CN205100354U - Side slope with escape canal - Google Patents
Side slope with escape canal Download PDFInfo
- Publication number
- CN205100354U CN205100354U CN201520893788.3U CN201520893788U CN205100354U CN 205100354 U CN205100354 U CN 205100354U CN 201520893788 U CN201520893788 U CN 201520893788U CN 205100354 U CN205100354 U CN 205100354U
- Authority
- CN
- China
- Prior art keywords
- slope
- ditch
- anchor
- drainage
- side slope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
本实用新型公开了一种设有排水沟的边坡,包括设置在边坡外侧的排水沟及用于支撑排水沟的支撑件,所述支撑件锚固在边坡上。将排水沟锚固在边坡上,结构简单,施工方便,造价低,可以增加边坡的安全性。
The utility model discloses a side slope provided with a drainage ditch, which comprises a drainage ditch arranged outside the side slope and a support for supporting the drainage ditch, and the support is anchored on the side slope. Anchoring the drainage ditch on the slope has simple structure, convenient construction and low cost, which can increase the safety of the slope.
Description
技术领域 technical field
本实用新型涉及一种设有排水沟的边坡,属于边坡排水领域。 The utility model relates to a side slope provided with drainage ditches, which belongs to the field of side slope drainage.
背景技术 Background technique
排水系统的设计是边坡设计的一个重要环节。如果排水系统不健全,很有可能造成边坡的失稳。排水沟是排水系统常用的排水通道,设于马道上作为横向排水通道。下雨时,坡面上的水沿着坡面,边坡内的水通过排水管到达排水沟,最终通过排水沟排出坡面。 The design of drainage system is an important part of slope design. If the drainage system is not perfect, it is likely to cause the instability of the slope. The drainage ditch is a common drainage channel in the drainage system, and it is set on the horse track as a horizontal drainage channel. When it rains, the water on the slope follows the slope, and the water in the slope reaches the drainage ditch through the drainage pipe, and finally discharges the slope through the drainage ditch.
由于征地范围、开挖边界的限制,边坡上常常无足够的位置设马道,或者由于地质条件的约束等,造成了马道垮塌,使得边坡的横向排水设施破坏,尤其是对高边坡而言,存在着巨大的安全隐患。 Due to the limitation of land expropriation scope and excavation boundary, there is often not enough space to set up a horse track on the slope, or due to the constraints of geological conditions, etc., the horse track collapses and the lateral drainage facilities of the slope are damaged, especially for high slopes. In other words, there is a huge security risk.
实用新型内容 Utility model content
本实用新型解决的技术问题是,在未设马道以及马道垮塌的高边坡上设置排水沟。 The technical problem solved by the utility model is to set drainage ditches on the high side slopes where the bridleway has not been set up or the bridleway has collapsed.
本实用新型的技术方案是,提供一种设有排水沟的边坡,包括设置在边坡外侧的排水沟及用于支撑排水沟的支撑件,所述支撑件锚固在边坡上。 The technical solution of the utility model is to provide a side slope provided with a drainage ditch, including a drainage ditch arranged outside the side slope and a support for supporting the drainage ditch, and the support is anchored on the side slope.
进一步地,边坡上固定一排水平的第一锚杆和一排垂直边坡坡面的第二锚杆,第一锚杆位于第二锚杆的上方,在边坡上设包含第一锚杆和第二锚杆在内的支撑混凝土,在支撑混凝土的上方设排水沟。 Further, a row of horizontal first anchor rods and a row of second anchor rods vertical to the slope surface are fixed on the slope, the first anchor rods are located above the second anchor rods, and the first anchor rods are set on the slope. The supporting concrete including the rod and the second anchor rod is provided with a drainage ditch above the supporting concrete.
进一步地,所述排水沟与支撑混凝土由浇筑混凝土一体成型。 Further, the drainage ditch and the supporting concrete are integrally formed by pouring concrete.
进一步地,所述排水沟包括第一沟壁、第二沟壁与沟底,第一沟壁沿边坡的坡面设置。 Further, the drainage ditch includes a first ditch wall, a second ditch wall and a ditch bottom, and the first ditch wall is arranged along the slope of the side slope.
进一步地,在第一锚杆和第二锚杆上固定连接竖直的钢筋网,钢筋网的顶端高于第一锚杆,沟底由包含第一锚杆在内的浇筑混凝土制成,第二沟壁由包含钢筋网在内的浇筑混凝土制成。 Further, the vertical reinforcement mesh is fixedly connected to the first anchor rod and the second anchor rod, the top of the reinforcement mesh is higher than the first anchor rod, and the bottom of the ditch is made of poured concrete including the first anchor rod. The walls of the second ditch are made of poured concrete including steel mesh.
进一步地,所述钢筋网由横向钢筋与竖向钢筋焊接。 Further, the steel mesh is welded by transverse steel bars and vertical steel bars.
进一步地,所述第一沟壁由喷射混凝土制成。 Further, the first ditch wall is made of shotcrete.
本实用新型先在边坡上将第一锚杆和第二锚杆设置在边坡上,然后在锚杆上设置模板,用混凝土制成排水沟。在锚杆上连接钢筋网,再浇筑混凝土,可以提高排水沟的强度。锚杆可与边坡原支护所用的锚杆结合使用。排水沟的第一沟壁是沿边坡的坡面设置,边坡上的水可以容易地流入排水沟,第一沟壁可以用喷射混凝土制作,可以防止雨水对边坡坡面的冲刷。 The utility model first arranges the first anchor rod and the second anchor rod on the side slope, and then sets a formwork on the anchor rod, and makes the drainage ditch with concrete. Connecting the steel mesh on the anchor rod and then pouring concrete can improve the strength of the drainage ditch. The bolts can be used in combination with the bolts used for the original support of the slope. The first ditch wall of the drainage ditch is arranged along the slope surface of the side slope, and the water on the side slope can easily flow into the drainage ditch. The first ditch wall can be made of shotcrete, which can prevent rainwater from scouring the side slope surface.
本实用新型的有益效果是,在边坡上设排水沟,结构简单,施工方便,造价低,可以增加边坡的安全性。 The beneficial effect of the utility model is that the drainage ditch is arranged on the side slope, the structure is simple, the construction is convenient, the cost is low, and the safety of the side slope can be increased.
附图说明 Description of drawings
图1表示本实用新型提供的设有排水沟的边坡的竖向剖面图。 Fig. 1 shows the vertical sectional view of the side slope provided by the utility model that is provided with drainage ditches.
具体实施方式 detailed description
下面结合附图和实施例对本实用新型作进一步说明。 Below in conjunction with accompanying drawing and embodiment the utility model is further described.
本实用新型提供一种设有排水沟的边坡,其结构如图1所示,边坡上固定一排水平的第一锚杆1和一排垂直边坡坡面3的第二锚杆2,第一锚杆1位于第二锚杆2的上方,在边坡上设包含第一锚杆1和第二锚杆2在内的支撑混凝土4,在支撑混凝土4的上方设排水沟5,排水沟5与支撑混凝土4由浇筑混凝土一体成型。排水沟5包括第一沟壁51、第二沟壁52与沟底53,第一沟壁51用喷射混凝土喷在边坡的坡面3上制成。第二沟壁52内设竖直的钢筋网,钢筋网与第一锚杆1和第二锚杆2连接,钢筋网由横向钢筋6和竖向钢筋7焊接而成。 The utility model provides a side slope provided with drainage ditches, its structure is shown in Figure 1, a row of horizontal first anchor rods 1 and a row of second anchor rods 2 vertical to the slope surface 3 are fixed on the side slope , the first anchor 1 is located above the second anchor 2, the supporting concrete 4 including the first anchor 1 and the second anchor 2 is set on the slope, and a drainage ditch 5 is established above the supporting concrete 4, The gutter 5 and the supporting concrete 4 are integrally formed by pouring concrete. The drainage ditch 5 includes a first ditch wall 51 , a second ditch wall 52 and a ditch bottom 53 , and the first ditch wall 51 is made by spraying shotcrete on the slope surface 3 of the slope. Vertical reinforcement mesh is arranged in the second ditch wall 52, and the reinforcement mesh is connected with the first anchor rod 1 and the second anchor rod 2, and the reinforcement mesh is formed by welding the horizontal reinforcement bar 6 and the vertical reinforcement bar 7.
该边坡上设排水沟的施工方法如下:先沿着垂直边坡方向打一排第二锚杆2,再在第二锚杆2上方沿水平方向打一排第一锚杆1,第一锚杆1和第二锚杆2均预留外露在边坡上的部分长度;用横向钢筋6和竖向钢筋7焊接成钢筋网,将钢筋网绑扎或焊接在外露在边坡上的第一锚杆1和第二锚杆2上;第二锚杆2既可用于边坡的支护,又可作为排水沟的支撑;最后再铺设模板,并浇筑混凝土,再排水沟5沿坡面3的一侧喷射混凝土得到排水沟5的第一沟壁51。 The construction method of establishing drainage ditches on the slope is as follows: first, a row of second anchor rods 2 is drilled along the vertical direction of the slope, and then a row of first anchor rods 1 is punched horizontally above the second anchor rods 2. Both the anchor rod 1 and the second anchor rod 2 reserve part of the length exposed on the slope; the transverse reinforcement 6 and the vertical reinforcement 7 are welded into a reinforcement mesh, and the reinforcement mesh is bound or welded on the first exposed slope. On the anchor rod 1 and the second anchor rod 2; the second anchor rod 2 can be used not only for the support of the slope, but also as the support of the drainage ditch; finally lay the formwork, and pour concrete, and then the drainage ditch 5 along the slope surface The first ditch wall 51 of the gutter 5 is obtained by spraying concrete on one side of the ditch.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520893788.3U CN205100354U (en) | 2015-11-11 | 2015-11-11 | Side slope with escape canal |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520893788.3U CN205100354U (en) | 2015-11-11 | 2015-11-11 | Side slope with escape canal |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205100354U true CN205100354U (en) | 2016-03-23 |
Family
ID=55516143
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520893788.3U Expired - Lifetime CN205100354U (en) | 2015-11-11 | 2015-11-11 | Side slope with escape canal |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205100354U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111764412A (en) * | 2020-07-14 | 2020-10-13 | 中国水利水电科学研究院 | A slope protection system for the ebb and flow zone of the reservoir area |
| CN113186949A (en) * | 2021-04-27 | 2021-07-30 | 中国电建集团成都勘测设计研究院有限公司 | Drainage and guide slope protection system for high and steep rock slope |
-
2015
- 2015-11-11 CN CN201520893788.3U patent/CN205100354U/en not_active Expired - Lifetime
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111764412A (en) * | 2020-07-14 | 2020-10-13 | 中国水利水电科学研究院 | A slope protection system for the ebb and flow zone of the reservoir area |
| CN113186949A (en) * | 2021-04-27 | 2021-07-30 | 中国电建集团成都勘测设计研究院有限公司 | Drainage and guide slope protection system for high and steep rock slope |
| CN113186949B (en) * | 2021-04-27 | 2025-05-27 | 中国电建集团成都勘测设计研究院有限公司 | Drainage and slope protection system for high and steep rock slopes |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205742213U (en) | Foundation pit supporting construction | |
| CN104947686B (en) | Support structure of basement in soft soil area | |
| CN102535519A (en) | I-shaped steel joint structure for underground continuous wall and construction method for I-shaped steel joint structure | |
| CN106836240B (en) | Basement annular brace construction method for supporting | |
| CN104594946A (en) | Water-rich narrow tunnel water drainage structure under soft surrounding rock condition | |
| CN201567582U (en) | A water-saving device for foundation pit dewatering | |
| CN103122642B (en) | Construction method of vertical post support change | |
| CN105951874B (en) | A kind of retaining wall reinforcement structure and its construction method | |
| CN204825928U (en) | Excavation supporting | |
| CN103741651B (en) | A kind of concrete teeth groove stiling basin and construction method thereof | |
| CN205100354U (en) | Side slope with escape canal | |
| CN212225231U (en) | Protective structure for bias tunnel portal | |
| CN108589769A (en) | A kind of embedding rock T shapes combined type column plate high gear wall construction method of overlength | |
| CN205907658U (en) | Be used for anti - structure that seeps water of concrete -faced rockfill dam construction time dam body | |
| CN118668715A (en) | Foundation pit water-stop supporting device and dewatering construction method thereof | |
| CN108729526B (en) | The construction method of longitudinal drainage canal is built on a kind of rickle | |
| CN207004520U (en) | A kind of robust structure of subway protection area shaft excavation | |
| CN204040163U (en) | cable trench drainage structure | |
| CN204781274U (en) | Tunnel portal faces upward on limit sloping catch water drain structure | |
| CN205171281U (en) | An embankment formula U type fender structure | |
| CN205502070U (en) | A dual -purpose underground gallery structure | |
| CN104153452B (en) | Cable trench drainage structure and cable trench construction method | |
| CN204825938U (en) | Local precipitation device of foundation ditch | |
| CN214940457U (en) | Device for controlling floating of bottom plate of pit in region rich in underground water | |
| CN108677891A (en) | Rock-fill dam body spillway antiskid structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term |
Granted publication date: 20160323 |
|
| CX01 | Expiry of patent term |