CN102041810B - Construction method for pouring dam foundation concrete in zone with centralized water gushing - Google Patents

Construction method for pouring dam foundation concrete in zone with centralized water gushing Download PDF

Info

Publication number
CN102041810B
CN102041810B CN2010106195522A CN201010619552A CN102041810B CN 102041810 B CN102041810 B CN 102041810B CN 2010106195522 A CN2010106195522 A CN 2010106195522A CN 201010619552 A CN201010619552 A CN 201010619552A CN 102041810 B CN102041810 B CN 102041810B
Authority
CN
China
Prior art keywords
dam foundation
foundation concrete
concrete
construction method
issue
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010106195522A
Other languages
Chinese (zh)
Other versions
CN102041810A (en
Inventor
黄维
陆欣
史彬
邵卿
刘晓宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina East China Engineering Corp
Original Assignee
Hydrochina East China Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina East China Engineering Corp filed Critical Hydrochina East China Engineering Corp
Priority to CN2010106195522A priority Critical patent/CN102041810B/en
Publication of CN102041810A publication Critical patent/CN102041810A/en
Application granted granted Critical
Publication of CN102041810B publication Critical patent/CN102041810B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention relates to a construction method for pouring dam foundation concrete in a zone with centralized water gushing. The technical problem to be solved by the invention is to provide the construction method for pouring the dam foundation concrete in the zone with the centralized water gushing, which has the advantages of low investment, simpleness in process and effectiveness, and aims at ensuring the strength and quality of the foundation concrete. The technical scheme for solving the problem is as follows: leveling a foundation around a centralized water gushing point; covering a grouting box on the water gushing point; then connecting two steel pipes on the top part of the grouting box; pouring the dam foundation concrete, and simultaneously utilizing the steel pipes for water pumping till the final setting of the concrete; and finally utilizing the steel pipes to carrying out grouting treatment on the centralized water gushing point in the grouting box. The construction method is applicable to water conservancy and hydropower engineering.

Description

Build dam foundation Concrete Construction method in concentrated water burst area
Technical field
The present invention relates to a kind ofly build dam foundation Concrete Construction method, be applicable to Hydraulic and Hydro-Power Engineering in concentrated water burst area.
Background technology
In Hydraulic and Hydro-Power Engineering, owing to the geological defects reason, Dam Base Surface tends to exist concentrated issue; In concreting; Concrete receives the influence of water burst near the issue, and cement paste is diluted, causes concrete water-cement ratio to change; Concrete quality is difficult to guarantee that intensity does not often reach designing requirement.
Summary of the invention
The technical problem that the present invention will solve is: to the problems referred to above, a kind of reduced investment is provided, technology is easy, effective builds dam foundation Concrete Construction method in concentrated water burst area, is intended to guarantee the intensity and the quality of base concrete.
The technical scheme that the present invention adopted is: a kind ofly build dam foundation Concrete Construction method in concentrated water burst area, it is characterized in that may further comprise the steps:
A, when building the dam foundation concrete, earlier with the basis leveling that has on the dam foundation face around the concentrated issue;
B, concentrate issue on grout box and fixing on the face shield, grout box closely contacts to close this concentrated issue with basement rock all around;
C, at the top of grout box two steel pipes are set vertically, steel pipe and grout box internal communication;
D, build the dam foundation concrete, utilize said steel pipe to draw water simultaneously until concrete final set;
E, treat that said dam foundation concreting finishes and reaches design strength after, utilize steel pipe and grout box that the concentrated issue in the grout box is carried out grouting treatment again.
The invention has the beneficial effects as follows: when issue is concentrated in the basis existence,, can eliminate the influence of water burst, reduce engineering defect, both save the expense of post-processed, help engineering safety again base concrete through application of the present invention.
Description of drawings
Fig. 1 is the layout plan of the embodiment of the invention.
Fig. 2 is the sectional view of the embodiment of the invention.
The specific embodiment
Like Fig. 1, shown in Figure 2, in this example, on Dam Base Surface, exist and concentrate issue 1.If directly at this foundation plane top-pour underpin concrete; Near the issue concrete just can receive the influence of water burst so; Cause cement paste diluted, concrete water-cement ratio changes, thereby influences the quality of base concrete; Make concrete not reach required intensity, and then influence engineering safety.
For this reason, with reference to Fig. 1, shown in Figure 2, when present embodiment is built the dam foundation concrete in concentrated water burst area, adopted following job practices:
A, at first with the basis leveling that has on the dam foundation face around the concentrated issue 1;
B, on face shield on the above-mentioned concentrated issue 1 grout box 2 and fixing, grout box 2 and basement rock all around be tight to be contacted closing concentrated issue, thereby water burst is collected in the grout box 2;
C, connect two vertical steel pipes of arranging 4 at the top of grout box 2, and steel pipe 4 and grout box 2 internal communication;
D, build dam foundation concrete 3, utilize steel pipe 4 to draw water (promptly extracting the water burst in the grout box) simultaneously until concrete final set;
E, treat dam foundation concrete 3 build finish and reach design strength after, utilize steel pipe 4 and concentrated issue 1 in 2 pairs of grout boxs of grout box to carry out grouting treatment again.On the one hand can carry out shutoff, on the other hand, can further strengthen near the quality of concrete and foundation plane the contact surface issue through grouting issue.

Claims (1)

1. build dam foundation Concrete Construction method in concentrated water burst area for one kind, it is characterized in that may further comprise the steps:
A, when building dam foundation concrete (3), earlier with concentrated issue (1) basis leveling is on every side arranged on the dam foundation face;
B, concentrating on the last face shield of issue (1) grout box (2) and fixing, grout box closely contacts to close this concentrated issue with basement rock all around;
C, at the top of grout box (2) two steel pipes (4) are set vertically, steel pipe and grout box (2) internal communication;
D, build dam foundation concrete (3), utilize said steel pipe (4) to draw water simultaneously until concrete final set;
E, treat said dam foundation concrete (3) build finish and reach design strength after, utilize steel pipe (4) and grout box (2) that the concentrated issue (1) in the grout box is carried out grouting treatment again.
CN2010106195522A 2010-12-22 2010-12-22 Construction method for pouring dam foundation concrete in zone with centralized water gushing Active CN102041810B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010106195522A CN102041810B (en) 2010-12-22 2010-12-22 Construction method for pouring dam foundation concrete in zone with centralized water gushing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010106195522A CN102041810B (en) 2010-12-22 2010-12-22 Construction method for pouring dam foundation concrete in zone with centralized water gushing

Publications (2)

Publication Number Publication Date
CN102041810A CN102041810A (en) 2011-05-04
CN102041810B true CN102041810B (en) 2012-08-22

Family

ID=43908322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010106195522A Active CN102041810B (en) 2010-12-22 2010-12-22 Construction method for pouring dam foundation concrete in zone with centralized water gushing

Country Status (1)

