CN211341803U - Tower crane hopper with telescopic string barrel - Google Patents

Tower crane hopper with telescopic string barrel Download PDF

Info

Publication number
CN211341803U
CN211341803U CN201922056210.3U CN201922056210U CN211341803U CN 211341803 U CN211341803 U CN 211341803U CN 201922056210 U CN201922056210 U CN 201922056210U CN 211341803 U CN211341803 U CN 211341803U
Authority
CN
China
Prior art keywords
string
tank body
hopper tank
hopper
diameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922056210.3U
Other languages
Chinese (zh)
Inventor
赵碧丹
潘启宇
朱玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201922056210.3U priority Critical patent/CN211341803U/en
Application granted granted Critical
Publication of CN211341803U publication Critical patent/CN211341803U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a tower machine hopper from taking telescopic cluster section of thick bamboo belongs to building tool technical field, very easily leaks the problem design of material when solving concreting. The utility model consists of a hopper tank body, a string cylinder and a bracket; the hopper tank body consists of a feeding hole, a discharging hole, a hanging lug and a valve, and two ends of the hopper tank body are in an open funnel shape; the section of the string cylinder is in a symmetrical Z-shaped structure, and the diameters of the string cylinders are sequentially reduced; the bracket is arranged at the bottom and the periphery of the hopper tank body and used for supporting the hopper tank body; before pouring, putting all the string barrels into a feeding hole in sequence according to the diameter; in the pouring process, the discharge port is connected with the string barrel with the largest diameter, and the diameter of each string barrel is progressively reduced and telescopically connected, so that material leakage is effectively prevented. The utility model discloses the engineering practicality is strong, has effectively avoided the concrete to leak the material phenomenon pouring high-rise building in-process and appearing, has practiced thrift a large amount of manpower and materials, and economic benefits is high.

Description

Tower crane hopper with telescopic string barrel
Technical Field
The utility model belongs to the technical field of the building tool, concretely relates to tower machine hopper especially relates to a tower machine hopper from taking telescopic cluster section of thick bamboo.
Background
The tower crane hopper is also called tower crane hopper, and is mainly used for high-rise building construction such as building foundation concrete pouring, conveying and mixing, wall scraping, piling, ring beam and the like. Because the free falling body height of the concrete can be isolated when the height exceeds two meters in the pouring work of the high-rise building, the cylinder string is needed to be utilized to prevent the concrete from being isolated when the tower crane hopper is used for pouring the concrete. At present, the pouring work of a high-rise building is usually completed in a mode that a tower crane hopper is connected with a string barrel through a hook on a construction site. Although the traditional method has the characteristics of simplicity, practicability and convenience in implementation, the material leakage phenomenon is easy to occur during concrete pouring, concrete waste is caused, and the pouring effect is poor. In order to solve the problem, a large amount of data search, field investigation and related experiments are developed for research, and the tower crane hopper with the telescopic string barrel is invented.
Disclosure of Invention
The utility model aims at providing a from tower machine hopper of taking telescopic cluster section of thick bamboo, the utility model discloses both can solve the problem that traditional approach leaked the material easily, can also guarantee to pour the quality, simple structure, it is easy and simple to handle, economic technology is feasible.
The utility model adopts the technical proposal that: the utility model relates to a tower crane hopper with a telescopic string cylinder, which comprises a hopper tank body, a string cylinder and a bracket; the hopper tank body consists of a feeding hole, a discharging hole, a hanging lug and a valve, and two ends of the hopper tank body are in an open funnel shape; the section of the string cylinder is in a symmetrical Z-shaped structure, and the diameters of the string cylinders are sequentially reduced; the bracket is arranged at the bottom and the periphery of the hopper tank body and used for supporting the hopper tank body; before pouring, putting all the string barrels into a feeding hole in sequence according to the diameter; in the pouring process, the discharge port is connected with the string barrel with the largest diameter, and the diameter of each string barrel is progressively reduced and telescopically connected, so that material leakage is effectively prevented.
The utility model discloses a construction application method is: a tower crane hopper with a telescopic string drum is characterized in that a valve at the bottom of a hopper tank body is closed, the valve is sequentially placed from a feeding hole of the hopper tank body according to the diameter of the string drum from large to small, and the tower crane hopper is completely installed; before concrete is poured into the hopper tank body, a valve at the bottom of the hopper tank body is opened, a crane lifts a tower crane hopper to a specified position by utilizing a suspension loop on the hopper tank body, and all the tandem cylinders fall down from a discharge port of the hopper tank body in sequence under the action of gravity to finish the preparation work of pouring the concrete; in the pouring process, concrete enters the interior of the hopper tank body from the feeding hole of the hopper tank body, then enters the string barrel from the discharging hole, and finally is poured to each position of a high-rise building by utilizing the string barrel.
The utility model discloses a theory of operation is: the utility model provides a from tower machine hopper of taking telescopic string section of thick bamboo, the adoption will be a string section of thick bamboo according to the diameter size mode of putting into by the feed inlet of the hopper jar body in proper order, and each string section of thick bamboo section is the structure of symmetry "Z" font, guarantee to follow the card under the discharge gate of the hopper jar body on the string section of thick bamboo that the diameter is the biggest, and follow the card under the string section of thick bamboo that the diameter is the biggest on the string section of thick bamboo that the diameter is bigger slightly, the string section of thick bamboo that the diameter is degressive connects gradually, form from the tower machine hopper structure of taking.
The utility model has the advantages that: the utility model provides a from tower machine hopper of taking telescopic string section of thick bamboo, each string section of thick bamboo that the diameter is degressive has formed from tower machine hopper structure of taking telescopic string section of thick bamboo, has effectively avoided the concrete to leak the material phenomenon of pouring high-rise building in-process appearance, and can guarantee according to the high reasonable string section of thick bamboo quantity of arranging of hoist and mount, guarantees can not take place the segregation phenomenon at the in-process concrete of pouring, simple structure, and is easy and simple to handle, and the engineering practicality is strong.
Drawings
Fig. 1 is the utility model relates to a schematic diagram during operation from tower machine hopper structure of taking telescopic cluster section of thick bamboo.
Fig. 2 is the utility model relates to a from tower machine hopper structure when not operating of taking telescopic cluster section of thick bamboo schematic diagram.
Fig. 3 is the utility model relates to a tower machine hopper cluster section of thick bamboo profile of section of thick bamboo from taking telescopic cluster.
Illustration of the drawings: (1) -a hopper tank; (2) -a stringing barrel; (3) -a support; (4) -a feed inlet; (5) -a discharge port; (6) -a suspension loop; (7) -a valve.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings.
As shown in the figure, the utility model relates to a tower crane hopper with a telescopic string cylinder, which comprises a hopper tank body (1), a string cylinder (2) and a bracket (3); the hopper tank body (1) consists of a feeding hole (4), a discharging hole (5), a hanging lug (6) and a valve (7), and two ends of the hopper tank body are in an open funnel shape; the section of each string cylinder (2) is in a symmetrical Z-shaped structure, and the diameters of the string cylinders (2) are sequentially reduced; the bracket (3) is arranged at the bottom and the periphery of the hopper tank body (1) and is used for supporting the hopper tank body (1); before pouring, the serial cylinders (2) are sequentially placed into the feed inlet (4) according to the diameter; in the pouring process, the discharge port (5) is connected with the string barrel (2) with the largest diameter, and the diameter of each string barrel (2) is progressively reduced and telescopically connected, so that material leakage is effectively prevented.
A tower crane hopper with a telescopic string drum is characterized in that a valve (7) at the bottom of a hopper tank body (1) is closed, the valve is sequentially placed from a feeding hole (4) of the hopper tank body (1) according to the diameter of the string drum (2), and the tower crane hopper is completely installed; before concrete is poured into the hopper tank body (1), a valve (7) at the bottom of the hopper tank body (1) is opened, a crane lifts a tower crane hopper to a specified position by utilizing a hanging lug (6) on the hopper tank body (1), and all the tandem drums (2) fall down from a discharge hole (5) of the hopper tank body (1) in sequence under the action of gravity, so that the preparation work of pouring the concrete is completed; in the pouring process, concrete enters the hopper tank body (1) from the feeding hole (4) of the hopper tank body (1), then enters the string barrel (2) from the discharging hole (5), and finally is poured to each position of a high-rise building by using the string barrel (2).

Claims (1)

1. A tower crane hopper with a telescopic string cylinder is characterized by comprising a hopper tank body, a string cylinder and a bracket; the hopper tank body consists of a feeding hole, a discharging hole, a hanging lug and a valve, and two ends of the hopper tank body are in an open funnel shape; the section of the string cylinder is in a symmetrical Z-shaped structure, and the diameters of the string cylinders are sequentially reduced; the bracket is arranged at the bottom and the periphery of the hopper tank body and used for supporting the hopper tank body; before pouring, putting all the string barrels into a feeding hole in sequence according to the diameter; in the pouring process, the discharge port is connected with the string barrel with the largest diameter, and the diameter of each string barrel is progressively reduced and telescopically connected, so that material leakage is effectively prevented.
CN201922056210.3U 2019-11-26 2019-11-26 Tower crane hopper with telescopic string barrel Expired - Fee Related CN211341803U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922056210.3U CN211341803U (en) 2019-11-26 2019-11-26 Tower crane hopper with telescopic string barrel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922056210.3U CN211341803U (en) 2019-11-26 2019-11-26 Tower crane hopper with telescopic string barrel

Publications (1)

Publication Number Publication Date
CN211341803U true CN211341803U (en) 2020-08-25

Family

ID=72134709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922056210.3U Expired - Fee Related CN211341803U (en) 2019-11-26 2019-11-26 Tower crane hopper with telescopic string barrel

Country Status (1)

Country Link
CN (1) CN211341803U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114290530A (en) * 2021-12-02 2022-04-08 杭州江河机电装备工程有限公司 Production equipment and production process for poor cementing material concrete

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114290530A (en) * 2021-12-02 2022-04-08 杭州江河机电装备工程有限公司 Production equipment and production process for poor cementing material concrete

Similar Documents

Publication Publication Date Title
CN211341803U (en) Tower crane hopper with telescopic string barrel
CN102808413B (en) Reinforcement-replacing sectional-grouting pipe with inner piston and construction method thereof
CN204491640U (en) A kind of circular single-arm steel hanging box being applicable to strong tidal bore district
CN211036991U (en) Fishbone string barrel suitable for deep foundation pit concrete warehousing pouring
CN102352628A (en) Filling pile concrete guide pipe assembling and disassembling device and construction method thereof
CN104746875B (en) A kind of portable block-shaped discarded concrete pours device
CN110700264A (en) Fishbone string barrel suitable for deep foundation pit concrete warehousing pouring
CN204221964U (en) A kind of extruding demolding structure producing reinforced concrete pipe
CN110777794A (en) Hopper for underground continuous wall joint pipe bin
CN102704687B (en) Concreting device for high-rise framed tubular column
CN206296035U (en) A kind of feed hopper flash adjusting means and vertical shaft impact crusher
CN102296598B (en) Construction method of PCC (cast-in-place concrete large-diameter pipe) pile
CN205110769U (en) Ladle bottom distributing device
CN208068539U (en) A kind of piping lane precast segment lubricating substance slot device
CN104552593B (en) Method for producing reinforced concrete pipe by extrusion demolding of double vibration sources
CN205950706U (en) Aggregate storage rack for building
CN206299129U (en) A kind of large-sized concrete cloth system
CN210651316U (en) Concrete automatic gate discharge apparatus
CN203156927U (en) Vertical pouring discharging equipment for prestressed concrete cylinder pipes
CN217840011U (en) Pipe drawing device for concrete pouring pipes of underground continuous walls
CN205475325U (en) Reverse construction method is mechanized to fall module system all
CN205835668U (en) A kind of concrete mixer for building
CN206902553U (en) A kind of steel sand ejection device
CN206416327U (en) A kind of concrete recycle reuse means
CN210737514U (en) Closed three-dimensional automatic mixing and grouting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200825

Termination date: 20211126