mm from the outer side of the cantilever beam to be poured, and set the second protective railing at the end of the extended wall part away from the shear wall.
可选地,所述悬挑支撑件的远离剪力墙一端还通过第一钢丝绳进行悬拉,所述第一钢丝绳的一端与所述第一部分的远离剪力墙一端连接,另一端与锚固于剪力墙且位于所述悬挑支撑件上方的螺栓连接。Optionally, the end of the cantilever support away from the shear wall is also suspended by a first steel wire rope, one end of the first steel wire is connected to the end of the first part away from the shear wall, and the other end is anchored to Shear walls and bolted connections above the cantilevered supports.
可选地,所述加长连墙件的远离剪力墙的一端还通过第二钢丝绳进行悬拉,所述第二钢丝绳的一端与所述加长连墙件的远离剪力墙一端连接,另一端与锚固于剪力墙且位于所述加长连墙件上方的螺栓连接。Optionally, the end of the lengthened connecting wall piece away from the shear wall is also suspended by a second steel wire rope, one end of the second steel wire rope is connected to the end of the lengthened connecting wall piece away from the shear wall, and the other end is It is connected with bolts anchored in the shear wall and located above the extension wall piece.
可选地,所述第一钢丝绳和所述第二钢丝绳均包括主钢丝绳和副钢丝绳,所述主钢丝绳和所述副钢丝绳的直径均为φ20mm。Optionally, both the first steel wire rope and the second steel wire rope include a main steel wire rope and an auxiliary steel wire rope, and the diameters of the main steel wire rope and the auxiliary steel wire rope are both φ20mm.
可选地,所述木盒的通孔处设有用于楔紧悬挑支撑件的楔形件。Optionally, a wedge for wedging the overhanging support is provided at the through hole of the wooden box.
可选地,与所述装脚手架相对应位置处的梁板钢筋上设有钢筋预埋环,所述第二部分穿过钢筋预埋环。Optionally, a steel bar pre-embedded ring is provided on the steel bar of the beam and slab corresponding to the position of the scaffolding, and the second part passes through the steel bar pre-embedded ring.
可选地,所述脚手架的立杆的纵向间距为1200mm,所述脚手架的水平杆步距为1500-1800mm。Optionally, the longitudinal spacing of the vertical poles of the scaffold is 1200mm, and the step distance of the horizontal poles of the scaffold is 1500-1800mm.
可选地,所述立杆、纵向扫地杆、横向扫地杆、连墙件和斜撑件均采用φ48×3.5钢管制成,所述悬挑支撑件采用20#工字钢制成,所述PVC管采用DN50PVC管制成。Optionally, the vertical poles, longitudinal sweeping poles, horizontal sweeping poles, wall parts and diagonal braces are all made of φ48×3.5 steel pipes, and the cantilevered supports are made of 20# I-beam. The PVC pipe is made of DN50PVC pipe.
可选地,所述第一部分的长度尺寸为1200-1300mm,所述第二部分的长度尺寸为1800-1900mm。Optionally, the length of the first part is 1200-1300mm, and the length of the second part is 1800-1900mm.
可选地,所述定位钢筋采用C20钢筋制成且长度尺寸为100-110mm。Optionally, the positioning reinforcement is made of C20 reinforcement and has a length of 100-110mm.
本发明的实施方式具有以下有益效果:Embodiments of the present invention have the following beneficial effects:
本发明实施方式提供的模板支撑悬挑脚手架施工平台搭设方法,操作方便,搭设速度快,大大提高了施工效率,降低了施工费用,本脚手架结构稳固可靠,钢丝绳的悬拉设置和防护栏杆的设置大大提高了脚手架的安全性能,而且该脚手架拆装方便,材料可重复利用,节约了成本。The formwork-supported cantilevered scaffolding construction platform erection method provided by the embodiment of the present invention is easy to operate and fast in erection speed, which greatly improves the construction efficiency and reduces the construction cost. The safety performance of the scaffold is greatly improved, and the scaffold is convenient for disassembly and assembly, and materials can be reused, thereby saving costs.