Country Link
CN (1) CN102041810B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104452827B (en) * 2014-10-16 2016-06-29 中国电建集团华东勘测设计研究院有限公司 A kind of processing method at Concrete Dam spring
CN106930294A (en) * 2017-04-26 2017-07-07 辽宁有色基础工程公司 A kind of bedrock fracture artesian area grouting method
CN108018864A (en) * 2017-11-13 2018-05-11 广东水电二局股份有限公司 A kind of bedrock surface construction method that can dredge subsurface pressure water burst
CN108222043B (en) * 2018-01-19 2020-05-05 青岛业高建设工程有限公司 Curtain sand gushing treatment method and curtain sand gushing treatment pipe
CN108951672A (en) * 2018-08-02 2018-12-07 中国铁建港航局集团有限公司 A kind of structure of voltage regulation that catchments for grouting construction
CN108999195B (en) * 2018-08-22 2019-10-29 山东大学 It is a kind of block the larger water burst of deep-foundation side wall stratum in the safe grouting construction process of step heap weir formula
CN109339086B (en) * 2018-10-17 2021-01-19 中国一冶集团有限公司 Concrete underwater bottom sealing cover for piping and using method
CN110747873A (en) * 2019-11-22 2020-02-04 上海宝冶集团有限公司 Device for sealing post-pouring strip piping and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1385585A (en) * 2002-06-26 2002-12-18 王衡 Dry method for stopping water leakage
CN101526003A (en) * 2009-03-23 2009-09-09 中国水电顾问集团华东勘测设计研究院 Method for blocking up and treating high pressure large-flow stable underground water burst
CN101550701A (en) * 2009-04-30 2009-10-07 中冶实久建设有限公司 Method and device for treating partial water burst of foundation ditch
CN201406688Y (en) * 2009-04-30 2010-02-17 中冶实久建设有限公司 Water gathering cover for treating partial water inrush of foundation pit

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1385585A (en) * 2002-06-26 2002-12-18 王衡 Dry method for stopping water leakage
CN101526003A (en) * 2009-03-23 2009-09-09 中国水电顾问集团华东勘测设计研究院 Method for blocking up and treating high pressure large-flow stable underground water burst
CN101550701A (en) * 2009-04-30 2009-10-07 中冶实久建设有限公司 Method and device for treating partial water burst of foundation ditch
CN201406688Y (en) * 2009-04-30 2010-02-17 中冶实久建设有限公司 Water gathering cover for treating partial water inrush of foundation pit

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
姜命强,向红利.乌江沙沱水电站10号坝段涌水封堵施工.《水利水电施工》.2009,(第S1期),第53页第1节第3段. *
熊太岘.浯溪水电站一期闸坝基坑涌水处理.《湖南水利水电》.2010,(第5期),第11页第3.2节最后1段. *

Also Published As

Publication number Publication date
CN102041810A (en) 2011-05-04

Similar Documents

Publication Publication Date Title
CN102041810B (en) Construction method for pouring dam foundation concrete in zone with centralized water gushing
CN202627006U (en) Plugging steel sleeve of dewatering well under basement floor
CN203188225U (en) Novel dewatering-well sealing structure
CN202164595U (en) Steel pipe pile and coffer made of steel pipe pile
CN208534081U (en) A kind of reconstruction structure of old building constructional column
CN104594389A (en) Post-cast strip external wall plugging structure with elastic water stoppers
CN103410172A (en) Construction method for post pouring belt plugging of underground structural roof plate
CN202559321U (en) Diversion tunnel plug concrete drainage pipe device
CN202520011U (en) Floor shore device
CN205382727U (en) Lightweight steel construction house
CN204401907U (en) prefabricated balcony cornice
CN204510688U (en) A kind of temporary fixing structure of precast wall panel
CN101649746B (en) Method for arranging drain plug peripheral water stopping sheet of tunnel plug
CN204356915U (en) The self waterproof structure that steel pipe column is crossing with concrete of basement exterior wall
CN209874074U (en) Porous inclined plane slip casting embedded pipe
CN204370831U (en) The additional Fabricated balcony structure in old community
CN203668963U (en) Double-way water blocking device at combining portion of prefabricated bearing platform reserved hole and pile foundation
CN203939037U (en) A kind of plugging dewatering well device
CN204021215U (en) A kind of job platform that is applicable to the excessive big vast tower of Tailings Dam
CN204475355U (en) Plugging structure
CN207512903U (en) A kind of connection structure of precast concrete balcony periphery sealing plate levels
CN206570827U (en) A kind of uninterrupted diversion cofferdam system
CN204491679U (en) A kind of ater-casting exterior wall plugging structure with elastic waterstop bar
CN203639921U (en) Obturator for underwater anchor rod grouting
CN204552096U (en) A kind of sealing reversed beam template is fixedly connected with positioner

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant