CN204163358U - Scaffold - Google Patents

Scaffold Download PDF

Info

Publication number
CN204163358U
CN204163358U CN201420642097.1U CN201420642097U CN204163358U CN 204163358 U CN204163358 U CN 204163358U CN 201420642097 U CN201420642097 U CN 201420642097U CN 204163358 U CN204163358 U CN 204163358U
Authority
CN
China
Prior art keywords
connection fastener
transverse tube
long transverse
scaffold
hinge structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420642097.1U
Other languages
Chinese (zh)
Inventor
黄国庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Anjie Scaffold Co Ltd
Original Assignee
Wuxi Anjie Scaffold Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Anjie Scaffold Co Ltd filed Critical Wuxi Anjie Scaffold Co Ltd
Priority to CN201420642097.1U priority Critical patent/CN204163358U/en
Application granted granted Critical
Publication of CN204163358U publication Critical patent/CN204163358U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of scaffold, comprise column, long transverse tube, the first connection fastener, the second connection fastener and loaded plate, column and long transverse tube are seamless square tube, and long transverse tube two ends are equipped with through hole; First connection fastener is coaxial pairing page structure, second connection fastener is a two bolted hinge structure of band, this hinge structure side is fixed with pedestal, and this pedestal axially extends a projection along this hinge structure, and this projection is mated with this clear size of opening; This loaded plate is slabbed construction, and its dual-side upper part extends lower prominent formation and links up with.The utility model utilizes the first connection fastener to connect two columns, convenient and swift, saves material; Recycling the second connection fastener is fixed on column by long transverse tube; Recycling loaded plate, is hung on long transverse tube, had both played load-carrying effect, play again the connection function in scaffold, scaffolds erecting easily convenient.

Description

Scaffold
Technical field
The utility model relates to building implement technical field, especially a kind of scaffold.
Background technology
Scaffold is at the construction field (site) for operative and high-rise working and the various supports set up, and is the generic term of building field, is mainly used in the higher place that cannot directly construct of exterior wall, interior decoration or floor height on building sites.Scaffold makes material bamboo and wood, steel pipe or synthetic materials etc. usually; Also used as template by scaffold in part engineering at present, it is also widely used in the fields such as advertising, municipal administration, traffic road and bridge, mine in addition.And get back in building field, the scaffold used at present mainly adopts steel pipe, connection card and miscellaneous part to set up according to predetermined specification, required fixed structure cannot be set up on existing support body in the process set up temporarily, and the different parts for support body needs the steel pipe using different size, cause scaffolding kind more, and frame structure is complicated, all need to expend too much artificial in the process of assembling and dismounting, with regard to single constructor, labour intensity is large; During assembling, the uniformity of support body different parts syndeton is low simultaneously, and then the uncertainty produced by human factor in an assembling process also increases thereupon, easily causes support body to there is many potential safety hazards; Therefore based on foregoing problems, be necessary to do further improvement for the structure of existing building scaffold.
Utility model content
The utility model is for the deficiencies in the prior art, and propose a kind of scaffold, structure is ingenious, use safety.
In order to realize above-mentioned utility model object, the utility model provides following technical scheme: a kind of scaffold, comprise column, long transverse tube, the first connection fastener, the second connection fastener and loaded plate, column and long transverse tube are seamless square tube, and long transverse tube two ends are equipped with through hole; First connection fastener is coaxial pairing page structure, second connection fastener is a two bolted hinge structure of band, this hinge structure side is fixed with pedestal, and this pedestal axially extends a projection along this hinge structure, and this projection is mated with this clear size of opening; This loaded plate is slabbed construction, and its dual-side upper part extends lower prominent formation and links up with.
Further, the size of this hook is mated with seamless square tube.
Further, be provided with triangle gusset below this pedestal, a side is fixed on this hinge structure, and another side is fixed on base bottom surface.
Compared with prior art, the utility model has the following advantages: utilize the first connection fastener to connect two columns, convenient and swift, saves material; Recycling the second connection fastener is fixed on column by long transverse tube; Recycling loaded plate, is hung on long transverse tube, had both played load-carrying effect, play again the connection function in scaffold, scaffolds erecting easily convenient.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model scaffold;
Fig. 2 is the structural representation of the first connection fastener and column;
Fig. 3 is the second connection fastener structural representation;
Fig. 4 is the structural representation of long transverse tube.
Detailed description of the invention
Be described in detail the utility model below in conjunction with accompanying drawing, the description of this part is only exemplary and explanatory, should not have any restriction to protection domain of the present utility model.
A kind of scaffold as shown in Figure 1, comprise column 1, long transverse tube 3, first connection fastener 4, second connection fastener 2 and loaded plate 5, column 1 and long transverse tube 3 are seamless square tube, and long transverse tube 3 two ends are equipped with through hole 31, as in Figure 2-4; First connection fastener 4 is coaxial pairing page structure, second connection fastener 2 is a two bolted hinge structure 21 of band, this hinge structure 21 side is fixed with pedestal 22, and this pedestal 22 axially extends a projection 23 along this hinge structure 21, and this projection 23 is mated with this through hole 31 size; This loaded plate 5 is slabbed construction, and its dual-side upper part extends lower prominent formation and links up with.
The size of this hook is mated with long transverse tube 3, facilitates loaded plate 5 to be hung on long transverse tube 3, in installation foot hand cradle process, hangs up loaded plate 5 in time, can play the effect of stable scaffold, conveniently scaffold erecting again; After scaffold installation, loaded plate 5 is indispensable instruments in construction.
Being provided with triangle gusset 24, side below this pedestal 22 is fixed on this hinge structure 2, and another side is fixed on pedestal 22 bottom surface, improves holding capacity.
The above is only preferred embodiment of the present utility model; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the utility model principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (3)

1. a scaffold, is characterized in that: comprise column, long transverse tube, the first connection fastener, the second connection fastener and loaded plate, and column and long transverse tube are seamless square tube, and long transverse tube two ends are equipped with through hole; First connection fastener is coaxial pairing page structure, second connection fastener is a two bolted hinge structure of band, this hinge structure side is fixed with pedestal, and this pedestal axially extends a projection along this hinge structure, and this projection is mated with this clear size of opening; This loaded plate is slabbed construction, and its dual-side upper part extends lower prominent formation and links up with.
2. scaffold as claimed in claim 1, is characterized in that: the size of this hook is mated with seamless square tube.
3. scaffold as claimed in claim 1, it is characterized in that: be provided with triangle gusset below this pedestal, a side is fixed on this hinge structure, and another side is fixed on base bottom surface.
CN201420642097.1U 2014-10-31 2014-10-31 Scaffold Withdrawn - After Issue CN204163358U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420642097.1U CN204163358U (en) 2014-10-31 2014-10-31 Scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420642097.1U CN204163358U (en) 2014-10-31 2014-10-31 Scaffold

Publications (1)

Publication Number Publication Date
CN204163358U true CN204163358U (en) 2015-02-18

Family

ID=52537060

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420642097.1U Withdrawn - After Issue CN204163358U (en) 2014-10-31 2014-10-31 Scaffold

Country Status (1)

Country Link
CN (1) CN204163358U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104372923A (en) * 2014-10-31 2015-02-25 无锡市安捷脚手架有限公司 Scaffold

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104372923A (en) * 2014-10-31 2015-02-25 无锡市安捷脚手架有限公司 Scaffold
CN104372923B (en) * 2014-10-31 2016-06-08 无锡市安捷脚手架有限公司 Scaffolding

Similar Documents

Publication Publication Date Title
CN203961992U (en) Portable full framing chassis
CN205421940U (en) Concrete spreader
CN104372923B (en) Scaffolding
CN204826593U (en) A portable supplementary operation platform for steel construction support body
CN204163358U (en) Scaffold
CN211447715U (en) Bearing stores pylon for civil engineering
CN204174902U (en) Scaffold
CN206438747U (en) It is a kind of to store integral scaffold
CN204174915U (en) Scaffold
CN204174903U (en) Scaffold
CN105421734A (en) Scaffold
CN104372935A (en) Scaffold
CN204174904U (en) Scaffold
CN205132926U (en) Special well word hoist of hydroelectric set tail water ell
CN204531362U (en) Scaffold
CN204163359U (en) Scaffold
CN104372922A (en) Scaffold
CN204174919U (en) Scaffold
CN207686266U (en) A kind of means for fastening scaffolding of fast demountable
CN206189829U (en) Auto -lock lifting foot hand rack
CN205224556U (en) Scaffold
CN205637524U (en) Novel safety scaffold
CN202299353U (en) Building scaffold
CN205502549U (en) Split type scaffold of hanging
CN205445132U (en) Curtain wall penel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150218

Effective date of abandoning: 20160608