CN101158161A - Underwater no-bottom closing concrete boxed cofferdam and method of use thereof - Google Patents
Underwater no-bottom closing concrete boxed cofferdam and method of use thereof Download PDFInfo
- Publication number
- CN101158161A CN101158161A CNA2007101133585A CN200710113358A CN101158161A CN 101158161 A CN101158161 A CN 101158161A CN A2007101133585 A CNA2007101133585 A CN A2007101133585A CN 200710113358 A CN200710113358 A CN 200710113358A CN 101158161 A CN101158161 A CN 101158161A
- Authority
- CN
- China
- Prior art keywords
- concrete
- casing
- boxed cofferdam
- cofferdam
- washboard
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Revetment (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200710113358A CN100591863C (en) | 2007-10-19 | 2007-10-19 | Underwater no-bottom closing concrete boxed cofferdam and method of use thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200710113358A CN100591863C (en) | 2007-10-19 | 2007-10-19 | Underwater no-bottom closing concrete boxed cofferdam and method of use thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101158161A true CN101158161A (en) | 2008-04-09 |
CN100591863C CN100591863C (en) | 2010-02-24 |
Family
ID=39306384
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200710113358A Active CN100591863C (en) | 2007-10-19 | 2007-10-19 | Underwater no-bottom closing concrete boxed cofferdam and method of use thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100591863C (en) |
Cited By (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101818500A (en) * | 2010-05-01 | 2010-09-01 | 张锦松 | Underwater plugging and water sealing method for bottom plate of concrete pouring jacket without back cover |
CN101487266B (en) * | 2009-02-18 | 2011-01-05 | 路桥集团国际建设股份有限公司 | Earth-steel combined cofferdam construction method for underwater pile cap of bridge |
CN102767189A (en) * | 2012-07-31 | 2012-11-07 | 中铁第五勘察设计院集团有限公司 | Set bearing platform foundations and construction method thereof |
CN102828521A (en) * | 2012-08-16 | 2012-12-19 | 中交第二航务工程局有限公司 | Underwater water-stopping method for precast pile caps |
CN103015459A (en) * | 2012-12-20 | 2013-04-03 | 浙江省第一水电建设集团股份有限公司 | Construction method for underwater baring platform steel cover box on storm surge river mouth |
CN103015441A (en) * | 2012-12-06 | 2013-04-03 | 上海市基础工程有限公司 | Floating water stop device for bridge bearing platform or construction platform |
CN103669416A (en) * | 2012-08-29 | 2014-03-26 | 颜可仁 | Water stop device used at junction between preformed hole of prefabricated pile cap and pile foundation |
CN103669415A (en) * | 2012-08-29 | 2014-03-26 | 颜可仁 | Method for water stop construction at junction between preformed hole of prefabricated pile cap and pile foundation |
CN104047294A (en) * | 2014-07-02 | 2014-09-17 | 广东省长大公路工程有限公司 | Integral type self-gravity water-stop steel pouring jacket for wet method installation of prefabricated piers and abutments |
CN104314011A (en) * | 2014-11-17 | 2015-01-28 | 华北水利水电大学 | Concrete construction method of underwater bearing platform |
CN104775445A (en) * | 2015-03-19 | 2015-07-15 | 福建省建研勘察设计院 | Hanging-type caisson device |
CN104775446A (en) * | 2014-01-15 | 2015-07-15 | 广东强光海洋工程有限公司 | Cylindrical pier for fixing water structure and mounting and constructing method of cylindrical pier |
CN105696468A (en) * | 2016-04-20 | 2016-06-22 | 中铁建港航局集团路桥工程有限公司 | Underwater concrete pouring method applied to water bridge construction |
CN106013156A (en) * | 2016-06-27 | 2016-10-12 | 航天建设集团深圳有限公司 | Construction method for underwater non-crack facing concrete composite structure of harbor engineering |
CN106049499A (en) * | 2016-06-27 | 2016-10-26 | 航天建设集团深圳有限公司 | Underwater seamless harbor engineering facing concrete composite structure |
CN107447767A (en) * | 2017-08-10 | 2017-12-08 | 重庆水利电力职业技术学院 | A kind of prefabricated reinforced concrete bottom plate steel lifted trunk and its construction method |
CN108005094A (en) * | 2017-12-07 | 2018-05-08 | 中铁二十局集团第工程有限公司 | Pier and pier top beam section construction method in naked rock river bed water |
CN109137751A (en) * | 2018-10-24 | 2019-01-04 | 中交第航务工程局有限公司 | Based on pier dry method mounting process in the water for sitting bottom cofferdam water sealing structure |
CN110080268A (en) * | 2019-06-11 | 2019-08-02 | 中交一航局第二工程有限公司 | Underwater cast-in-place pile and casing connection structure and attaching method thereof |
CN110397052A (en) * | 2019-07-30 | 2019-11-01 | 中交一航局第二工程有限公司 | Dry construction system and dry operating environment construction method for underwater repair |
CN110820782A (en) * | 2019-12-05 | 2020-02-21 | 中国铁建大桥工程局集团有限公司 | Novel underwater bottom-sealing-free steel concrete combined hanging box and lowering method thereof |
CN111436487A (en) * | 2020-03-26 | 2020-07-24 | 北京福瑞通科技有限公司 | Sample box for air-conditioned cold store and using method thereof |
CN113152386A (en) * | 2021-02-04 | 2021-07-23 | 南昌工学院 | Cable crane grading damming system for wet stockpiling tailing pond and implementation method |
CN113863341A (en) * | 2021-11-02 | 2021-12-31 | 同济大学建筑设计研究院(集团)有限公司 | Bottom water sealing device for cofferdam construction process |
CN114000525A (en) * | 2021-11-23 | 2022-02-01 | 中国二十二冶集团有限公司 | Construction method of tie beam in water |
CN114086605A (en) * | 2022-01-21 | 2022-02-25 | 中国土木工程集团有限公司 | Integrated underwater bearing platform flexible water stop structure and construction method thereof |
CN114277821A (en) * | 2021-12-29 | 2022-04-05 | 中交路桥建设有限公司 | Bottom-sealing-free jacket box system and installation method thereof |
CN114277822A (en) * | 2021-12-29 | 2022-04-05 | 中交路桥建设有限公司 | Assembled suit case bottom plate |
CN115288176A (en) * | 2022-08-26 | 2022-11-04 | 中国铁建大桥工程局集团有限公司 | Construction method of steel suspension box with recyclable non-sealing-bottom concrete |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109339033B (en) * | 2018-10-19 | 2022-03-25 | 中交第二航务工程局有限公司 | High-pile bearing platform inclined pile leakage stopping structure under low water level and construction method |
-
2007
- 2007-10-19 CN CN200710113358A patent/CN100591863C/en active Active
Cited By (39)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101487266B (en) * | 2009-02-18 | 2011-01-05 | 路桥集团国际建设股份有限公司 | Earth-steel combined cofferdam construction method for underwater pile cap of bridge |
CN101818500B (en) * | 2010-05-01 | 2011-08-31 | 张锦松 | Underwater plugging and water sealing method for bottom plate of concrete pouring jacket without back cover |
CN101818500A (en) * | 2010-05-01 | 2010-09-01 | 张锦松 | Underwater plugging and water sealing method for bottom plate of concrete pouring jacket without back cover |
CN102767189B (en) * | 2012-07-31 | 2014-06-25 | 中铁第五勘察设计院集团有限公司 | Set bearing platform foundations and construction method thereof |
CN102767189A (en) * | 2012-07-31 | 2012-11-07 | 中铁第五勘察设计院集团有限公司 | Set bearing platform foundations and construction method thereof |
CN102828521A (en) * | 2012-08-16 | 2012-12-19 | 中交第二航务工程局有限公司 | Underwater water-stopping method for precast pile caps |
CN102828521B (en) * | 2012-08-16 | 2014-09-10 | 中交第二航务工程局有限公司 | Underwater water-stopping method for precast pile caps |
CN103669415A (en) * | 2012-08-29 | 2014-03-26 | 颜可仁 | Method for water stop construction at junction between preformed hole of prefabricated pile cap and pile foundation |
CN103669416A (en) * | 2012-08-29 | 2014-03-26 | 颜可仁 | Water stop device used at junction between preformed hole of prefabricated pile cap and pile foundation |
CN103015441A (en) * | 2012-12-06 | 2013-04-03 | 上海市基础工程有限公司 | Floating water stop device for bridge bearing platform or construction platform |
CN103015459A (en) * | 2012-12-20 | 2013-04-03 | 浙江省第一水电建设集团股份有限公司 | Construction method for underwater baring platform steel cover box on storm surge river mouth |
CN104775446A (en) * | 2014-01-15 | 2015-07-15 | 广东强光海洋工程有限公司 | Cylindrical pier for fixing water structure and mounting and constructing method of cylindrical pier |
CN104775446B (en) * | 2014-01-15 | 2021-06-15 | 广东海上城建控股发展有限公司 | Barrel pier for fixing water structure and installation and construction method thereof |
CN104047294A (en) * | 2014-07-02 | 2014-09-17 | 广东省长大公路工程有限公司 | Integral type self-gravity water-stop steel pouring jacket for wet method installation of prefabricated piers and abutments |
CN104314011A (en) * | 2014-11-17 | 2015-01-28 | 华北水利水电大学 | Concrete construction method of underwater bearing platform |
CN104775445A (en) * | 2015-03-19 | 2015-07-15 | 福建省建研勘察设计院 | Hanging-type caisson device |
CN104775445B (en) * | 2015-03-19 | 2016-10-05 | 福建省建研工程顾问有限公司 | A kind of hanging caisson device |
CN105696468B (en) * | 2016-04-20 | 2017-06-16 | 中铁建港航局集团路桥工程有限公司 | Underwater concreting method in the construction of water Bridge |
CN105696468A (en) * | 2016-04-20 | 2016-06-22 | 中铁建港航局集团路桥工程有限公司 | Underwater concrete pouring method applied to water bridge construction |
CN106049499A (en) * | 2016-06-27 | 2016-10-26 | 航天建设集团深圳有限公司 | Underwater seamless harbor engineering facing concrete composite structure |
CN106013156A (en) * | 2016-06-27 | 2016-10-12 | 航天建设集团深圳有限公司 | Construction method for underwater non-crack facing concrete composite structure of harbor engineering |
CN107447767B (en) * | 2017-08-10 | 2019-02-26 | 重庆水利电力职业技术学院 | A kind of prefabricated reinforced concrete bottom plate steel lifted trunk and its construction method |
CN107447767A (en) * | 2017-08-10 | 2017-12-08 | 重庆水利电力职业技术学院 | A kind of prefabricated reinforced concrete bottom plate steel lifted trunk and its construction method |
CN108005094A (en) * | 2017-12-07 | 2018-05-08 | 中铁二十局集团第工程有限公司 | Pier and pier top beam section construction method in naked rock river bed water |
CN108005094B (en) * | 2017-12-07 | 2019-09-10 | 中铁二十局集团第一工程有限公司 | Pier and pier top beam section construction method in naked rock river bed water |
CN109137751A (en) * | 2018-10-24 | 2019-01-04 | 中交第航务工程局有限公司 | Based on pier dry method mounting process in the water for sitting bottom cofferdam water sealing structure |
CN110080268A (en) * | 2019-06-11 | 2019-08-02 | 中交一航局第二工程有限公司 | Underwater cast-in-place pile and casing connection structure and attaching method thereof |
CN110397052A (en) * | 2019-07-30 | 2019-11-01 | 中交一航局第二工程有限公司 | Dry construction system and dry operating environment construction method for underwater repair |
CN110820782A (en) * | 2019-12-05 | 2020-02-21 | 中国铁建大桥工程局集团有限公司 | Novel underwater bottom-sealing-free steel concrete combined hanging box and lowering method thereof |
CN111436487A (en) * | 2020-03-26 | 2020-07-24 | 北京福瑞通科技有限公司 | Sample box for air-conditioned cold store and using method thereof |
CN113152386A (en) * | 2021-02-04 | 2021-07-23 | 南昌工学院 | Cable crane grading damming system for wet stockpiling tailing pond and implementation method |
CN113152386B (en) * | 2021-02-04 | 2023-03-21 | 南昌工学院 | Cable crane grading damming system of wet-process stockpiling tailing pond |
CN113863341A (en) * | 2021-11-02 | 2021-12-31 | 同济大学建筑设计研究院(集团)有限公司 | Bottom water sealing device for cofferdam construction process |
CN114000525A (en) * | 2021-11-23 | 2022-02-01 | 中国二十二冶集团有限公司 | Construction method of tie beam in water |
CN114000525B (en) * | 2021-11-23 | 2023-08-22 | 中国二十二冶集团有限公司 | Construction method of underwater tie beam |
CN114277821A (en) * | 2021-12-29 | 2022-04-05 | 中交路桥建设有限公司 | Bottom-sealing-free jacket box system and installation method thereof |
CN114277822A (en) * | 2021-12-29 | 2022-04-05 | 中交路桥建设有限公司 | Assembled suit case bottom plate |
CN114086605A (en) * | 2022-01-21 | 2022-02-25 | 中国土木工程集团有限公司 | Integrated underwater bearing platform flexible water stop structure and construction method thereof |
CN115288176A (en) * | 2022-08-26 | 2022-11-04 | 中国铁建大桥工程局集团有限公司 | Construction method of steel suspension box with recyclable non-sealing-bottom concrete |
Also Published As
Publication number | Publication date |
---|---|
CN100591863C (en) | 2010-02-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100591863C (en) | Underwater no-bottom closing concrete boxed cofferdam and method of use thereof | |
CN201137151Y (en) | Underwater bottom cover-free concrete case box | |
CN101476327B (en) | Subaqueous bearing platform construction method | |
CN101832049B (en) | Concrete-structured conjoined cylindrical shell construction device and method therefor | |
CN103615053B (en) | Monolithic reinforced concrete structure post empiricism engineering method | |
CN106013172A (en) | Double row pile and diagonal brace combined soft soil deep foundation pit supporting structure and construction method | |
CN110952456A (en) | Pile type bridge construction process | |
CN109537895A (en) | Method for mounting beam-slab column of cast-in-place core tube structure of assembled integral frame | |
CN107299773B (en) | Load bearing wall reinforcing construction method | |
CN107034842A (en) | A kind of modular assembly formula pile foundation wharfs structural system and its construction method | |
CN109457814B (en) | Construction method for top cover of high-rise and large-diameter building based on Bailey truss structure | |
CN108643213B (en) | Construction method of underwater bearing platform construction structure | |
CN108425374B (en) | Integral construction method of steel suspension box cofferdam with tie beam dumbbell-shaped bearing platform under complex sea condition | |
CN208121808U (en) | Die body system is hung in bottom plate and side wall one-time-concreting molding pond | |
CN109137990A (en) | A kind of prefabricated cushion cap of land delay-pour joint sectional type and its production and installation method | |
CN109083184A (en) | A kind of prefabricated cushion cap of land sectional type and its production and installation method | |
CN102605988A (en) | Synchronous construction method for chimney lining external concrete | |
CN105822128A (en) | Interior masonry and exterior sliding construction process method for chimney | |
CN110080516A (en) | Attachment type raise scaffold wall-attached supporting seat installation method | |
CN207597341U (en) | A kind of modular assembly formula pile foundation wharfs structural system | |
CN216041698U (en) | Connecting structure of prefabricated T beam and prefabricated U beam | |
CN108755701A (en) | The construction method of the support construction of deep basal pit | |
CN114016417A (en) | Top cover plate capping construction bottom template and method for oblique hollow pier | |
CN210507298U (en) | Integrated template for wave dissipation hole breast wall | |
WO1980002708A1 (en) | A method for performing underwater casting of concrete structures,and an apparatus for carrying out the method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20080409 Assignee: Shandong Railway Road & Bridge Group Co., Ltd. Assignor: CRBC International Co., Ltd. Contract record no.: 2014370000057 Denomination of invention: Underwater no-bottom closing concrete boxed cofferdam and method of use thereof Granted publication date: 20100224 License type: Common License Record date: 20140415 Application publication date: 20080409 Assignee: Zhongjiao Second Highway Engineering Bureau Co., Ltd. Assignor: CRBC International Co., Ltd. Contract record no.: 2014370000058 Denomination of invention: Underwater no-bottom closing concrete boxed cofferdam and method of use thereof Granted publication date: 20100224 License type: Common License Record date: 20140415 Application publication date: 20080409 Assignee: Road & Bridge South China Engineering Co., Ltd. Assignor: CRBC International Co., Ltd. Contract record no.: 2014370000056 Denomination of invention: Underwater no-bottom closing concrete boxed cofferdam and method of use thereof Granted publication date: 20100224 License type: Common License Record date: 20140415 |
|
LICC | Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model |