CN108951672A - A kind of structure of voltage regulation that catchments for grouting construction - Google Patents
A kind of structure of voltage regulation that catchments for grouting construction Download PDFInfo
- Publication number
- CN108951672A CN108951672A CN201810872158.6A CN201810872158A CN108951672A CN 108951672 A CN108951672 A CN 108951672A CN 201810872158 A CN201810872158 A CN 201810872158A CN 108951672 A CN108951672 A CN 108951672A
- Authority
- CN
- China
- Prior art keywords
- catchment covers
- voltage regulation
- grouting construction
- catchments
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/22—Lining sumps in trenches or other foundation pits
Abstract
The invention discloses a kind of structure of voltage regulation that catchments for grouting construction, it is related to plasma pouring constructing skill field, water burst drives the cement slurry of injection constantly to gush out when for grouting construction, the technical issues of causing grouting quality decline that can not even be in the milk, catch pit is offered using the position of the upper surface seepage point concentration in foundation pit bottom, catchment covers are fixedly installed on catch pit, it is connected at the top of catchment covers with balance pipe, the filler that can be seeped water is provided in catchment covers, fill concrete layer is covered on the scheme on catchment covers.It is interconnected using catch pit, catchment covers and balance pipe, water burst can effectively be collected, when the water in catch pit gradually increases, enter catchment covers and balance pipe by filler gap, water level in balance pipe gradually increases the state being finally reached with water burst hydraulic balance, after hydraulic balance, water burst, which will be reduced, even to disappear, to ensure that going on smoothly and capable of guaranteeing construction quality for grouting works.
Description
Technical field
The present invention relates to plasma pouring constructing skill field, in particular to a kind of structure of voltage regulation that catchments for grouting construction.
Background technique
Consolidation grouting be in order to improve developmental joint fissure or have crushed zone rock physical and mechanical property and carry out
Grouting works.For karst as the natural phenomena formed under a kind of special geological conditions, it is each that karst can form scale in rock mass
Different weak structural face or cave, weakens the globality of rock foundation, and there are leakage problems, underground chamber is collapsed and gushed suddenly
Water gushes mud, roof fall problem, and the engineering problems such as foundation stability bring many hazards to engineering construction.
Development of resources, great infrastructure development project with the needs of socio-economic development, in above-mentioned karst area
It will be more and more.Water conservancy, traffic and urban operating mechanism project are mainly characterized by high to ground requirement for bearing capacity;Ground generallys use
Under the action of earth's surface and ground water pressure, it is mixed to be located at backfill since construction location is lower than earth's surface for the form of heavy excavation, deep basal pit
Often there is water burst at solidifying soil layer, these water bursts drive the cement slurry injected when grouting construction constantly to gush out, and lead to grouting quality
Decline can not even be in the milk.
Summary of the invention
The present invention provides a kind of structure of voltage regulation that catchments for grouting construction, opens greatly to solve to generally use in ground
It digs, under the form of deep basal pit, since construction location is lower than earth's surface, fill concrete is located under the action of earth's surface and ground water pressure
Often there is water burst at layer, these water bursts drive the cement slurry injected when grouting construction constantly to gush out, and grouting quality is caused to decline
The technical issues of can not being even in the milk.
To solve the above problems, the present invention adopts the following technical scheme that realization:
A kind of structure of voltage regulation that catchments for grouting construction is equipped with backfill coagulation including foundation pit and in the upper surface of foundation pit bottom
Soil layer, and the grout hole opened up in foundation pit bottom are opened up in the position that the upper surface seepage point of the foundation pit bottom is concentrated
There is catch pit;
Catchment covers are fixedly installed on the catch pit;
It is connected at the top of the catchment covers with balance pipe;
The filler that can be seeped water is provided in the catchment covers, the fill concrete layer is covered on the catchment covers.
It is interconnected, water burst can effectively be collected, when the water in catch pit using catch pit, catchment covers and balance pipe
When gradually increasing, enter catchment covers and balance pipe by filler gap, the water level in balance pipe gradually increase be finally reached with
The state of water burst hydraulic balance, after hydraulic balance, water burst, which will be reduced, even to disappear, to ensure that the smooth of grouting works
It carries out and can guarantee construction quality.
Preferably, the catchment covers are funnel-shaped structure, and big open end is downward.
Water burst is collected convenient for more large area using funnel structure and is introduced in balance pipe convenient for concentrating.
Preferably, the catchment covers are made using steel.
Catchment covers are made using steel, are able to bear biggish pressure, very helpful for the stabilization of structure.
Preferably, the balance pipe is steel pipe, and described steel pipe one end and the catchment covers top are welded.
Steel pipe is common engineered building materials, can be faster using welding manner using steel pipe convenient for construction and operation
Speed is more efficiently constructed.
Preferably, the diameter of steel tube is 150mm, thickness of pipe wall 6mm.
Preferably, the catch pit depth is less than 3m.
Catch pit depth is less than 3m, and this is the best practices value summed up in long-term engineering practice, and such depth can expire
The existing duty requirements of foot.
Preferably, the balance pipe upper end is provided with screw thread, is connected through a screw thread the length for being able to extend the balance pipe.
