CN204826702U - Hard protector of folded cascade elevartor shaft - Google Patents

Hard protector of folded cascade elevartor shaft Download PDF

Info

Publication number
CN204826702U
CN204826702U CN201520565679.9U CN201520565679U CN204826702U CN 204826702 U CN204826702 U CN 204826702U CN 201520565679 U CN201520565679 U CN 201520565679U CN 204826702 U CN204826702 U CN 204826702U
Authority
CN
China
Prior art keywords
steel pipe
horizontal rod
rod steel
elevator shaft
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520565679.9U
Other languages
Chinese (zh)
Inventor
邓伟
曹海艳
潘巍
石峰
万守芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No3 Construction Co Of Guizhou Construction Engineering Group
Original Assignee
No3 Construction Co Of Guizhou Construction Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No3 Construction Co Of Guizhou Construction Engineering Group filed Critical No3 Construction Co Of Guizhou Construction Engineering Group
Priority to CN201520565679.9U priority Critical patent/CN204826702U/en
Application granted granted Critical
Publication of CN204826702U publication Critical patent/CN204826702U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Elevator Door Apparatuses (AREA)

Abstract

本实用新型公开了一种可折叠式电梯井硬防护装置,包括电梯井墙体,还包括工字钢(1)、横向水平杆钢管(6)、纵向水平杆钢管(4)和模板(3),两根工字钢(1)作为主要支撑骨架一端插入电梯井墙体预留洞(2)里,横向水平杆钢管(6)跟纵向水平杆钢管(4)用十字扣件(10)连接作为次骨架搭设在主骨架工字钢(1)上;平台采用两块模板(3)搭设,两块模板(3)中间用合页(8)进行连接,以达到两个模板折叠用;预先在模板(3)跟工字钢(1)搭设出四个角预留长型空洞(7),并用弯钩式螺栓(9)对模板(3)跟工字钢(1)进行固定。本实用新型能消除过去在电梯井搭设防护时安全隐患,更好的满足施工安全及文明施工的需要。

The utility model discloses a foldable hard protection device for an elevator shaft, which comprises an elevator shaft wall, an I-beam (1), a horizontal horizontal rod steel pipe (6), a longitudinal horizontal rod steel pipe (4) and a template (3 ), two I-beams (1) are used as the main support frame and one end is inserted into the reserved hole (2) in the wall of the elevator shaft, and the horizontal horizontal rod steel pipe (6) and the vertical horizontal rod steel pipe (4) are used with cross fasteners (10) The connection is set up on the main frame I-beam (1) as a secondary frame; the platform is built with two templates (3), and the middle of the two templates (3) is connected with a hinge (8) to achieve the folding of the two templates; Set up the four corners of the formwork (3) and the I-beam (1) in advance to reserve long cavities (7), and use hook bolts (9) to fix the formwork (3) and the I-beam (1). The utility model can eliminate hidden safety hazards when erecting protection for elevator shafts in the past, and better meet the needs of construction safety and civilized construction.

Description

可折叠式电梯井硬防护装置Foldable elevator shaft hard protection device

技术领域 technical field

本实用新型属于建筑设施,具体地涉及一种可折叠式电梯井硬防护装置。 The utility model belongs to building facilities, in particular to a foldable hard protection device for elevator shafts.

背景技术 Background technique

随着城市化的进程,建筑物的施工技术越来越高,但一些常见的安全隐患无法得到很好的根除。其中较为明显的临边防护、洞口防护问题。目前现场采用较多的方法是:在电梯井简易用几根钢管搭设,然后封闭电梯井门。但由于施工时的随意性和工人技术水平的差异或其他原因,此方法处理往往达不到安全的效果。 With the process of urbanization, the construction technology of buildings is getting higher and higher, but some common safety hazards cannot be well eradicated. Among them, the more obvious problems are edge protection and hole protection. The method that adopts more on the spot at present is: simply erect with several steel pipes in the elevator shaft, then close the elevator shaft door. However, due to the arbitrariness of construction and the difference in the technical level of workers or other reasons, this method often fails to achieve safe results.

