CN103015459A - Construction method for underwater baring platform steel cover box on storm surge river mouth - Google Patents

Construction method for underwater baring platform steel cover box on storm surge river mouth Download PDF

Info

Publication number
CN103015459A
CN103015459A CN2012105567048A CN201210556704A CN103015459A CN 103015459 A CN103015459 A CN 103015459A CN 2012105567048 A CN2012105567048 A CN 2012105567048A CN 201210556704 A CN201210556704 A CN 201210556704A CN 103015459 A CN103015459 A CN 103015459A
Authority
CN
China
Prior art keywords
casing
construction
pile
flange
cover box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105567048A
Other languages
Chinese (zh)
Inventor
翁国华
何建岳
陈立
楼汉卿
王静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Province No1 Water Conservancy & Electric Power Construction Group Holdings Co Ltd
Original Assignee
Zhejiang Province No1 Water Conservancy & Electric Power Construction Group Holdings Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Province No1 Water Conservancy & Electric Power Construction Group Holdings Co Ltd filed Critical Zhejiang Province No1 Water Conservancy & Electric Power Construction Group Holdings Co Ltd
Priority to CN2012105567048A priority Critical patent/CN103015459A/en
Publication of CN103015459A publication Critical patent/CN103015459A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention is suitable for a storm surge river stretch. Underwater structural concrete for cover box construction is adopted. The construction method disclosed by the invention comprises the following steps of: (1) designing and manufacturing a cover box for later use; (2) constructing foundation filling piles, and chiseling pile heads without pulling an outer pile casing; (3) after the pile heads are chiseled, welding a lower flange and installing a shroud ring on the outer wall of an inner pile casing, measuring the central coordinates of the flange once again, drawing a lofted drawing, and pulling the outer pile casing of the filling piles; (4) after the outer pile casing is pulled, erecting supporting I steel; (5) hoisting the cover box in place; (6) after the cover box is hoisted in place, extruding an upper flanges and the lower flange to realize water stop, and draining river water in the cover box by pumping; (7) welding and sealing the upper and lower flanges; (8) performing bearing platform construction; and (9) after construction is completed, cutting the cover box off by adopting an underwater welding gun. Due to the adoption of the construction method, the problem of difficulty in underwater platform construction in a storm surge riverway is solved, and good economic and social benefits are achieved in applied engineering.

Description

Pile cap steel casing construction engineering method under the force tidal bore estuarine water
 
Technical field
The present invention is applicable in the force tidal bore section, adopts the underwater structures concrete (bored concrete pile foundation) of casing construction.
Background technology
The conventional steel casing construction, generally on-the-spot merogenesis, piecemeal assembly unit casing on the above erection construction platform of construction period water level, platform, merogenesis sinks, and then carries out the Underwater Concrete back cover, the operation of drawing water at last, operation is various, and casing installation period is long.The cushion cap concrete is built under the force tidal bore estuarine water, because the factor affecting such as the depth of water, tidal bore adopt conventional steel casing construction method, cause casing to be installed and will experience the impact failure of repeatedly surging, particularly 8, the spring tide in September is between flood season, is the difficult problem that construction enterprises often face.
Summary of the invention
For the problems referred to above, the present invention discloses pile cap steel casing construction engineering method under a kind of force tidal bore estuarine water, can effectively solve in the force tidal bore river course bearing platform construction difficulty under water, and obtained preferably economic and social benefit in applied engineering.
The present invention is achieved by the following technical solutions: pile cap steel casing construction engineering method under a kind of force tidal bore estuarine water, step be the ⑴ casing design and produce finish for subsequent use; ⑵ after foundation pouring pile construction is finished, do not pull out outer casing, carry out pile crown and cut; ⑶ after pile crown cuts, at interior casing outer wall welding lower flange with shroud ring is installed, after the installation, and flange center's coordinate remeasured, draw full-size drawing, pull out the outer casing of castinplace pile this moment; ⑷ after outer casing is pulled out, set up the support i iron; ⑸ casing hoisted in position; ⑹ behind the casing hoisted in position, lower flange is realized sealing in the extruding, then drains river in the casing; ⑺ then up and down flange welding sealing; ⑻ bearing platform construction; ⑼ after construction was finished, casing adopted under water that welding gun cuts off.
As improvement, before implementing among the step ⑸, first according to the lower flange full-size drawing that records among the step ⑶, cut at the cover box plate and to establish the cover eye, and at cover eyeground section welding upper flange.
As improvement, the size of described cover eye and flange is larger than the stake footpath.
As preferably, among the step ⑸, before hanging, " O " type sealing collar is cemented in the flange groove with marine glue first.
As preferably, among the step ⑹, shoulder pole girder is linked to each other with main muscle in the stake in casing by the diver, the jack jacking of shoulder pole girder two, " O " type sealing collar in the extruding between lower flange is realized sealing.
As preferably, among the step ⑺, remove shoulder pole girder and jack.
As preferably, among the step ⑼, before casing is removed, to water filling ballast in the casing.
The present invention has adopted above-mentioned measure to improve, beneficial effect is remarkable: this engineering method has changed the conventional steel casing: the technological process of assembly unit waterborne → merogenesis sinking → concrete back cover → draw water, adopt monolithic machine-shaping, back cover not, disposablely lay, sealing, and consideration surge impact factor, before tidal bore is arrived, to casing water filling ballast, effectively resist surge impact, tidewater is drained river in the casing later, carry out construction operation in the casing, by rise, at ebb tide between, loop water filling, the operation of drawing water, until the construction of cushion cap concrete is finished.
This engineering method one adopts integral manufacturing on the bank, during the ebb of neap flood, and disposable laying, casing and foundation pouring pile adopt flange connect, " O " rubber ring sealing, need not the concrete back cover, do not establish the system of holding, and have greatly shortened laying the duration of casing; Two, casing does not bear the direct impact of surging in making, installation course; Three, in the bearing platform construction, casing connects owing to passing through the flange rigidity, and can greatly strengthen the impact capacity of the anti-tidal bore of casing toward water filling ballast in the casing, thereby greatly reduces the risk that casing is destroyed by the rough swell wave.
Description of drawings
Fig. 1 is process chart of the present invention.
The specific embodiment
The present invention is further illustrated in conjunction with the embodiments for the below's contrast accompanying drawing:
With reference to shown in Figure 1, pile cap steel casing construction engineering method under a kind of force tidal bore estuarine water among the embodiment 1, step be the ⑴ casing design and produce finish for subsequent use; ⑵ pile crown is rejected: after the foundation pouring pile construction was finished, outer casing was not pulled out first, utilizes outer casing dash, carries out pile crown and cuts.Go deep into the cushion cap base plate according to design drawing grout pile concrete needs, for the ease of the welding of upper lower flange in the next procedure, the pile crown concrete need be cut a hole into " product " font; ⑶ after pile crown cuts, utilize outer casing dash, at interior casing outer wall welding lower flange and installation shroud ring, after the installation, flange center's coordinate is remeasured, draw full-size drawing.The cover eye of bottom and upper flange must be according to the full-size drawing location of drawing, to guarantee upper lower flange docking accurately when casing was made.After lower flange and anchor ear installation, can pull out the outer casing of castinplace pile; ⑷ after outer casing is pulled out, set up the support i iron under water by the diver on the anchor ear bracket, i iron is connected with the bracket bolt by junction plate; ⑸ first according to the lower flange full-size drawing that records among the step ⑶, cut at the cover box plate and establish the cover eye, and at cover eyeground section welding upper flange, the size of cover eye and flange is laid, is located to make things convenient for casing than the stake footpath greatly; Before this outer case is laid and hung, " O " type sealing collar is cemented in the flange groove with marine glue first; Then casing employing overall time hangs and puts in place, is chosen in neap and installs between flood season, slowly transfers, until upper lower flange docking accurately; ⑹ behind the casing hoisted in position, shoulder pole girder is linked to each other with main muscle in the stake in casing by the diver, the jack jacking of shoulder pole girder two realizes sealing by " O " type sealing collar that pushes between upper lower flange, then drains river in the casing; ⑺ after river is drained in the casing, with the welding of upper lower flange gap closely, firmly, then remove shoulder pole girder and jack; ⑻ the sealing of casing flange welding is finished, and can utilize the casing dash and as concrete form, realize the cushion cap dry work; ⑼ after construction was finished, casing adopted under water that welding gun cuts off.If wherein when river tidal bore power is large, particularly 8, the high and impact force of tidewater wave in September all reaches the peak in a year, can before spring tide surges between flood season, to casing water filling ballast, improve the ability that casing is resisted surge impact at every turn.
What more than enumerate only is specific embodiments of the invention, obviously, the invention is not restricted to above embodiment.All distortion that those of ordinary skill in the art can directly derive or associate from content disclosed by the invention all should belong to protection scope of the present invention.

Claims (7)

1. pile cap steel casing construction engineering method under the force tidal bore estuarine water is characterized in that, step be the ⑴ casing design and produce finish for subsequent use; ⑵ after foundation pouring pile construction is finished, do not pull out outer casing, carry out pile crown and cut; ⑶ after pile crown cuts, at interior casing outer wall welding lower flange with shroud ring is installed, after the installation, and flange center's coordinate remeasured, draw full-size drawing, pull out the outer casing of castinplace pile this moment; ⑷ after outer casing is pulled out, set up the support i iron; ⑸ casing hoisted in position; ⑹ behind the casing hoisted in position, lower flange is realized sealing in the extruding, then drains river in the casing; ⑺ then up and down flange welding sealing; ⑻ bearing platform construction; ⑼ after construction was finished, casing adopted under water that welding gun cuts off.
2. pile cap steel casing construction engineering method under the force tidal bore estuarine water according to claim 1, it is characterized in that, before implementing among the step ⑸, first according to the lower flange full-size drawing that records among the step ⑶, cut at the cover box plate and to establish cover eye, and at cover eyeground section welding upper flange.
3. pile cap steel casing construction engineering method under the force tidal bore estuarine water according to claim 2 is characterized in that, the size of described cover eye and flange is larger than the stake footpath.
4. pile cap steel casing construction engineering method under the force tidal bore estuarine water according to claim 1 is characterized in that, among the step ⑸, before hanging, " O " type sealing collar is cemented in the flange groove with marine glue first.
5. pile cap steel casing construction engineering method under the force tidal bore estuarine water according to claim 4, it is characterized in that, among the step ⑹, shoulder pole girder is linked to each other with main muscle in the stake in casing by the diver, the jack jacking of shoulder pole girder two, " O " type sealing collar in the extruding between lower flange is realized sealing.
6. pile cap steel casing construction engineering method under the force tidal bore estuarine water according to claim 5 is characterized in that, among the step ⑺, removes shoulder pole girder and jack.
7. pile cap steel casing construction engineering method under the force tidal bore estuarine water according to claim 1 is characterized in that, among the step ⑼, before casing is removed, to water filling ballast in the casing.
CN2012105567048A 2012-12-20 2012-12-20 Construction method for underwater baring platform steel cover box on storm surge river mouth Pending CN103015459A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105567048A CN103015459A (en) 2012-12-20 2012-12-20 Construction method for underwater baring platform steel cover box on storm surge river mouth

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105567048A CN103015459A (en) 2012-12-20 2012-12-20 Construction method for underwater baring platform steel cover box on storm surge river mouth

Publications (1)

Publication Number Publication Date
CN103015459A true CN103015459A (en) 2013-04-03

Family

ID=47964521

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105567048A Pending CN103015459A (en) 2012-12-20 2012-12-20 Construction method for underwater baring platform steel cover box on storm surge river mouth

Country Status (1)

Country Link
CN (1) CN103015459A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223355A (en) * 2016-08-15 2016-12-14 中国华西企业有限公司 A kind of high bearing platform supported on piles in deep water Hold Hoop method has device and the construction method of end steel jacket box
CN111119214A (en) * 2019-12-26 2020-05-08 四川路航建设工程有限责任公司 Construction method of bridge underwater bearing platform
CN111779015A (en) * 2020-06-27 2020-10-16 中建五局土木工程有限公司 Construction method of bottom-sealed concrete of underwater bearing platform steel sleeve box
CN114960725A (en) * 2022-06-08 2022-08-30 无锡市航道工程有限公司 Construction process of pile cap concrete of underwater bearing platform of high-pile wharf

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100645319B1 (en) * 2005-08-16 2006-11-14 (주) 선암기술연구소 Pile foundation construction method using temporary cofferdam caisson of improved for weakness ground
CN101158161A (en) * 2007-10-19 2008-04-09 山东高速集团青岛高速公路有限公司 Underwater no-bottom closing concrete boxed cofferdam and method of use thereof
CN101775809A (en) * 2010-01-15 2010-07-14 中铁大桥局集团第五工程有限公司 Construction method of marine self-floating type steel soleplate single-wall suspension box cofferdam and single-wall suspension box cofferdam
CN102330433A (en) * 2010-07-12 2012-01-25 南通尧盛钢结构有限公司 Structure node for fast dismounting steel sleeve box of seaborne cushion cap on water

