CN103306479A - Long-length overhang trusswork high form hanger system - Google Patents
Long-length overhang trusswork high form hanger system Download PDFInfo
- Publication number
- CN103306479A CN103306479A CN2013102852800A CN201310285280A CN103306479A CN 103306479 A CN103306479 A CN 103306479A CN 2013102852800 A CN2013102852800 A CN 2013102852800A CN 201310285280 A CN201310285280 A CN 201310285280A CN 103306479 A CN103306479 A CN 103306479A
- Authority
- CN
- China
- Prior art keywords
- encorbelmenting
- fixed
- concrete truss
- pin concrete
- shaped steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000004567 concrete Substances 0.000 claims abstract description 32
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 24
- 239000010959 steel Substances 0.000 claims abstract description 24
- 239000002965 rope Substances 0.000 claims abstract description 12
- 230000001681 protective Effects 0.000 claims description 15
- 238000009415 formwork Methods 0.000 claims description 13
- 238000009416 shuttering Methods 0.000 claims description 11
- 239000003063 flame retardant Substances 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 7
- 239000000463 material Substances 0.000 abstract description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 12
- 229910052742 iron Inorganic materials 0.000 description 6
- 239000011295 pitch Substances 0.000 description 3
- 230000003247 decreasing Effects 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 1
- 230000003796 beauty Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 238000011017 operating method Methods 0.000 description 1
- 230000001105 regulatory Effects 0.000 description 1
- 231100000817 safety factor Toxicity 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013102852800A CN103306479A (en) | 2013-07-09 | 2013-07-09 | Long-length overhang trusswork high form hanger system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013102852800A CN103306479A (en) | 2013-07-09 | 2013-07-09 | Long-length overhang trusswork high form hanger system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103306479A true CN103306479A (en) | 2013-09-18 |
Family
ID=49132161
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013102852800A Pending CN103306479A (en) | 2013-07-09 | 2013-07-09 | Long-length overhang trusswork high form hanger system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103306479A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104100090A (en) * | 2014-07-17 | 2014-10-15 | 成都市第四建筑工程公司 | High-altitude comprehensive construction method of big-cantilever steel truss structure |
CN107152160A (en) * | 2017-06-22 | 2017-09-12 | 中国五冶集团有限公司 | A kind of shuttering supporting builder's jack operation platform erection method |
CN107165281A (en) * | 2017-06-20 | 2017-09-15 | 中国华西企业有限公司 | A kind of high-altitude long-span overhung steel platform mould bases construction |
CN107355075A (en) * | 2017-07-28 | 2017-11-17 | 南通华新建工集团有限公司 | Overlength cantilevered structure shuttering supporting steel truss and its construction method |
CN113818691A (en) * | 2021-09-27 | 2021-12-21 | 贵州建工集团第一建筑工程有限责任公司 | Construction method for large cantilever beam platform of high-rise building |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3383080A (en) * | 1966-02-02 | 1968-05-14 | James W. Frisbie | Overhang bracket |
CN101538896A (en) * | 2009-04-03 | 2009-09-23 | 标力建设集团有限公司 | Construction method for jettied structure at high attitude of high-rise building |
CN201428239Y (en) * | 2009-04-09 | 2010-03-24 | 温州建设集团公司 | Supporting system for combined channel steel cantilever bracket template |
CN201818051U (en) * | 2010-09-30 | 2011-05-04 | 浙江丰惠建设集团有限公司 | Supporting frame for overhanging mold plate |
CN102733606A (en) * | 2011-04-08 | 2012-10-17 | 中国建筑第八工程局有限公司 | Construction method of high large cantilever structure |
CN203334664U (en) * | 2013-07-09 | 2013-12-11 | 中铁航空港建设集团北京有限公司 | Ultra-long cantilever truss structure high formwork supporting system |
-
2013
- 2013-07-09 CN CN2013102852800A patent/CN103306479A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3383080A (en) * | 1966-02-02 | 1968-05-14 | James W. Frisbie | Overhang bracket |
CN101538896A (en) * | 2009-04-03 | 2009-09-23 | 标力建设集团有限公司 | Construction method for jettied structure at high attitude of high-rise building |
CN201428239Y (en) * | 2009-04-09 | 2010-03-24 | 温州建设集团公司 | Supporting system for combined channel steel cantilever bracket template |
CN201818051U (en) * | 2010-09-30 | 2011-05-04 | 浙江丰惠建设集团有限公司 | Supporting frame for overhanging mold plate |
CN102733606A (en) * | 2011-04-08 | 2012-10-17 | 中国建筑第八工程局有限公司 | Construction method of high large cantilever structure |
CN203334664U (en) * | 2013-07-09 | 2013-12-11 | 中铁航空港建设集团北京有限公司 | Ultra-long cantilever truss structure high formwork supporting system |
Non-Patent Citations (1)
Title |
---|