发明内容 Contents of the invention

本实用新型的目的在于提供了安全、稳定的可折叠式电梯井硬防护装置,并且不用考虑对于空间的限制,简易的拆除、安装,更好的满足施工现场安全需要和文明施工要求。 The purpose of the utility model is to provide a safe and stable foldable elevator shaft hard protection device, which can be easily dismantled and installed without considering the limitation of space, and better meet the safety needs of the construction site and civilized construction requirements.

本发明的目的及解决其主要技术问题是采用以下技术方案来实现的:一种可折叠式电梯井硬防护装置,包括电梯井墙体,其特征在于:还包括工字钢、横向水平杆钢管、纵向水平杆钢管和模板,两根工字钢作为主要支撑骨架一端插入电梯井墙体预留洞里,横向水平杆钢管跟纵向水平杆钢管用十字扣件连接作为次骨架搭设在主骨架工字钢上;平台采用两块模板搭设,两块模板中间用合页进行连接,以达到两个模板折叠用;预先在模板跟工字钢搭设出四个角预留长型空洞,并用弯钩式螺栓对模板跟工字钢进行固定,使得平台模板跟骨架进行固定。 The purpose of the present invention and its main technical problems are achieved by adopting the following technical solutions: a foldable elevator shaft hard protection device, including the elevator shaft wall, which is characterized in that: it also includes I-beams, horizontal horizontal rod steel pipes 1. Longitudinal horizontal rod steel pipe and formwork. Two I-beams are used as the main support frame and one end is inserted into the reserved hole in the wall of the elevator shaft. The horizontal horizontal rod steel pipe and the longitudinal horizontal rod steel pipe are connected with cross fasteners as the secondary skeleton. On the beam; the platform is set up with two templates, and the middle of the two templates is connected by a hinge to achieve the folding of the two templates; the four corners of the template and the I-beam are set up in advance to reserve long holes, and use hooks Type bolts are used to fix the template and the I-beam, so that the platform template and the frame are fixed.

所述的可折叠式电梯井硬防护装置,其中:横向水平杆钢管跟纵向水平杆钢管两端均增设可调式顶撑顶住四周墙体,以达到整体骨架固定安全。 The foldable hard protection device for the elevator shaft, wherein: both ends of the horizontal horizontal rod steel pipe and the vertical horizontal rod steel pipe are provided with adjustable top braces to withstand the surrounding walls, so as to achieve the safety of the overall skeleton fixation.

所述的可折叠式电梯井硬防护装置,其中:横向水平杆钢管跟纵向水平杆钢管为Φ48mm钢管。 The foldable elevator shaft hard protection device, wherein: the horizontal horizontal bar steel pipe and the longitudinal horizontal bar steel pipe are Φ48mm steel pipes.

所述的可折叠式电梯井硬防护装置,其中:模板厚16mm。 The foldable elevator shaft hard protection device, wherein: the thickness of the template is 16mm.

本实用新型与现有技术相比具有明显的优点和有益效果。由以上技术方案可知,本实用新型现场安装,轻松拆除、安全稳定,具有以下特点: Compared with the prior art, the utility model has obvious advantages and beneficial effects. It can be seen from the above technical scheme that the utility model is installed on site, easy to dismantle, safe and stable, and has the following characteristics:

1、两块模板中间用合页进行连接,达到两个模板折叠用。 1. The middle of the two templates is connected by a hinge to achieve the folding of the two templates.

2、用弯钩式螺栓对模板跟工字钢进行固定,使得平台模板跟骨架进行固定。 2. Use hook bolts to fix the template and the I-beam, so that the platform template and the frame are fixed.

3、横向水平杆钢管跟纵向水平杆钢管两端均增设可调式顶撑顶住四周墙体,达到整体骨架固定安全。 3. Both ends of the horizontal horizontal rod steel pipe and the vertical horizontal rod steel pipe are equipped with adjustable top supports to withstand the surrounding walls, so as to achieve the safety of the overall skeleton fixation.

附图说明 Description of drawings

图1是本实用新型结构示意图, Fig. 1 is a structural representation of the utility model,

图2是图1的仰视图,即电梯井门示意图, Fig. 2 is the bottom view of Fig. 1, that is, the schematic diagram of the elevator shaft door,

图3是本实用新型折叠模板示意图, Fig. 3 is a schematic diagram of the folding template of the present invention,

图4是本实用新型折叠模板连接处的示意图。 Fig. 4 is a schematic diagram of the joint of the folded formwork of the present invention.

图中标记:1、工字钢,2、预留洞,3、模板,4、纵向水平杆钢管,5、顶撑,6、横向水平杆钢管7、长型空洞,8、合页,9、弯钩式螺栓,10、十字扣件。 Marks in the figure: 1. I-beam, 2. Reserved hole, 3. Template, 4. Longitudinal horizontal rod steel pipe, 5. Top support, 6. Horizontal horizontal rod steel pipe 7. Long hollow, 8. Hinge, 9 , Hook bolts, 10, cross fasteners.

具体实施方式 Detailed ways

以下结合附图和较佳实施例,对依据本实用新型提出的可折叠式电梯井硬防护装置具体实施方式、特征及其功效,详细说明如后。 Below in conjunction with the accompanying drawings and preferred embodiments, the specific implementation, features and effects of the foldable elevator shaft hard protection device proposed according to the utility model will be described in detail as follows.

参见图1-4,一种可折叠式电梯井硬防护装置,包括电梯井墙体,其特征在于:还包括工字钢1、横向水平杆钢管6、纵向水平杆钢管4和模板3,两根工字钢1作为主要支撑骨架一端插入电梯井墙体预留洞2里,横向水平杆钢管6跟纵向水平杆钢管4用十字扣件10连接作为次骨架搭设在主骨架工字钢1上;平台采用两块模板3搭设,两块模板3中间用合页8进行连接,以达到两个模板折叠用;预先在模板3跟工字钢1搭设出四个角预留长型空洞7,并用弯钩式螺栓9对模板3跟工字钢1进行固定,使得平台模板跟骨架进行固定。 Referring to Figures 1-4, a foldable elevator shaft hard protection device, including the elevator shaft wall, is characterized in that: it also includes I-beam 1, horizontal horizontal rod steel pipe 6, longitudinal horizontal rod steel pipe 4 and template 3, two One end of the root I-beam 1 is used as the main supporting frame and one end is inserted into the reserved hole 2 in the wall of the elevator shaft. The horizontal horizontal rod steel pipe 6 and the longitudinal horizontal rod steel pipe 4 are connected with cross fasteners 10 as a secondary frame and erected on the main frame I-beam 1. The platform is set up with two templates 3, and the middle of the two templates 3 is connected with a hinge 8 to achieve the folding of the two templates; the four corners of the template 3 and the I-beam 1 are set up in advance to reserve a long cavity 7, And the formwork 3 is fixed with the I-beam 1 with the hook type bolt 9, so that the platform formwork is fixed with the skeleton.

所述的可折叠式电梯井硬防护装置,其中:横向水平杆钢管6跟纵向水平杆钢管4两端均增设可调式顶撑5顶住四周墙体,以达到整体骨架固定安全。 The foldable hard protection device for the elevator shaft, wherein: both ends of the horizontal horizontal rod steel pipe 6 and the longitudinal horizontal rod steel pipe 4 are provided with adjustable top braces 5 to withstand the surrounding walls, so as to achieve the safety of the overall skeleton fixation.

所述的可折叠式电梯井硬防护装置,其中:横向水平杆钢管6跟纵向水平杆钢管4为Φ48mm钢管。 The foldable elevator shaft hard protection device, wherein: the horizontal horizontal rod steel pipe 6 and the longitudinal horizontal rod steel pipe 4 are Φ48mm steel pipes.

所述的可折叠式电梯井硬防护装置,其中:模板3厚16mm。 The foldable elevator shaft hard protection device, wherein: the template 3 is 16mm thick.

本实用新型现场安装,轻松拆除、安全稳定,采用防治结合的特点,改变了现有工序的现状,将建立起一种统一的安装标准和要求,保证了施工质量。 The utility model is installed on site, easy to dismantle, safe and stable, adopts the characteristics of combination of prevention and control, changes the status quo of the existing process, will establish a unified installation standard and requirements, and guarantees the construction quality.

以上所述,仅是本实用新型的较佳实施例而已,并非对本实用新型作任何形式上的限制,任何未脱离本实用新型技术方案内容,依据本实用新型的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本实用新型技术方案的范围内。 The above are only preferred embodiments of the present utility model, and are not intended to limit the present utility model in any form. Any modifications made to the above embodiments according to the technical essence of the present utility model do not deviate from the content of the technical solution of the present utility model. Any simple modifications, equivalent changes and modifications still belong to the scope of the technical solution of the present utility model.

Claims (4)

1.一种可折叠式电梯井硬防护装置,包括电梯井墙体,其特征在于:还包括工字钢(1)、横向水平杆钢管(6)、纵向水平杆钢管(4)和模板(3),两根工字钢(1)作为主要支撑骨架一端插入电梯井墙体预留洞(2)里,横向水平杆钢管(6)跟纵向水平杆钢管(4)用十字扣件(10)连接作为次骨架搭设在主骨架工字钢(1)上;平台采用两块模板(3)搭设,两块模板(3)中间用合页(8)连接;预先在模板(3)跟工字钢(1)搭设出四个角预留长型空洞(7),并用弯钩式螺栓(9)对模板(3)跟工字钢(1)固定。 1. A foldable elevator shaft hard protection device, including the elevator shaft wall, is characterized in that: it also includes I-beam (1), horizontal horizontal rod steel pipe (6), longitudinal horizontal rod steel pipe (4) and template ( 3), two I-beams (1) are inserted into the reserved hole (2) of the elevator shaft wall as the main support frame, and the horizontal horizontal rod steel pipe (6) and the vertical horizontal rod steel pipe (4) are connected with cross fasteners (10 ) connection as a secondary frame on the main frame I-beam (1); the platform is built using two templates (3), and the middle of the two templates (3) is connected by a hinge (8); pre-installed on the template (3) The beam (1) sets up four corners to reserve a long cavity (7), and fixes the formwork (3) with the I-beam (1) with hook bolts (9). 2.如权利要求1所述的可折叠式电梯井硬防护装置,其特征在于:横向水平杆钢管(6)跟纵向水平杆钢管(4)两端均增设可调式顶撑(5)顶住四周墙体。 2. The foldable elevator shaft hard protection device according to claim 1, characterized in that: both ends of the horizontal horizontal rod steel pipe (6) and the longitudinal horizontal rod steel pipe (4) are equipped with adjustable top braces (5) to withstand surrounding walls. 3.如权利要求1所述的可折叠式电梯井硬防护装置,其特征在于:横向水平杆钢管(6)跟纵向水平杆钢管(4)为Φ48mm钢管。 3. The foldable hard protection device for elevator shafts according to claim 1, characterized in that: the horizontal horizontal rod steel pipe (6) and the vertical horizontal rod steel pipe (4) are Φ48mm steel pipes. 4.如权利要求1所述的可折叠式电梯井硬防护装置,其特征在于:模板(3)厚16mm。 4. The foldable elevator shaft hard protection device according to claim 1, characterized in that: the template (3) is 16mm thick.
CN201520565679.9U 2015-07-31 2015-07-31 Hard protector of folded cascade elevartor shaft Expired - Fee Related CN204826702U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520565679.9U CN204826702U (en) 2015-07-31 2015-07-31 Hard protector of folded cascade elevartor shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520565679.9U CN204826702U (en) 2015-07-31 2015-07-31 Hard protector of folded cascade elevartor shaft

Publications (1)

Publication Number Publication Date
CN204826702U true CN204826702U (en) 2015-12-02

Family

ID=54684317

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520565679.9U Expired - Fee Related CN204826702U (en) 2015-07-31 2015-07-31 Hard protector of folded cascade elevartor shaft

Country Status (1)

Country Link
CN (1) CN204826702U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049890A (en) * 2016-08-08 2016-10-26 中建四局第三建筑工程有限公司 Anti-falling hard protection block inside tower body and making method of hard protection block
TWI623483B (en) * 2017-07-12 2018-05-11 Wan Chang Yi Elevator shaft working platform
CN112554579A (en) * 2020-12-22 2021-03-26 中建四局第六建设有限公司 Movable platform of unloading of assembled building utilization elevator well
CN112854787A (en) * 2021-02-27 2021-05-28 安徽水利开发有限公司 Self-locking horizontal sealing protective device for elevator shaft
CN116122549A (en) * 2023-03-29 2023-05-16 上海星杰装饰有限公司 Fitment is with safety device
CN117188800A (en) * 2023-08-30 2023-12-08 中建五局第三建设有限公司 Vertical entrance to a cave protector suitable for construction

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049890A (en) * 2016-08-08 2016-10-26 中建四局第三建筑工程有限公司 Anti-falling hard protection block inside tower body and making method of hard protection block
CN106049890B (en) * 2016-08-08 2018-06-05 中建四局第三建筑工程有限公司 Preventing dropped material hard protection block and preparation method thereof inside a kind of tower body
TWI623483B (en) * 2017-07-12 2018-05-11 Wan Chang Yi Elevator shaft working platform
CN112554579A (en) * 2020-12-22 2021-03-26 中建四局第六建设有限公司 Movable platform of unloading of assembled building utilization elevator well
CN112854787A (en) * 2021-02-27 2021-05-28 安徽水利开发有限公司 Self-locking horizontal sealing protective device for elevator shaft
CN116122549A (en) * 2023-03-29 2023-05-16 上海星杰装饰有限公司 Fitment is with safety device
CN117188800A (en) * 2023-08-30 2023-12-08 中建五局第三建设有限公司 Vertical entrance to a cave protector suitable for construction

Similar Documents

Publication Publication Date Title
CN105201195A (en) Liftable supporting leg type elevator shaft construction platform and method
CN204126230U (en) Assembly scaffold unit
CN103556820A (en) Suspension mold for enlarging and reinforcing concrete beam and construction method of suspension mold
CN206352391U (en) Socket joint type key slot type Quick Release support system
CN102454292A (en) Supporting steel frame of high altitude large-span cantilever structure mold frame
CN205224288U (en) Connection node of reinforced concrete superposed beam and steel pipe column
CN201991226U (en) Flange template support structure
CN204343642U (en) Builder's jack corner support frame
CN203441069U (en) Outer wall dangling working platform capable of overturning
CN201943350U (en) Supporting steel frame for die holder of high-altitude large span overhanging structure
CN205577404U (en) Template fixing tool is pour to shear force wall waist rail concrete
CN219826024U (en) Scaffold structure easy to build
CN204001702U (en) A kind of J-shaped wall plastic formwork
CN105756067B (en) A kind of method of horizontal temporary support support replacement in deep basal pit
CN206376514U (en) Tool climbing scaffold
CN205822464U (en) Floor type self-bearing prefabricated external wall panel
CN204357020U (en) Ancient building eaves structure
CN205591507U (en) Scaffold frame of easily dismantling
CN211257760U (en) A triangular support device for cantilevered scaffolding
CN205153144U (en) Joint construction of shear force corner portion and slant girder steel
CN209243920U (en) A kind of prefabricated components connecting node
CN103276889B (en) Full hall fastener type steel pipe scaffold anti-side shifting method
CN205242981U (en) Concrete construction operation platform
CN219431314U (en) Construction platform for outer flue of outer wall
CN106703388A (en) Construction scaffold platform erected in super-high-layer building elevator shaft

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151202