CN103243658B - The spelling method of cable stayed bridge dragging suspension basket - Google Patents

The spelling method of cable stayed bridge dragging suspension basket Download PDF

Info

Publication number
CN103243658B
CN103243658B CN201310181950.4A CN201310181950A CN103243658B CN 103243658 B CN103243658 B CN 103243658B CN 201310181950 A CN201310181950 A CN 201310181950A CN 103243658 B CN103243658 B CN 103243658B
Authority
CN
China
Prior art keywords
hanging basket
cable
stayed bridge
main
assembling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310181950.4A
Other languages
Chinese (zh)
Other versions
CN103243658A (en
Inventor
江俊波
庄值政
雷志超
何志强
张敬弦
刘怀刚
安邦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Road and Bridge South China Engineering Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Road and Bridge South China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, Road and Bridge South China Engineering Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN201310181950.4A priority Critical patent/CN103243658B/en
Publication of CN103243658A publication Critical patent/CN103243658A/en
Application granted granted Critical
Publication of CN103243658B publication Critical patent/CN103243658B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开一种斜拉桥牵索挂篮,该牵索挂篮包括可互相拼接在一起的呈“曰”字框架结构的前半部分和后半部分,所述前半部分包括一对平行设置的主纵梁和设置在该主纵梁之间的前横梁和中横梁;其后半部分包括与所述主纵梁共线连接的一对平行设置的尾纵梁和设置在靠近该尾纵梁后端的后横梁。该牵索挂篮的组拼方法,首先利用索塔下横梁安装一托架,在该托架上完成0-1#主梁的施工,然后利用塔柱预留的临时索完成挂篮组拼平台安装,进行挂篮前半部分的组拼,并完成0-2#块的浇筑;其次将前半部分挂篮下落并在平台上向前推移,组拼后半部分挂篮;最后将组拼好的挂篮整体提升,并与所述斜拉桥的0-2#主梁锚固连接。本发明施工简便、成本降低、安全风险低。

The invention discloses a cable-stayed bridge hanging basket. The hanging basket includes a front half and a rear half which can be spliced together with a frame structure in the shape of a "Japanese" character. The front half includes a pair of The main longitudinal beam and the front cross beam and the middle cross beam arranged between the main longitudinal beams; the rear half part includes a pair of parallel rear longitudinal beams connected in line with the main longitudinal beams and arranged near the rear longitudinal beams The rear cross member at the rear end. The assembling method of the dragline hanging basket first installs a bracket by using the lower beam of the cable tower, and completes the construction of the 0-1# main beam on the bracket, and then uses the temporary cable reserved for the tower column to complete the hanging basket assembly platform For installation, assemble the first half of the hanging basket and complete the pouring of blocks 0-2#; secondly, drop the first half of the hanging basket and move it forward on the platform to assemble the second half of the hanging basket; finally assemble the assembled The hanging basket is lifted as a whole, and is anchored and connected with the 0-2# main girder of the cable-stayed bridge. The invention has the advantages of simple and convenient construction, reduced cost and low safety risk.

Description

斜拉桥牵索挂篮的组拼方法Assembling Method of Cable-Stayed Bridge Hanging Basket

技术领域technical field

本发明涉及一种路桥施工技术,尤其涉及一种斜拉桥牵索挂篮的组拼方法。The invention relates to a road and bridge construction technology, in particular to a method for assembling cable-stayed bridge suspension baskets.

背景技术Background technique

斜拉桥是一种桥面体系受压,支撑体系受拉的桥梁,其桥面体系由加劲梁构成,其支撑体系由钢索组成。自从1956年瑞典Stromsun桥拉开了现代斜拉桥建造的序幕后,随着材料科学与计算机科学的发展,国内外已修建了大量的斜拉桥,并且,其跨径也在逐步增大。斜拉桥以其跨越能力大、结构性能好、施工简便、易于维修、造价便宜和外形轻巧美观等优点,得以迅速发展。斜拉桥的主要特点是利用桥塔引出的斜缆索作为梁垮的弹性中间支撑,借以降低梁垮的截面弯矩,减轻梁重,提高梁的跨越能力。A cable-stayed bridge is a bridge whose deck system is under compression and its support system is under tension. The deck system is composed of stiffened beams, and its support system is composed of steel cables. Since the Stromsun Bridge in Sweden opened the prelude to the construction of modern cable-stayed bridges in 1956, with the development of material science and computer science, a large number of cable-stayed bridges have been built at home and abroad, and their spans are gradually increasing. Cable-stayed bridges develop rapidly due to their large spanning capacity, good structural performance, simple construction, easy maintenance, low cost and light and beautiful appearance. The main feature of the cable-stayed bridge is to use the oblique cables drawn from the bridge tower as the elastic intermediate support of the beam collapse, so as to reduce the section bending moment of the beam collapse, reduce the beam weight, and improve the spanning capacity of the beam.

斜拉桥是一个由索、塔、梁为基本结构组成的组合结构,其中,梁和塔是主要承重构件,两者组合成整体结构。根据梁的支撑方式,其中包括梁与塔或墩的联结方式,组成不同形式的母体结构,但都是借斜缆索将梁以弹性支撑的形式吊挂在塔上,这种中间弹性支撑(斜缆索)增强了梁的刚度,形成了多点弹性支撑的变截面连续梁、单悬臂梁、T型刚架及连续刚架。A cable-stayed bridge is a composite structure composed of cables, towers, and beams as the basic structure. Among them, beams and towers are the main load-bearing components, and the two are combined to form an overall structure. According to the support mode of the beam, including the connection mode between the beam and the tower or pier, different forms of parent structures are formed, but the beam is suspended on the tower in the form of elastic support by means of oblique cables. This intermediate elastic support (diagonal Cables) enhance the stiffness of the beam, forming multi-point elastically supported variable cross-section continuous beams, single cantilever beams, T-shaped rigid frames and continuous rigid frames.

斜拉桥的施工架设方法总的来说有三种常用方法:支架法、顶推法和悬臂施工法。前两种方法在早期的斜拉桥施工中多采用,对于目前的长大斜拉桥,尤其是多跨密索斜拉桥多采用从桥塔向两侧的悬臂施工,用斜缆逐节支承。悬臂施工法一般是在塔柱区先浇0号梁段,以作为放置起吊设备的起始梁段,然后用各种起吊设备从塔柱两侧依次对称安装梁段,使悬臂伸长直到合拢,这种方法需要使用到一种重要的设备——牵索挂篮。Generally speaking, there are three commonly used methods for the construction and erection of cable-stayed bridges: support method, jacking method and cantilever construction method. The first two methods were mostly used in the early construction of cable-stayed bridges. For the current long cable-stayed bridges, especially multi-span cable-stayed bridges, the cantilever construction from the bridge tower to the two sides is often used, and the cable-stayed bridges are constructed section by section. support. The cantilever construction method is generally to pour the No. 0 beam section in the tower column area first, as the initial beam section for placing the lifting equipment, and then use various lifting equipment to install the beam sections symmetrically from both sides of the tower column in sequence, so that the cantilever can be extended until it is closed , this method requires the use of an important piece of equipment - the lanyard basket.

牵索挂篮的组拼在斜拉桥悬臂浇筑的过程中是一道十分重要的工序,传统挂篮组拼的方式为:先在空旷场地上进行牵索挂篮组拼,然后利用卷扬机等提升体系进行挂篮提升,最后将挂篮锚固于主梁,最终完成挂篮的组拼。The assembling of the hanging baskets is a very important process in the cantilever pouring process of the cable-stayed bridge. The traditional way of assembling the hanging baskets is: first assemble the hanging baskets on the open space, and then use the hoist to lift The system carries out the lifting of the hanging basket, and finally anchors the hanging basket to the main beam, and finally completes the assembly of the hanging basket.

一般情况下,当桥面离地面较低时,0号和1号现浇段均搭设临时支架施工,施工完后再搭设支架平台进行挂篮的组拼;而当桥面离地面较高的,则采用落地钢管支架组拼挂篮,进行现浇段施工和挂篮悬臂施工。随着我国经济的发展,一批深水基础和山区峡谷的大跨度桥梁将大范围修建,斜拉桥因具有大跨越能力将成为首选桥型。但山区斜拉桥施工场地狭小,桥面距地面高度较高,可达100m以上,所需的支架材料数量太大,成本较高,同时搭设和拆除也极不方便,安全风险大,施工周期长;而且挂篮整体提升高度较高,安全风险极大。为此,需要一种新的挂篮组拼方法来降低山区斜拉桥挂篮组拼的安全风险、造价成本和施工工期。Under normal circumstances, when the bridge deck is relatively low from the ground, temporary supports are erected for No. 0 and No. 1 cast-in-place sections. , the floor-to-ceiling steel pipe brackets are used to assemble the hanging basket, and the cast-in-place section construction and the hanging basket cantilever construction are carried out. With the development of my country's economy, a number of deep-water foundations and large-span bridges in mountain canyons will be built on a large scale, and cable-stayed bridges will become the preferred bridge type because of their large-span capabilities. However, the construction site of cable-stayed bridges in mountainous areas is narrow, and the height of the bridge deck from the ground is high, which can reach more than 100m. The amount of support materials required is too large, and the cost is high. Long; and the overall lifting height of the hanging basket is high, which poses a great safety risk. For this reason, a new hanging basket assembly method is needed to reduce the safety risk, construction cost and construction period of the hanging basket assembly of cable-stayed bridges in mountainous areas.

发明内容Contents of the invention

本发明的目的是,克服现有技术的不足,提供一种安全风险低、工期缩短、施工成本低的,适合在施工条件差、地形陡峭、场地狭小和大型设备及构件运输困难的场地开展的斜拉桥牵索挂篮的组拼方法。The purpose of the present invention is to overcome the deficiencies of the prior art and provide a construction project with low safety risk, shortened construction period and low construction cost, which is suitable for construction in places with poor construction conditions, steep terrain, narrow sites and difficult transportation of large equipment and components. A method for assembling cable-stayed bridge suspension baskets.

为达到以上技术目的,本发明采用的技术方案如下:For achieving above technical purpose, the technical scheme that the present invention adopts is as follows:

一种斜拉桥牵索挂篮,其中,该牵索挂篮包括可互相拼接在一起的呈“曰”字框架结构的前半部分和后半部分,所述前半部分包括一对平行设置的主纵梁和设置在该主纵梁之间的前横梁和中横梁,该前横梁设置在靠近主纵梁的前端,中横梁设置在靠近主纵梁的中后端;其后半部分包括与所述主纵梁共线连接的一对平行设置的尾纵梁和设置在靠近该尾纵梁后端的后横梁。A cable-stayed bridge hanging basket, wherein, the hanging basket includes a front half and a rear half of a frame structure in the shape of a "day" that can be spliced together, and the front half includes a pair of main shafts arranged in parallel. The longitudinal beam and the front beam and the middle beam arranged between the main beam, the front beam is arranged near the front end of the main beam, and the middle beam is arranged near the middle and rear end of the main beam; A pair of parallel tail longitudinal beams connected by the main longitudinal beams collinearly and a rear cross member arranged near the rear end of the tail longitudinal beams.

上述斜拉桥牵索挂篮的组拼方法,其包括以下步骤:The assembling method of above-mentioned cable-stayed bridge stay cable hanging basket, it comprises the following steps:

(1)在已建好的索塔的下横梁的两侧,安装贝雷桁架式托架;(1) Install Bailey truss brackets on both sides of the lower beam of the built cable tower;

(2)以所述贝雷桁架式托架作为作业平台,浇筑斜拉桥的0-1#主梁,至此完成牵索挂篮的组拼平台的安装;(2) use the Bailey truss type bracket as the work platform, pour the 0-1# main girder of the cable-stayed bridge, so far complete the installation of the assembling platform of the dragline hanging basket;

(3)在所述组拼平台进行牵索挂篮前半部分的组拼;(3) Carry out the assembly of the first half of the dragline hanging basket on the assembly platform;

(4)以所述已组拼好的牵索挂篮前半部分为作业平台,浇筑斜拉桥的0-2#主梁;(4) take the first half of the guy rope hanging basket that has been put together as the work platform, and pour the 0-2# main girder of the cable-stayed bridge;

(5)将所述挂篮的前半部分沿斜拉桥主梁延伸方向前推,直至留出组拼挂篮后半部分的空间;(5) push forward the first half of the hanging basket along the extension direction of the main girder of the cable-stayed bridge, until leaving the space for assembling the second half of the hanging basket;

(6)在所述组拼平台进行挂篮后半部分的组拼;(6) Assembling the second half of the hanging basket on the assembly platform;

(7)将组拼好的挂篮整体提升,并与所述斜拉桥的0-2#主梁锚固连接,至此完成牵索挂篮的安装。(7) Lift the assembled hanging basket as a whole, and anchor it with the 0-2# main beam of the cable-stayed bridge, so far the installation of the dragline hanging basket is completed.

具体地,所述索塔还包括设置在其下横梁两侧的牛腿和设置在其塔柱上的临时索,所述贝雷桁架式托架一端与所述牛腿固定连接,其另一端与所述临时索锚固连接。Specifically, the cable tower also includes corbels arranged on both sides of its lower beam and temporary cables arranged on its tower column. One end of the Bailey truss bracket is fixedly connected to the corbel, and the other end Anchored connection with the temporary cable.

更进一步地,所述挂篮整体通过分别设置再其主纵梁、中横梁和尾纵梁上的中锚杆、中吊杆和后吊杆与斜拉桥的0-2#主梁锚固连接。Furthermore, the whole hanging basket is anchored and connected to the 0-2# main beam of the cable-stayed bridge by respectively setting the middle anchor rod, the middle hanger rod and the rear hanger rod on the main longitudinal beam, the middle cross beam and the tail longitudinal beam respectively. .

与现有技术相比较,本发明具有如下优势:Compared with the prior art, the present invention has the following advantages:

a、本发明提供的斜拉桥牵索挂篮的组拼方法,用架设在索塔上的贝雷桁架式托架作为挂篮的组拼平台,克服了山区施工场地狭小和桥面高度高的条件劣势,使工程更容易开展;a, the assembling method of cable-stayed bridge cable hanging basket provided by the present invention uses the Bailey truss type bracket erected on the cable tower as the assembling platform of hanging basket, which overcomes the narrow and small construction site in mountainous areas and the high bridge deck height The inferior conditions make it easier to carry out the project;

b、本发明提供的斜拉桥牵索挂篮的组拼方法,贝雷桁架式托架整体为简支结构,主受力结构的托架受力特点明确、施工简单、承载能力大、结构安全;还可通过调整临时索的索力使托架处于合适的受力状况;b. The assembling method of the cable-stayed bridge cable hanging basket provided by the present invention, the Bailey truss type bracket is a simply supported structure as a whole, and the bracket of the main stress structure has clear stress characteristics, simple construction, large bearing capacity, and strong structure. Safety; the bracket can also be in a suitable stress state by adjusting the cable force of the temporary cable;

c、本发明提供的斜拉桥牵索挂篮的组拼方法,将组拼平台的安装和挂篮的组拼分两次完成,降低了施工材料提升安装的风险。c. The method for assembling the cable-stayed hanging basket of the cable-stayed bridge provided by the present invention divides the installation of the assembling platform and the assembly of the hanging basket into two parts, which reduces the risk of lifting and installing construction materials.

附图说明Description of drawings

图1为本发明斜拉桥牵索挂篮的组拼方法中组拼平台的结构示意图,其中贝雷桁架式托架已安装,0-1#主梁已浇筑完成。Fig. 1 is the structural representation of the assembly platform in the assembling method of cable-stayed bridge suspension basket of cable-stayed bridge of the present invention, wherein Bailey truss type bracket has been installed, and 0-1# main girder has been poured and completed.

图2为本发明斜拉桥牵索挂篮的组拼方法中挂篮前半部分在组拼平台组拼完成后的示意图。Fig. 2 is a schematic diagram of the first half of the hanging basket in the assembling method of the hanging basket of the cable-stayed bridge of the present invention after the assembling is completed on the assembling platform.

图3为本发明斜拉桥牵索挂篮的组拼方法中挂篮后半部分组拼前桥梁各部件的位置示意图,其中0-2#主梁已浇筑完成,挂篮的前半部分已前推。Fig. 3 is a schematic diagram of the position of each part of the bridge before the second half of the hanging basket is assembled in the assembling method of the hanging basket of the cable-stayed bridge of the present invention, wherein the main girder of 0-2# has been poured, and the first half of the hanging basket has been moved forward. push.

图4为本发明斜拉桥牵索挂篮的组拼方法中挂篮整体提升的示意图,主要示出挂篮后半部分的侧视结构示意图、提升用的工具。Fig. 4 is a schematic diagram of the overall lifting of the hanging basket in the assembling method of the cable-stayed hanging basket of the cable-stayed bridge of the present invention, mainly showing the side view structural diagram of the second half of the hanging basket and the tools for lifting.

图5为本发明斜拉桥牵索挂篮的组拼方法中牵索挂篮的结构俯视图。Fig. 5 is a top view of the structure of the cable-stayed basket in the assembling method of the cable-stayed basket of the present invention.

图6为本发明斜拉桥牵索挂篮的组拼方法中挂篮整体与桥梁主梁的锚固结构的示意图。Fig. 6 is a schematic diagram of the anchorage structure of the whole hanging basket and the bridge girder in the assembling method of the cable-stayed hanging basket of the cable-stayed bridge according to the present invention.

具体实施方式Detailed ways

以下结合附图和具体实施方式对本发明的斜拉桥牵索挂篮的组拼方法进一步详述如下:Below in conjunction with accompanying drawing and specific embodiment, the assembling method of cable-stayed bridge suspension basket of the present invention is further detailed as follows:

参考图1-6,首先,在已建好的索塔1的下横梁11的两侧,安装贝雷桁架式托架2;其次,以所述贝雷桁架式托架2作为作业平台,浇筑斜拉桥的0-1#主梁31,如图1所示,至此完成牵索挂篮的组拼平台(未标示)的安装。With reference to Fig. 1-6, at first, install Bailey truss bracket 2 on both sides of the lower beam 11 of cable tower 1 that has been built; The 0-1# main girder 31 of the cable-stayed bridge, as shown in Figure 1, has completed the installation of the assembling platform (not marked) of the cable hanging basket so far.

所述索塔1还包括预埋在其下横梁11两侧的牛腿5和设置在其塔柱上的临时索4。所述托架2充分利用斜拉桥的结构特点,其后端利用所述牛腿5和精轧螺纹钢(未图示)固定于索塔1的下横梁11两侧,该牛腿5主要承受托架2因自重产生的竖向剪力,该精轧螺纹钢主要承受托架2对该牛腿5带来的拉力;所述临时索4的一端固定在所述塔柱上,另一端则固定于托架2的前端,从而对托架2起到临时悬挂定位作用。The cable tower 1 also includes corbels 5 pre-buried on both sides of its lower beam 11 and temporary cables 4 arranged on its tower column. The bracket 2 makes full use of the structural characteristics of the cable-stayed bridge, and its rear end is fixed on both sides of the lower beam 11 of the cable tower 1 by using the corbel 5 and finished-rolled rebar (not shown). To withstand the vertical shear force generated by the bracket 2 due to its own weight, the finish-rolled rebar mainly bears the tension brought by the bracket 2 to the corbel 5; one end of the temporary cable 4 is fixed on the tower column, and the other end Then it is fixed on the front end of the bracket 2, so as to temporarily suspend and position the bracket 2.

然后,在所述组拼平台上按照后述的牵索挂篮6的预设结构进行牵索挂篮前半部分61的组拼,如图2所示;再次,以所述已组拼好的前半部分挂篮61为作业平台,浇筑斜拉桥的0-2#主梁32,如图3所示;下一步,将所述挂篮的前半部分61利用千斤顶5和反力架7沿斜拉桥主梁延伸方向前推,直至留出组拼挂篮后半部分62的空间,如图3所示;再下一步,在所述组拼平台进行挂篮后半部分62的组拼,如图4所示。Then, carry out the assembly of the front half 61 of the cable hanging basket on the platform according to the preset structure of the cable hanging basket 6 described later, as shown in Figure 2; The first half of the hanging basket 61 is a working platform, and the 0-2# main beam 32 of the pouring cable-stayed bridge is shown in Figure 3; Pull the main girder extension direction of the bridge and push forward until the space for assembling the second half of the hanging basket 62 is left, as shown in Figure 3; in the next step, carry out the assembly of the second half of the hanging basket 62 on the assembly platform, As shown in Figure 4.

从上述的几个施工步骤可知,在本发明中,该斜拉桥的0#主梁3实质上是分两段浇筑的,先利用所述已安装好的托架2浇筑靠近索塔1的0-1#主梁31,再利用所述组拼好的挂篮前半部分61浇筑邻近0-1#主梁31的0-2#主梁32,这两段主梁的浇筑都是利用已部分安装好的作业平台先后完成的,以此避免在施工现场一次提升过多的施工材料,进而减少了施工风险。As can be seen from the above several construction steps, in the present invention, the 0# main girder 3 of this cable-stayed bridge is poured in two sections in essence, and the bracket 2 that has been installed is used to pour the bridge near the cable tower 1 earlier. 0-1# main beam 31, utilize the hanging basket first half part 61 that described group puts together to build the 0-2# main beam 32 adjacent to 0-1# main beam 31, the pouring of these two sections of main beams all is to utilize existing Part of the installed work platforms are completed one after another, so as to avoid lifting too many construction materials at the construction site at one time, thereby reducing construction risks.

请参考图5,从牵索挂篮6的俯视图中可见:整个挂篮6呈“曰”字框架结构,挂篮6包括了可拼接在一起的挂篮的前半部分61和后半部分62。所述挂篮的前半部分61包括平行设置的一对主纵梁611、平行设置在该主纵梁611之间的前横梁612和中横梁613,其中,所述前横梁612设置在靠近主纵梁611的前端,中横梁613设置在靠近主纵梁611的中后端;所述挂篮的后半部分62包括与所述主纵梁611共线连接的一对平行设置的尾纵梁622和设置在靠近所述尾纵梁621后端的后横梁622。Please refer to Fig. 5, as can be seen from the top view of the lanyard hanging basket 6: the whole hanging basket 6 is a "day" frame structure, and the hanging basket 6 includes a front half 61 and a rear half 62 of the hanging basket that can be spliced together. The front half part 61 of the hanging basket includes a pair of main longitudinal beams 611 arranged in parallel, a front crossbeam 612 and a middle crossbeam 613 arranged in parallel between the main longitudinal beams 611, wherein the front crossbeam 612 is arranged near the main longitudinal beams The front end of the beam 611, the middle cross beam 613 is arranged near the middle rear end of the main longitudinal beam 611; the second half 62 of the hanging basket includes a pair of parallel tail longitudinal beams 622 connected in line with the main longitudinal beam 611 And the rear beam 622 arranged near the rear end of the tail longitudinal beam 621 .

最后,将组拼好的挂篮6整体提升,并与所述斜拉桥的0-2#主梁32锚固连接,如图4和图6所示,至此完成牵索挂篮的安装。Finally, the assembled hanging basket 6 is lifted as a whole, and anchored to the 0-2# main beam 32 of the cable-stayed bridge, as shown in Figures 4 and 6, and the installation of the dragline hanging basket is completed so far.

请参考图5和图6,所述挂篮6还包括用于提升其自身及将其锚固在斜拉桥主梁上的锚固系统,该锚固系统包括设置在主纵梁611上的在该主纵梁611和中横梁613连接处的C型梁63、设置在主纵梁611上并且邻近该C型梁63的中锚杆64、设置在尾纵梁622末端的后吊杆65和设置在中横梁613中段的中吊杆(未图示);在挂篮6的各纵梁和横梁上,分别开设了安装所述中锚杆64、中吊杆(未图示)和后吊杆65的预留孔6111、6131和6211。Please refer to Fig. 5 and Fig. 6, described hanging basket 6 also comprises the anchoring system that is used to promote itself and it is anchored on the main girder of cable-stayed bridge, and this anchoring system includes being arranged on the main longitudinal girder 611 on this main girder. The C-shaped beam 63 at the junction of the longitudinal beam 611 and the middle beam 613, the middle anchor rod 64 arranged on the main longitudinal beam 611 and adjacent to the C-shaped beam 63, the rear boom 65 arranged at the end of the tail longitudinal beam 622 and the The middle suspender (not shown) in the middle section of the middle crossbeam 613; on each longitudinal beam and crossbeam of the hanging basket 6, respectively offer the installation of the middle anchor 64, the middle suspender (not shown) and the rear suspender 65 The reserved holes 6111, 6131 and 6211.

在实际的施工过程中,挂篮6的提升实质上是锚固系统的安装过程,参考图4和图6,该挂篮6利用中锚杆64和千斤顶9提升,提升前应将中锚杆64稍稍拧紧,然后对托架2的临时索4进行放张,该临时索4放张时需要将对称位置的几根临时索同时进行放张,顺着临时索4的放张,挂篮6的重量慢慢转移到0#主梁3上,最后再通过中吊杆和后吊杆65提升挂篮6,并锚固,所述c型梁63跨在0#主梁3上,同时以安装在尾纵梁621上的止推器66和反顶装置67稳定挂篮6,以此完成挂篮组拼。In the actual construction process, the lifting of the hanging basket 6 is essentially the installation process of the anchoring system. Referring to Figure 4 and Figure 6, the hanging basket 6 is lifted by the middle anchor 64 and the jack 9, and the middle anchor 64 should be lifted before lifting. Tighten it slightly, and then stretch the temporary cables 4 of the bracket 2. When the temporary cables 4 are stretched, several temporary cables at symmetrical positions need to be stretched at the same time. The weight is slowly transferred to the 0# main beam 3, and finally the hanging basket 6 is lifted by the middle suspender and the rear suspender 65, and anchored. The c-shaped beam 63 is straddled on the 0# main beam 3, and is installed on the The thruster 66 on the tail longitudinal beam 621 and the anti-jack device 67 stabilize the hanging basket 6, so as to complete the hanging basket assembly.

综上所述,本发明斜拉桥牵索挂篮的组拼方法施工简便、成本降低、安全风险低,适合在施工条件差、地形陡峭、场地狭小和大型设备及构件运输困难的场地施行。In summary, the method for assembling cable-stayed hanging baskets of cable-stayed bridges according to the present invention is simple in construction, low in cost, and low in safety risks, and is suitable for implementation in sites with poor construction conditions, steep terrain, narrow sites, and difficult transportation of large equipment and components.

因此,上述实施例为本发明较佳的实施方式,但并不仅仅受上述实施例的限制,其他的任何未背离本发明的精神实质与原理下所作的改变、修饰、替代、组合、简化,均应为等效的置换方式,均包含在本发明的保护范围之内。Therefore, the above-mentioned embodiment is a preferred embodiment of the present invention, but not only limited by the above-mentioned embodiment, any other changes, modifications, substitutions, combinations, and simplifications that do not deviate from the spirit and principle of the present invention, All should be equivalent replacement methods, and all are included in the protection scope of the present invention.

Claims (3)

1.一种斜拉桥牵索挂篮的组拼方法,其特征在于,其包括以下步骤:1. a kind of assembly method of cable-stayed bridge cable hanging basket is characterized in that, it comprises the following steps: (1)在已建好的索塔的下横梁的两侧,安装贝雷桁架式托架;(1) Install Bailey truss brackets on both sides of the lower beam of the built cable tower; (2)以所述贝雷桁架式托架作为作业平台,浇筑斜拉桥的0-1#主梁,至此完成牵索挂篮的组拼平台的安装;(2) use the Bailey truss type bracket as the work platform, pour the 0-1# main girder of the cable-stayed bridge, so far complete the installation of the assembling platform of the dragline hanging basket; (3)在所述组拼平台进行牵索挂篮前半部分的组拼;(3) Carry out the assembly of the first half of the dragline hanging basket on the assembly platform; (4)以所述已组拼好的牵索挂篮前半部分为作业平台,浇筑斜拉桥的0-2#主梁;(4) take the first half of the guy rope hanging basket that has been put together as the work platform, and pour the 0-2# main girder of the cable-stayed bridge; (5)将所述挂篮的前半部分沿斜拉桥主梁延伸方向前推,直至留出组拼挂篮后半部分的空间;(5) push forward the first half of the hanging basket along the extension direction of the main girder of the cable-stayed bridge, until leaving the space for assembling the second half of the hanging basket; (6)在所述组拼平台进行挂篮后半部分的组拼;(6) Assembling the second half of the hanging basket on the assembly platform; (7)将组拼好的挂篮整体提升,并与所述斜拉桥的0-2#主梁锚固连接,至此完成牵索挂篮的安装;(7) overall promotion of the hanging basket assembled together, and anchored connection with the 0-2# main girder of the cable-stayed bridge, so far the installation of the dragline hanging basket is completed; 其中,所述牵索挂篮包括可互相拼接在一起的呈“曰”字框架结构的前半部分和后半部分,所述前半部分包括一对平行设置的主纵梁和设置在该主纵梁之间的前横梁和中横梁,该前横梁设置在靠近主纵梁的前端,中横梁设置在靠近主纵梁的中后端;其后半部分包括与所述主纵梁共线连接的一对平行设置的尾纵梁和设置在靠近该尾纵梁后端的后横梁。Wherein, the lanyard hanging basket includes a front half and a rear half of a frame structure in the form of a "Japanese" that can be spliced together, and the front half includes a pair of main longitudinal beams arranged in parallel and a Between the front crossbeam and the middle crossbeam, the front crossbeam is arranged near the front end of the main longitudinal beam, and the middle crossbeam is arranged near the middle and rear ends of the main longitudinal beam; The tail longitudinal beam arranged in parallel and the rear cross member arranged near the rear end of the tail longitudinal beam. 2.如权利要求1所述的斜拉桥牵索挂篮的组拼方法,其特征在于:所述索塔还包括设置在其下横梁两侧的牛腿和设置在其塔柱上的临时索,所述贝雷桁架式托架一端与所述牛腿固定连接,其另一端与所述临时索锚固连接。2. The assembling method of cable-stayed bridge suspension baskets as claimed in claim 1, characterized in that: said cable tower also includes corbels arranged on both sides of its lower crossbeam and temporary braces arranged on its pylons. One end of the Bailey truss bracket is fixedly connected to the corbel, and the other end is anchored to the temporary cable. 3.如权利要求1所述的斜拉桥牵索挂篮的组拼方法,其特征在于:所述挂篮整体通过分别设置在其主纵梁、中横梁和尾纵梁上的中锚杆、中吊杆和后吊杆与斜拉桥的0-2#主梁锚固连接。3. The assembling method of cable-stayed bridge hanging basket of cable-stayed bridge as claimed in claim 1, characterized in that: said hanging basket as a whole passes through middle anchor rods respectively arranged on its main longitudinal beam, middle beam and tail longitudinal beam. , The middle hanger and the rear hanger are anchored to the 0-2# main girder of the cable-stayed bridge.
CN201310181950.4A 2013-05-16 2013-05-16 The spelling method of cable stayed bridge dragging suspension basket Expired - Fee Related CN103243658B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310181950.4A CN103243658B (en) 2013-05-16 2013-05-16 The spelling method of cable stayed bridge dragging suspension basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310181950.4A CN103243658B (en) 2013-05-16 2013-05-16 The spelling method of cable stayed bridge dragging suspension basket

Publications (2)

Publication Number Publication Date
CN103243658A CN103243658A (en) 2013-08-14
CN103243658B true CN103243658B (en) 2015-11-25

Family

ID=48923510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310181950.4A Expired - Fee Related CN103243658B (en) 2013-05-16 2013-05-16 The spelling method of cable stayed bridge dragging suspension basket

Country Status (1)

Country Link
CN (1) CN103243658B (en)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103726445B (en) * 2013-12-05 2015-09-09 中交一公局第三工程有限公司 The construction method that a kind of cable-stayed bridge with tower beam consolidation 0# block support cast-in-place combines with Hanging Basket cantilever
CN103898835B (en) * 2014-03-02 2015-11-11 葛洲坝集团第一工程有限公司 The anti-back of the body of bridge draws load-bearing construction bracket and construction method
CN104314013B (en) * 2014-10-14 2016-04-20 中铁大桥局集团有限公司 Two Cantilever Construction Methods of a kind of pole asymmetrical array beam
CN104652289B (en) * 2015-03-20 2016-06-08 中建三局第三建设工程有限责任公司 Dragging suspension basket slide installation method
CN105735146B (en) * 2016-03-11 2017-11-03 广东省长大公路工程有限公司 The different rope construction method of dragging suspension basket of concrete deck cable stayed bridge
CN110158467B (en) * 2018-03-07 2020-12-15 中国铁建港航局集团有限公司 Sectional installation method for composite guy cable hanging basket in narrow region
CN110055904B (en) * 2019-06-03 2024-11-05 核工业长沙中南建设工程集团公司 Bridge construction device and bridge construction method
CN111996913A (en) * 2020-07-14 2020-11-27 中交第二航务工程局有限公司 Novel front fulcrum hanging basket construction process
CN112709140B (en) * 2020-12-23 2022-08-05 中铁广州工程局集团有限公司 Construction method of concrete box girder of middle-supporting basket concrete-filled steel tube arch bridge
CN113969547A (en) * 2021-11-11 2022-01-25 无锡金诚工程技术服务有限公司 U-shaped manned hanging basket type maintenance platform for large bridge tower
CN116084302B (en) * 2022-09-08 2025-03-28 中铁广州工程局集团有限公司 A construction method for constructing concrete box girder segments of cable-stayed bridges using guy-cable hanging basket
CN115748482A (en) * 2022-11-25 2023-03-07 中铁建大桥工程局集团第四工程有限公司 A construction method for the lower beam and 0# section of a cable-stayed bridge
CN117248469A (en) * 2023-08-29 2023-12-19 云南省铁路集团有限公司 Front fulcrum cable hanging basket for cable-stayed bridge main beam construction and its installation method
CN120061244A (en) * 2025-04-28 2025-05-30 中铁十一局集团有限公司 Truss type hanger for long cantilever concrete beam and construction process thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2597531Y (en) * 2002-11-21 2004-01-07 广东省长大公路工程有限公司第一分公司 Single rope face tracting rope hanging cage
JP2004197313A (en) * 2002-12-16 2004-07-15 Kajima Corp Method of erection of beam structure
CN101158146A (en) * 2007-11-20 2008-04-09 中铁大桥局集团第二工程有限公司 Cable-stayed bridge main-beam sliding form frame system and construction method
CN201526014U (en) * 2009-08-27 2010-07-14 孙广喜 Internal cable-stayed bailey cradle

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100969005B1 (en) * 2009-11-06 2010-07-09 동아대학교 산학협력단 Constructing method of suspension bridge and temporary cable therefor

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2597531Y (en) * 2002-11-21 2004-01-07 广东省长大公路工程有限公司第一分公司 Single rope face tracting rope hanging cage
JP2004197313A (en) * 2002-12-16 2004-07-15 Kajima Corp Method of erection of beam structure
CN101158146A (en) * 2007-11-20 2008-04-09 中铁大桥局集团第二工程有限公司 Cable-stayed bridge main-beam sliding form frame system and construction method
CN201526014U (en) * 2009-08-27 2010-07-14 孙广喜 Internal cable-stayed bailey cradle

Also Published As

Publication number Publication date
CN103243658A (en) 2013-08-14

Similar Documents

Publication Publication Date Title
CN103243658B (en) The spelling method of cable stayed bridge dragging suspension basket
CN100543235C (en) Method and system for erecting steel truss girder with cable-assisted full cantilever
CN102261039B (en) Integral thrusting construction method of network tied arch bridge
CN100590266C (en) Reverse-sequence dismantling method for prestressed concrete tied arch bridge
CN211815489U (en) Super large span flying swallow type concrete filled steel tube arch bridge with self-anchoring suspension cable system
CN103510475B (en) Three main truss steel truss girder simply connected twin spans are without nose girder long distance push construction method
CN103290784B (en) Arched girder conjugative bridge construction method for hanging
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN103911956B (en) A kind of large span stayed-cable bridge steel truss girder mounting method
CN111335142A (en) Self-anchored cable-stayed arch bridge
CN102713071A (en) Construction method of cable-stayed bridge in tension-free cable-stayed state using erection cables and erection cables used therefor
CN101220580A (en) Longitudinal multi-point continuous drag construction method for steel truss girders
CN103147385B (en) Double-spliced extradosed cable-stayed bridge
CN105648917A (en) Cable-beam synchronization construction method for composite beam self-anchored suspension bridge
CN104314013B (en) Two Cantilever Construction Methods of a kind of pole asymmetrical array beam
CN106012872A (en) Non-back cable cable-stayed reinforcement system and construction method of continuous rigid frame bridge
CN101736685A (en) Ground-anchored-self-anchored suspension combined system bridge
CN102888813B (en) Pulling and erecting method of truss girder
CN107142830A (en) Steel pipe web prestressing force steel reinforced concrete combines main beam structure and construction method
CN111996896B (en) Super-large span cable-stayed bridge with thrust piers and construction method thereof
CN106758827B (en) Herringbone Prestressed Concrete Pretensioning Bridge Erection Machine and Its Application Method
CN106120573A (en) Multispan cable-carried arch bridge self-balancing button over strait hangs construction method
CN202280022U (en) Inversely-hung triangular aslant-climbing hanging basket
CN105220609A (en) Compound beam self-anchored suspension bridge and construction technology thereof
CN201738227U (en) Ground-anchored and self-anchored hauling combined system bridge

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CCCC ROAD AND BRIDGE CONSTRUCTION CO., LTD.

Effective date: 20131119

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20131119

Address after: 528400 Guangdong city of Zhongshan Province East Xing Zheng Road No. 1 Central Plaza 3 floor 19

Applicant after: ROAD & BRIDGE SOUTH CHINA ENGINEERING Co.,Ltd.

Applicant after: ROAD & BRIDGE INTERNATIONAL Co.,Ltd.

Address before: 528400 Guangdong city of Zhongshan Province East Xing Zheng Road No. 1 Central Plaza 3 floor 19

Applicant before: ROAD & BRIDGE SOUTH CHINA ENGINEERING Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151125

CF01 Termination of patent right due to non-payment of annual fee