CN201148615Y CNU2007200885852U CN200720088585U CN201148615Y CN 201148615 Y CN201148615 Y CN 201148615Y CN U2007200885852 U CNU2007200885852 U CN U2007200885852U CN 200720088585 U CN200720088585 U CN 200720088585U CN 201148615 Y CN201148615 Y CN 201148615Y
Authority
CN
China
Prior art keywords
steel pipe
pipe pile
steel
pile foundation
rod iron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2007200885852U
Other languages
Chinese (zh)
Inventor
杨齐海
王喜良
高兴泽
王鹤
张国刚
杨先权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Co Ltd
Original Assignee
China Railway Major Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Co Ltd filed Critical China Railway Major Bridge Engineering Co Ltd
Priority to CNU2007200885852U priority Critical patent/CN201148615Y/en
Application granted granted Critical
Publication of CN201148615Y publication Critical patent/CN201148615Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a steel pipe pile foundation for planting steel bar construction and is characterized in that the interior of a bedrock is fixedly connected with a steel bar part; the steel bar outside the bedrock is arranged in a steel pipe; the steel pipe is connected with at least a steel bar to integrally form the steel pipe pile foundation. The steel pipe pile foundation with novel and simple structure is suitable for underwater shallow overburden layer or bare bedrock. The utility model solves the problem that the steel pipe pile foundation on the underwater bedrock surface is difficult to be driven into the rock layer with sufficient depth, thus hardly ensuring the stability of the pile body; handles the problem through a small amount of construction; relatively simplifies the complicated steel pipe pile foundation on the underwater bedrock surface; and ensures the quality of the steel pipe pile foundation.

Description

The steel pipe pile basis that planting steel stick is built
Technical field
The utility model belongs to pile foundation construction, is specifically related to the steel pipe pile basis on a kind of shallow covering layer or the exposed basement rock under water.
Background technology
Build the steel pipe pile basis in the riverbed, generally adopt driven pile, promptly adopt piling machinery that steel pipe is squeezed into the certain degree of depth in riverbed, this moment, steel pipe pile can rely on the stake end and pile body ground on every side bearing capacity to be provided, also to keep stable.But in the riverbed of exposed bedrock, because the extremely shallow or intectate of covering layer, steel pipe pile is difficult to squeeze into the enough degree of depth in rock stratum again, so the stability of pile body is difficult to ensure.
Summary of the invention
The purpose of this utility model is to provide a kind of steel pipe pile basis that can guarantee that planting steel stick stable on shallow under water covering layer of steel pipe pile or the exposed basement rock is built, to address the above problem.
Technical scheme of the present invention is: it is partly to be connected and fixed with rod iron in the basement rock, and the outer rod iron of basement rock is located in the steel pipe, and steel pipe and at least one rod iron connect into integrally formed steel pipe pile basis.
Here the interior rod iron quantity of steel pipe pile can be one or more, arranges evenly that in steel pipe pile the rod iron diameter is selected according to the steel pipe pile force request, and rod iron should be selected the profile strong with grip of concrete for use.
The steel pipe pile basis of this structure is novel, simple; Be applicable to the steel pipe pile basis on shallow covering layer or the exposed basement rock under water.It has solved under water, and the steel pipe pile basis is difficult to squeeze into the enough degree of depth in rock stratum on the bedrock surface, so the stability of pile body is difficult to construction difficult problems such as guarantee; Solve problem by less relatively construction volume, steel pipe pile foundation construction on the bedrock surface under water of complexity is oversimplified relatively, guarantee the steel pipe pile mass of foundation.
Description of drawings
Fig. 1 planting steel stick is built steel pipe pile foundation structure schematic diagram.
Fig. 2~Fig. 5 planting steel stick is built the construction sequence schematic diagram on steel pipe pile basis.
The specific embodiment
Present embodiment is used for the explanation to the utility model claim, and protection domain of the present utility model is not limited to the following example.
As shown in Figure 1, be connected and fixed with rod iron 2 parts in the basement rock 5, basement rock 5 outer rod irons 2 are located in the steel pipe 3, and steel pipe 3 connects into integrally formed steel pipe pile basis with rod iron 2 by underwater concrete 4.Offer core-drawing hole 1 on basement rock 5, the aperture of loosing core is inserted in rod iron 2 in the hole 1 greater than rod iron 2 diameters, and core-drawing hole 1 footpath is less than steel pipe 3 internal diameters.
Its construction sequence is as follows:
As Fig. 2, on basement rock, drill through the small bore 1 of loosing core with light-duty geological drilling rig;
As Fig. 3, in the small bore 1 of loosing core, plant rod iron 2 under water by the diver;
Stable for rod iron, can between rod iron 2 and hole 1 wall, establish rod iron fastening devices 6.Rod iron fastening devices 6 can be a fixation fork, and fixed bar etc. can make rod iron fixing part or assembly.
As Fig. 4, under diver's the assistance steel pipe 3 is being socketed in the periphery of rod iron 2 and standing on the riverbed face;
As Fig. 5, adopt pouring underwater concrete 4 in vertical conduit normal direction steel pipe 3 bottoms and the small bore 1 of loosing core; Pouring underwater concrete is in steel pipe bottom and core-drawing hole.The steel pipe 2 outer underwater concretes of building are connected steel pipe 2 peripheries with basement rock 5
When treating that underwater concrete 4 reaches design strength, rock foundation firmly can be connected with steel pipe 3 by rod iron 2, form the steel pipe pile basis.The vertical bearing capacity of this pile foundation by rock foundation provide, horizontal bearing capacity provides jointly by rod iron 2 and underwater concrete 4.
The single steel pipe pile technical data of construction in case history of planting: the small bore diameter of loosing core is 8.0~12.0cm, hole depth 1.0~2.0m; Rod iron diameter 30.0~50.0mm, long 3.0~4.0m can place 1~3 in the every steel pipe; Steel pipe is plain edition steel pipes with straight or spiral steel pipe, diameter 500.0~1000.0mm; Underwater concrete is with C30 and above pea gravel concreten, and cobble-stone diameter 5.0~20.0mm also can adopt mortar, can mix an amount of early strength admixture in concrete or mortar.

Claims (5)

1, a kind of steel pipe pile basis of planting steel stick construction is characterized in that it is partly to be connected and fixed with rod iron in the basement rock, and the outer rod iron of basement rock is located in the steel pipe, and steel pipe and at least one rod iron connect into integrally formed steel pipe pile basis.
2, planting steel stick is built the steel pipe pile basis according to claim 1, it is characterized in that the steel pipe and the bedrock surface on described steel pipe pile basis connects into integral body by underwater concrete.
3, planting steel stick is built the steel pipe pile basis according to claim 1, it is characterized in that pouring underwater concrete connects into integral body with steel pipe and rod iron in the steel pipe.
4, planting steel stick is built the steel pipe pile basis according to claim 1, it is characterized in that offering core-drawing hole on basement rock, and the aperture of loosing core is inserted in rod iron in the hole greater than the rod iron diameter, and the aperture of loosing core is less than pipe diameter.
5, build the steel pipe pile basis as arbitrary planting steel stick as described in claim 1 or 2 or 3 or 4, it is characterized in that pouring underwater concrete is in steel pipe bottom and core-drawing hole.
CNU2007200885852U 2007-11-29 2007-11-29 Steel tube pile foundation built by inseminate steel bar Expired - Lifetime CN201148615Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200885852U CN201148615Y (en) 2007-11-29 2007-11-29 Steel tube pile foundation built by inseminate steel bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200885852U CN201148615Y (en) 2007-11-29 2007-11-29 Steel tube pile foundation built by inseminate steel bar

Publications (1)

Publication Number Publication Date
CN201148615Y true CN201148615Y (en) 2008-11-12

Family

ID=40116381

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200885852U Expired - Lifetime CN201148615Y (en) 2007-11-29 2007-11-29 Steel tube pile foundation built by inseminate steel bar

Country Status (1)

Country Link
CN (1) CN201148615Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101173515B (en) * 2007-11-29 2010-09-08 中铁大桥局股份有限公司 Steel pipe pile foundation built by planting steel stick and building method thereof
CN105297764A (en) * 2015-10-30 2016-02-03 上海勘测设计研究院有限公司 Offshore wind plant fan single pile foundation and construction method thereof
CN106638582A (en) * 2017-02-15 2017-05-10 中交第二航务工程勘察设计院有限公司 Pile stabilizing device for socketed pile steel casing

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101173515B (en) * 2007-11-29 2010-09-08 中铁大桥局股份有限公司 Steel pipe pile foundation built by planting steel stick and building method thereof
CN105297764A (en) * 2015-10-30 2016-02-03 上海勘测设计研究院有限公司 Offshore wind plant fan single pile foundation and construction method thereof
CN105297764B (en) * 2015-10-30 2017-09-22 上海勘测设计研究院有限公司 Marine wind electric field fan single-pile foundation and its construction method
CN106638582A (en) * 2017-02-15 2017-05-10 中交第二航务工程勘察设计院有限公司 Pile stabilizing device for socketed pile steel casing
CN106638582B (en) * 2017-02-15 2019-01-29 中交第二航务工程勘察设计院有限公司 A kind of steady stake device of embedded rock pile steel pile casting

Similar Documents

Publication Publication Date Title
CN102691296B (en) Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof
CN101761074B (en) Method for improving bearing capacity and tensile capacity of tubular pile end
CN100476082C (en) Post-grouting construction method for long helical bore grouting pile and grouting device thereof
CN109024651B (en) Steel pipe concrete mixed pile foundation and construction method
CN101812843B (en) Centre grouted poured post-grouting pile construction methods, and grouter and grout injector used thereby
CN204370469U (en) A kind of drilled pile long leg jacket offshore wind turbine foundation
CN202509533U (en) Single reinforcement pulling force type anti-floating anchor rod
CN101173515B (en) Steel pipe pile foundation built by planting steel stick and building method thereof
CN201148615Y (en) Steel tube pile foundation built by inseminate steel bar
CN206157786U (en) Compound muscle material anti -floating anchor rod structure of basalt
CN206646541U (en) A kind of embedding rock single-pile foundation of batholith sea bed offshore wind turbine
CN104196021A (en) Uplift pile structure and construction method thereof
CN204125941U (en) Uplift pile structure
CN204080797U (en) The composite pile of a kind of PHC stake and YTSC stake
CN210288415U (en) Foundation pit slope support anchoring structure
CN202299138U (en) Grout anchor rebar connecting piece
CN202124857U (en) Splitting pile
CN203256736U (en) Composite pile with strongly-stirred soil implanted with rigid body and embedded with hard bearing layer
CN206495202U (en) A kind of top expansion type cement-soil composite pile
CN206418494U (en) Steel reinforcement cage plants pile foundation structure
CN205259174U (en) Stake of sleeve pipe bamboo reinforcement soil cement
CN204662452U (en) A kind of cast-in-place concrete pile base pressure slurry closing device
CN203334292U (en) Batter pile for supporting building foundation pit
CN205501993U (en) Back slip casting bored concrete pile structure
CN203961809U (en) Super large caliber Drilling Water mud collar structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20081112

Effective date of abandoning: 20071129