附图说明Description of drawings
为了更清楚地说明本发明实施方式的技术方案,下面将对实施方式中所需要使用的附图作简单地介绍,应当理解,以下附图仅示出了本发明的某些实施方式,因此不应被看作是对范围的限定,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他相关的附图。In order to illustrate the technical solutions of the embodiments of the present invention more clearly, the accompanying drawings used in the embodiments will be briefly introduced below. It should be understood that the following drawings only show some embodiments of the present invention, and therefore do not It should be regarded as a limitation on the scope, and those skilled in the art can also obtain other related drawings based on these drawings without creative work.
图1为本发明实施方式提供的模板支撑悬挑脚手架施工平台的结构示意图。Fig. 1 is a schematic structural view of a formwork-supported cantilevered scaffold construction platform provided by an embodiment of the present invention.
图标:101-剪力墙;102-木盒;103-PVC管;201-悬挑支撑件;2011- 第一部分;2012-第二部分;202-楔形件;203-第一钢丝绳;204-螺栓;205- 定位钢筋;206-脚手架;2061-立杆;2062-横向扫地杆;2063-纵向扫地杆; 207-连接件;208-连墙件;2081-加长连墙件;209-第二钢丝绳;210-里立杆;211-模板顶托;212-斜撑件;213-第一防护栏杆;214-第二防护栏杆。Icons: 101-shear wall; 102-wooden box; 103-PVC pipe; 201-cantilever support; 2011-first part; 2012-second part; 202-wedge; 203-first wire rope; 204-bolt ;205-positioning reinforcement;206-scaffolding;2061-pole;2062-horizontal sweeping rod;2063-longitudinal sweeping rod; ; 210-li pole; 211-formwork jack; 212-diagonal brace; 213-the first protective railing; 214-the second protective railing.
具体实施方式detailed description
为使本发明实施方式的目的、技术方案和优点更加清楚,下面将结合本发明实施方式中的附图,对本发明实施方式中的技术方案进行清楚、完整地描述,显然,所描述的实施方式是本发明一部分实施方式,而不是全部的实施方式。通常在此处附图中描述和示出的本发明实施方式的组件可以以各种不同的配置来布置和设计。In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments It is some embodiments of the present invention, but not all of them. The components of the embodiments of the invention generally described and illustrated in the figures herein may be arranged and designed in a variety of different configurations.
因此,以下对在附图中提供的本发明的实施方式的详细描述并非旨在限制要求保护的本发明的范围,而是仅仅表示本发明的选定实施方式。基于本发明中的实施方式,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施方式,都属于本发明保护的范围。Accordingly, the following detailed description of the embodiments of the invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the invention. Based on the implementation manners in the present invention, all other implementation manners obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.
需要说明的是,在不冲突的情况下,本发明中的实施方式及实施方式中的特征可以相互组合。It should be noted that, in the case of no conflict, the embodiments and features in the embodiments of the present invention can be combined with each other.
应注意到:相似的标号和字母在下面的附图中表示类似项,因此,一旦某一项在一个附图中被定义,则在随后的附图中不需要对其进行进一步定义和解释。It should be noted that like numerals and letters denote similar items in the following figures, therefore, once an item is defined in one figure, it does not require further definition and explanation in subsequent figures.
在本发明的描述中,需要说明的是,术语“上”、“下”、“纵向”、“横向”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,或者是该发明产品使用时惯常摆放的方位或位置关系,或者是本领域技术人员惯常理解的方位或位置关系,或者是该发明产品使用时惯常摆放的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。此外,术语“第一”、“第二”等仅用于区分描述,而不能理解为指示或暗示相对重要性。In the description of the present invention, it should be noted that the orientations or The positional relationship is based on the orientation or positional relationship shown in the drawings, or the orientation or positional relationship that is usually placed when the product of the invention is used, or the orientation or positional relationship that is commonly understood by those skilled in the art, or the orientation or positional relationship that the product of the invention uses Orientation or positional relationship that is conventionally placed is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be interpreted as Limitations on the Invention. In addition, the terms "first", "second", etc. are only used for distinguishing descriptions, and should not be construed as indicating or implying relative importance.