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100645319B1 (en) * 2005-08-16 2006-11-14 (주) 선암기술연구소 Pile foundation construction method using temporary cofferdam caisson of improved for weakness ground
CN101158161A (en) * 2007-10-19 2008-04-09 山东高速集团青岛高速公路有限公司 Underwater no-bottom closing concrete boxed cofferdam and method of use thereof
CN101775809A (en) * 2010-01-15 2010-07-14 中铁大桥局集团第五工程有限公司 Construction method of marine self-floating type steel soleplate single-wall suspension box cofferdam and single-wall suspension box cofferdam
CN102330433A (en) * 2010-07-12 2012-01-25 南通尧盛钢结构有限公司 Structure node for fast dismounting steel sleeve box of seaborne cushion cap on water

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
楼伟中: "深水强涌潮河口钢管排架验算及有底钢套箱施工", 《中国水运》, vol. 12, no. 9, 30 September 2012 (2012-09-30) *
苏孝敏: "浅谈强涌潮河口水下承台钢套箱施工工法", 《水利建设与管理》, no. 08, 31 August 2011 (2011-08-31) *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223355A (en) * 2016-08-15 2016-12-14 中国华西企业有限公司 A kind of high bearing platform supported on piles in deep water Hold Hoop method has device and the construction method of end steel jacket box
CN111119214A (en) * 2019-12-26 2020-05-08 四川路航建设工程有限责任公司 Construction method of bridge underwater bearing platform
CN111119214B (en) * 2019-12-26 2021-03-26 四川路航建设工程有限责任公司 Construction method of bridge underwater bearing platform
CN111779015A (en) * 2020-06-27 2020-10-16 中建五局土木工程有限公司 Construction method of bottom-sealed concrete of underwater bearing platform steel sleeve box
CN114960725A (en) * 2022-06-08 2022-08-30 无锡市航道工程有限公司 Construction process of pile cap concrete of underwater bearing platform of high-pile wharf

Similar Documents

Publication Publication Date Title
CN104805854A (en) Method for constructing deep-water ultra-long steel plate pile cofferdam in tide environment
CN205152976U (en) Marine precast concrete cushion cap wind turbine foundation
CN103741657B (en) The construction method of large-sized multifunction waterborne traffic accident
CN101545462B (en) A steel-concrete combined weight type offshore wind fan foundation structure
CN204370469U (en) A kind of drilled pile long leg jacket offshore wind turbine foundation
CN205917719U (en) Marine anemometer tower of multi -bucket negative -pressure barrel formula
CN103015459A (en) Construction method for underwater baring platform steel cover box on storm surge river mouth
CN104563126B (en) A kind of churning driven bored pile construction method
CN101824825B (en) Deep foundation pit open cutting construction method
CN103572770B (en) A kind of stake case hydraulic structures and construction method thereof
CN201713827U (en) Fan base structure of offshore wind power station
CN203654309U (en) Pile-caisson hydraulic structure
CN204626377U (en) W shaped steel plate pile structure
CN204059460U (en) The interior river intake structure of electric power plant circulating water system
CN106759432A (en) A kind of construction method of offshore wind farm super-large diameter piling bar
CN204212174U (en) Single pile adds taper pile brace type offshore wind turbine foundation structure
CN205000332U (en) After drive piles a marine wind turbine foundation construction equipment and a stake bushing structure
CN103088801A (en) One-step integral installation platform for offshore wind turbine and pile foundation
KR101262865B1 (en) Construction method for cofferdam
CN104074234B (en) The interior river intake structure of electric power plant circulating water system and construction method thereof
CN204825955U (en) After drive piles construction equipment on marine fan basis
CN110670620A (en) Cast-in-place gravity type suction caisson foundation with wing plates
CN204898696U (en) Telescopic steel cofferdam
CN203924089U (en) For the pile foundation of offshore wind farm facility
CN111980039B (en) Construction method and structure of steel sheet pile cofferdam in tidal zone of sea area

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130403