CN105696468B - Underwater concreting method in the construction of water Bridge - Google Patents
Underwater concreting method in the construction of water Bridge Download PDFInfo
- Publication number
- CN105696468B CN105696468B CN201610247564.4A CN201610247564A CN105696468B CN 105696468 B CN105696468 B CN 105696468B CN 201610247564 A CN201610247564 A CN 201610247564A CN 105696468 B CN105696468 B CN 105696468B
- Authority
- CN
- China
- Prior art keywords
- rubber hose
- concrete
- bakie
- hopper
- support frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Underground Or Underwater Handling Of Building Materials (AREA)
Abstract
The present invention discloses a kind of underwater concreting method in water Bridge construction, including hopper, bakie and rubber hose, bakie is made up of trumpet flare part and circular tube shaped part of leting slip a remark, the upper end of rubber hose and circular tube shaped part of leting slip a remark are connected, the connection end is cylindrical, the lower end of rubber hose is free end, and when passing through without concrete, the lower port of rubber hose is in flat.The device makes simple, deadweight is light, rubber hose length can arbitrarily change, and flexible pipe lower end is in its natural state flat closure state, only concrete by when just open it is cylindrical, concrete thus effectively reduces the attaching space of the concrete in flexible pipe and water, so as to effectively reduce the influence that concrete is flush with water by reverting to flat closure state immediately again afterwards.Additionally, rubber hose lower end can arbitrarily swing, this just reduces the number of times of hopper movement, so as to improve the plugging effect between steel lifted trunk base plate and cushion cap steel pile casting.
Description
Technical field
The present invention relates to a kind of construction method of water Bridge, mixing under water in specifically a kind of water Bridge bearing platform construction
Solidifying soil casting method.
Background technology
In the bearing platform construction of water Bridge engineering, often constructed using steel suspended box cofferdam, wherein carrying out steel
When space between box base plate and cushion cap steel pile casting blocks, conventional concreting method is with hopper made of iron plus made of iron
Hollow cylinder conduit, but it is this pour device have can not arbitrarily change from great, catheter length, conduit can not arbitrarily be put
The shortcomings of water body attaching space volume is big, concrete is easily flush with water in dynamic and concrete and conduit.In addition, being applied pouring
During in work, operation is more, and also inconvenience is mobile for hopper.
The content of the invention
The purpose of the present invention pours device technique not aiming at current existing underwater bearing platform steel suspension case bottom concrete
A kind of foot, by technological improvement, there is provided the coagulation under water in water Bridge construction simple to operate, with low cost, easy construction
Native casting method.
To achieve the above object, the technical solution adopted in the present invention is:
Underwater concreting method in the construction of water Bridge, comprises the following steps:
A, bakie make:Bakie is made up of trumpet flare part and circular tube shaped part of leting slip a remark, with the thick roll of steel plate of 4mm
It is made a trumpet flare part of upper shed diameter about 30cm, circular tube shaped is let slip a remark the diameter about 15cm of part, according to cushion cap
The interior diameter about rubber hose of 16cm, rubber of corresponding length are cut out to the actual range of steel lifted trunk bottom base plate in steel pile casting top
The upper end of glue flexible pipe and circular tube shaped part of leting slip a remark are connected, and are fastened with iron wire colligation, and the lower end of rubber hose is free end, can from
By swinging, when passing through without concrete, the lower port of rubber hose is in flat;
The installation of B, endless glide:Endless glide is installed on cushion cap steel pile casting top, endless glide is enclosed within pile cap steel and is protected
The periphery of cylinder;
The installation of C, hopper and bakie:By hopper support on intersecting parallels support frame, by the hanging of intersecting parallels support frame in ring
On shape slide rail, then bakie is suspended at hopper feed opening;
D, using pump truck concrete is delivered into hopper by feed pipe, concrete is slid to steel lifted trunk bottom by bakie again
Space between plate and cushion cap steel pile casting, after after rubber hose, directly vertically below position concreting is finished, then to swing rubber soft
Pipe to adjacent position is poured;
E, when the gap between the steel lifted trunk base plate and cushion cap steel pile casting in the swingable scope of rubber hose has all poured
Bi Hou, then pull intersecting parallels support frame to be moved along endless glide by artificial, makes intersecting parallels support frame drive hopper to next
Individual construction location is constructed, so circulation, until complete single cushion cap steel pile casting being mixed with the closure of steel lifted trunk bottom plate interspaces
Solidifying soil is poured.
Further, the intersecting parallels support frame is provided with roller, and intersecting parallels support frame is hung sliding in annular by roller
On rail.
Beneficial effects of the present invention:
Due to using above-mentioned underwater concreting method, with simple to operate, with low cost, easy construction spy
Point.
Rubber hose length on the bakie of the making can arbitrarily change, and flexible pipe lower end is in its natural state in flat
Flat closure state, only concrete by when just open cylindrical, concrete reverts to flat closure immediately again by rear
State, thus effectively reduces the attaching space of the concrete in flexible pipe and water, is flush with water so as to effectively reduce concrete
Influence.
Brief description of the drawings
The present invention is described in further detail with reference to the accompanying drawings and detailed description:
Fig. 1 is the structural representation of hopper and bakie;
Fig. 2 is schematic diagram in running order after the present invention is assembled.
In figure:1st, trumpet flare part;2nd, circular tube shaped is let slip a remark part;3rd, rubber hose;4th, iron wire;5th, pile cap steel shield
Cylinder;6th, endless glide;7th, bakie;8th, intersecting parallels support frame;9th, pump truck;10th, steel lifted trunk base plate;11st, space;12nd, feed pipe;
13rd, hopper.
Specific embodiment
Below in conjunction with the accompanying drawings and case is described in further details to the present invention, these cases are only used for illustrating the present invention,
Its scope is not limited.
Underwater concreting method in the construction of water Bridge, comprises the following steps:
A, bakie make:Bakie 7 is made up of trumpet flare part 1 and circular tube shaped part 2 of leting slip a remark, with the thick steel of 4mm
Coiled sheet is made a trumpet flare part 1 of upper shed diameter about 30cm, and circular tube shaped is let slip a remark the diameter about 15cm of part 2, root
According to the actual range on cushion cap steel pile casting top to steel lifted trunk bottom base plate, the interior diameter about rubber of 16cm for cutting out corresponding length is soft
Pipe 3, upper end and the circular tube shaped of rubber hose 3 part of leting slip a remark is connected, and is fastened with the colligation of iron wire 4, the lower end of rubber hose be from
Swingable by holding, when passing through without concrete, the lower port of rubber hose is in flat, as shown in Figure 1;
B, as shown in Fig. 2 the installation of endless glide 6:Endless glide 6 is installed on the top of cushion cap steel pile casting 5, makes endless glide
6 peripheries for being enclosed within cushion cap steel pile casting 5;
The installation of C, hopper and bakie:Hopper 13 is supported on intersecting parallels support frame 8, intersecting parallels support frame 8 is hung
In endless glide 6, then bakie 7 is suspended at the feed opening of hopper 13;
D, using pump truck 9 concrete is delivered into hopper 13 by feed pipe 12, concrete is slid to steel by bakie 7 again
Space 11 between box base plate 10 and cushion cap steel pile casting 5, after after rubber hose 3, directly vertically below position concreting is finished,
Rubber hose 3 to adjacent position is swung again to be poured;
E, all pour at the steel lifted trunk base plate in the swingable scope of rubber hose 3 and the space 11 between cushion cap steel pile casting
After finishing, then pull intersecting parallels support frame 8 to be moved along endless glide 6 by artificial, make intersecting parallels support frame 8 drive hopper to arrive
Next construction location is constructed, so circulation, until completing the envelope of single cushion cap steel pile casting and steel lifted trunk bottom plate interspaces
Stifled concreting.
Further, the intersecting parallels support frame is provided with roller, and intersecting parallels support frame is hung sliding in annular by roller
On rail.
The above is the preferred embodiment of the present invention, can not limit the right model of the present invention with this certainly
Enclose, it is noted that for those skilled in the art, technical scheme is modified or is waited
With replacing, without departure from the protection domain of technical solution of the present invention.
Claims (2)
1. a kind of underwater concreting method during water Bridge is constructed, it is characterised in that comprise the following steps:
A, bakie make:Bakie is made up of trumpet flare part and circular tube shaped part of leting slip a remark, and is rolled into the thick steel plates of 4mm
One trumpet flare part of upper shed diameter 30cm, circular tube shaped is let slip a remark the diameter 15cm of part, according to cushion cap steel pile casting top
To the actual range of steel lifted trunk bottom base plate, the interior diameter for cutting out corresponding length is the rubber hose of 16cm, rubber hose it is upper
End be connected with circular tube shaped part of leting slip a remark, and with iron wire colligation fastening, the lower end of rubber hose is free end, swingable,
The lower port of rubber hose is in flat when not having concrete to pass through;
The installation of B, endless glide:Endless glide is installed on cushion cap steel pile casting top, endless glide is enclosed within cushion cap steel pile casting
Periphery;
The installation of C, hopper and bakie:It is by hopper support on intersecting parallels support frame, the hanging of intersecting parallels support frame is sliding in annular
On rail, then bakie is suspended at hopper feed opening;
D, concrete is delivered into hopper using pump truck, concrete again by hopper fall into bakie and slide to steel lifted trunk base plate with
Space between cushion cap steel pile casting, after directly vertically below position concreting is finished after rubber hose, then swings rubber hose extremely
Adjacent position is poured;
E, after the gap between the steel lifted trunk base plate and cushion cap steel pile casting in the swingable scope of rubber hose has all poured and has finished,
Pull intersecting parallels support frame to be moved along endless glide by artificial again, intersecting parallels support frame is driven hopper to next construction
Position is constructed, so circulation, until complete single steel pile casting being poured with the blocking concrete of steel lifted trunk bottom plate interspaces.
2. the underwater concreting method during water Bridge according to claim 1 is constructed, it is characterised in that:The well
Font support frame is provided with roller, and intersecting parallels support frame is hung in endless glide by roller.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610247564.4A CN105696468B (en) | 2016-04-20 | 2016-04-20 | Underwater concreting method in the construction of water Bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610247564.4A CN105696468B (en) | 2016-04-20 | 2016-04-20 | Underwater concreting method in the construction of water Bridge |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105696468A CN105696468A (en) | 2016-06-22 |
CN105696468B true CN105696468B (en) | 2017-06-16 |
Family
ID=56217278
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610247564.4A Active CN105696468B (en) | 2016-04-20 | 2016-04-20 | Underwater concreting method in the construction of water Bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105696468B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109629574A (en) * | 2019-01-09 | 2019-04-16 | 中国建筑第四工程局有限公司 | One kind is for steel lifted trunk bottom plate blocking concrete construction hopper |
CN110172913A (en) * | 2019-05-10 | 2019-08-27 | 中国建筑第六工程局有限公司 | A kind of device for plugging for steel suspended box cofferdam |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1018229A (en) * | 1996-06-28 | 1998-01-20 | Fujita Corp | Cofferdam construction method of existing underwater structure |
CN101158161A (en) * | 2007-10-19 | 2008-04-09 | 山东高速集团青岛高速公路有限公司 | Underwater no-bottom closing concrete boxed cofferdam and method of use thereof |
CN101476326A (en) * | 2009-01-23 | 2009-07-08 | 广州市市政集团有限公司 | Bearing platform prefabrication and construction method |
CN203066095U (en) * | 2013-01-24 | 2013-07-17 | 中交第三航务工程局有限公司南京分公司 | Assembled single-wall steel hanging box |
CN104314011A (en) * | 2014-11-17 | 2015-01-28 | 华北水利水电大学 | Concrete construction method of underwater bearing platform |
-
2016
- 2016-04-20 CN CN201610247564.4A patent/CN105696468B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1018229A (en) * | 1996-06-28 | 1998-01-20 | Fujita Corp | Cofferdam construction method of existing underwater structure |
CN101158161A (en) * | 2007-10-19 | 2008-04-09 | 山东高速集团青岛高速公路有限公司 | Underwater no-bottom closing concrete boxed cofferdam and method of use thereof |
CN101476326A (en) * | 2009-01-23 | 2009-07-08 | 广州市市政集团有限公司 | Bearing platform prefabrication and construction method |
CN203066095U (en) * | 2013-01-24 | 2013-07-17 | 中交第三航务工程局有限公司南京分公司 | Assembled single-wall steel hanging box |
CN104314011A (en) * | 2014-11-17 | 2015-01-28 | 华北水利水电大学 | Concrete construction method of underwater bearing platform |
Also Published As
Publication number | Publication date |
---|---|
CN105696468A (en) | 2016-06-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206267139U (en) | A kind of pile foundation steel bar cage positioning and concrete pouring support | |
CN102587663A (en) | Concrete construction process of steel tube columns of super-high-rise building | |
CN105696468B (en) | Underwater concreting method in the construction of water Bridge | |
CN105804403B (en) | Big scale of construction special-shaped stiffness concrete column body slips ball concrete pouring structure and method on the ground | |
CN204266133U (en) | A kind of pier stud reinforcing cage whole lifting structure | |
CN101250870B (en) | Positioning device for filling pile reinforcement cage | |
CN209652990U (en) | The antiseepage plugging structure of the hole for hoist of basement computer room | |
CN205975620U (en) | Underwater concrete pours device | |
CN205077480U (en) | Double cannula bored concrete pile structure | |
CN206110494U (en) | Reinforced concrete joist structure | |
CN204780928U (en) | Major diameter bored concrete pile concrete first set groundwater increment controlling means | |
CN204604563U (en) | A kind of pipe of cement casting equipment | |
CN204010717U (en) | The hanging apparatus of canyon protective cover plate | |
CN211341803U (en) | Tower crane hopper with telescopic string barrel | |
CN210369938U (en) | A can have enough to meet need sleeve for pouring stake core | |
CN204252082U (en) | Arch dam bracket plate device | |
CN209261225U (en) | A kind of tool for pouring concrete into steel column | |
CN106351253A (en) | Novel water conservancy project retaining wall | |
CN207245193U (en) | A kind of concrete placing installation | |
CN206538759U (en) | It is a kind of to prevent the device of rising of steel cage | |
CN205501993U (en) | Back slip casting bored concrete pile structure | |
CN206090570U (en) | Rear side grouting device for pile | |
CN201169768Y (en) | Positioning device for filling pile reinforcing cage | |
CN206752485U (en) | Vacuum-dewatering well plugging structure | |
CN109137924A (en) | It is a kind of that the long structure and method of deep soft soil stake is reduced by form compound foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170705 Address after: 519000, room 19, 507 Haihe street, Hengqin Town, Guangdong, Zhuhai Patentee after: China iron Jian Ganghangju Group Co.,Ltd Address before: 511442 Guangdong Province, Guangzhou City Southern towns Panyu District Hungnam Avenue No. 118 Building 2, 4 floor Luqiao company Patentee before: CRCC HARBOUR & CHANNEL ENGINEERING BUREAU GROUP ROAD AND BRIDGE ENGINEERING CO., LTD. |