在本发明的描述中,还需要说明的是,除非另有明确的规定和限定,术语“设置”、“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本发明中的具体含义。In the description of the present invention, it should also be noted that, unless otherwise clearly specified and limited, the terms "installation", "installation", "connection" and "connection" should be understood in a broad sense, for example, it may be a fixed connection, It can also be a detachable connection or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediary, and it can be the internal communication of two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention in specific situations.
实施方式Implementation
参考图1所示,本发明实施方式提供了一种模板支撑悬挑脚手架施工平台搭设方法,用于在剪力墙101的外侧搭设脚手架206。Referring to FIG. 1 , an embodiment of the present invention provides a method for erecting a formwork-supported cantilevered scaffolding construction platform, which is used for erecting a scaffold 206 outside a shear wall 101 .
需要说明的是,在结构施工到一定位置时,在剪力墙101内预埋木盒 102或DN50PVC管103,木盒102上预留通孔;在结构施工到梁板钢筋绑扎时,在梁板钢筋上预设φ16钢筋预埋环。It should be noted that when the structure is constructed to a certain position, the wooden box 102 or DN50PVC pipe 103 is pre-embedded in the shear wall 101, and a through hole is reserved on the wooden box 102; The pre-embedded ring of φ16 steel bar is preset on the steel bar.
待搭设的脚手架206具有横向方向、纵向方向和竖直方向。The scaffold 206 to be erected has a transverse direction, a longitudinal direction and a vertical direction.
本模板支撑悬挑脚手架206平台搭设方法包括以下步骤:The formwork supports the cantilevered scaffolding 206 platform erection method including the following steps:
安装悬挑支撑件201:在待安装脚手架206位置处,将悬挑支撑件201 从木盒102的通孔处穿入剪力墙101,悬挑支撑件201的位于剪力墙101的外侧的部分为第一部分2011,第一部分2011悬空,悬挑支撑件201的位于剪力墙101的内侧的部分为第二部分2012,第二部分2012穿过钢筋预埋环且固定在梁板钢筋上。Install the cantilever support 201: At the position of the scaffold 206 to be installed, the cantilever support 201 is penetrated into the shear wall 101 from the through hole of the wooden box 102, and the cantilever support 201 is located on the outside of the shear wall 101 Part is the first part 2011, the first part 2011 is suspended, the part of the cantilever support 201 located inside the shear wall 101 is the second part 2012, and the second part 2012 passes through the pre-embedded ring of the steel bar and is fixed on the steel bar of the beam and slab.
第一部分2011的长度尺寸为1200-1300mm,优选1200mm;第二部分2012 的长度尺寸为1800-1900mm,优选1800mm。The length dimension of the first part 2011 is 1200-1300mm, preferably 1200mm; the length dimension of the second part 2012 is 1800-1900mm, preferably 1800mm.
悬挑支撑件201在纵向方向上平行设置有多根,相邻两根悬挑支撑件 201之间的距离根据设计的脚手架206的立杆2061纵距确定。Cantilever supports 201 are arranged in parallel in the longitudinal direction with many, and the distance between adjacent two cantilever supports 201 is determined according to the vertical distance of the vertical pole 2061 of the scaffold 206 designed.
为了避免悬挑支撑件201在通孔内滑动,可以通孔处设置楔形件202,楔形件202卡入悬挑支撑件201与木盒102的间隙内。In order to prevent the cantilevered support 201 from sliding in the through hole, a wedge 202 can be arranged at the through hole, and the wedge 202 is inserted into the gap between the cantilevered support 201 and the wooden box 102 .
为了提高悬挑支撑件201的安全性,可以在悬挑支撑件201的远离剪力墙101一端通过第一钢丝绳203进行悬拉,第一钢丝绳203的一端与第一部分2011的远离剪力墙101一端连接,另一端与锚固于剪力墙101且位于悬挑支撑件201上方的螺栓204连接。In order to improve the safety of the cantilever support 201, the first wire rope 203 can be used to suspend at the end of the cantilever support 201 away from the shear wall 101. One end is connected, and the other end is connected with a bolt 204 anchored to the shear wall 101 and located above the cantilever support 201 .
第一钢丝绳203包括主钢丝绳和副钢丝绳,这样能够大大提高悬拉的安全性。The first wire rope 203 includes a main wire rope and an auxiliary wire rope, which can greatly improve the safety of suspension.
本实施方式中,悬挑支撑件201可以采用20#工字钢制成,楔形件202 可以采用木质材料制成,锚固于剪力墙101上的螺栓204可以采用M24高强度螺栓204,主钢丝绳和副钢丝绳均采用直径尺寸均为φ20mm钢丝绳。In this embodiment, the cantilever support 201 can be made of 20# I-beam, the wedge 202 can be made of wood material, the bolt 204 anchored on the shear wall 101 can be M24 high-strength bolt 204, and the main wire rope Both the diameter and the auxiliary steel wire rope are φ20mm steel wire rope.
悬挑支撑件201上设置生根点:在悬挑支撑件201的第一部分2011的上表面设置定位钢筋205作为脚手架206的生根点,相邻两根定位钢筋205 的间距为1000-1050mm。Rooting points are set on the cantilever support 201: on the upper surface of the first part 2011 of the cantilever support 201, positioning steel bars 205 are set as the rooting points of the scaffold 206, and the distance between two adjacent positioning steel bars 205 is 1000-1050mm.
本实施方式中,定位钢筋205采用C20钢筋制成,当然也可以采用钢管制成,定位钢筋205的长度尺寸为100-110mm。优选的,定位钢筋205的长度尺寸为100mm,相邻两根定位钢筋205的间距为1050mm左右。In this embodiment, the positioning steel bar 205 is made of C20 steel bar, of course, it can also be made of steel pipe, and the length of the positioning steel bar 205 is 100-110mm. Preferably, the length of the positioning steel bar 205 is 100 mm, and the distance between two adjacent positioning steel bars 205 is about 1050 mm.
安装脚手架206:在定位钢筋205处设置立杆2061,将纵向扫地杆2063 和横向扫地杆2062分别固定于立杆2061,纵向扫地杆2063和横向扫地杆 2062与悬挑支撑件201的间距为180-200mm,将纵向水平杆和横向水平杆固定于立杆2061构成脚手架206,在脚手架206的下端设置脚手板。Install the scaffolding 206: set the vertical rod 2061 at the positioning steel bar 205, fix the vertical sweeping rod 2063 and the horizontal sweeping rod 2062 to the vertical rod 2061 respectively, and the distance between the vertical sweeping rod 2063, the horizontal sweeping rod 2062 and the cantilever support 201 is 180 -200mm, the vertical horizontal bar and the horizontal horizontal bar are fixed on the vertical bar 2061 to form a scaffold 206, and a scaffold board is arranged at the lower end of the scaffold 206.
本实施方式中,立杆2061的纵距为1200mm左右,立杆2061的横距为 1050mm左右,纵向水平杆和横向水平杆的步距为1500-1800mm,纵向扫地杆2063和横向扫地杆2062与悬挑支撑件201的间距为200mm左右。In this embodiment, the vertical distance of the vertical rod 2061 is about 1200mm, the horizontal distance of the vertical rod 2061 is about 1050mm, the step distance between the vertical horizontal rod and the horizontal horizontal rod is 1500-1800mm, the vertical sweeping rod 2063 and the horizontal sweeping rod 2062 The distance between the cantilevered supports 201 is about 200mm.
本实施方式中,立杆2061、纵向扫地杆2063、横向扫地杆2062、纵向水平杆和横向水平杆均可以采用φ48×3.5钢管制成。In this embodiment, the vertical bar 2061, the longitudinal sweeping bar 2063, the horizontal sweeping bar 2062, the longitudinal horizontal bar and the horizontal horizontal bar can all be made of φ48×3.5 steel pipes.
安装连墙件208:在剪力墙101的内外侧靠近PVC管103的位置处分别设置一根连接件207,连接件207通过U型卡固定在剪力墙101上,将连墙件208的一端从PVC管103内穿过且与两根连接件207连接,连墙件208 的另一端位于剪力墙101的外侧且与脚手架206连接,在竖直方向上,脚手架206的上端和下端各设有一根连墙件208,在纵向方向上,每隔三跨设置一根连墙件208。Install the connecting wall piece 208: a connecting piece 207 is respectively set at the position close to the PVC pipe 103 inside and outside the shear wall 101. One end passes through the PVC pipe 103 and is connected with two connectors 207, and the other end of the wall member 208 is positioned at the outside of the shear wall 101 and is connected with the scaffold 206. In the vertical direction, the upper end and the lower end of the scaffold 206 respectively A wall connecting piece 208 is provided, and a wall connecting piece 208 is provided every three spans in the longitudinal direction.
脚手架206的上端的连墙件208为加长连墙件2081,为了提高加长连墙件2081的稳定性及安全性,可以在加长连墙件2081的远离剪力墙101 的一端通过第二钢丝绳209进行悬拉,第二钢丝绳209的一端与加长连墙件2081的远离剪力墙101一端连接,另一端与锚固于剪力墙101且位于加长连墙件2081上方的螺栓204连接。The wall part 208 at the upper end of the scaffold 206 is an extended wall part 2081. In order to improve the stability and safety of the extended wall part 2081, the second steel wire rope 209 can be passed at the end of the extended wall part 2081 away from the shear wall 101. For suspension, one end of the second steel wire rope 209 is connected to the end of the extension wall 2081 away from the shear wall 101 , and the other end is connected to the bolt 204 anchored to the shear wall 101 and located above the extension wall 2081 .
第二钢丝绳209也包括主钢丝绳和副钢丝绳,这样能够大大提高悬拉的安全性。The second wire rope 209 also includes a main wire rope and an auxiliary wire rope, which can greatly improve the safety of suspension.
本实施方式中,连墙件208和连接件207均可以采用φ48×3.5钢管制成。In this embodiment, both the wall connecting piece 208 and the connecting piece 207 can be made of φ48×3.5 steel pipe.
安装模板顶托211:在脚手架206的横向方向上,靠近剪力墙101的立杆2061为里立杆210,里立杆210距离剪力墙101的外侧壁200mm左右,在里立杆210的顶部设置模板顶托211用于支撑模板。Install template jacking 211: in the transverse direction of scaffolding 206, the vertical pole 2061 close to the shear wall 101 is the inner vertical pole 210, and the inner vertical pole 210 is about 200mm away from the outer wall of the shear wall 101, and the inner vertical pole 210 A formwork jack 211 is provided on the top for supporting the formwork.
安装斜撑件212:脚手架206的上端的连墙件208为加长连墙件2081,将斜撑件212设置于加长连墙件2081与悬挑支撑件201之间,斜撑件212 的一端与悬挑支撑件201抵接且靠近悬挑支撑件201的部分与脚手架206 连接,另一端与加长连墙件2081的远离剪力墙101的一端连接。Install the diagonal brace 212: the wall connecting piece 208 at the upper end of the scaffold 206 is an extended wall connecting piece 2081, the diagonal brace 212 is arranged between the lengthening connecting wall piece 2081 and the cantilever support 201, and one end of the diagonal brace 212 is connected to the The part of the cantilever support 201 abutting against and close to the cantilever support 201 is connected to the scaffold 206 , and the other end is connected to the end of the extended wall connecting member 2081 away from the shear wall 101 .
本实施方式中,加长连墙件2081作为半永久性连墙件208,便于拆卸。In this embodiment, the extended wall connecting piece 2081 is used as the semi-permanent wall connecting piece 208 for easy disassembly.
安装防护栏杆:在加长连墙件2081的上侧距离待浇筑悬挑梁的外侧200-220mm处设置第一防护栏杆213,优选在距离待浇筑悬挑梁的外侧200mm 处设置第一防护栏杆213,第一防护栏杆213的高度尺寸为1200mm,在加长连墙件2081的远离剪力墙101的一端设置第二防护栏杆214,第二防护栏杆214距离加长连墙件2081的远离剪力墙101的一端的尺寸为200mm。Install the protective railing: set the first protective railing 213 on the upper side of the extended wall part 2081 at a distance of 200-220 mm from the outer side of the cantilever beam to be poured, preferably at a distance of 200 mm from the outer side of the cantilever beam to be poured. Set the first protective railing 213 , the height dimension of the first protective railing 213 is 1200mm, and the second protective railing 214 is set at the end of the extended connecting wall piece 2081 away from the shear wall 101, and the distance between the second protective railing 214 and the lengthening connecting wall piece 2081 is far away from the shear wall 101 The size of one end is 200mm.
第二防护栏杆214作为半永久性防护栏杆,便于拆卸。The second protective railing 214 is used as a semi-permanent protective railing, which is convenient for disassembly.
本发明实施方式提供的模板支撑悬挑脚手架施工平台搭设方法,操作方便,搭设速度快,大大提高了施工效率,降低了施工费用,本脚手架206 结构稳固可靠,钢丝绳的悬拉设置和防护栏杆的设置大大提高了脚手架206 的安全性能,而且该脚手架206拆装方便,材料可重复利用,节约了成本。The formwork supported cantilevered scaffolding construction platform erecting method provided by the embodiment of the present invention is easy to operate, fast in erection speed, greatly improves the construction efficiency, and reduces the construction cost. The structure of the scaffold 206 is stable and reliable. The setting greatly improves the safety performance of the scaffold 206, and the scaffold 206 is easy to disassemble, and the materials can be reused, which saves the cost.
以上所述仅为本发明的优选实施方式而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and changes. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710482698.9A CN107152160A (en) | 2017-06-22 | 2017-06-22 | A kind of shuttering supporting builder's jack operation platform erection method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710482698.9A CN107152160A (en) | 2017-06-22 | 2017-06-22 | A kind of shuttering supporting builder's jack operation platform erection method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN107152160A true CN107152160A (en) | 2017-09-12 |
Family
ID=59795081
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710482698.9A Pending CN107152160A (en) | 2017-06-22 | 2017-06-22 | A kind of shuttering supporting builder's jack operation platform erection method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107152160A (en) |
Cited By (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107740569A (en) * | 2017-10-25 | 2018-02-27 | 湖北海洋工程装备研究院有限公司 | A kind of scaffold building method |
| CN107842192A (en) * | 2017-11-23 | 2018-03-27 | 安徽同济建设集团有限责任公司 | A kind of making of the outer builder's jack closed cover of architectural engineering and installation method |
| CN108331343A (en) * | 2018-02-07 | 2018-07-27 | 中国二十冶集团有限公司 | The construction method of Cantilever Beams and aluminum alloy mould plate lap-joint |
| CN108643544A (en) * | 2018-04-02 | 2018-10-12 | 中国十七冶集团有限公司 | A kind of high-altitude overhanging operation platform strutting system and construction method |
| CN110259120A (en) * | 2019-07-01 | 2019-09-20 | 中国二十二冶集团有限公司 | Overhanging formwork support device |
| CN111441577A (en) * | 2020-04-17 | 2020-07-24 | 中建一局集团第一建筑有限公司 | A kind of reinforcement structure and method of super thick cantilever plate side formwork |
| CN111706087A (en) * | 2020-04-30 | 2020-09-25 | 上海二十冶建设有限公司 | Mounting method of steel support frame for C-shaped stock ground cantilever platform construction |
| CN113047592A (en) * | 2021-03-30 | 2021-06-29 | 浙江泛华工程咨询有限公司 | High-rise building engineering construction protector |
| CN114753611A (en) * | 2022-06-02 | 2022-07-15 | 中铁七局集团郑州工程有限公司 | Curtain wall construction platform |
| CN115162350A (en) * | 2022-07-07 | 2022-10-11 | 中国华冶科工集团有限公司 | Supporting system and supporting method for cantilever beam plate under condition of vertical support of ultra-deep foundation pit |
| CN115341701A (en) * | 2022-08-19 | 2022-11-15 | 山东金城建设有限公司 | High-altitude overhanging steel bar truss floor support plate hanging formwork construction method |
| CN116201242A (en) * | 2023-05-04 | 2023-06-02 | 中铁建工集团有限公司 | Conversion construction method for ultra-long cantilever structure |
| CN116591454A (en) * | 2023-05-26 | 2023-08-15 | 新疆雪域高原建设工程有限公司 | Aluminum mould matched overhanging outer frame of full concrete outer wall structure and construction method |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2012052305A (en) * | 2010-08-31 | 2012-03-15 | Taihei Dengyo Kaisha Ltd | Scaffold inside boiler and construction method therefor |
| JP2012077544A (en) * | 2010-10-04 | 2012-04-19 | Asahi Kasei Homes Co | Temporary scaffold and construction method of building |
| CN202954557U (en) * | 2012-11-26 | 2013-05-29 | 浙江恒盛建设集团有限公司 | Scaffold wall connection part |
| CN103306479A (en) * | 2013-07-09 | 2013-09-18 | 中国中铁航空港建设集团有限公司海南分公司 | Long-length overhang trusswork high form hanger system |
| CN203924656U (en) * | 2014-06-13 | 2014-11-05 | 浙江中成建工集团有限公司 | A kind of high-altitude overlength cable-stayed type shaped steel job platform structure |
| CN105350761A (en) * | 2015-11-06 | 2016-02-24 | 广西华业建筑工程有限公司 | Installation method of I-steel cantilevered external scaffolding |
-
2017
- 2017-06-22 CN CN201710482698.9A patent/CN107152160A/en active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2012052305A (en) * | 2010-08-31 | 2012-03-15 | Taihei Dengyo Kaisha Ltd | Scaffold inside boiler and construction method therefor |
| JP2012077544A (en) * | 2010-10-04 | 2012-04-19 | Asahi Kasei Homes Co | Temporary scaffold and construction method of building |
| CN202954557U (en) * | 2012-11-26 | 2013-05-29 | 浙江恒盛建设集团有限公司 | Scaffold wall connection part |
| CN103306479A (en) * | 2013-07-09 | 2013-09-18 | 中国中铁航空港建设集团有限公司海南分公司 | Long-length overhang trusswork high form hanger system |
| CN203924656U (en) * | 2014-06-13 | 2014-11-05 | 浙江中成建工集团有限公司 | A kind of high-altitude overlength cable-stayed type shaped steel job platform structure |
| CN105350761A (en) * | 2015-11-06 | 2016-02-24 | 广西华业建筑工程有限公司 | Installation method of I-steel cantilevered external scaffolding |
Cited By (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107740569A (en) * | 2017-10-25 | 2018-02-27 | 湖北海洋工程装备研究院有限公司 | A kind of scaffold building method |
| CN107842192A (en) * | 2017-11-23 | 2018-03-27 | 安徽同济建设集团有限责任公司 | A kind of making of the outer builder's jack closed cover of architectural engineering and installation method |
| CN108331343A (en) * | 2018-02-07 | 2018-07-27 | 中国二十冶集团有限公司 | The construction method of Cantilever Beams and aluminum alloy mould plate lap-joint |
| CN108643544A (en) * | 2018-04-02 | 2018-10-12 | 中国十七冶集团有限公司 | A kind of high-altitude overhanging operation platform strutting system and construction method |
| CN108643544B (en) * | 2018-04-02 | 2020-10-23 | 中国十七冶集团有限公司 | High-altitude overhanging construction platform support system and construction method |
| CN110259120A (en) * | 2019-07-01 | 2019-09-20 | 中国二十二冶集团有限公司 | Overhanging formwork support device |
| CN111441577B (en) * | 2020-04-17 | 2024-07-23 | 中建一局集团第一建筑有限公司 | A reinforcement structure and method for side formwork of ultra-thick cantilevered slab |
| CN111441577A (en) * | 2020-04-17 | 2020-07-24 | 中建一局集团第一建筑有限公司 | A kind of reinforcement structure and method of super thick cantilever plate side formwork |
| CN111706087A (en) * | 2020-04-30 | 2020-09-25 | 上海二十冶建设有限公司 | Mounting method of steel support frame for C-shaped stock ground cantilever platform construction |
| CN113047592A (en) * | 2021-03-30 | 2021-06-29 | 浙江泛华工程咨询有限公司 | High-rise building engineering construction protector |
| CN114753611A (en) * | 2022-06-02 | 2022-07-15 | 中铁七局集团郑州工程有限公司 | Curtain wall construction platform |
| CN115162350A (en) * | 2022-07-07 | 2022-10-11 | 中国华冶科工集团有限公司 | Supporting system and supporting method for cantilever beam plate under condition of vertical support of ultra-deep foundation pit |
| CN115162350B (en) * | 2022-07-07 | 2024-04-16 | 中国华冶科工集团有限公司 | Support system and support method for cantilever beam plate under ultra-deep foundation pit vertical support condition |
| CN115341701A (en) * | 2022-08-19 | 2022-11-15 | 山东金城建设有限公司 | High-altitude overhanging steel bar truss floor support plate hanging formwork construction method |
| CN115341701B (en) * | 2022-08-19 | 2024-05-28 | 山东金城建设有限公司 | Hanging formwork construction method for high-altitude overhanging steel bar truss floor support plate |
| CN116201242A (en) * | 2023-05-04 | 2023-06-02 | 中铁建工集团有限公司 | Conversion construction method for ultra-long cantilever structure |
| CN116201242B (en) * | 2023-05-04 | 2023-09-08 | 中铁建工集团有限公司 | Conversion construction method for ultra-long cantilever structure |
| CN116591454A (en) * | 2023-05-26 | 2023-08-15 | 新疆雪域高原建设工程有限公司 | Aluminum mould matched overhanging outer frame of full concrete outer wall structure and construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107152160A (en) | A kind of shuttering supporting builder's jack operation platform erection method | |
| CN104453197B (en) | High Large Cantilever concrete structural steel shape supports platform | |
| CN103452311B (en) | A kind of erection method of shaped steel suspended structural support frame | |
| CN102220806B (en) | Construction method for supporting and reinforcing ultrahigh hanging single-sided vertical formwork | |
| CN104088397B (en) | A kind of prefabricated post and precast construction method thereof | |
| CN105971274A (en) | Cantilever support frame formwork system and construction method thereof | |
| CN215253499U (en) | Scaffold device | |
| CN111779248A (en) | High-support formwork system and its construction method | |
| CN205604719U (en) | Superelevation, jumbo size board structural template braced system that encorbelments | |
| CN103122691A (en) | Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method | |
| CN114215333B (en) | Quick construction method for outer cornices of high-rise buildings | |
| CN103334580A (en) | Section steel tripod for cantilevered scaffold and scaffold system | |
| CN101906870A (en) | Suspended scaffolding | |
| CN212406038U (en) | Lower hanging construction platform module of high-altitude large-cantilever steel roof truss | |
| CN211689948U (en) | A suspension operation platform device for the construction of a cable-stayed bridge tower | |
| CN216664766U (en) | Assembled parapet that cornices | |
| CN103669817A (en) | Building structure overhanging type scaffold external corner assembling type frame device and construction method | |
| CN114033171B (en) | Clamp type triangular support system of cantilever roof panel and construction method thereof | |
| CN207177310U (en) | A kind of crane beam on rock wall for underground power house reinforcing bar is from steady structure | |
| CN115853314A (en) | Parapet top overhanging component supporting device and construction method | |
| CN107587722A (en) | A kind of advanced mounting process of crane beam on rock wall for underground power house reinforcing bar and its reinforcing bar are from steady structure | |
| CN201053199Y (en) | Large template pylon | |
| CN114592674A (en) | A kind of cantilever scaffold and its construction method | |
| KR200294830Y1 (en) | Supporting structure of scaffold for mold | |
| CN206458067U (en) | Operation platform in high-rise building elevator |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170912 |
|
| RJ01 | Rejection of invention patent application after publication |