Prior art keywords
expansion tube
directional
dustless
fracture
pile crown
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420753452.2U
Other languages
Chinese (zh)
Inventor
李京财
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420753452.2U priority Critical patent/CN204356777U/en
Application granted granted Critical
Publication of CN204356777U publication Critical patent/CN204356777U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of directional expansion pipe for dustless directional fracture foundation pile pile crown, comprise outer expansion tube, the lower end lower end cap of described outer expansion tube seals, described outer expansion tube inside is also provided with interior expansion tube, and between outer expansion tube and interior expansion tube, be provided with the spring being in compressive state, described lower spring end contacts with lower end cap, upper end is connected with interior expansion tube lower end, the upper end upper plug head of interior expansion tube seals, and upper plug head connecting stay wire one end, the described bracing wire other end is connected with the starting drive being arranged on upper plug head outside, the balanced line for balancing spring elastic force is also provided with between starting drive and lower end cap.Application the utility model carries out that the construction method safety of dustless directional fracture foundation pile pile crown is high, dustless environment protecting, efficient energy-saving, cost are low, by ambient conditions restriction, fracture noresidue, both artistic and practical.

Description

A kind of directional expansion pipe for dustless directional fracture foundation pile pile crown
Technical field
The utility model relates to a kind of building field, specifically a kind of directional expansion pipe for dustless directional fracture foundation pile pile crown being applied in the fields such as high speed, high ferro, harbour, wind-powered electricity generation pile foundation.
Background technology
The building lot stake of large-scale fortification all adopts the mode of reinforcing cage 1 concrete perfusion 2, in order to guaranteed strength, first the height of the building lot stake obtained of constructing is higher than object height, and then is removed by the pile crown of building lot stake, makes it expose a part of reinforcing cage.
At present, the form of construction work that pile crown is removed in building lot stake is: first drive air drill or electric drilling device to abolish concrete beyond reinforcing cage by construction worker with air compressor machine, then with air drill punching, put into voussoir, hammering makes it rupture, and can remove pile crown; Not only occur dust during the method construction, affect working environment; And labor strength is large and efficiency is low, construction cost is high and safety is low.
Utility model content
The purpose of this utility model is to provide the directional expansion pipe for dustless directional fracture foundation pile pile crown that a kind of safety is high, dustless environment protecting, efficient energy-saving, cost are low.
For achieving the above object, the utility model provides following technical scheme:
A kind of directional expansion pipe for dustless directional fracture foundation pile pile crown, comprise outer expansion tube, the lower end lower end cap of described outer expansion tube seals, described outer expansion tube inside is also provided with interior expansion tube, and between outer expansion tube and interior expansion tube, be provided with the spring being in compressive state, described lower spring end contacts with lower end cap, upper end is connected with interior expansion tube lower end, the upper end upper plug head of interior expansion tube seals, and upper plug head connecting stay wire one end, the described bracing wire other end is connected with the starting drive being arranged on upper plug head outside, the balanced line for balancing spring elastic force is also provided with between starting drive and lower end cap.
As further program of the utility model: described starting drive is cross bar or X-type framework.
As further program of the utility model: described balanced line is connected with cross bar by the metal hook of end.
As further program of the utility model: the tube wall of described outer expansion tube and interior expansion tube is equipped with some axial notches.
Compared with prior art, the beneficial effects of the utility model are: application the utility model carries out that the construction method safety of dustless directional fracture foundation pile pile crown is high, dustless environment protecting, efficient energy-saving, cost are low, by ambient conditions restriction, fracture noresidue, both artistic and practical.
Accompanying drawing explanation
Fig. 1 is the structural representation of the directional expansion pipe for dustless directional fracture foundation pile pile crown.
The structural representation of directional expansion pipe when Fig. 2 is the ejection of interior expansion tube.
Fig. 3 is the sectional view of interior expansion tube or outer expansion tube.
Main TV structure schematic diagram when Fig. 4 is the utility model use.
Plan structure schematic diagram when Fig. 5 is the utility model use.
In figure: expansion tube, 45-upper plug head, 46-bracing wire, 47-axial notch, 48-balanced line, 49-cross bar, 5-isolated tube, 6-vertical reinforcement in the outer expansion tube of 1-reinforcing cage, 2-concrete, 3-pile crown interface, 4-directional expansion pipe, 41-lower end cap, 42-, 43-spring, 44-.
Detailed description of the invention
Be described in more detail below in conjunction with the technical scheme of detailed description of the invention to this patent.
Refer to Fig. 1-3, a kind of directional expansion pipe 4 for dustless directional fracture foundation pile pile crown, comprise outer expansion tube 42, the lower end lower end cap 41 of described outer expansion tube 42 seals, prevent the expansion agent in outer expansion tube 42 from flowing out, described outer expansion tube 42 inside is also provided with interior expansion tube 44, and between outer expansion tube 41 and interior expansion tube 44, be provided with the spring 43 being in compressive state, described spring 43 lower end contacts with lower end cap 41, upper end is connected with interior expansion tube 44 lower end, the upper end upper plug head 45 of interior expansion tube 44 seals, and upper plug head 45 connecting stay wire 46 one end, described bracing wire 46 other end is connected with the cross bar 49 being arranged on upper plug head 45 outside, the balanced line 48 for balancing spring 43 elastic force is also provided with between described cross bar 49 and lower end cap 41, described balanced line 48 is connected with cross bar 49 by the metal hook of end.The tube wall of described outer expansion tube 42 and interior expansion tube 44 is equipped with some axial notches 47, for reducing pipeline strength, is convenient to pipeline and is inflated agent and bursts.
Refer to Fig. 4 and Fig. 5, the Specific construction step that application the utility model carries out dustless directional fracture foundation pile pile crown comprises:
(1) on reinforcing cage 1, design the pile crown interface 3 of level;
(2) at least one directional expansion pipe 4 that the inclined upward of pile crown interface 3 is installed, and directional expansion pipe 4 is 5-15 ° with the angle of pile crown interface 3, and reinforcing cage 1 is stretched out in directional expansion pipe 4 upper end, and the central axis of reinforcing cage 1 is pointed in lower end;
(3) outside of every root vertical reinforcement 6 of the reinforcing cage 1 of pile crown interface more than 3 is set with isolated tube 5, and isolated tube 5 and vertical reinforcing bar 6 matched in clearance, isolated tube 5 upper and lower side does sealing process; Described isolated tube 5 adopts plastic pipe (pvc pipe) or metal tube or foam software, prevents the concrete of pile crown from contacting with vertical reinforcement 6, plays insulation blocking effect;
(4) reinforcing cage 1 is put into ground well, then gently bracing wire 46 makes metal hook depart from cross bar 49, and interior expansion tube 44 is under spring 43 acts on, and outer expansion tube 42 is stretched out in upper end, makes interior expansion tube 44 effectively reach ground well edge; Then concrete perfusion 2, obtains building lot stake after concrete 2 solidification forming;
(5) when excavating pile crown, find out interior expansion tube 44 upper end, upper plug head 45 is extracted by bracing wire 46, then by injection expansion agent in interior expansion tube 44 outwards expansion tube 42, after certain hour, expansion agent acutely expands, directional expansion pipe 4 produces huge expansion force, and pile crown can rupture automatically, and does not produce sand and dust.
To those skilled in the art, obvious the utility model is not limited to the details of above-mentioned one exemplary embodiment, and when not deviating from spirit of the present utility model or essential characteristic, can realize the utility model in other specific forms.Therefore, no matter from which point, all should embodiment be regarded as exemplary, and be nonrestrictive, scope of the present utility model is limited by claims instead of above-mentioned explanation, and all changes be therefore intended in the implication of the equivalency by dropping on claim and scope are included in the utility model.Any Reference numeral in claim should be considered as the claim involved by limiting.
In addition, be to be understood that, although this manual is described according to embodiment, but not each embodiment only comprises an independently technical scheme, this narrating mode of manual is only for clarity sake, those skilled in the art should by manual integrally, and the technical scheme in each embodiment also through appropriately combined, can form other embodiments that it will be appreciated by those skilled in the art that.

Claims (4)

1. the directional expansion pipe for dustless directional fracture foundation pile pile crown, it is characterized in that, comprise outer expansion tube, the lower end lower end cap of described outer expansion tube seals, described outer expansion tube inside is also provided with interior expansion tube, and between outer expansion tube and interior expansion tube, be provided with the spring being in compressive state, described lower spring end contacts with lower end cap, upper end is connected with interior expansion tube lower end, the upper end upper plug head of interior expansion tube seals, and upper plug head connecting stay wire one end, the described bracing wire other end is connected with the starting drive being arranged on upper plug head outside, the balanced line for balancing spring elastic force is also provided with between starting drive and lower end cap.
2. the directional expansion pipe for dustless directional fracture foundation pile pile crown according to claim 1, is characterized in that, described starting drive is cross bar or X-type framework.
3. the directional expansion pipe for dustless directional fracture foundation pile pile crown according to claim 1 and 2, is characterized in that, described balanced line is connected with cross bar by the metal hook of end.
4. the directional expansion pipe for dustless directional fracture foundation pile pile crown according to claim 3, is characterized in that, the tube wall of described outer expansion tube and interior expansion tube is equipped with some axial notches.
CN201420753452.2U 2015-04-08 2015-04-08 A kind of directional expansion pipe for dustless directional fracture foundation pile pile crown Expired - Fee Related CN204356777U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420753452.2U CN204356777U (en) 2015-04-08 2015-04-08 A kind of directional expansion pipe for dustless directional fracture foundation pile pile crown

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420753452.2U CN204356777U (en) 2015-04-08 2015-04-08 A kind of directional expansion pipe for dustless directional fracture foundation pile pile crown

Publications (1)

Publication Number Publication Date
CN204356777U true CN204356777U (en) 2015-05-27

Family

ID=53258256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420753452.2U Expired - Fee Related CN204356777U (en) 2015-04-08 2015-04-08 A kind of directional expansion pipe for dustless directional fracture foundation pile pile crown

Country Status (1)

Country Link
CN (1) CN204356777U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111424664A (en) * 2020-04-17 2020-07-17 中铁九局集团第七工程有限公司 Construction method for removing pile head of pre-fractured bored pile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111424664A (en) * 2020-04-17 2020-07-17 中铁九局集团第七工程有限公司 Construction method for removing pile head of pre-fractured bored pile

Similar Documents

Publication Publication Date Title
CN104404950B (en) A kind of reinforcing bar is isolated dustless orientation and is autotomyed the construction method of pile crown
CN204512671U (en) A kind of natural gas tube proof protecting device
CN102852506B (en) High-pressure pneumatic blasting pressure relieving and transmission increasing method
CN103215946A (en) Electroosmosis electrode and electroosmosis draining system thereof
CN103925855A (en) Blasting dust precipitation method
CN102127975A (en) Concrete beforehand pore-forming static breaking technology
CN105649647A (en) Dismounting method of negative ring duct piece in shield tunneling tunnel
CN106930746A (en) The alternative expression coal seam anti-reflection method that drilling acetone invasion and attack are combined with hydraulic fracturing
CN204356777U (en) A kind of directional expansion pipe for dustless directional fracture foundation pile pile crown
CN203741843U (en) Punching grouting conical head
CN103334433B (en) A kind of construction method of pile pulling
CN204551463U (en) The anchor pole of a kind of rotatable break-in and recovery
CN204809641U (en) Ball pin type lightning rod suitable for high -rise building
CN103015459A (en) Construction method for underwater baring platform steel cover box on storm surge river mouth
CN204000861U (en) Bored pile casing in a kind of water
CN202247924U (en) Assembled steel structure open caisson in pipe jacking construction
CN204435330U (en) The interim ecological bleeder pipe plugging system of a kind of water power hydraulic engineering
CN205242463U (en) Subway station foundation pit retaining structure ground is construction monitoring structure of wall even
CN204252565U (en) One faces frontier defense protection unit
CN204139577U (en) Embedment means formula wall-connecting piece after a kind of
CN205382884U (en) Improve hang down straightness's support body device of drilling bored concrete pile pore -forming
CN204080818U (en) A kind of grouting rotary aperture locking device
CN102733621A (en) Blasting demolition method of buildings with hollow wall body and brick-concrete structure
CN203670597U (en) Civil engineering impact construction damping noise reduction device
CN206396757U (en) New Anchor Cable removes machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150527