Steel pipe pile basis and construction method thereof that planting steel stick is built
Technical field
The invention belongs to pile foundation and job practices thereof, be specifically related to steel pipe pile basis and job practices thereof on a kind of shallow covering layer or the exposed basement rock under water.
Background technology
Build the steel pipe pile basis in the riverbed, generally adopt driven pile, promptly adopt piling machinery that steel pipe is squeezed into the certain degree of depth in riverbed, this moment, steel pipe pile can rely on the stake end and pile body ground on every side bearing capacity to be provided, also to keep stable.But in the riverbed of exposed bedrock, because the extremely shallow or intectate of covering layer, steel pipe pile is difficult to squeeze into the enough degree of depth in rock stratum again, so the stability of pile body is difficult to ensure.
Summary of the invention
The object of the present invention is to provide a kind of steel pipe pile basis and job practices thereof that can guarantee that planting steel stick stable on shallow under water covering layer of steel pipe pile or the exposed basement rock is built, to address the above problem.
Technical scheme of the present invention is: planting steel stick is built the method on steel pipe pile basis, it is to offer core-drawing hole in basement rock, at least one rod iron partly planted in the core-drawing hole of basement rock, with steel pipe socket outside rod iron, underwater concrete is poured in steel pipe bottom and the core-drawing hole, makes steel pipe and rod iron and basement rock connect into integral body.
Here the interior rod iron quantity of steel pipe pile can be one or more, arranges evenly that in steel pipe pile the rod iron diameter is selected according to the steel pipe pile force request, and rod iron should be selected the profile strong with grip of concrete for use.
Two of technical scheme of the present invention is: it is partly to be connected and fixed with rod iron in the basement rock, and the outer rod iron of basement rock is located in the steel pipe, and steel pipe and rod iron connect into integrally formed steel pipe pile basis.
This method has solved under water that the steel pipe pile basis is difficult to squeeze into the enough degree of depth in rock stratum on the bedrock surface, so the stability of pile body is difficult to construction difficult problems such as guarantee; Solve problem by less relatively construction volume, steel pipe pile foundation construction on the bedrock surface under water of complexity is oversimplified relatively, guarantee the steel pipe pile mass of foundation.The steel pipe pile basis of this structure is novel, simple; Be applicable to the steel pipe pile foundation construction on shallow covering layer or the exposed basement rock under water.
Description of drawings
Fig. 1 planting steel stick is built steel pipe pile foundation structure schematic diagram.
Fig. 2~Fig. 5 planting steel stick is built the construction sequence schematic diagram on steel pipe pile basis.
The specific embodiment
Present embodiment is used for the explanation to claim of the present invention, and protection scope of the present invention is not limited to the following example.
As shown in Figure 1, be connected and fixed with rod iron 2 parts in the basement rock 5, basement rock 5 outer rod irons 2 are located in the steel pipe 3, and steel pipe 3 connects into integrally formed steel pipe pile basis with rod iron 2 by underwater concrete 4.Offer core-drawing hole 1 on basement rock 5, the diameter of core-drawing hole 1 is inserted in rod iron 2 in the core-drawing hole 1 greater than rod iron 2 diameters, and the diameter of core-drawing hole 1 is less than steel pipe 3 internal diameters.
Its construction sequence is as follows:
As Fig. 2, on basement rock, drill through core-drawing hole 1 with light-duty geological drilling rig;
As Fig. 3, in core-drawing hole 1, plant rod iron 2 under water by the diver;
Stable for rod iron, can between rod iron 2 and hole 1 wall, establish rod iron fastening devices 6.Rod iron fastening devices 6 can be a fixation fork, and fixed bar etc. can make rod iron fixing part or assembly.
As Fig. 4, under diver's the assistance steel pipe 3 is being socketed in the periphery of rod iron 2 and standing on the riverbed face;
As Fig. 5, adopt pouring underwater concrete 4 in vertical conduit normal direction steel pipe 3 bottoms and the core-drawing hole 1; Pouring underwater concrete is in steel pipe bottom and core-drawing hole.The steel pipe 2 outer underwater concretes of building are connected steel pipe 2 peripheries with basement rock 5
When treating that underwater concrete 4 reaches design strength, rock foundation firmly can be connected with steel pipe 3 by rod iron 2, form the steel pipe pile basis.The vertical bearing capacity of this pile foundation by rock foundation provide, horizontal bearing capacity provides jointly by rod iron 2 and underwater concrete 4.
The single steel pipe pile technical data of construction in case history of planting: the core-drawing hole diameter is 8.0~12.0cm, hole depth 1.0~2.0m; Rod iron diameter 30.050.0mm, long 3.0~4.0m can place 1~3 in the every steel pipe; Steel pipe is plain edition steel pipes with straight or spiral steel pipe, diameter 500.0~1000.0mm; Underwater concrete is with C30 and above pea gravel concreten, and cobble-stone diameter 5.0~20.0mm also can adopt mortar, can mix an amount of early strength admixture in concrete or mortar.