The length of balance pipe can be quicklyd increase using thread connecting mode, improve working efficiency.
Preferably, the filler includes sand, stone.
Sand, stone are the most common materials in building site, and they have certain load-bearing capacity and water permeable ability.
Preferably, the filler is constituted using geotextiles package gravel.
Preferably, the fill concrete layer uses C15 concrete.
Beneficial effect of the present invention includes:
Structure is simple, low in cost, easy to operate, and stability is good, convenient for assembling.
Detailed description of the invention
Fig. 1 is embodiment construction scene figure provided by the invention;
Fig. 2 is example structure schematic diagram provided by the invention.
In figure, each label is respectively indicated:
Foundation pit bottom 1, seepage point 11, catch pit 12, fill concrete layer 2, balance pipe 3, catchment covers 30, is filled out penetrating passage 10
Fill object 31, grout hole 4.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with attached in the embodiment of the present invention
Figure, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is the present invention
A part of the embodiment, instead of all the embodiments.The embodiment of the present invention being usually described and illustrated herein in the accompanying drawings
Detailed description is not intended to limit the range of claimed invention, but is merely representative of selected embodiment of the invention.Base
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts it is all its
His embodiment, shall fall within the protection scope of the present invention.
As depicted in figs. 1 and 2, a kind of structure of voltage regulation that catchments for grouting construction, foundation pit bottom 1 in foundation pit it is upper
The position that surface seepage point 11 is concentrated offers catch pit 12, and the depth of general catch pit 12 is no more than 3 meters, and the diameter view in hole is existing
Depending on seepage point is how many, if seepage point mostly just excavate it is big some seepage point can be excavated a little bit smaller if lacking, do not do and have herein
Body limits.
It is placed with the filler 31 that water penetration can be allowed to cross gap using geotextiles package gravel in catch pit 12, needs to infuse
Meaning, as long as the filler 31 can seep water and have certain load-bearing capacity can be have to be not necessarily geotextiles
Wrap up the mode of gravel.Filler 31 is covered by catchment covers 30, and catchment covers 30 are the funnel-shaped structures made of steel, big
Opening is fixedly connected and is connected to balance pipe 3 by welding manner in small opening towards covered with filler 31.Balance pipe 3 is
Use diameter made of steel pipe for 150mm, thickness of pipe wall is the tubing of 6mm, is vertically established on foundation pit bottom 1, the upper end of pipe
Mode can be connected through a screw thread and realize extension.The upper surface of foundation pit bottom 1 and catchment covers 30 pass through the backfill of model C15
Concrete layer 2 wraps.
In use, as shown in Figure 1, underground water is along the water in the entrance catch pit 12 of penetrating passage 10, in catch pit 12
When gradually increasing, enter catchment covers 30 and balance pipe 3 by 31 gap of filler, the water level in balance pipe 3 gradually increases finally
Reach the state with water burst hydraulic balance, after hydraulic balance, water burst, which will be reduced, even to disappear, at this time can be toward grout hole
Cement slurry is poured into 4, because of hydraulic balance, therefore water flow will not be occurred without very big infiltration water flow and be asked what cement slurry was taken away
Topic, to ensure that going on smoothly and capable of guaranteeing construction quality for grouting works.
Claims (10)
1. a kind of structure of voltage regulation that catchments for grouting construction is equipped with back including foundation pit and in the upper surface of foundation pit bottom (1)
It fills out concrete layer (2), and the grout hole (4) opened up in foundation pit bottom (1), it is characterised in that:
Catch pit (12) are offered in the position that the upper surface seepage point (11) of the foundation pit bottom (1) is concentrated;
Catchment covers (30) are fixedly installed on the catch pit (12);
It is connected at the top of the catchment covers (30) with balance pipe (3);
The filler (31) that can be seeped water is provided in the catchment covers (30), the fill concrete layer (2) is covered on described
On catchment covers (30).
2. the structure of voltage regulation that catchments according to claim 1 for grouting construction, it is characterised in that:
The catchment covers (30) are funnel-shaped structure, and big open end is downward.
3. the structure of voltage regulation that catchments according to claim 2 for grouting construction, it is characterised in that:
The catchment covers (30) are made using steel.
4. the structure of voltage regulation that catchments according to claim 1 for grouting construction, it is characterised in that:
The balance pipe (3) is steel pipe, and described steel pipe one end and the catchment covers (30) top are welded.
5. the structure of voltage regulation that catchments according to claim 4 for grouting construction, it is characterised in that:
The diameter of steel tube is 150mm, thickness of pipe wall 6mm.
6. the structure of voltage regulation that catchments according to claim 1 for grouting construction, it is characterised in that:
Catch pit (12) depth is less than 3m.
7. the structure of voltage regulation that catchments according to claim 1 for grouting construction, it is characterised in that:
Balance pipe (3) upper end is provided with screw thread, is connected through a screw thread the length for being able to extend the balance pipe (3).
8. the structure of voltage regulation that catchments according to claim 1 for grouting construction, it is characterised in that:
The filler (31) includes sand, stone.
9. the structure of voltage regulation that catchments according to claim 1 for grouting construction, it is characterised in that:
The filler (31) is constituted using geotextiles package gravel.
10. the structure of voltage regulation that catchments according to claim 1 for grouting construction, it is characterised in that:
The fill concrete layer (2) uses C15 concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810872158.6A CN108951672A (en) | 2018-08-02 | 2018-08-02 | A kind of structure of voltage regulation that catchments for grouting construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810872158.6A CN108951672A (en) | 2018-08-02 | 2018-08-02 | A kind of structure of voltage regulation that catchments for grouting construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108951672A true CN108951672A (en) | 2018-12-07 |
Family
ID=64467187
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810872158.6A Pending CN108951672A (en) | 2018-08-02 | 2018-08-02 | A kind of structure of voltage regulation that catchments for grouting construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108951672A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101245886A (en) * | 2008-03-13 | 2008-08-20 | 武汉京冶地基基础工程有限责任公司 | Processing method for deep building pit piping |
CN102041810A (en) * | 2010-12-22 | 2011-05-04 | 中国水电顾问集团华东勘测设计研究院 | Construction method for pouring dam foundation concrete in zone with centralized water gushing |
CN205387712U (en) * | 2016-02-04 | 2016-07-20 | 上海建浩工程顾问有限公司 | Quick treatment device of foundation pit piping |
CN105780793A (en) * | 2016-04-06 | 2016-07-20 | 中建交通建设集团有限公司 | Emergency treatment method for sudden gushing of high confined water stratum foundation pit |
CN208870062U (en) * | 2018-08-02 | 2019-05-17 | 中国铁建港航局集团有限公司 | A kind of structure of voltage regulation that catchments for grouting construction |
-
2018
- 2018-08-02 CN CN201810872158.6A patent/CN108951672A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101245886A (en) * | 2008-03-13 | 2008-08-20 | 武汉京冶地基基础工程有限责任公司 | Processing method for deep building pit piping |
CN102041810A (en) * | 2010-12-22 | 2011-05-04 | 中国水电顾问集团华东勘测设计研究院 | Construction method for pouring dam foundation concrete in zone with centralized water gushing |
CN205387712U (en) * | 2016-02-04 | 2016-07-20 | 上海建浩工程顾问有限公司 | Quick treatment device of foundation pit piping |
CN105780793A (en) * | 2016-04-06 | 2016-07-20 | 中建交通建设集团有限公司 | Emergency treatment method for sudden gushing of high confined water stratum foundation pit |
CN208870062U (en) * | 2018-08-02 | 2019-05-17 | 中国铁建港航局集团有限公司 | A kind of structure of voltage regulation that catchments for grouting construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108589718B (en) | Piles in Karst Region base construction method | |
CN102518135B (en) | Horizontal jet grouting soil anchor and castinplace pile Composite Foundation Pit supporting construction engineering method | |
CN107503257B (en) | One kind being close to mountain high-filled subgrade stabilization and Deformation control structure and construction method | |
CN106988302B (en) | A kind of high inclination-angle competent bed rotary digging pile driving construction engineering method | |
US20140026518A1 (en) | Construction method for root-type foundation anchorage and bored, root-type cast in-situ pile with anchor bolts | |
CN105239586B (en) | Method for supporting foundation pit by adopting support structure | |
CN207109475U (en) | It is close to mountain high-filled subgrade stabilization and Deformation control structure | |
CN105239598A (en) | Integral sinking construction method for well-type full-automatic stereo garage | |
CN104499479A (en) | Dig-hole pile construction method based on penetration of sand gravel backfilling layer | |
CN102852141A (en) | Rock-socketed pipe pile foundation with pile core by concrete pouring and pile side by static pressure grouting and construction method for rock-socketed pipe pile foundation | |
CN106948340A (en) | A kind of construction method of the Manual excavated pile structure of high polymer grouting protection | |
CN102808407B (en) | Construction method of soft-foundation reinforced concrete cast-in-place pile | |
CN103572764A (en) | Watertight structure for retaining wall of ultra-deep manually excavated pile and construction method thereof | |
CN104988914A (en) | Cast-in-situ bored pile breakage processing method under water area environment | |
CN111364449A (en) | Construction method and structure for penetrating karst cave of precast tubular pile | |
CN103015408A (en) | Cast-in-place pile synchronous casing hole-forming constructing method | |
CN208201874U (en) | A kind of open-cell cloth bag grouting structure | |
CN102174818A (en) | Controlled impermeable leaking stoppage grout-extruding water-stopping technology of strong water permeable stratum of quaternary system | |
CN202644591U (en) | A reinforced bridge pile foundation in tunnel construction under the geological condition of water-rich quicksand | |
CN101586341B (en) | Water sealing method for civil engineering groundwork | |
CN109610473A (en) | A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration | |
CN208870062U (en) | A kind of structure of voltage regulation that catchments for grouting construction | |
CN102425179B (en) | Structure of reinforced soil sewer supported by bored concrete piles of mini steel tubes | |
CN111042161A (en) | Slope collapse high slope flexible processing structure and construction method thereof | |
CN109024621A (en) | The compound retaining wall supporting construction of embankment high slope tubular pole and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |