CN205501993U - Back slip casting bored concrete pile structure - Google Patents

Back slip casting bored concrete pile structure Download PDF

Info

Publication number
CN205501993U
CN205501993U CN201620216673.5U CN201620216673U CN205501993U CN 205501993 U CN205501993 U CN 205501993U CN 201620216673 U CN201620216673 U CN 201620216673U CN 205501993 U CN205501993 U CN 205501993U
Authority
CN
China
Prior art keywords
reinforcement cage
bored concrete
behind shaft
drift lining
grouting behind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620216673.5U
Other languages
Chinese (zh)
Inventor
宁希彦
王春雨
韩云飞
刘进军
徐家锦
张汉勇
岳彦峰
陈万清
陈磊
谷正标
赵志豪
刘斌
谭春兵
吕培华
刘寿开
宁希泉
戴花军
陈伟
陆文坤
赵国成
刘自强
王鹏飞
王玮
刘博�
余思林
汪根平
刘少锋
陈斌
宋少伟
张皓洲
周旭超
叶金鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA CHEMICAL ENGINEERING HEAVY MECHANIZATION CO., LTD.
Original Assignee
CHINA CHEMICAL ENGINEERING HEAVY MACHINERY Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA CHEMICAL ENGINEERING HEAVY MACHINERY Co filed Critical CHINA CHEMICAL ENGINEERING HEAVY MACHINERY Co
Priority to CN201620216673.5U priority Critical patent/CN205501993U/en
Application granted granted Critical
Publication of CN205501993U publication Critical patent/CN205501993U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a back slip casting bored concrete pile structure, including bored concrete pile body (1), be located the vertical back of bored concrete pile body outlying annotate stake (2) with the level that is located bored concrete pile body lower part after annotate (3), is the bored concrete pile body provided with by vertical main muscle (1 1 ), lateral tie (1 2 )And wire spiral (1 3 )Is welded fastening's steel reinforcement cage still provided with vertical back slip casting pipe (1 on each other 5 )And horizontal back slip casting pipe (1 6 ). The utility model has the advantages of the popularization is hanged down, is done benefit to to simple structure, cost, but the wide application has effectively improved the influence of soil layer and sediment in the bored concrete pile of back slip casting technique, improved the single pile bearing ability, has reduced single pile bearing power difference.

Description

A kind of grouting behind shaft or drift lining filling pile structure
Technical field
This utility model belongs to the realm of building construction, is specifically related to a kind of grouting behind shaft or drift lining filling pile structure.
Background technology
Bored concrete pile refers to pass through the means such as machine drilling, steel pipe soil compaction or manpower excavation at engineering site on ground Base soil forms stake holes, and within it places steel reinforcement cage, concrete perfusion and the stake made.Learn both at home and abroad Person has carried out substantial amounts of research to multiple bored concrete pile, and achieves many valuable scientific achievements, for filling The application of note stake provides theory support.Post Grouting Technique was applied first in 1961, state In begin to use the beginning of the eighties in last century, Post Grouting Technique is after bored concrete pile has poured, at stake end Reinject cement mortar, improve pile body bearing capacity.This technical operation is easy, surcharge is low.
But improve the bearing capacity of pile body structure the most further, structural stability remains affiliated technology neck An important research contents in territory.
Summary of the invention
The purpose of this utility model is for problem present in filling pile construction in prior art, it is provided that A kind of grouting behind shaft or drift lining filling pile structure.It is strong that grouting behind shaft or drift lining filling pile structure of the present utility model possesses bearing capacity, knot Structure is reliable and stable, the bored concrete pile of low cost of manufacture.
For solving above-mentioned technical problem, this utility model adopts the following technical scheme that
A kind of grouting behind shaft or drift lining filling pile structure, including bored concrete pile body 1, is positioned at bored concrete pile body 1 periphery Note stake 2 after vertically and note stake 3 after the level being positioned at bored concrete pile body 1 bottom;
Described bored concrete pile body 1 is provided with steel reinforcement cage, and described steel reinforcement cage includes lengthways main steel bar 1-1, horizontal To stirrup 1-2, and tie hoop 1-3;Wherein, lengthways main steel bar 1-1, lateral tie 1-2 and spiral Stirrup 1-3 is welded to each other fixing;
Described lengthways main steel bar 1-1 peripheral solder has many group protection ring 1-4, and each group of protection ring is along steel reinforcement cage Same even circumferential arranges 2-6, two groups of adjacent protection ring interlaced arrangement;Described protection ring is handle Hands shape;
The lengthways main steel bar 1-1 of described steel reinforcement cage is also associated with longitudinal grouting behind shaft or drift lining pipe 1-5, described steel reinforcement cage Bottom is provided with horizontal grouting behind shaft or drift lining pipe 1-6;It is provided with several on described longitudinal grouting behind shaft or drift lining pipe 1-5 tube wall Hole, low side is blind end;Described horizontal grouting behind shaft or drift lining pipe 1-6 is inverted T shape structure, is provided with bottom it Guan Bi coil pipe, described closure disc tube wall is provided with several holes;
The hole of described longitudinal grouting behind shaft or drift lining pipe 1-5 and the hole of horizontal grouting behind shaft or drift lining pipe 1-6 are provided with waterproof Adhesive tape wraps up, and prevents hole plug.
Preferably, the spacing between adjacent lengthways main steel bar 1-1 in described steel reinforcement cage is 13-18cm, The spacing of adjacent lateral tie 1-2 is 10-20cm, pitch 12-17cm of tie hoop 1-3;Described The a length of 8-18m, a diameter of 1.5-2.5m of steel reinforcement cage.
Preferably, the spacing between adjacent lengthways main steel bar 1-1 in described steel reinforcement cage is 14cm, phase The spacing of adjacent lateral tie 1-2 is 15cm, pitch 13cm of tie hoop 1-3;Described reinforcing bar The a length of 10m of cage, a diameter of 2m.
Preferably, lengthways main steel bar 1-1, lateral tie 1-2 and the tie hoop in described steel reinforcement cage The rebar surface of 1-3 is coated with antirust coat, and the thickness of antirust coat is 100-200 μm, and preferably 150 μm。
Preferably, described bored concrete pile body 1 is cylindrical.
Preferably, each group of described protection ring arranges 4 along the same even circumferential of steel reinforcement cage.
The rear of bored concrete pile body 1 periphery that be positioned in this utility model is noted stake 2 and is positioned at bored concrete pile originally Note stake 3 after the level of body 1 bottom and improve the annexation of pile body and the soil body, improve single-column bearing capacity.
Steel reinforcement cage in this utility model is by lengthways main steel bar 1-1, lateral tie 1-2 and tie hoop 1-3 phase It is welded and fixed mutually, there is Stability Analysis of Structures, the uniform feature of stress, serve stable reinforcement and support perfusion The effect of stake.
Protection ring 1-4 during this utility model is dry serves the effect of protection steel reinforcement cage, it is adaptable to different Geological conditions.
Longitudinal grouting behind shaft or drift lining pipe 1-5 and horizontal grouting behind shaft or drift lining pipe 1-6 in this utility model can select PVC Material or stainless steel, wherein, hole surface is wrapped up by adhesive waterproof tape, it is therefore prevented that pour filling in advance During note stake body, cement mortar pours in down a chimney, and has poured and after maintenance at bored concrete pile body, then has noted after longitudinal direction Slurry pipe 1-5 and laterally grouting behind shaft or drift lining pipe 1-6 carry out grouting behind shaft or drift lining operation, owing to grouting behind shaft or drift lining pressure is relatively big, and energy Enough break through adhesive waterproof tape to flow out from hole, improve the combination of pile body and soil layer.
The spacing between adjacent lengthways main steel bar 1-1 in steel reinforcement cage in this utility model is 13-18cm, The spacing of adjacent lateral tie 1-2 is 10-20cm, pitch 12-17cm of tie hoop 1-3;Described The a length of 8-18m, a diameter of 1.5-2.5m of steel reinforcement cage;And give further preferred numerical value. The steel reinforcement cage possessing above-mentioned parameter has good stability and high intensity, it is possible to play good propping up Support effect, improves bearing capacity.
Lengthways main steel bar 1-1, lateral tie 1-2 and tie hoop in steel reinforcement cage in this utility model The rebar surface of 1-3 is coated with antirust coat.The raw material of antirust coat can select commercially available antirust agent, anti- The setting of rusty scale improves the performance of reinforcing bar, avoids corrosion harmfulness, improves the life-span of stake.
A kind of grouting behind shaft or drift lining filling pile structure of the present utility model has simple in construction, cost is low, be beneficial to popularization Advantage, can be widely applied in the bored concrete pile of Post Grouting Technique, effectively improve soil layer and sediment shadow Ring, improve single pile bearing capacity, reduce bearing capacity of single pile difference.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of grouting behind shaft or drift lining filling pile structure of the present utility model.
Fig. 2 is the schematic diagram of steel reinforcement cage of the present utility model.
Fig. 3 is the schematic diagram of protection ring of the present utility model.
Wherein, bored concrete pile body 1, the stake 2 of rear note, note stake 3, lengthways main steel bar 1-1, horizontal stroke after level To stirrup 1-2, tie hoop 1-3, protection ring 1-4, longitudinal grouting behind shaft or drift lining pipe 1-5, horizontal grouting behind shaft or drift lining pipe 1-6。
Detailed description of the invention
Below in conjunction with the accompanying drawings, this utility model is described in further detail.
As Figure 1-3, a kind of grouting behind shaft or drift lining filling pile structure, including bored concrete pile body 1, wherein irrigate Stake body 1 is preferably cylindrical, is positioned at the rear note stake 2 of bored concrete pile body 1 periphery and is positioned at perfusion Stake 3 is noted after the level of stake body 1 bottom;Described bored concrete pile body 1 is provided with steel reinforcement cage, described steel Muscle cage includes lengthways main steel bar 1-1, lateral tie 1-2, and tie hoop 1-3;Wherein, lengthways main steel bar 1-1, lateral tie 1-2 and tie hoop 1-3 are welded to each other fixing;Described lengthways main steel bar 1-1 is peripheral Being welded with many group protection ring 1-4, each group of protection ring arranges 2-6 along the same even circumferential of steel reinforcement cage, excellent Elect 4 as, two groups of adjacent protection ring interlaced arrangement;Described protection ring is handle-shaped;Described steel The lengthways main steel bar 1-1 of muscle cage is also associated with longitudinal grouting behind shaft or drift lining pipe 1-5, is provided with horizontal stroke bottom described steel reinforcement cage Grouting Pipe 1-6 backward;Being provided with several holes on described longitudinal grouting behind shaft or drift lining pipe 1-5 tube wall, low side is envelope Closed end;Described horizontal grouting behind shaft or drift lining pipe 1-6 is inverted T shape structure, is provided with Guan Bi coil pipe, institute bottom it It is provided with several holes on the closure disc tube wall stated;The hole of described longitudinal grouting behind shaft or drift lining pipe 1-5 and horizontal stroke The hole of Grouting Pipe 1-6 is provided with adhesive waterproof tape parcel backward, prevents hole plug.
Wherein, the spacing between adjacent lengthways main steel bar 1-1 in described steel reinforcement cage is 13-18cm, The spacing of adjacent lateral tie 1-2 is 10-20cm, pitch 12-17cm of tie hoop 1-3;Described The a length of 8-18m, a diameter of 1.5-2.5m of steel reinforcement cage;The most adjacent lengthways main steel bar 1-1 Between spacing be 14cm, the spacing of adjacent lateral tie 1-2 is 15cm, tie hoop 1-3's Pitch 13cm;The a length of 10m of described steel reinforcement cage, a diameter of 2m;Indulging in described steel reinforcement cage Rebar surface to main muscle 1-1, lateral tie 1-2 and tie hoop 1-3 is coated with antirust coat, anti- The thickness of rusty scale is 100-200 μm.Wherein, note stake 3 after noting stake 2 and level the most afterwards and improve pile body With the annexation of the soil body, improve single-column bearing capacity.Steel reinforcement cage has Stability Analysis of Structures, and stress is uniform Feature, serves the stable effect strengthening supporting bored concrete pile.Protection ring 1-4 serves protection steel reinforcement cage Effect, it is adaptable to different geological conditions.Longitudinal grouting behind shaft or drift lining pipe 1-5 and laterally grouting behind shaft or drift lining pipe 1-6 Can select PVC material or stainless steel, wherein, hole surface is wrapped up by adhesive waterproof tape, it is therefore prevented that When pouring bored concrete pile body in advance, cement mortar pours in down a chimney, and has poured and after maintenance at bored concrete pile body, Grouting behind shaft or drift lining operation is carried out, due to grouting behind shaft or drift lining again from longitudinal grouting behind shaft or drift lining pipe 1-5 and horizontal grouting behind shaft or drift lining pipe 1-6 Pressure is bigger, it is possible to breaks through adhesive waterproof tape and flows out from hole, improves the combination of pile body and soil layer.
Grouting behind shaft or drift lining filling pile structure disclosed above has simple in construction, cost is low, be beneficial to the advantage of popularization, Can be widely applied in the bored concrete pile of Post Grouting Technique, effectively improve soil layer and sediment impact, improve Single pile bearing capacity, reduces bearing capacity of single pile difference.
It is pointed out that above-mentioned specific embodiment mode is only that this utility model is the most specific Embodiment, be not intended that restriction of the present utility model, any this utility model claim that falls into It is real that embodiment in the protection domain of the present utility model that feature or equivalent feature are constituted all constitutes infringement With novel patent right.

Claims (6)

1. a grouting behind shaft or drift lining filling pile structure, it is characterised in that include bored concrete pile body (1), note stake (3) after noting stake (2) after being positioned at peripheral vertical of bored concrete pile body and being positioned at the level of bored concrete pile body lower part;
Described bored concrete pile body (1) is provided with steel reinforcement cage, and described steel reinforcement cage includes lengthways main steel bar (1-1), lateral tie (1-2), and tie hoop (1-3);Wherein, lengthways main steel bar (1-1), lateral tie (1-2) and tie hoop (1-3) are welded to each other fixing;
Described lengthways main steel bar (1-1) peripheral solder organizes protection ring (1-4) more, and each group of protection ring arranges 2-6 along the same even circumferential of steel reinforcement cage, two groups of adjacent protection ring interlaced arrangement;Described protection ring is handle-shaped;
The lengthways main steel bar (1-1) of described steel reinforcement cage is also associated with longitudinal grouting behind shaft or drift lining pipe (1-5), is provided with horizontal grouting behind shaft or drift lining pipe (1-6) bottom described steel reinforcement cage;Being provided with several holes on described longitudinal grouting behind shaft or drift lining pipe (1-5) tube wall, low side is blind end;Described horizontal grouting behind shaft or drift lining pipe (1-6) is inverted T shape structure, is provided with Guan Bi coil pipe, described closure disc tube wall is provided with several holes bottom it;
The hole of described longitudinal grouting behind shaft or drift lining pipe (1-5) and the hole of horizontal grouting behind shaft or drift lining pipe (1-6) are provided with adhesive waterproof tape parcel, prevent hole plug.
A kind of grouting behind shaft or drift lining filling pile structure the most according to claim 1, it is characterized in that, the spacing between adjacent lengthways main steel bar (1-1) in described steel reinforcement cage is 13-18cm, the spacing of adjacent lateral tie (1-2) is 10-20cm, pitch 12-17cm of tie hoop (1-3);The a length of 8-18m of described steel reinforcement cage, a diameter of 1.5-2.5m.
A kind of grouting behind shaft or drift lining filling pile structure the most according to claim 2, it is characterized in that, the spacing between adjacent lengthways main steel bar (1-1) in described steel reinforcement cage is 14cm, the spacing of adjacent lateral tie (1-2) is 15cm, pitch 13cm of tie hoop (1-3);The a length of 10m of described steel reinforcement cage, a diameter of 2m.
A kind of grouting behind shaft or drift lining filling pile structure the most according to claim 1, it is characterized in that, the rebar surface of lengthways main steel bar (1-1), lateral tie (1-2) and tie hoop (1-3) in described steel reinforcement cage is coated with antirust coat, and the thickness of antirust coat is 100-200 μm.
A kind of grouting behind shaft or drift lining filling pile structure the most according to claim 1, it is characterised in that described bored concrete pile body (1) is cylindrical.
A kind of grouting behind shaft or drift lining filling pile structure the most according to claim 1, it is characterised in that each group of described protection ring arranges 4 along the same even circumferential of steel reinforcement cage.
CN201620216673.5U 2016-03-21 2016-03-21 Back slip casting bored concrete pile structure Active CN205501993U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620216673.5U CN205501993U (en) 2016-03-21 2016-03-21 Back slip casting bored concrete pile structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620216673.5U CN205501993U (en) 2016-03-21 2016-03-21 Back slip casting bored concrete pile structure

Publications (1)

Publication Number Publication Date
CN205501993U true CN205501993U (en) 2016-08-24

Family

ID=56732003

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620216673.5U Active CN205501993U (en) 2016-03-21 2016-03-21 Back slip casting bored concrete pile structure

Country Status (1)

Country Link
CN (1) CN205501993U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112281824A (en) * 2020-10-30 2021-01-29 黄淮学院 Post-grouting construction method for pile bottom of post-inserted reinforcement cage of cast-in-place concrete pile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112281824A (en) * 2020-10-30 2021-01-29 黄淮学院 Post-grouting construction method for pile bottom of post-inserted reinforcement cage of cast-in-place concrete pile

Similar Documents

Publication Publication Date Title
CN2934352Y (en) Root key type drilling perfusion stake construction device
CN208167713U (en) A kind of film bag grouting and reinforcing type filling pile structure
CN206941608U (en) A kind of diaphram wall foundation pit supporting construction
CN202509533U (en) Single reinforcement pulling force type anti-floating anchor rod
CN103485349A (en) Lime nail composite frame prestressed anchor tube structure and construction method for reinforcing weak slope
CN103898916A (en) Mini-pile combined support structure and construction method thereof
CN208472708U (en) A kind of grouting behind shaft or drift lining filling pile structure
CN105804403B (en) Big scale of construction special-shaped stiffness concrete column body slips ball concrete pouring structure and method on the ground
CN207436069U (en) A kind of deep foundation pit supporting structure
CN202194129U (en) Composite prestress soil-blocking pile
CN205676882U (en) A kind of novel supporting construction
CN105649106B (en) The retaining wall structure and its construction method of steel pipe bone rib
CN207998838U (en) A kind of compound pile pile of resistance to plucking
CN205501993U (en) Back slip casting bored concrete pile structure
CN101173515B (en) Steel pipe pile foundation built by planting steel stick and building method thereof
CN203866852U (en) Anti-floating pile structure composited by deep spiral-spraying cement soil plate and anchor rod
CN108842792A (en) A kind of layering is interior to draw anchor pole and construction method with being lifted discharging type
CN208996052U (en) The drilling tool of supporting construction and use that foundation pit anchor wall draws anchor supporting to be formed
CN207228108U (en) A kind of novel enhanced pile pile
CN204825874U (en) Dismantlement formula strenghthened type concrete pile
CN206815321U (en) A kind of anxious pilework of hydraulic engineering
CN206887953U (en) Soil nailing port closing device and soil nailing wall structure
CN209194572U (en) A kind of corrugated steel construction retaining wall of culvert end
CN209669861U (en) Prestressed reinforced concrete screw thread tubular pole
CN110080314B (en) Method for reducing side friction resistance of pile foundation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100007 Dazhuang Village South, Daxing District, Beijing

Patentee after: CHINA CHEMICAL ENGINEERING HEAVY MECHANIZATION CO., LTD.

Address before: 100007 Dazhuang Village South, Daxing District, Beijing

Patentee before: China Chemical Engineering Heavy Machinery Co.

CP01 Change in the name or title of a patent holder