CN103669415A - Method for water stop construction at junction between preformed hole of prefabricated pile cap and pile foundation - Google Patents
Method for water stop construction at junction between preformed hole of prefabricated pile cap and pile foundation Download PDFInfo
- Publication number
- CN103669415A CN103669415A CN201210324616.5A CN201210324616A CN103669415A CN 103669415 A CN103669415 A CN 103669415A CN 201210324616 A CN201210324616 A CN 201210324616A CN 103669415 A CN103669415 A CN 103669415A
- Authority
- CN
- China
- Prior art keywords
- water stop
- preformed hole
- junction
- pile cap
- pile foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Revetment (AREA)
Abstract
At present, construction of cross-sea bridges is in the industrialized production stage, however, due to the fact that water stop at the junction between a preformed hole of a prefabricated pile cap and a pile foundation is not achieved effectively, the industrialized progress of the bridges is hindered. The invention provides a method for water stop construction at the junction between the preformed hole of the prefabricated pile cap and the pile foundation. The method for the water stop construction at the junction between the preformed hole of the prefabricated pile cap and the pile foundation aims to achieve the water stop at the junction between the preformed hole of the prefabricated pile cap and the pile foundation. According to the method for the water stop construction at the junction between the preformed hole of the prefabricated pile cap and the pile foundation, an upper movable flange ring and a lower movable flange ring are arranged in the preformed hole of the prefabricated pile cap, the distance between the upper movable flange ring and the lower movable flange ring is about 40cm, the upper movable flange ring and the lower movable flange ring are respectively provided with a water stop rubber belt, a grouting pipe and a grout outlet pipe are pre-buried in the middle, high-pressure water is pressed into the grouting pipe continuously before the pile cap enters sludge so that the sludge can be prevented from entering an grouting area, and the grouting pipe is filled with water stop materials immediately after the pile cap is in place.
Description
Technical field
The present invention relates to a kind of bridge prefabrication cushion cap preformed hole and pile foundation junction water stop construction method.
Technical background
The construction of bridge spanning the sea has at present entered the batch production production phase, and the sealing problem of prefabricated cushion cap preformed hole and pile foundation joining place not yet effectively solves, and has hindered the process of bridge girder plant.
Summary of the invention
The sealing problem being connected with pile foundation for solving prefabricated cushion cap preformed hole, the invention provides a kind of bridge prefabrication cushion cap preformed hole and pile foundation junction water stop construction method.
The technical solution adopted for the present invention to solve the technical problems is, in prefabricated cushion cap preformed hole, establish upper and lower two interval, road 40cm left and right with the loose flange circle of watertight rubber band, middle built-in slip casting pipe and outlet pipe, before cushion cap enters mud, in Grouting Pipe, do not stop to be pressed into water under high pressure, to prevent that mud from entering slip casting district, after cushion cap is in place, in Grouting Pipe, inject immediately sealing material (band fibrous cement paste).
The invention has the beneficial effects as follows, reliable construction quality, stagnant water effect is good.
Accompanying drawing explanation
Fig. 1 is prefabricated cushion cap preformed hole and pile foundation junction water stop construction method plan view
Fig. 2 is prefabricated cushion cap preformed hole and pile foundation junction water stop construction method sectional drawing
In figure: 1. prefabricated reinforced concrete cushion cap; 2. two after date pouring concretes; 3. pile foundation; 4. descend antipriming; 5. go up antipriming; 6. Grouting Pipe; 7. outlet pipe; 8. slip casting district.
Specific implementation method
In Fig. 2, lower antipriming (4), upper antipriming (5) are fixed on cage of reinforcement when prefabricated reinforced concrete cushion cap (1) is prefabricated, Grouting Pipe (6) outlet pipe (7) is installed simultaneously, build prefabricated reinforced concrete cushion cap (1), prefabricated reinforced concrete cushion cap (1) is arranged in pile foundation (3), then in Grouting Pipe (6), waterproofing materials (band fibrous cement paste) is injected to slip casting district (8) till outlet pipe (7) pulp.
Claims (1)
1. prefabricated cushion cap preformed hole and a pile foundation junction water stop construction method, is characterized in that: in prefabricated cushion cap preformed hole, establish upper and lower two road antiprimings, establish Grouting Pipe and inject sealing material between Er road antipriming.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210324616.5A CN103669415A (en) | 2012-08-29 | 2012-08-29 | Method for water stop construction at junction between preformed hole of prefabricated pile cap and pile foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210324616.5A CN103669415A (en) | 2012-08-29 | 2012-08-29 | Method for water stop construction at junction between preformed hole of prefabricated pile cap and pile foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103669415A true CN103669415A (en) | 2014-03-26 |
Family
ID=50308129
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210324616.5A Pending CN103669415A (en) | 2012-08-29 | 2012-08-29 | Method for water stop construction at junction between preformed hole of prefabricated pile cap and pile foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103669415A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101158161A (en) * | 2007-10-19 | 2008-04-09 | 山东高速集团青岛高速公路有限公司 | Underwater no-bottom closing concrete boxed cofferdam and method of use thereof |
CN101260674A (en) * | 2008-04-15 | 2008-09-10 | 钟爱民 | Hermetic seal process for box body and pile body |
CN201137151Y (en) * | 2007-10-19 | 2008-10-22 | 山东高速集团青岛高速公路有限公司 | Underwater bottom cover-free concrete case box |
CN201512800U (en) * | 2009-06-17 | 2010-06-23 | 钟爱民 | Guide bell |
CN102605795A (en) * | 2012-04-06 | 2012-07-25 | 山东高速青岛公路有限公司 | Waterproof sleeve for repairing concrete surface of water table fluctuation region and application method of waterproof sleeve |
-
2012
- 2012-08-29 CN CN201210324616.5A patent/CN103669415A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101158161A (en) * | 2007-10-19 | 2008-04-09 | 山东高速集团青岛高速公路有限公司 | Underwater no-bottom closing concrete boxed cofferdam and method of use thereof |
CN201137151Y (en) * | 2007-10-19 | 2008-10-22 | 山东高速集团青岛高速公路有限公司 | Underwater bottom cover-free concrete case box |
CN101260674A (en) * | 2008-04-15 | 2008-09-10 | 钟爱民 | Hermetic seal process for box body and pile body |
CN201512800U (en) * | 2009-06-17 | 2010-06-23 | 钟爱民 | Guide bell |
CN102605795A (en) * | 2012-04-06 | 2012-07-25 | 山东高速青岛公路有限公司 | Waterproof sleeve for repairing concrete surface of water table fluctuation region and application method of waterproof sleeve |
Non-Patent Citations (1)
Title |
---|
姜言泉等: "特大跨海桥梁水下无封底混凝土套箱关键技术", 《公路》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205276316U (en) | Modular prefabricated piping lane | |
CN101831875A (en) | Precast assembly process of prestressed concrete cylindrical hollow pier | |
CN208981531U (en) | A kind of prefabricated assembled parapet connection structure | |
CN109083131A (en) | Prefabricated draining bamboo joint pile and preparation method thereof | |
CN105804410A (en) | Sub-cabin pressure grouting method for vertical connection of prefabricated concrete structure | |
CN201554493U (en) | Quick water-retaining wall in mine | |
CN102041810B (en) | Construction method for pouring dam foundation concrete in zone with centralized water gushing | |
CN109024870A (en) | The connection structure and its construction method of assembled underground structure vertical member | |
CN105113660B (en) | A kind of construction method for the constructional column constructed simultaneously with frame structure filling wall | |
CN104652417A (en) | High-performance concrete corrugated sheet pile, forming die and production method for high-performance concrete corrugated sheet pile | |
CN203668963U (en) | Double-way water blocking device at combining portion of prefabricated bearing platform reserved hole and pile foundation | |
CN105756100B (en) | Basement post-pouring zone system and preparation method thereof | |
CN104032713B (en) | A kind of pressure diversion tunnel composite lining concrete anti-seepage structure and construction technology thereof | |
CN106149877A (en) | Docking structure at concrete frame structure prefabricated post and beam slab node and method | |
CN209040133U (en) | Well-covering device for dewatering well suitable for rich groundwater region | |
CN104594389A (en) | Post-cast strip external wall plugging structure with elastic water stoppers | |
CN103924676A (en) | Prestressed connecting joint for concrete beam and circular steel pipe concrete column | |
CN203855937U (en) | Composite lining concrete impervious structure of pressure water diversion tunnel | |
CN203514332U (en) | Casing for blocking dewatering tube well of post-cast strip | |
CN104452746A (en) | Construction method for bored pile | |
CN103669415A (en) | Method for water stop construction at junction between preformed hole of prefabricated pile cap and pile foundation | |
CN102518129A (en) | Post pressure-grouting pre-stressed hollow square pile and manufacturing method thereof | |
CN202247914U (en) | Fitting-slope foundation structure for rocky slope | |
CN205475215U (en) | Concrete pipe pile | |
CN205224781U (en) | Cooling tower pond structure of in cold areas prestressing without bondn structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140326 |