CN206646541U - A kind of embedding rock single-pile foundation of batholith sea bed offshore wind turbine - Google Patents

A kind of embedding rock single-pile foundation of batholith sea bed offshore wind turbine Download PDF

Info

Publication number
CN206646541U
CN206646541U CN201720319684.0U CN201720319684U CN206646541U CN 206646541 U CN206646541 U CN 206646541U CN 201720319684 U CN201720319684 U CN 201720319684U CN 206646541 U CN206646541 U CN 206646541U
Authority
CN
China
Prior art keywords
steel
pipe pile
pile
rock
pile foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720319684.0U
Other languages
Chinese (zh)
Inventor
甘毅
王宇楠
李祖发
张金福
王桂兰
李响亮
杨伟华
贺正兴
胡雪扬
郑俨刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Water Conservancy And Hydropower Survey And Design Institute (ministry Of Water Resources Fujian Institute Of Water Conservancy And Hydropower Investigation And Design)
Original Assignee
Fujian Water Conservancy And Hydropower Survey And Design Institute (ministry Of Water Resources Fujian Institute Of Water Conservancy And Hydropower Investigation And Design)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Water Conservancy And Hydropower Survey And Design Institute (ministry Of Water Resources Fujian Institute Of Water Conservancy And Hydropower Investigation And Design) filed Critical Fujian Water Conservancy And Hydropower Survey And Design Institute (ministry Of Water Resources Fujian Institute Of Water Conservancy And Hydropower Investigation And Design)
Priority to CN201720319684.0U priority Critical patent/CN206646541U/en
Application granted granted Critical
Publication of CN206646541U publication Critical patent/CN206646541U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

It the utility model is related to a kind of embedding rock single-pile foundation of batholith sea bed offshore wind turbine, including the steel-pipe pile in insertion weak-weathered rock basic unit, the annular groove positioned at steel-pipe pile bottom periphery is offered in batholith, steel-pipe pile lower end internal sleeve is provided with interior casing, leave gap between interior casing and steel-pipe pile inwall, high-strength grouting body is perfused with the gap in annular groove and between interior casing and steel-pipe pile inwall.The embedding rock single-pile foundation of the utility model batholith sea bed offshore wind turbine is reliable and stable, ensures that single-pile foundation can combine closely with the basement rock of surrounding, and be reliably mounted in weak-weathered rock basic unit;The out-of-flatness of the influence and the scar that drills of reduction large diameter borehole aperture and borehole perpendicularity error to single-pile foundation slope causes the problem of stress concentration that steel-pipe pile in-rock segment is locally lain in;Side's amount of in-rock segment backfill concrete can be reduced simultaneously.Efficiently solve the key technique problem that single-pile foundation is applied in batholith sea bed.

