CN101173515B - Steel pipe pile foundation built by planting steel stick and building method thereof - Google Patents

Steel pipe pile foundation built by planting steel stick and building method thereof Download PDF

Info

Publication number
CN101173515B
CN101173515B CN2007101685152A CN200710168515A CN101173515B CN 101173515 B CN101173515 B CN 101173515B CN 2007101685152 A CN2007101685152 A CN 2007101685152A CN 200710168515 A CN200710168515 A CN 200710168515A CN 101173515 B CN101173515 B CN 101173515B
Authority
CN
China
Prior art keywords
steel pipe
steel
pipe pile
rod iron
planting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2007101685152A
Other languages
Chinese (zh)
Other versions
CN101173515A (en
Inventor
杨齐海
王喜良
高兴泽
王鹤
张国刚
杨先权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Co Ltd filed Critical China Railway Major Bridge Engineering Co Ltd
Priority to CN2007101685152A priority Critical patent/CN101173515B/en
Publication of CN101173515A publication Critical patent/CN101173515A/en
Application granted granted Critical
Publication of CN101173515B publication Critical patent/CN101173515B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a steel pipe pile foundation constructed by planting steel bars and the construction method of the foundation, which is characterized in that at least one steel bar is partly planted into a base rock, the steel pipe is sleeved outside the steel bar, underwater concrete is poured into the steel pipe to connect the steel pipe and the steel bar as a whole; part of the steel bar is fixedly connected with the base rock, the steel bar outside the base rock is arranged in the steel pipe, the steel pipe and the steel bar are connected as a whole to form the steel pipe pile foundation. The method solved the problem that the steel pipe pile foundation on the underwater base rock surface is hard to be driven into the rock stratum by sufficient depth, thus the stability of the pile body is hard to be ensured; the problem is solved with relatively less amount of construction, the complex construction of the steel pipe pile foundation on the underwater base rock surface is relatively simplified, the quality of the steel pipe pile foundation is ensured. The steel pipe pile foundation has the advantages of novelty, simplification, and applicability to the construction of steel pipe pile foundation on the underwater shallow coverage layer and the uncovered base rock.

Description

Steel pipe pile basis and construction method thereof that planting steel stick is built
Technical field
The invention belongs to pile foundation and job practices thereof, be specifically related to steel pipe pile basis and job practices thereof on a kind of shallow covering layer or the exposed basement rock under water.
Background technology
Build the steel pipe pile basis in the riverbed, generally adopt driven pile, promptly adopt piling machinery that steel pipe is squeezed into the certain degree of depth in riverbed, this moment, steel pipe pile can rely on the stake end and pile body ground on every side bearing capacity to be provided, also to keep stable.But in the riverbed of exposed bedrock, because the extremely shallow or intectate of covering layer, steel pipe pile is difficult to squeeze into the enough degree of depth in rock stratum again, so the stability of pile body is difficult to ensure.
Summary of the invention
The object of the present invention is to provide a kind of steel pipe pile basis and job practices thereof that can guarantee that planting steel stick stable on shallow under water covering layer of steel pipe pile or the exposed basement rock is built, to address the above problem.
Technical scheme of the present invention is: planting steel stick is built the method on steel pipe pile basis, it is to offer core-drawing hole in basement rock, at least one rod iron partly planted in the core-drawing hole of basement rock, with steel pipe socket outside rod iron, underwater concrete is poured in steel pipe bottom and the core-drawing hole, makes steel pipe and rod iron and basement rock connect into integral body.
Here the interior rod iron quantity of steel pipe pile can be one or more, arranges evenly that in steel pipe pile the rod iron diameter is selected according to the steel pipe pile force request, and rod iron should be selected the profile strong with grip of concrete for use.
Two of technical scheme of the present invention is: it is partly to be connected and fixed with rod iron in the basement rock, and the outer rod iron of basement rock is located in the steel pipe, and steel pipe and rod iron connect into integrally formed steel pipe pile basis.
This method has solved under water that the steel pipe pile basis is difficult to squeeze into the enough degree of depth in rock stratum on the bedrock surface, so the stability of pile body is difficult to construction difficult problems such as guarantee; Solve problem by less relatively construction volume, steel pipe pile foundation construction on the bedrock surface under water of complexity is oversimplified relatively, guarantee the steel pipe pile mass of foundation.The steel pipe pile basis of this structure is novel, simple; Be applicable to the steel pipe pile foundation construction on shallow covering layer or the exposed basement rock under water.
Description of drawings
Fig. 1 planting steel stick is built steel pipe pile foundation structure schematic diagram.
Fig. 2~Fig. 5 planting steel stick is built the construction sequence schematic diagram on steel pipe pile basis.
The specific embodiment
Present embodiment is used for the explanation to claim of the present invention, and protection scope of the present invention is not limited to the following example.
As shown in Figure 1, be connected and fixed with rod iron 2 parts in the basement rock 5, basement rock 5 outer rod irons 2 are located in the steel pipe 3, and steel pipe 3 connects into integrally formed steel pipe pile basis with rod iron 2 by underwater concrete 4.Offer core-drawing hole 1 on basement rock 5, the diameter of core-drawing hole 1 is inserted in rod iron 2 in the core-drawing hole 1 greater than rod iron 2 diameters, and the diameter of core-drawing hole 1 is less than steel pipe 3 internal diameters.
Its construction sequence is as follows:
As Fig. 2, on basement rock, drill through core-drawing hole 1 with light-duty geological drilling rig;
As Fig. 3, in core-drawing hole 1, plant rod iron 2 under water by the diver;
Stable for rod iron, can between rod iron 2 and hole 1 wall, establish rod iron fastening devices 6.Rod iron fastening devices 6 can be a fixation fork, and fixed bar etc. can make rod iron fixing part or assembly.
As Fig. 4, under diver's the assistance steel pipe 3 is being socketed in the periphery of rod iron 2 and standing on the riverbed face;
As Fig. 5, adopt pouring underwater concrete 4 in vertical conduit normal direction steel pipe 3 bottoms and the core-drawing hole 1; Pouring underwater concrete is in steel pipe bottom and core-drawing hole.The steel pipe 2 outer underwater concretes of building are connected steel pipe 2 peripheries with basement rock 5
When treating that underwater concrete 4 reaches design strength, rock foundation firmly can be connected with steel pipe 3 by rod iron 2, form the steel pipe pile basis.The vertical bearing capacity of this pile foundation by rock foundation provide, horizontal bearing capacity provides jointly by rod iron 2 and underwater concrete 4.
The single steel pipe pile technical data of construction in case history of planting: the core-drawing hole diameter is 8.0~12.0cm, hole depth 1.0~2.0m; Rod iron diameter 30.050.0mm, long 3.0~4.0m can place 1~3 in the every steel pipe; Steel pipe is plain edition steel pipes with straight or spiral steel pipe, diameter 500.0~1000.0mm; Underwater concrete is with C30 and above pea gravel concreten, and cobble-stone diameter 5.0~20.0mm also can adopt mortar, can mix an amount of early strength admixture in concrete or mortar.

Claims (9)

1. a planting steel stick is built the method on steel pipe pile basis, it is to offer core-drawing hole on basement rock, at least one rod iron partly planted in the core-drawing hole of basement rock, with steel pipe socket outside rod iron, underwater concrete is poured in the bottom and core-drawing hole of steel pipe, makes steel pipe and rod iron and basement rock connect into integral body.
2. planting steel stick is built the method on steel pipe pile basis according to claim 1, it is characterized in that building underwater concrete and be connected with steel pipe with basement rock rod iron is peripheral in steel pipe.
3. planting steel stick is built the method on steel pipe pile basis according to claim 1, it is characterized in that described core-drawing hole diameter greater than the rod iron diameter, and the core-drawing hole diameter is less than pipe diameter, and steel pipe stands on the riverbed bedrock surface.
4. build the method on steel pipe pile basis as planting steel stick as described in the claim 3, it is characterized in that establishing between rod iron and the hole wall rod iron fastening devices.
5. the planting steel stick steel pipe pile basis of building, it is partly to be connected and fixed with rod iron in the basement rock, and the outer rod iron of basement rock is located in the steel pipe, and steel pipe and rod iron connect into integrally formed steel pipe pile basis.
6. build the steel pipe pile basis as planting steel stick as described in the claim 5, it is characterized in that the steel pipe and the bedrock surface on described steel pipe pile basis connects into integral body by underwater concrete.
7. build the steel pipe pile basis as planting steel stick as described in the claim 5, it is characterized in that pouring underwater concrete connects into integral body with steel pipe and rod iron in the steel pipe.
8. build the steel pipe pile basis as planting steel stick as described in the claim 5, it is characterized in that offering core-drawing hole on basement rock, the core-drawing hole diameter is inserted in rod iron in the core-drawing hole greater than the rod iron diameter, and the core-drawing hole diameter is less than pipe diameter, and steel pipe stands on the riverbed bedrock surface.
9. build the steel pipe pile basis as planting steel stick as described in the claim 8, it is characterized in that pouring underwater concrete is in steel pipe bottom and core-drawing hole.
CN2007101685152A 2007-11-29 2007-11-29 Steel pipe pile foundation built by planting steel stick and building method thereof Active CN101173515B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007101685152A CN101173515B (en) 2007-11-29 2007-11-29 Steel pipe pile foundation built by planting steel stick and building method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007101685152A CN101173515B (en) 2007-11-29 2007-11-29 Steel pipe pile foundation built by planting steel stick and building method thereof

Publications (2)

Publication Number Publication Date
CN101173515A CN101173515A (en) 2008-05-07
CN101173515B true CN101173515B (en) 2010-09-08

Family

ID=39422248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007101685152A Active CN101173515B (en) 2007-11-29 2007-11-29 Steel pipe pile foundation built by planting steel stick and building method thereof

Country Status (1)

Country Link
CN (1) CN101173515B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102268871B (en) * 2010-06-03 2013-06-05 中国建筑第七工程局有限公司 Construction method of turnover platform for underwater pile foundation of bridge
CN102733407A (en) * 2011-04-01 2012-10-17 上海同济启明星科技发展有限公司 Two-ring grouted single pile foundation
CN102312442A (en) * 2011-07-01 2012-01-11 中铁大桥局股份有限公司 Construction method of trestle steel pipe pile foundation
CN102704472A (en) * 2012-05-17 2012-10-03 中国水电建设集团十五工程局有限公司 Embedding method of large-diameter steel casing in bay deep-water area seabed without covering layer
CN109837920A (en) * 2017-11-24 2019-06-04 上海勘测设计研究院有限公司 Marine brace foundation

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1896383A (en) * 2005-07-14 2007-01-17 胡柏英 Steel-pipe concrete assembled pile of predrilled hole rock-embedded and its construction
CN201148615Y (en) * 2007-11-29 2008-11-12 中铁大桥局股份有限公司 Steel tube pile foundation built by inseminate steel bar

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1896383A (en) * 2005-07-14 2007-01-17 胡柏英 Steel-pipe concrete assembled pile of predrilled hole rock-embedded and its construction
CN201148615Y (en) * 2007-11-29 2008-11-12 中铁大桥局股份有限公司 Steel tube pile foundation built by inseminate steel bar

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王鹤等.千岛湖大桥主桥嵌岩钢管混凝土桩施工.安徽建筑2005 4.2005,2005(4),81,82,87. *

Also Published As

Publication number Publication date
CN101173515A (en) 2008-05-07

Similar Documents

Publication Publication Date Title
CN109024651B (en) Steel pipe concrete mixed pile foundation and construction method
CN102691296A (en) Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof
CN101812843B (en) Centre grouted poured post-grouting pile construction methods, and grouter and grout injector used thereby
CN101173515B (en) Steel pipe pile foundation built by planting steel stick and building method thereof
CN208167713U (en) A kind of film bag grouting and reinforcing type filling pile structure
CN206928305U (en) A kind of rigid passive area buttress type supporting construction
CN105672307A (en) Expanded-base combination end pile bearing foundation
CN102852141A (en) Rock-socketed pipe pile foundation with pile core by concrete pouring and pile side by static pressure grouting and construction method for rock-socketed pipe pile foundation
CN207176673U (en) Suitable for the anti-depression ground base enforcement structure of the small-sized ancient building in soft clay area
CN103243740A (en) Construction method of rotary excavating and long spiral combination bored concrete pressure grouting secant pile continuous wall
CN206157786U (en) Compound muscle material anti -floating anchor rod structure of basalt
CN201148615Y (en) Steel tube pile foundation built by inseminate steel bar
CN208472592U (en) Close to the steel pipe pile reinforced construction of deep basal pit bridge friction pile
CN206337556U (en) A kind of grouting behind shaft or drift lining Prefabricated hollow pile
CN108625388A (en) A kind of sleeve combination formula large diameter single pile foundation and its construction method suitable for Shallow Bedrock geological conditions
CN105113492A (en) Construction method of composite pile applicable to cohesive soil, sandy soil and muddy soil foundations
CN101793027A (en) Core-grouted static pressure anchor rod pile
CN111749231A (en) Double-sleeve double-drive full-rotation pile forming device and pile forming process
CN209243732U (en) A kind of efficient mini steel-pipe pile constructing structure
CN103410529A (en) Tunnel supporting arch foot reinforced structure for soft surrounding rocks and construction method
CN109056747A (en) A kind of efficient mini steel-pipe pile constructing structure, method
CN205501998U (en) Expand end combination end -bearing pile basis
CN205188933U (en) Utilize composite foundation of precipitation well formation
CN204080797U (en) The composite pile of a kind of PHC stake and YTSC stake
CN107687168A (en) Inside hit and plant stake method and its application

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD.

Effective date: 20150204

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150204

Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau

Address before: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd.