CN205100527U - A cantilever construction platform for surmounting retaining wall - Google Patents

A cantilever construction platform for surmounting retaining wall Download PDF

Info

Publication number
CN205100527U
CN205100527U CN201520882289.4U CN201520882289U CN205100527U CN 205100527 U CN205100527 U CN 205100527U CN 201520882289 U CN201520882289 U CN 201520882289U CN 205100527 U CN205100527 U CN 205100527U
Authority
CN
China
Prior art keywords
platform
horizontal rectangle
longeron
horizontal rectangular
supporting beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520882289.4U
Other languages
Chinese (zh)
Inventor
钱栋栋
冀文有
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Construction Engineering Co Ltd
Original Assignee
CNR Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNR Construction Engineering Co Ltd filed Critical CNR Construction Engineering Co Ltd
Priority to CN201520882289.4U priority Critical patent/CN205100527U/en
Application granted granted Critical
Publication of CN205100527U publication Critical patent/CN205100527U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a cantilever construction platform for surmounting retaining wall, including crossbeam, perpendicular roof beam, longeron, oblique supporting beam, ledger board, reinforcement connecting piece and pre -buried screw rod, the crossbeam of about two interval settings passes through respectively pre -buried screw rod vertical fixation is on wall to the longeron that sets up with two front and back intervals encloses into a horizontal rectangle frame, two at least horizontal rectangle frames, and just the adjacent horizontal rectangle frame in interval passes through to control the continuous formation platform skeleton of two perpendicular roof beams that the interval set up from top to bottom, the interval is provided with two oblique supporting beam about the below of every horizontal rectangle frame, and the oblique supporting beam who is located the horizontal rectangle frame of the bottom installs at wall, and the oblique supporting beam of all the other horizontal rectangle frames installs on the platform skeleton, crossbeam, longeron, the connection position that erects between roof beam, the oblique supporting beam link to each other through the reinforcement connecting piece, and every horizontal rectangle frame upper berth is equipped with the ledger board forms operation platform. Effective construction input that reduces improves construction efficiency and construction quality, increases the construction security.

Description

For the cantilever construction platform of retaining Wall
Technical field
The utility model belongs to building field, specifically, is a kind of cantilever construction platform structure for retaining Wall.
Background technology
In the past when retaining Wall is constructed, mainly at wall body both sides or one-sided double-pole scaffold of setting up as operating platform, there is very large limitation when this method is constructed in complicated landform.One is when retaining wall is positioned at abrupt slope or edge, stream, needs first scaffold based process to be carried out on abrupt slope or stream; When being positioned at abrupt slope, a large amount of cubic metre of earth and stone need be backfilled, and carry out effective basement process; When being positioned at edge, stream, interim guide measure need be increased, and support body base position is carried out excavation and change and fill out, waste a large amount of human and material resources, support needs to carry out long foundation settlement survey after setting up, and scaffold operating platform exists very large security risk in whole work progress.Two is utilize scaffold building operating platform to construct, and every layer of scaffold need be set up along with the lifting flowing water of wall body template, and sets up lower floor's scaffold wall connecting piece, and the time of setting up is longer, and supporting frame material drops into and labour cost is higher.
Utility model content
The utility model aims to provide a kind of cantilever construction platform for retaining Wall, can improve construction efficiency, construction quality and working security, and reduce construction cost.
For this reason, the technical scheme that the utility model adopts is: a kind of cantilever construction platform for retaining Wall, comprise crossbeam, vertical beam, longeron, raker beam, scaffold floor, reinforcement connector and pre embedded bolt, about two spaced crossbeams are vertically fixed on respectively by described pre embedded bolt with it wall, and surround a horizontal rectangular frame with the longeron that two time intervals are arranged, at least two horizontal rectangular frames, and be connected to form platform skeleton every adjacent horizontal rectangular frame by spaced two vertical beams in left and right between the upper and lower; Be arranged at intervals with two raker beam about the below of each horizontal rectangular frame, the raker beam being positioned at the horizontal rectangular frame of the bottom is arranged on it wall, and the raker beam of all the other horizontal rectangular frames is arranged on platform skeleton; Connecting portion between described crossbeam, longeron, vertical beam, raker beam is connected by reinforcement connector, each horizontal rectangular frame is equipped with described scaffold floor and forms operating platform.
Preferred as such scheme, cat ladder and guard rail are installed in the sky side of facing of described operating platform.
The beneficial effects of the utility model are: compared with prior art, effectively can solving scaffold operating platform in traditional construction, to set up based process difficulty large, wall-connecting piece is not easily arranged, operation support body sets up difficult problems such as having high input, long in time limit and security risk is high, and makes simple, can Integral lifting, repeatedly have enough to meet the need, effective reduction construction drops into, and improves construction efficiency and construction quality, increases working security.
Accompanying drawing explanation
Fig. 1 is stereogram of the present utility model.
Fig. 2 is left view of the present utility model.
Detailed description of the invention
Below by embodiment also by reference to the accompanying drawings, the utility model is described in further detail:
Shown in composition graphs 1, Fig. 2, a kind of cantilever construction platform for retaining Wall, primarily of compositions such as crossbeam 1, vertical beam 2, longeron 3, raker beam 4, scaffold floor 5, reinforcement connector 6 and pre embedded bolts 7.
About two spaced crossbeams 1 are vertically fixed on respectively by pre embedded bolt 7 with it wall, and surround a horizontal rectangular frame with the longeron 3 that two time intervals are arranged, cantilever construction platform is at least made up of two horizontal rectangular frames, but is not limited to two, can be three or more.Between the upper and lower every setting between horizontal rectangular frame.Platform skeleton is connected to form by spaced two vertical beams 2 in left and right between the upper and lower every adjacent horizontal rectangular frame.
Be arranged at intervals with two raker beam 4 about the below of each horizontal rectangular frame, except the lower end of the raker beam 4 of the horizontal rectangular frame of the bottom be arranged on wall with it except, the termination of the raker beam 4 of all the other horizontal rectangular frames is installed on platform skeleton; Connecting portion between crossbeam 1, longeron 3, vertical beam 2, raker beam 4 is connected by reinforcement connector 6, each horizontal rectangular frame is equipped with scaffold floor 5 and forms operating platform.
Preferably, cat ladder 8 and guard rail 9 are installed in the sky side of facing of operating platform.
After platform has been assembled, can Integral lifting in work progress, be hoisted through pre embedded bolt 7 by crossbeam 1 and retaining wall structure consolidation at every turn.

Claims (2)

1. the cantilever construction platform for retaining Wall, it is characterized in that: comprise crossbeam (1), vertical beam (2), longeron (3), raker beam (4), scaffold floor (5), reinforcement connector (6) and pre embedded bolt (7), about two spaced crossbeams (1) are vertically fixed on respectively by described pre embedded bolt (7) with it wall, and surround a horizontal rectangular frame with the longeron (3) that two time intervals are arranged, at least two horizontal rectangular frames, and be connected to form platform skeleton every adjacent horizontal rectangular frame by spaced two vertical beams (2) in left and right between the upper and lower, two raker beam (4) are arranged at intervals with about the below of each horizontal rectangular frame, the raker beam (4) being positioned at the horizontal rectangular frame of the bottom is arranged on it wall, and the raker beam (4) of all the other horizontal rectangular frames is arranged on platform skeleton, connecting portion between described crossbeam (1), longeron (3), vertical beam (2), raker beam (4) is connected by reinforcement connector (6), each horizontal rectangular frame is equipped with described scaffold floor (5) and forms operating platform.
2. the cantilever construction platform for retaining Wall according to claim 1, is characterized in that: cat ladder (8) and guard rail (9) are installed in the sky side of facing of described operating platform.
CN201520882289.4U 2015-11-06 2015-11-06 A cantilever construction platform for surmounting retaining wall Active CN205100527U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520882289.4U CN205100527U (en) 2015-11-06 2015-11-06 A cantilever construction platform for surmounting retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520882289.4U CN205100527U (en) 2015-11-06 2015-11-06 A cantilever construction platform for surmounting retaining wall

Publications (1)

Publication Number Publication Date
CN205100527U true CN205100527U (en) 2016-03-23

Family

ID=55516315

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520882289.4U Active CN205100527U (en) 2015-11-06 2015-11-06 A cantilever construction platform for surmounting retaining wall

Country Status (1)

Country Link
CN (1) CN205100527U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107354953A (en) * 2017-07-07 2017-11-17 安徽省新路建设工程集团有限责任公司 Concrete rib band and the reinforced Retaining wall structure of intensive aspect and construction method
CN113863364A (en) * 2021-09-13 2021-12-31 华能(浙江)能源开发有限公司清洁能源分公司 Retaining wall construction device and retaining wall construction method
CN114165034A (en) * 2021-11-12 2022-03-11 中建新疆建工集团第五建筑工程有限公司 Telescopic elevator construction platform easy to disassemble and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107354953A (en) * 2017-07-07 2017-11-17 安徽省新路建设工程集团有限责任公司 Concrete rib band and the reinforced Retaining wall structure of intensive aspect and construction method
CN107354953B (en) * 2017-07-07 2019-05-31 安徽省新路建设工程集团有限责任公司 Concrete rib band and the reinforced Retaining wall structure of intensive aspect and construction method
CN113863364A (en) * 2021-09-13 2021-12-31 华能(浙江)能源开发有限公司清洁能源分公司 Retaining wall construction device and retaining wall construction method
CN114165034A (en) * 2021-11-12 2022-03-11 中建新疆建工集团第五建筑工程有限公司 Telescopic elevator construction platform easy to disassemble and construction method thereof

Similar Documents

Publication Publication Date Title
CN104806011B (en) Raft board post poured band formwork for placing
CN205100527U (en) A cantilever construction platform for surmounting retaining wall
CN203174619U (en) Reverse raft concrete terrace
CN207749908U (en) A kind of enclosure wall of full assembly lightweight steel construction
CN105133575B (en) Suspended formwork supporting device for casting lining on surface of underground continuous wall and construction method
CN204112346U (en) High slope massif grid beams under complex geological condition
CN210216163U (en) Self-supporting cantilever formwork support system
CN205062817U (en) Landing stage with combination of excavation supporting system
CN102864796B (en) Construction spreading foundation adaptive to filled ground settlement and construction method
CN204690763U (en) Long side slope protection concrete continuous fast pouring drawing-die system
CN203334301U (en) Cave slope strengthening protection structure
CN205100242U (en) Three laminar cantilever operation platform systems
CN204000885U (en) Metro Deep Excavation concrete support hangs mould mould
CN203905331U (en) Cast-in-place plate-type staircase with seamless steps
CN211646413U (en) Modular lattice steel frame shotcrete anchor supporting construction
CN203222804U (en) Composite plate type composite anti-skidding structure
CN203531349U (en) Novel high-bearing easily-dismantled overhanging type scaffold
CN206753140U (en) A kind of body frame structure of the fermentation computer room of structure optimization
CN203755165U (en) Bracket structure for steel pipe pile
CN206873470U (en) A kind of high slope rockmass structure
CN206308623U (en) A kind of Cast-in-situ Beam falsework for soft base matter
CN206736743U (en) Lay the easy structure of mountable steel bridge
CN205116774U (en) Harmless cutting demolition structure of interior supporting rope saw
CN206288820U (en) The mounting structure of the wall-attached frame of building hoist
CN204780967U (en) Be applied to high board position raft board basis of transformer substation's complex building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100078 Beijing city Fengtai District park is a district 15 building five floor 501, 503

Patentee after: ZHONGCHE CONSTRUCTION ENGINEERING CO., LTD.

Address before: 100078 Beijing city Fengtai District park is a district 15 building five floor 501, 503

Patentee before: CNR Construction Engineering Co., Ltd.