Prior art keywords
balcony
cornice
seat limit
reinforcement component
forms
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520042188.6U
Other languages
Chinese (zh)
Inventor
虞嘉泉
加藤俊道
星野新辅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Kecheng Construction Engineering Co ltd
Original Assignee
Ten Thousand Pairs Shanghai Building Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ten Thousand Pairs Shanghai Building Technology Co Ltd filed Critical Ten Thousand Pairs Shanghai Building Technology Co Ltd
Priority to CN201520042188.6U priority Critical patent/CN204401907U/en
Application granted granted Critical
Publication of CN204401907U publication Critical patent/CN204401907U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a kind of prefabricated balcony cornice.In order to overcome, existing balcony cornice construction method is outmoded, technique is loaded down with trivial details, the site operation cycle is long, the defect of easy generation hollowing, cracking, dew muscle, the seat limit that the technical solution adopted in the utility model comprises reinforcement component, formed on reinforcement component with concreting, the front portion on seat limit forms the vertical upper edge that arranges and lower extension, and the rear portion of reinforcement component is provided with evagination in the sidewall on seat limit and the joint bar that can be plugged in balcony; The upper surface on described seat limit forms the inclined-plane mated with balcony upper surface.Its advantage is: stabilized structure, concreting in a down-to-earth manner, effectively can shorten the site operation cycle of balcony cornice, improve construction quality, save manpower.

Description

Prefabricated balcony cornice
Technical field
The utility model relates to building field, specifically a kind of prefabricated balcony cornice.
Background technology
Balcony cornice has two kinds of section types: board-like cornice and beam type cornice.The construction method of traditional board-like cornice has been built together with balcony on the seat limit of cornice, bar planting on cornice seat limit, formwork, concreting, edge and lower extension in formation.The construction method of traditional beam type cornice is on the basis of balcony, balcony front end be cornice seat limit, on edge and lower extension bar planting, then formwork, concreting, form cornice.
All there is the problem that construction method is outmoded, technique is loaded down with trivial details, the site operation cycle is long in board-like cornice and beam type cornice.And, owing to building inconvenience, also there is edge and cannot water the more eave structure of real problem, particularly lines, easily produce the quality problems such as hollowing, cracking, dew muscle.In addition, for the ease of balcony draining, cornice seat limit also needs to coordinate balcony to do secondary and plasters, and jointly form the inclined plane of a water conservancy diversion with balcony, waste of manpower, construction speed is also slow.
Summary of the invention
Technical problem to be solved in the utility model is the defect overcoming the existence of above-mentioned prior art, the prefabricated balcony cornice that a kind of stabilized structure, concreting are sturdy is provided, effectively can shortens the site operation cycle of balcony cornice, improve construction quality, save manpower.
For this reason, the technical solution adopted in the utility model is as follows: prefabricated balcony cornice, its technical characteristic is, the seat limit that it comprises reinforcement component, is formed on reinforcement component with concreting, the front portion on seat limit forms the vertical upper edge that arranges and lower extension, and the rear portion of reinforcement component is provided with evagination in the sidewall on seat limit and the joint bar that can be plugged in balcony; The upper surface on described seat limit forms the inclined-plane mated with balcony upper surface.
Prefabricated balcony cornice one-time-concreting after place of producer steel form formwork is shaping, then is transported to construction site, is installed to station, coordinates with balcony by lifting.This prefabricated balcony cornice is convenient to build, and therefore avoids edge and cannot water real problem, and overall structure is firm, sturdy, improves construction quality, and, substantially reduce the cycle of site operation, save manpower.
As improvement, along upper plant railing post on described.This setting, makes the syndeton between edge and column simple, firm.
As improvement, described seat limit is offered the gutter for water conservancy diversion; Floor drain is also installed in described seat limit.This setting, makes the draining of balcony cornice smooth and easy.
As improvement, on described, form upper overturning along the front portion of upper end; The front portion of described lower extension lower end forms lower flange, and the upper surface of lower flange is outward-dipping, and the bottom surface of described lower flange forms the drip of indent.Utilize steel form can have how abundant lines at the balcony cornice that producer is prefabricated, and rainwater outwards guides by the upper surface of lower flange outward-dipping being conducive to, the drip of bottom surface then can utilize the tension force of water by rainwater gear outside balcony cornice, good water-proof effect.
Accompanying drawing explanation
Fig. 1 is the side sectional view after the utility model and balcony assemble.
Fig. 2 is the top view after the utility model and balcony assemble.
Shown in figure: 1, reinforcement component, 11, joint bar, 2, seat limit, 21, inclined-plane, 22, gutter, 3, upper edge, 4, lower extension, 5, railing post, 6, floor drain, 7, upper overturning, 8, lower flange, 81, drip, 9, balcony.
Detailed description of the invention
Below in conjunction with specification drawings and specific embodiments, the utility model is described in further detail.
Prefabricated balcony cornice as shown in Figure 1, after place of producer steel form formwork, one-time-concreting is shaping, then is transported to construction site, is installed to station, coordinates with balcony 9 by lifting.This prefabricated balcony cornice primarily of reinforcement component 1, seat limit 2, on form along 3 and lower extension 4, on formed along the front portion on 3 and all present limit 2 of lower extension 4.The rear portion of reinforcement component 1 is provided with evagination in the sidewall on seat limit 2 and the joint bar 11 that can be plugged in balcony 9.
Upper overturning 7 is formed along the front portion of 3 upper ends on described; The front portion of described lower extension 4 lower end forms lower flange 8, and the upper surface of lower flange 8 is outward-dipping, and the bottom surface of described lower flange 8 forms the drip 81 of indent.
The upper surface on described seat limit 2 forms the inclined-plane 21 mated with balcony 9 upper surface.Described seat limit 2 is offered the gutter 22 for water conservancy diversion; Floor drain 6 is also installed on described seat limit 2.
Along railing post 5 of planting on 3 on described.
Below be only described with regard to the utility model preferred embodiment, but can not be interpreted as it is limitations on claims.The utility model is not only confined to above embodiment, and its concrete structure allows to change.All various changes done in the protection domain of the utility model independent claims are all in protection domain of the present utility model.

Claims (4)

1. prefabricated balcony cornice, it is characterized in that: the seat limit (2) that it comprises reinforcement component (1), is above formed at reinforcement component (1) with concreting, the front portion of seat limit (2) forms the vertical upper edge (3) that arranges and lower extension (4), and the rear portion of reinforcement component (1) is provided with evagination in the sidewall of seat limit (2) and the joint bar (11) that can be plugged in balcony; The upper surface of described seat limit (2) forms the inclined-plane (21) mated with balcony upper surface.
2. prefabricated balcony cornice according to claim 1, is characterized in that: railing post (5) of planting in described upper edge (3).
3. prefabricated balcony cornice according to claim 1, is characterized in that: described seat limit (2) is offered the gutter (22) for water conservancy diversion; Floor drain (6) is also installed on described seat limit (2).
4. prefabricated balcony cornice according to claim 1, is characterized in that: the front portion of described upper edge (3) upper end forms upper overturning (7); The front portion of described lower extension (4) lower end forms lower flange (8), and the upper surface of lower flange (8) is outward-dipping, and the bottom surface of described lower flange (8) forms the drip (81) of indent.
CN201520042188.6U 2015-01-21 2015-01-21 prefabricated balcony cornice Expired - Fee Related CN204401907U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520042188.6U CN204401907U (en) 2015-01-21 2015-01-21 prefabricated balcony cornice

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520042188.6U CN204401907U (en) 2015-01-21 2015-01-21 prefabricated balcony cornice

Publications (1)

Publication Number Publication Date
CN204401907U true CN204401907U (en) 2015-06-17

Family

ID=53425782

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520042188.6U Expired - Fee Related CN204401907U (en) 2015-01-21 2015-01-21 prefabricated balcony cornice

Country Status (1)

Country Link
CN (1) CN204401907U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105064500A (en) * 2015-07-17 2015-11-18 南通德源建设工程科技有限公司 Balcony beam slab inner side filling wall body and main body structure integral casting construction method
CN111236554A (en) * 2020-01-20 2020-06-05 湖南宝家云建筑工程管理有限公司 One-step forming pouring method for cornice

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105064500A (en) * 2015-07-17 2015-11-18 南通德源建设工程科技有限公司 Balcony beam slab inner side filling wall body and main body structure integral casting construction method
CN105064500B (en) * 2015-07-17 2017-05-17 中如建工集团有限公司 Balcony beam slab inner side filling wall body and main body structure integral casting construction method
CN111236554A (en) * 2020-01-20 2020-06-05 湖南宝家云建筑工程管理有限公司 One-step forming pouring method for cornice
CN111236554B (en) * 2020-01-20 2022-02-11 湖南宝信云建筑综合服务平台股份有限公司 One-step forming pouring method for cornice

Similar Documents

Publication Publication Date Title
CN205100120U (en) Bury mounting structure of formula waterstop in box culvert
CN102041810B (en) Construction method for pouring dam foundation concrete in zone with centralized water gushing
CN204401907U (en) prefabricated balcony cornice
CN108999281A (en) A kind of novel precast concrete bean column node and its construction method
CN203270627U (en) Construction joint structure of shear wall
CN101886470B (en) Construction method of exposed concrete ribbed beams
CN201406834Y (en) Reserved opening die for top plate
CN107190781A (en) Horizontal joint waterproofing construction method is set up in large space basement roof post-cast strip
CN204982634U (en) Novel coal transporting trestle prevents sparge water pattern steel construction
CN207749588U (en) A kind of floor built-in type soil stack connector
CN205369714U (en) A constructional column structure that be used for at bottom of tie -beam with brick wall or floor
CN204356915U (en) The self waterproof structure that steel pipe column is crossing with concrete of basement exterior wall
CN204097885U (en) For the combined steel board fixing structure of ring road bridge anti-collision wall construction
CN209082681U (en) A kind of prefabricated assembled bay window constructing structure of residential building
CN202689365U (en) Prefabricated reinforced concrete roof gutter
CN207453460U (en) A kind of big drop plate formwork erecting structure of structure
CN203361191U (en) Basement exterior wall structure
CN205875876U (en) Triangle angle steel communication steel tower mast prevent wind fixing base
CN206408743U (en) A kind of assembly concrete node
CN205100354U (en) Side slope with escape canal
CN105019656A (en) Construction method for floor system concrete post-cast strip suspended formwork
CN205205644U (en) Stride river bridge cable steel frame construction
CN204982938U (en) Do benefit to gravity retaining wall who builds artistic view
CN204282550U (en) Outdoor flush joint combined water guide deformation joint structure
CN204662362U (en) Riverbed type factory building normal state concrete water retaining structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181122

Address after: Room 323, 3-storey P District, 15 Building 7888 Waiqingsong Highway, Qingpu District, Shanghai, 20107

Patentee after: SHANGHAI KECHENG CONSTRUCTION ENGINEERING Co.,Ltd.

Address before: No. 3568 Qiju Road, Minhang District, Shanghai, 2010

Patentee before: SHANGHAI WANSHUANG BUILDING TECHNOLOGY CO.,LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150617

Termination date: 20220121