王兴明: "高空超长悬挑管架模板施工技术", 《安徽建筑》, no. 5, 30 September 2012 (2012-09-30) * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104100090A (en) * | 2014-07-17 | 2014-10-15 | 成都市第四建筑工程公司 | High-altitude comprehensive construction method of big-cantilever steel truss structure |
CN107165281A (en) * | 2017-06-20 | 2017-09-15 | 中国华西企业有限公司 | A kind of high-altitude long-span overhung steel platform mould bases construction |
CN107152160A (en) * | 2017-06-22 | 2017-09-12 | 中国五冶集团有限公司 | A kind of shuttering supporting builder's jack operation platform erection method |
CN107355075A (en) * | 2017-07-28 | 2017-11-17 | 南通华新建工集团有限公司 | Overlength cantilevered structure shuttering supporting steel truss and its construction method |
CN113818691A (en) * | 2021-09-27 | 2021-12-21 | 贵州建工集团第一建筑工程有限责任公司 | Construction method for large cantilever beam platform of high-rise building |
CN113818691B (en) * | 2021-09-27 | 2022-09-06 | 贵州建工集团第一建筑工程有限责任公司 | Construction method for large cantilever beam platform of high-rise building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203334664U (en) | Ultra-long cantilever truss structure high formwork supporting system | |
CN103306479A (en) | Long-length overhang trusswork high form hanger system | |
CN104975566B (en) | Apply the steel pipe support in cable-stayed bridge arch tower is constructed | |
CN102661054B (en) | Lateral reinforcing structure in whole lifting of plane steel truss and whole lifting method | |
CN103243658B (en) | The spelling method of cable stayed bridge dragging suspension basket | |
CN104278637B (en) | A kind of main rope of suspension bridge strand is without the cableway erection method in cat road | |
CN105862878A (en) | Supporting system for deep foundation pit | |
CN203923882U (en) | One-sided dorsal funciculus steel work cable stayed bridge | |
CN105926443A (en) | Construction method for continuous rigid frame side span by first girder installation and then closure | |
CN104532749A (en) | Support used for construction of upper beam of main tower of suspension bridge | |
CN105932940A (en) | Fish-bellied multi-cable photovoltaic support | |
CN204040515U (en) | Cat ladder | |
CN107724244A (en) | Temporary T structure and its construction method without bearing continuous rigid frame end bay beam section composition | |
CN204385629U (en) | A kind of support for the construction of suspension bridge king-tower top rail | |
CN104120659A (en) | Descending type suspended scaffold | |
CN205100531U (en) | Lift scaffold support body assembly | |
CN205575534U (en) | Lattice formula groined type support body lifting means | |
CN203514510U (en) | Profile inner distributed cable supported net rack structure | |
CN203559570U (en) | Operating platform for steel pipe support frame overhung on surrounding columns | |
CN203430009U (en) | Construction hanging basket | |
CN206667458U (en) | The constructing device of vestibule system steel structure girder | |
CN205976573U (en) | Large -span stand cable protection canopy | |
CN202323772U (en) | Upside-down hanging construction device for steel stranded wires of bridge V-shaped support | |
CN209585576U (en) | A kind of builder's jack | |
CN203188125U (en) | Side-sliding system of cable crane towers |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: CHINA RAILWAY AIRPORT CONSTRUCTION GROUP BEIJING C Free format text: FORMER OWNER: HAINAN BRANCH COMPANY, CHINA RAILWAY AIRPORT CONSTRUCTION GROUP CO., LTD. Effective date: 20131105 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Ma Liqiang Inventor after: Liu Haifeng Inventor after: Ji Xiangyang Inventor after: Chen Junbo Inventor after: Fang Jiankun Inventor after: Li Bing Inventor after: Han Chao Inventor after: Yu Qingtao Inventor after: Jia Lei Inventor after: Zhang Guohong Inventor after: Mo Kun Inventor after: Dai Congfeng Inventor after: Luo Yufeng Inventor after: Li Weiming Inventor after: Li Jiaxi Inventor before: Jia Lei Inventor before: Zhang Guohong Inventor before: Mo Kun Inventor before: Dai Congfeng Inventor before: Luo Yufeng |
|
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 572000 SANYA, HAINAN PROVINCE TO: 100070 FENGTAI, BEIJING Free format text: CORRECT: INVENTOR; FROM: JIA LEI ZHANG GUOHONG MO KUN DAI CONGFENG LUO YUFENG TO: MA LIQIANG YU QINGTAO JIA LEI ZHANG GUOHONG MO KUN DAI CONGFENG LUO YUFENG LI WEIMING LI JIAXI LIU HAIFENG JI XIANGYANG CHEN JUNBO FANG JIANKUN LI BING HAN CHAO |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20131105 Address after: 100070, No. 18, No. 12, No. 188, South Fourth Ring Road, Fengtai District, Beijing Applicant after: CHINA RAILWAY AIRPORT CONSTRUCTION GROUP BEIJING CO., LTD.? Address before: 572000 beautiful crown project, No. 299, Xinfeng street, Hedong District, Hainan, Sanya Applicant before: Hainan Branch, China Railway Airport Construction Group Co., Ltd. |
|
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130918 |