CN208167713U CN201820447317.3U CN201820447317U CN208167713U CN 208167713 U CN208167713 U CN 208167713U CN 201820447317 U CN201820447317 U CN 201820447317U CN 208167713 U CN208167713 U CN 208167713U
Authority
CN
China
Prior art keywords
pile structure
filling pile
film bag
grouting
slip casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820447317.3U
Other languages
Chinese (zh)
Inventor
曹慧
许利东
张骏
薛毅
王晓曙
涂伟
王自忠
赵湖潮
奚春生
吴俊鹏
奚晶
陈明
潘延连
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Construction Investment Foundation Engineering Co Ltd
Original Assignee
Yunnan Construction Investment Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Construction Investment Foundation Engineering Co Ltd filed Critical Yunnan Construction Investment Foundation Engineering Co Ltd
Priority to CN201820447317.3U priority Critical patent/CN208167713U/en
Application granted granted Critical
Publication of CN208167713U publication Critical patent/CN208167713U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The utility model belongs to building pile foundation engineering technical field, disclose a kind of film bag grouting and reinforcing type filling pile structure, including filling pile structure, pore-forming in the inlet well of its bottom, the bottom of the through inlet well in pre-buried slip casting eyelet road is set to inside filling pile structure through setting pre-buried slip casting eyelet road, Grouting Pipe, filling pile structure bottom is arranged film bag.The utility model is in the pile foundation engineering conventional construction of architectural engineering, while guaranteeing pile foundation engineering stable structure itself and supporting effect, just execution conditions have been reserved for later period consolidation process that may be present, once there are the engineering problems such as differential settlement in pile foundation engineering, it only need to be in time by the Grouting Pipe in pre-buried slip casting eyelet road to the filling grouting and reinforcing body of the film bag, the consolidation process to base stratum can be realized, solving the built pile foundation engineering later period there is the construction difficult problem of Lack of support, avoid the appearance of abandoned project, the use of the utility model is not limited by construction technology and geological environment.

Description

A kind of film bag grouting and reinforcing type filling pile structure
Technical field
The utility model relates to a kind of filling pile structures, and in particular to a kind of film bag grouting and reinforcing type filling pile structure belongs to In building pile foundation engineering technical field.
Background technique
With the fast development of China's infrastructure, the special work such as limestone (karst) area, deep cumulosol area Pile foundation engineering under journey geological conditions is more and more.Due to the diversity of special geological environment condition, it often will appear geology and survey The case where result is not inconsistent with the practical geological conditions of engineering is examined, pile foundation after the completion of causing pile foundation engineering initial design to be constructed Lack of support, occurs that differential settlement occurs after construction in pile foundation engineering, there is also the engineering problems such as solution cavity under stake.Once There is the above problem, would have to that built pile foundation engineering is carried out to reinforce or construct again, but this certainly will influence project progress, Increase engineering construction cost, while built pile foundation engineering is reinforced also by engineering construction technique and geological conditions It influences, constructional difficulties are dealt with improperly and are also easy to cause abandoned project.If can during pile foundation construction if consider that this is asked Topic reserves execution conditions for the consolidation process that the later period is likely to occur, is all highly advantageous to entire engineering construction.
Utility model content
For many shortcomings and deficiencies present in above-mentioned background technique, the utility model proposes a kind of film bag slip castings to add Curable type filling pile structure, while guaranteeing pile foundation engineering stable structure and supporting effect, for the reserved construction of later period consolidation process Condition, when use, are not limited by geological environment, can effectively solve the built pile foundation engineering later period occur Lack of support construction it is difficult Topic, avoids the appearance of abandoned project.
To achieve the above object, the utility model uses following design structure and design scheme:A kind of film bag note Reinforcement type filling pile structure is starched, including filling pile structure (1), pore-forming in the inlet well (3) of filling pile structure (1) bottom, institute It states and is set to the pre-buried slip casting eyelet through setting pre-buried slip casting eyelet road (2), Grouting Pipe (4) inside filling pile structure (1) Road (2) goes directly the bottoms of the inlet well (3), and exposes at the top of the filling pile structure (1), the pipe of the Grouting Pipe (4) Section base opening is blocked and is cased with plug (8), and filling pile structure (1) bottom is arranged film bag (5).
Preferably, filling pile structure (1) section is circle, and stake diameter is not less than 0.5m.
Scheme as a further preference, the pre-buried slip casting eyelet road (2) is made of pvc pipe, according to the perfusion The diameter of pilework (1), is uniformly arranged at least one.When the diameter of the filling pile structure (1) is 0.5~0.8m, it is placed in the middle with one heart 1 pre-buried slip casting eyelet road (2) is set;When the filling pile structure (1) diameter be 0.8~1.8m, can equilateral setting 3 A pre-buried slip casting eyelet road (2);When the filling pile structure (1) diameter be greater than 1.8m, can be several by quincuncial arrangement A pre-buried slip casting eyelet road (2).
As further preferred embodiment, the pre-buried slip casting eyelet road (2) and filling pile structure (1) outer profile away from From being not less than 10cm, and it is set on the inside of steel reinforcement cage.
Further, the Grouting Pipe (4) is made using steel pipe, including standard tube coupling Grouting Pipe and with eye tube coupling slip casting It manages, the long 1.5m of the standard tube coupling Grouting Pipe section, is connected with thread between joint;The band eye tube coupling long 0.8m of slip casting tube coupling, pipe It being drilled on wall slip casting eyelet (7), the aperture of the slip casting eyelet (7) is Φ 20mm, the spacing of two adjacent slip casting eyelets (7)≤ 100mm.Preferably, the diameter of steel tube is Φ 30mm~Φ 40mm, wall thickness is 3mm~5mm.
Preferably, the film bag (5) is set in the filling pile structure (1) bottom or more at least position 0.5m Place, film bag (5) middle part are bound in Grouting Pipe every 0.5m with iron wire (6), and film bag (5) upward 300mm in bottom end is tied up with iron wire (6) It pricks.Further, it is roll type nylon fiber bag not less than Φ 400mm that the film bag (5), which is diameter,.
Use a kind of film bag grouting and reinforcing type filling pile structure of the utility model, the filling grouting and reinforcing of the film bag (5) Body (9), the grouting and reinforcing body (9) select cement-fly ash mixed serum, and cement selection ordinary portland cement, label is not Lower than PO32.5.
A kind of working principle of film bag grouting and reinforcing type filling pile structure of the utility model is:It has constructed in pile foundation engineering Cheng Hou, when there is the situation of bearing capacity of pile foundation deficiency, in time by the Grouting Pipe (4) to the filling pile structure (1) bottom The filling grouting and reinforcing body (9) of the film bag (5) in portion carries out consolidation process to pile foundation engineering stratum, can effectively ensure that in any soil layer In grouting consolidation effect.
Generated beneficial effect is the utility model compared with prior art:Pile foundation of the utility model in architectural engineering It is just elongated in filling pile structure pile body arrangement of reinforcement and concreting process that pre-buried slip casting eyelet is set when engineering conventional construction Road, and Grouting Pipe and film bag are correspondingly set, it is the later period while guaranteeing pile foundation engineering stable structure itself and supporting effect Consolidation process that may be present has reserved execution conditions.The use of the utility model is not by the limit of construction technology and geological environment System, can effectively solve the built pile foundation engineering later period there is the construction difficult problem of Lack of support, avoids the appearance of abandoned project.
Detailed description of the invention
Fig. 1, Fig. 2:Pre-buried slip casting eyelet road top view on the utility model filling pile structure;
Fig. 3:The utility model filling pile structure elevational schematic view;
Fig. 4:Schematic diagram is arranged in the utility model inlet well;
Fig. 5:Schematic diagram is completed in the binding of the utility model film bag;
Fig. 6:Elevational schematic view after the filling grouting and reinforcing body of the utility model film bag;
Fig. 7:Drawing is completed in the binding of the utility model film bag.
Wherein, 1- filling pile structure;2- pre-buried slip casting eyelet road;3- inlet well;4- Grouting Pipe;5- film bag;6- iron wire; 7- slip casting eyelet;8- plug;9- grouting and reinforcing body.
Specific embodiment
The utility model is described in further detail below by drawings and examples, but the protection model of the utility model It encloses and is not limited to the content.
As shown in FIG. 1 to FIG. 7, a kind of film bag grouting and reinforcing type filling pile structure of the utility model, in architectural engineering During pile foundation engineering conventional construction, 3 pore-forming of inlet well is carried out first, then in the 3 top normal construction of inlet well Filling pile structure 1, the elongated setting pre-buried slip casting eyelet road in the 1 pile body arrangement of reinforcement of filling pile structure and concreting process 2, and Grouting Pipe 4 is set in the go directly bottom of the inlet well 3 of the pre-buried slip casting eyelet road 2, while in the bored concrete pile The bottom of structure 1 is arranged film bag 5.
Specifically work progress is:After the completion of 3 pore-forming of inlet well, normal construction filling pile structure 1, section is circle Shape, stake diameter are 1.0m.In the 1 pile body arrangement of reinforcement of filling pile structure and concreting process, the elongated pre-buried injected hole of setting Eye road 2, pre-buried slip casting eyelet road 2 are made of pvc pipe, and hole location diameter is Φ 20cm, are arranged 3 by the form of equilateral triangle Pre-buried slip casting eyelet road 2, pre-buried slip casting eyelet road 2 are 12cm at a distance from pilework outer profile, are set on the inside of steel reinforcement cage.Institute The pre-buried slip casting eyelet road 2 stated goes directly the bottom of the inlet well 3, and Grouting Pipe 4 is set to the through note in pre-buried slip casting eyelet road 2 The bottom of slurry drilling 3, and expose the distance of the top 0.6m of the filling pile structure 1.It is sealed simultaneously in the tube coupling base opening of Grouting Pipe 4 Plastic cap 8 is held and be cased with, is arranged film bag 5 in the bottom of filling pile structure 1.
The Grouting Pipe 4 uses diameter to be made of Φ 40mm, wall thickness of the steel pipe of 3mm, selects band eye tube coupling, band eye tube coupling Long 0.8m, the spacing that tube wall is drilled between the slip casting eyelet 7 that aperture is Φ 20mm, adjacent slip casting eyelet 7 is 100mm, is in plum blossom Shape arrangement.
The film bag 5 uses diameter for the roll type nylon fiber bag of Φ 400mm, in the construction process, according to setting in advance The length for needing the length of slip casting to determine film bag 5 counted.When being arranged film bag 5, the upper end is bound in 1 or more 0.5m of filling pile structure At position, 5 middle part of film bag is bound together every 0.5m iron wire, and entire film bag is divided into multistage binding in Grouting Pipe 4.Film bag The upward 300mm in 5 bottom end binds twice with thin wire, and checks whether and tighten, in case slurry is let out in bottom.Bind the iron wire of film bag 5 14# iron wire can be used, binding dynamics is firm.
Engineering geological drilling rig, GPS-10 type circulation drill, DZ60KS type can be selected in the pore-forming equipment of the inlet well 3 Vibration hammer immersed tube machine etc., pore-forming can be recycled when creeping into clear water, collapse hole stratum using mud circulation for easily collapsing;Inlet well 3 Depth determined according to pile foundation bottom weak surrounding rock and bearing capacity demand.
Above as a kind of preferred embodiment of film bag grouting and reinforcing type filling pile structure of the utility model, in practice it has proved that energy Enough guarantee pile foundation engineering stable structure itself and supporting effect, and reserves construction item for later period consolidation process that may be present Part.
After the completion of construction, there is differential settlement in case of pile foundation engineering, under stake there is also engineering problems such as solution cavities, It need to only can be realized in time by the Grouting Pipe 4 in pre-buried slip casting eyelet road 2 to the filling grouting and reinforcing body 9 of the film bag 5 to stake The consolidation process on bottom stratum.The grouting and reinforcing body 9 selects cement-fly ash mixed serum, cement selection normal silicate water Mud, label are not lower than PO32.5.During slip casting, it then follows from bottom to top, the principle of mud jacking, pulls out slip casting upwards on one side section by section Pipe 4, one side slip casting.Extubation time is determined according to the length of injection speed, every linear meter(lin.m.) design grouting amount and each tube drawing, it is general every Secondary tube drawing height is the height of every section Grouting Pipe 4.Grouting pressure is comprehensive according to the quantity and distribution situation in pre-buried slip casting eyelet road 2 It closes and determines, guarantee that the range of grouting and reinforcing body 9 is not less than the area of section of filling pile structure 1.
Above embodiments are only to illustrate the technical solution of the utility model, rather than are limited, although referring to before Embodiment is stated the utility model is described in detail, it for those of ordinary skill in the art, still can be right Technical solution documented by previous embodiment is modified or equivalent replacement of some of the technical features.And these Modifications or substitutions, the utility model technical solution claimed that it does not separate the essence of the corresponding technical solution spirit and Range.

Claims (10)

1. a kind of film bag grouting and reinforcing type filling pile structure, including filling pile structure (1), pore-forming are in filling pile structure (1) bottom Inlet well (3), it is characterised in that through setting pre-buried slip casting eyelet road (2), Grouting Pipe inside the filling pile structure (1) (4) it is set to the pre-buried slip casting eyelet road (2) to go directly the bottoms of the inlet well (3), and exposes the filling pile structure (1) top, the tube coupling base opening of the Grouting Pipe (4) are blocked and are cased with plug (8), and filling pile structure (1) bottom is arranged film Bag (5).
2. a kind of film bag grouting and reinforcing type filling pile structure as described in claim 1, which is characterized in that the filling pile structure (1) section is circle, and stake diameter is not less than 0.5m.
3. a kind of film bag grouting and reinforcing type filling pile structure as described in claim 1, which is characterized in that the pre-buried injected hole Eye road (2) is made of pvc pipe, according to the diameter of the filling pile structure (1), is uniformly arranged at least one.
4. a kind of film bag grouting and reinforcing type filling pile structure as claimed in claim 3, which is characterized in that when the bored concrete pile knot The diameter of structure (1) is 0.5~0.8m, is arranged concentrically 1 pre-buried slip casting eyelet road (2) between two parties;When the filling pile structure (1) diameter is 0.8~1.8m, can the pre-buried slip casting eyelet road (2) of equilateral setting 3;When the filling pile structure (1) Diameter be greater than 1.8m, can by quincuncial arrangement several described pre-buried slip casting eyelet roads (2).
5. a kind of film bag grouting and reinforcing type filling pile structure as described in claim 1, which is characterized in that the pre-buried injected hole Eye road (2) is not less than 10cm at a distance from filling pile structure (1) outer profile, and is set on the inside of steel reinforcement cage.
6. a kind of film bag grouting and reinforcing type filling pile structure as described in claim 1, which is characterized in that the Grouting Pipe (4) It is made using steel pipe, including standard tube coupling Grouting Pipe and with eye tube coupling Grouting Pipe, the long 1.5m of the standard tube coupling Grouting Pipe section is closed Internode is connected with thread;The band eye tube coupling slip casting tube coupling long 0.8m is drilled with slip casting eyelet (7) on tube wall, the slip casting eyelet (7) aperture is Φ 20mm, spacing≤100mm of two adjacent slip casting eyelets (7).
7. a kind of film bag grouting and reinforcing type filling pile structure as claimed in claim 6, which is characterized in that the diameter of steel tube is Φ 30mm~Φ 40mm, wall thickness are 3mm~5mm.
8. a kind of film bag grouting and reinforcing type filling pile structure as described in claim 1, which is characterized in that film bag (5) set It is located at at least position 0.5m of the filling pile structure (1) bottom or more, is bound every 0.5m with iron wire (6) in the middle part of film bag (5) On Grouting Pipe (4), film bag (5) upward 300mm in bottom end is bound with iron wire (6).
9. a kind of film bag grouting and reinforcing type filling pile structure as described in claim 1, which is characterized in that the film bag (5) is Diameter is not less than the roll type nylon fiber bag of Φ 400mm.
10. a kind of film bag grouting and reinforcing type filling pile structure as described in claim 1, which is characterized in that the film bag (5) fills It is filled with slurry reinforcing body (9), the grouting and reinforcing body (9) selects cement-fly ash mixed serum, cement selection normal silicate water Mud, label are not less than PO32.5.
CN201820447317.3U 2018-03-30 2018-03-30 A kind of film bag grouting and reinforcing type filling pile structure Expired - Fee Related CN208167713U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820447317.3U CN208167713U (en) 2018-03-30 2018-03-30 A kind of film bag grouting and reinforcing type filling pile structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820447317.3U CN208167713U (en) 2018-03-30 2018-03-30 A kind of film bag grouting and reinforcing type filling pile structure

Publications (1)

Publication Number Publication Date
CN208167713U true CN208167713U (en) 2018-11-30

Family

ID=64372904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820447317.3U Expired - Fee Related CN208167713U (en) 2018-03-30 2018-03-30 A kind of film bag grouting and reinforcing type filling pile structure

Country Status (1)

Country Link
CN (1) CN208167713U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424378A (en) * 2019-07-10 2019-11-08 湖南大学 Punish stress dispersion intussusception steel-pipe pile and its installation method that solution cavity is lain concealed at stake end
CN111455981A (en) * 2020-04-05 2020-07-28 来安县祥瑞机电科技有限责任公司 Concrete cast-in-place pile of sludge texture foundation and construction method thereof
CN114108675A (en) * 2021-12-06 2022-03-01 中冶集团武汉勘察研究院有限公司 Pile forming method for pile foundation in karst area
CN115288159A (en) * 2022-09-13 2022-11-04 山东兖州建设总公司 Shock attenuation formula building engineering pile foundation
CN115305905A (en) * 2022-07-14 2022-11-08 北京中岩大地科技股份有限公司 Method for reinforcing soft foundation interlayer combined with pile foundation construction
CN116752554B (en) * 2023-06-27 2023-11-14 中国铁道科学研究院集团有限公司 High slope support system based on controlled cement grouting and implementation method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424378A (en) * 2019-07-10 2019-11-08 湖南大学 Punish stress dispersion intussusception steel-pipe pile and its installation method that solution cavity is lain concealed at stake end
CN110424378B (en) * 2019-07-10 2024-03-22 湖南大学 Stress dispersion telescopic steel pipe pile for treating pile end hidden karst cave and installation method thereof
CN111455981A (en) * 2020-04-05 2020-07-28 来安县祥瑞机电科技有限责任公司 Concrete cast-in-place pile of sludge texture foundation and construction method thereof
CN114108675A (en) * 2021-12-06 2022-03-01 中冶集团武汉勘察研究院有限公司 Pile forming method for pile foundation in karst area
CN114108675B (en) * 2021-12-06 2022-12-16 中冶集团武汉勘察研究院有限公司 Pile forming method for pile foundation in karst area
CN115305905A (en) * 2022-07-14 2022-11-08 北京中岩大地科技股份有限公司 Method for reinforcing soft foundation interlayer combined with pile foundation construction
CN115288159A (en) * 2022-09-13 2022-11-04 山东兖州建设总公司 Shock attenuation formula building engineering pile foundation
CN116752554B (en) * 2023-06-27 2023-11-14 中国铁道科学研究院集团有限公司 High slope support system based on controlled cement grouting and implementation method

Similar Documents

Publication Publication Date Title
CN208167713U (en) A kind of film bag grouting and reinforcing type filling pile structure
CN206512701U (en) Miniature steel-pipe pile supporting construction of built-in shaped steel
CN105862721B (en) A kind of high building structure reinforcement and rectification that is applied to has the slip casting composite foundation and its construction method of adjustability embedded steel tube
CN104612143A (en) Bored composite pile structure under karst cave/soil cave geological condition
CN206928305U (en) A kind of rigid passive area buttress type supporting construction
CN107503362A (en) A kind of compound antiskid piling wall retaining structure and construction method suitable for reservoir stability
CN107747312A (en) A kind of method of sand and gravel stratum well cementing construction
CN208472708U (en) A kind of grouting behind shaft or drift lining filling pile structure
CN108625369A (en) The hard patterning method construction method of interlocking pile in karst area
CN207211165U (en) A kind of compound antiskid piling wall retaining structure suitable for reservoir stability
CN207295685U (en) Huge karst cavity ruggedized construction in Railway Tunnel
CN208056108U (en) A kind of prefabricated assembled underground pipe gallery depression Disease Treatment structure
CN204959787U (en) Novel tower crane combination formula basis
CN107268647A (en) Impervious wall construction method under big flow high flow rate river channels at the underground river of underground
CN208472592U (en) Close to the steel pipe pile reinforced construction of deep basal pit bridge friction pile
CN114483081A (en) Construction method of deflection-preventing structure of curved middle wall of multi-arch tunnel under terrain bias pressure
CN110080779A (en) Tunnel tunnel bottom karst cave treatment construction method
CN101793027A (en) Core-grouted static pressure anchor rod pile
CN207484290U (en) The hollow clump of piles anchorage of super-large diameter
CN105698582B (en) Improve the preset energy ball geothermal heat exchanger of heat transfer efficiency
CN107268603A (en) The karst cave treatment structure and processing method of a kind of diaphram wall
CN208996052U (en) The drilling tool of supporting construction and use that foundation pit anchor wall draws anchor supporting to be formed
CN205530218U (en) Slip casting composite foundation suitable for high -rise building structural strengthening is rectified
CN205688443U (en) It is applicable to the core stake guider of cement slotting built pile
CN201635072U (en) Centrally grouted static-pressured anchor pile former

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181130

Termination date: 20210330

CF01 Termination of patent right due to non-payment of annual fee