Description

A kind of embedding rock single-pile foundation of batholith sea bed offshore wind turbine
Technical field
It the utility model is related to a kind of embedding rock single-pile foundation of batholith sea bed offshore wind turbine.
Background technology
Current generation, the Wind turbines foundation pattern for being used for marine wind electric field both at home and abroad mainly have pile foundation(Including single pile Basis, jacket basis, tripod basis etc.), gravity type foundation, four kinds of suction cartridge type basis and floating type basis etc..Wherein, Single-pile foundation force analysis is clear and definite, and structural shape is simple, and speed of application is fast.Single-pile foundation is applied to 0 by external wind power plant ~ 40m depth of waters marine site, wind power generating set single-machine capacity are up to 8MW;It is soft that domestic wind power plant has also possessed abundant single-pile foundation Base sea bed construction experiences.According to statistics, the offshore wind turbine foundation in the whole world more than 75% uses single-pile foundation pattern at present.
Because the marine sites such as domestic the Taiwan Straits are batholith sea bed, rock stratum buried depth is shallower at the seat in the plane of part, and steel-pipe pile can Driving depth is shorter, and steel-pipe pile stake end, which needs to be embedded in weak weathered rockses, could meet the related request of basic constructional design.According to Domestic batholith sea bed construction experience, under existing construction level and ability, steel-pipe pile can not directly sink to weak weathered rockses, i.e., without The disposable pile sinking of method is in place, it is necessary to carry out drilling construction.According to marine site geological conditions such as existing geological mapping data, the Taiwan Straits Change greatly, scar big rise and fall.It there may be that the rock stratum i.e. sides of different rate of decay in same plane to be present be compared with hard rock Layer, opposite side are the situations compared with incompetent bed, when actual pile sinking and drilling construction, the different resistances or differential settlement of both sides The perpendicularity of single-pile foundation can be caused to be unsatisfactory for specification and design requirement, uncontrollable factor is relatively more in work progress, drilling The control difficulty of perpendicularity and aperture accuracy is larger, and the out-of-flatness for the scar that drills is so that steel-pipe pile in-rock segment locally there may be Problem of stress concentration.
Utility model content
In view of this, the purpose of this utility model is to provide a kind of novel embedding rock single pile of batholith sea bed offshore wind turbine of structure Basis, ensure single-pile foundation in batholith sea bed using reliable and stable.
The utility model is realized using following scheme:A kind of embedding rock single-pile foundation of batholith sea bed offshore wind turbine, including insertion Steel-pipe pile in weak-weathered rock basic unit, offers the annular groove positioned at steel-pipe pile bottom periphery in batholith, in steel-pipe pile lower end Portion is arranged with interior casing, leaves gap between interior casing and steel-pipe pile inwall, in annular groove and interior casing and steel-pipe pile inwall Between gap in be perfused with high-strength grouting body.
Further, steel-pipe pile upper end is provided with fastener for connection section, and blower fan tower barrel is provided with positioned at fastener for connection section top.
Further, the internal connection position between fastener for connection section and steel-pipe pile is perfused with linkage section high-strength grouting body, Steel-pipe pile side wall has the bracket to supporting steel pipe linkage section.
Compared with prior art, the utility model has the advantages that:The utility model batholith sea bed offshore wind turbine Embedding rock single-pile foundation is reliable and stable, ensures that single-pile foundation can combine closely with the basement rock of surrounding, and be reliably mounted in weak wind Change in batholith layer;Reduce the influence and drilling scar of large diameter borehole aperture and borehole perpendicularity error to single-pile foundation slope Out-of-flatness cause problem of stress concentration that steel-pipe pile in-rock segment is locally lain in;The side of in-rock segment backfill concrete can be reduced simultaneously Amount, infrastructure investment is reduced, efficiently solves the key technique problem that single-pile foundation is applied in batholith sea bed.
For the purpose of this utility model, technical scheme and advantage is more clearly understood, specific embodiment will be passed through below And relevant drawings, the utility model is described in further detail.
Brief description of the drawings
Fig. 1 is the utility model embodiment organigram;
Fig. 2 is the utility model embodiment work progress step(3)Schematic diagram;
Fig. 3 is the utility model embodiment work progress step(4)Schematic diagram;
Fig. 4 is the utility model embodiment work progress step(5)Schematic diagram;
Fig. 5 is the utility model embodiment work progress step(6)Schematic diagram;
Fig. 6 is the utility model embodiment work progress step(7)Schematic diagram;
Label declaration in figure:Protected in 1- fastener for connection section, 2- linkage section high-strength groutings body, 3- brackets, 4- steel-pipe piles, 5- Cylinder, 6- high-strength groutings body, 7- annular grooves.
Embodiment
As shown in figure 1, a kind of embedding rock single-pile foundation of batholith sea bed offshore wind turbine, includes inserting the weak-weathered rock basic unit of batholith In steel-pipe pile 4, the annular groove 7 positioned at the bottom of steel-pipe pile 4 periphery is offered in batholith, steel-pipe pile lower end internal sleeve is provided with interior Casing 5, leaves gap between interior casing 5 and steel-pipe pile 4 inwall, in annular groove 7 and between interior casing and steel-pipe pile inwall High-strength grouting body 6 of the presetting period no less than 8h is perfused with gap, high-strength grouting body 6 ensures that steel-pipe pile outer wall and rock mass are tight Close combination, by increasing casing in thin-walled inside single-pile foundation lower end, and realize the reliable grouting at stake end, ensure single pile Basis can combine closely with the basement rock of surrounding, and reliably be mounted in weak-weathered rock basic unit;Reduce large diameter borehole aperture And the out-of-flatness of influence and drill scar of the borehole perpendicularity error to single-pile foundation slope make it that steel-pipe pile in-rock segment is local Existing problem of stress concentration;Side's amount of in-rock segment backfill concrete can be reduced simultaneously.Single-pile foundation is efficiently solved in batholith sea The key technique problem applied in bed.
In the present embodiment, the upper end of steel-pipe pile 4 is provided with fastener for connection section 1, and wind is provided with positioned at the top of fastener for connection section 1 Machine tower.
In the present embodiment, the internal connection position between fastener for connection section 1 and steel-pipe pile 4 is perfused with the high-strength filling of linkage section Slurry 2, the side wall of steel-pipe pile 4 have the bracket 3 to supporting steel pipe linkage section.
The work progress of the embedding rock single-pile foundation of batholith sea bed offshore wind turbine:(1)Carry out steel pipe sunk pile pile drivability point Analysis, the depth and pile sinking that analysis steel-pipe pile can be squeezed into stop hammer standard;(2)Prefabricated steel-pipe pile, interior casing and fastener for connection section, transport To appointed place;(3)High-energy hydraulic impact hammer pile sinking is coordinated to certain depth using vibration hammer, as shown in Figure 2;(4)Using Pile gripper or steady stake platform fix steel-pipe pile, and embedding rock drilling machine is set up at the top of steel-pipe pile, along the drilling downwards of steel-pipe pile centre, bore Reaming can be started after to steel-pipe pile lower surface to drilling bottom elevation is designed, as shown in Figure 3;(5)After the completion of reaming, take out and bore Machine, after borehole cleaning reaches requirement, interior casing is transferred to institute's foot of hole, and casing axis and steel in guarantee along steel-pipe pile inwall Pile tube axis overlaps, as shown in Figure 4;(6)8h high-strength grouting body is no less than to the steel-pipe pile inside perfusion presetting period, it is high-strength The body that is in the milk enters with being further in the milk behind the space of interior casing along steel-pipe pile inwall, until the space quilt between interior casing and basement rock Completely fill out, as shown in Figure 5;(7)Beaten before high-strength grouting body initial set, then by steel-pipe pile to foot of hole, sink to steel-pipe pile In high-strength grouting body, formed and combined closely after the condensation of high-strength grouting body, as shown in Figure 6;(8)Fastener for connection section, adjustment are installed The flatness of fastener for connection section top flange simultaneously irrigates linkage section high-strength grouting body, as shown in Figure 1.
Above-listed preferred embodiment, the purpose of this utility model, technical scheme and advantage are further described, It should be understood that and the foregoing is only preferred embodiment of the present utility model, it is all not to limit the utility model Within the spirit and principles of the utility model, any modification, equivalent substitution and improvements made etc., this practicality should be included in Within new protection domain.

Claims (3)

  1. A kind of 1. embedding rock single-pile foundation of batholith sea bed offshore wind turbine, it is characterised in that:Including the steel in insertion weak-weathered rock basic unit Pile tube, the annular groove positioned at steel-pipe pile bottom periphery is offered in batholith, and steel-pipe pile lower end internal sleeve is provided with interior casing, interior shield Gap is left between cylinder and steel-pipe pile inwall, is perfused with the gap in annular groove and between interior casing and steel-pipe pile inwall High-strength grouting body.
  2. 2. the embedding rock single-pile foundation of batholith sea bed offshore wind turbine according to claim 1, it is characterised in that:Pacify steel-pipe pile upper end Equipped with fastener for connection section, blower fan tower barrel is installed positioned at fastener for connection section top.
  3. 3. the embedding rock single-pile foundation of batholith sea bed offshore wind turbine according to claim 2, it is characterised in that:Fastener for connection section with Internal connection position between steel-pipe pile is perfused with linkage section high-strength grouting body, and steel-pipe pile side wall has to be connected to supporting steel pipe The bracket of section.
CN201720319684.0U 2017-03-30 2017-03-30 A kind of embedding rock single-pile foundation of batholith sea bed offshore wind turbine Expired - Fee Related CN206646541U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720319684.0U CN206646541U (en) 2017-03-30 2017-03-30 A kind of embedding rock single-pile foundation of batholith sea bed offshore wind turbine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720319684.0U CN206646541U (en) 2017-03-30 2017-03-30 A kind of embedding rock single-pile foundation of batholith sea bed offshore wind turbine

Publications (1)

Publication Number Publication Date
CN206646541U true CN206646541U (en) 2017-11-17

Family

ID=60280239

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720319684.0U Expired - Fee Related CN206646541U (en) 2017-03-30 2017-03-30 A kind of embedding rock single-pile foundation of batholith sea bed offshore wind turbine

Country Status (1)

Country Link
CN (1) CN206646541U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108505534A (en) * 2018-05-24 2018-09-07 中能电力科技开发有限公司 A kind of embedding rock single pile construction method of offshore wind turbine base expanding and base expanding formula and system
CN109811786A (en) * 2019-03-26 2019-05-28 福建永福电力设计股份有限公司 A kind of offshore wind farm composite base structure of outer and inner tube stake combination
CN112031017A (en) * 2020-09-11 2020-12-04 中铁十一局集团第一工程有限公司 Construction method suitable for deep water pile foundation steel casing under bare rock geological condition
CN113250238A (en) * 2021-05-19 2021-08-13 中交第三航务工程局有限公司 Rock-socketed construction method of marine ultra-large-diameter single pile based on loosening ring theory

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108505534A (en) * 2018-05-24 2018-09-07 中能电力科技开发有限公司 A kind of embedding rock single pile construction method of offshore wind turbine base expanding and base expanding formula and system
CN109811786A (en) * 2019-03-26 2019-05-28 福建永福电力设计股份有限公司 A kind of offshore wind farm composite base structure of outer and inner tube stake combination
CN109811786B (en) * 2019-03-26 2024-03-26 福建永福电力设计股份有限公司 Offshore wind power composite foundation structure with inner steel pipe pile and outer steel pipe pile combined
CN112031017A (en) * 2020-09-11 2020-12-04 中铁十一局集团第一工程有限公司 Construction method suitable for deep water pile foundation steel casing under bare rock geological condition
CN113250238A (en) * 2021-05-19 2021-08-13 中交第三航务工程局有限公司 Rock-socketed construction method of marine ultra-large-diameter single pile based on loosening ring theory

Similar Documents

Publication Publication Date Title
CN106759449A (en) A kind of embedding rock single-pile foundation of batholith sea bed offshore wind turbine and its construction method
CN206646541U (en) A kind of embedding rock single-pile foundation of batholith sea bed offshore wind turbine
CN102691296B (en) Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof
WO2018210019A1 (en) Pile formation method for down-the-hole impact rotary jet composite piles
CN103603342B (en) Major diameter assembled casing super-long filling pile construction method
CN107299632A (en) Marine rock drilling strike-on type large diameter pile structure and construction method
CN104018512B (en) The caisson sinking construction method dynamic to environment micro-turbulence
CN204370469U (en) A kind of drilled pile long leg jacket offshore wind turbine foundation
CN102852141B (en) Rock-socketed pipe pile foundation with pile core by concrete pouring and pile side by static pressure grouting and construction method for rock-socketed pipe pile foundation
CN102383431B (en) Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof
CN105780806A (en) Offshore wind turbine foundation for long-leg jacket of drilling piles and construction method of offshore wind turbine foundation
CN106906840A (en) The method of offshore wind farm rock-socketed steel pipe piles and the outer grouting construction of stake
WO2024007591A1 (en) Rock-socketed monopile construction method based on double-casing pile stabilizing platform
CN206646538U (en) Single-pile foundation for batholith sea bed soft overburden
CN108265720A (en) A kind of single-point bellows grouting device and its method for controlling soil deformation
CN103015408A (en) Cast-in-place pile synchronous casing hole-forming constructing method
CN206956717U (en) Marine rock drilling strike-on type large diameter pile structure
CN102808407A (en) Construction method of soft-foundation reinforced concrete cast-in-place pile
CN110241731A (en) A method of forming rock-socketed pile foundation in seabed
CN107447749A (en) A kind of heat-exchange system and construction technology based on deep layer pipe laying and energy pile
CN110185059A (en) A kind of suction tube jacket wind turbine foundation and its construction method
CN211646445U (en) Riprap layer pile
CN203977417U (en) Ribs built-in steel casing for a kind of pile of deep water pile foundation
CN111749231A (en) Double-sleeve double-drive full-rotation pile forming device and pile forming process
CN206681002U (en) A kind of complicated geological soil layer Self-drilling hollow grouting anchoring-bolt

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant