CN204898696U - Telescopic steel cofferdam - Google Patents
Telescopic steel cofferdam Download PDFInfo
- Publication number
- CN204898696U CN204898696U CN201520661137.1U CN201520661137U CN204898696U CN 204898696 U CN204898696 U CN 204898696U CN 201520661137 U CN201520661137 U CN 201520661137U CN 204898696 U CN204898696 U CN 204898696U
- Authority
- CN
- China
- Prior art keywords
- support bar
- steel
- level
- cofferdam
- steel cofferdam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a telescopic steel cofferdam, including bottom plate, guide rail, several grades of steel cofferdams and supporting mechanism, its median level steel cofferdam cup joints into a whole and can go up and down according to the diameter size in proper order, and guide rail and supporting mechanism are established on the bottom plate, and the steel cofferdam of bottom is established on the guide rail, and several grades of steel cofferdams go up and down through the supporting mechanism. The material of bottom plate, guide rail, base, one -level bracing piece, second grade bracing piece and ejector pin is steel. The one -level bracing piece is detachable construction with the connection structure of base and base and bottom plate. The outside of the steel cofferdam junction of looks adjacent level is pasted and is had the PVC water proof membrane. Beneficial effect: save manpower and material resources for the construction progress shortens construction period, the circulated use of each component, service life is longer, the simple structure, construction convenience, the cost is cheap relatively, it is extravagant to avoid the construction.
Description
Technical field
The utility model relates to a kind of cofferdam, particularly the telescopic steel cofferdam of one.
Background technology
At present, along with the fast development of China's economy, hydraulic engineering, speedway, building railway increase day by day, cross a river, also to get more and more across bridge engineering such as rivers, all need the cofferdam that temporary water dash is set before these engineering constructions, so that excavation pit, build building.Cofferdam structure conventional at present has earth-rock cofferdam structure, turf cofferdam structure, concrete cofferdam structure and steel sheet pile sash cofferdam structure.It is comparatively large mainly to there is cofferdam section in earth-rock cofferdam structure, turf cofferdam structure, uses the earthwork more, unfavorable environmental protection, and cofferdam is several respects shortcoming such as side erosion resistibility difference near water; Concrete cofferdam structure construction difficulty; Conventional steel sheet pile cofferdam structure involves great expense as La Ersen steel sheet pile and clarke Wan Nashi steel sheet pile, going along with sb. to guard him scope excessive, when carrying out small bridge Bridge Pier Construction, can cause larger waste.Moreover the construction and installation of these cofferdam structures and dismantle all more complicated, need at substantial man power and material, and consuming time longer.
Summary of the invention
The purpose of this utility model is to solve the various deficiency that existing several cofferdam structure exists in work progress and the telescopic steel cofferdam of one provided.
The telescopic steel cofferdam that the utility model provides includes base plate, guide rail, several grades of steel cofferdams and supporting mechanism, wherein several grades of steel cofferdams are socketed into an entirety successively according to diameter and can be elevated, guide rail and supporting mechanism are located on base plate, the steel cofferdam of bottom is located on guide rail, and several grades of steel cofferdams are elevated by supporting mechanism.
Supporting mechanism includes pedestal, one level of support bar, secondary support bar and several sections of push rod, wherein one level of support bar is located on pedestal, secondary support bar is plugged in one level of support bar, the top of one level of support bar is provided with connecting hole, the lower end of secondary support bar is provided with several adjustment hole, one level of support bar and secondary support bar are fixed by connecting hole and adjustment hole and are connected, the height of secondary support bar is regulated by the adjustment hole of secondary support bar bottom, push rod is located at the top of secondary support bar, and the upper end of push rod is resisted against bottom the steel cofferdam of the first order.
The material of base plate, guide rail, pedestal, one level of support bar, secondary support bar and push rod is steel.
The syndeton of one level of support bar and pedestal and pedestal and base plate is demountable structure.
The outside of the steel cofferdam joint of adjacent level is pasted with PVC waterproof film.
Use principle of the present utility model:
According to the depth of water and go along with sb. to guard him area determination steel cofferdam progression and steel cofferdam diameter at different levels, go along with sb. to guard him the number of area and shape determination supporting mechanism according to cofferdam.Guide rail is fixed on base plate, steel cofferdam at different levels is connected together, then the steel cofferdam of bottom one-level put into guide rail and carry out being fixed into an entirety, by crane by this overall submerged assigned address, afterwards several grades of steel cofferdams are upwards sling until its upper edge exceeds the water surface, ensure that steel cofferdam at different levels stretches out completely simultaneously.Afterwards each one level of support bar is fixed with pedestal and is connected, then determine that one level of support bar and the corresponding position of secondary support bar use bolt to be fixed connection by connecting hole and adjustment hole according to the height to base plate bottom several grades of steel cofferdams, overall length after one level of support bar and secondary support bar connect slightly is shorter than the height to base plate bottom several grades of steel cofferdams, again by regulating the height of push rod, it is made to contact with bottom several grades of steel cofferdams, remove the power be applied on several grades of steel cofferdams afterwards, the weight of upper end steel cofferdam at different levels is all born by supporting mechanism.Finally drawn water in inside, cofferdam, PVC waterproof film is attached to outside steel cofferdam joint at different levels in pump process, inside and outside cofferdam, mineralization pressure is poor gradually, and PVC waterproof film is tightly attached to outside the joint of steel cofferdam at different levels under the effect of external and internal pressure difference, prevents cofferdam seepage.
The beneficial effects of the utility model:
Steel cofferdam can stretch, and greatly shortens the steel cofferdam installation and removal time used, saves man power and material, accelerating construction progress, shorten the construction period; Each component can be recycled, and service life is longer; Simple structure, easy construction, cost relative moderate; According to the depth of water and go along with sb. to guard him area determination steel cofferdam progression and cofferdam at different levels diameter, according to the number going along with sb. to guard him area and shape determination supporting mechanism, avoid construction waste.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
1, base plate 2, guide rail 3, steel cofferdam 4, pedestal 5, one level of support bar 6, secondary support bar 7, push rod 8, connecting hole 9, adjustment hole.
Detailed description of the invention
Refer to shown in Fig. 1:
The telescopic steel cofferdam that the utility model provides includes base plate 1, guide rail 2, several grades of steel cofferdams 3 and supporting mechanism, wherein several grades of steel cofferdams 3 are socketed into an entirety successively according to diameter and can be elevated, guide rail 2 and supporting mechanism are located on base plate 1, the steel cofferdam 3 of bottom is located on guide rail 2, and several grades of steel cofferdams 3 are elevated by supporting mechanism.
Supporting mechanism includes pedestal 4, one level of support bar 5, secondary support bar 6 and several sections of push rod 7, wherein one level of support bar 5 is located on pedestal 4, secondary support bar 6 is plugged in one level of support bar 5, the top of one level of support bar 5 is provided with connecting hole 8, the lower end of secondary support bar 6 is provided with several adjustment hole 9, one level of support bar 5 and secondary support bar 6 are fixed by connecting hole 8 and adjustment hole 9 and are connected, the height of secondary support bar 6 is regulated by the adjustment hole 9 of secondary support bar 6 bottom, push rod 7 is located at the top of secondary support bar 6, the upper end of push rod 7 is resisted against bottom the steel cofferdam 3 of the first order.
The material of base plate 1, guide rail 2, pedestal 4, one level of support bar 5, secondary support bar 6 and push rod 7 is steel.
One level of support bar 5 is demountable structure with pedestal 4 and pedestal 4 with the syndeton of base plate 1.
The outside of steel cofferdam 3 joint of adjacent level is pasted with PVC waterproof film.
Use principle of the present utility model:
According to the depth of water and go along with sb. to guard him area determination steel cofferdam 3 progression and steel cofferdam at different levels 3 diameter, go along with sb. to guard him the number of area and shape determination supporting mechanism according to steel cofferdam 3.Guide rail 2 is fixed on base plate 1, steel cofferdam 3 at different levels is connected together, then the steel cofferdam 3 of bottom one-level put into guide rail 2 and carry out being fixed into an entirety, by crane by this overall submerged assigned address, afterwards several grades of steel cofferdams 3 are upwards sling until its upper edge exceeds the water surface, ensure that steel cofferdam 3 at different levels stretches out completely simultaneously.Afterwards each one level of support bar 5 is fixed with pedestal 4 and is connected, then determine that one level of support bar 5 and the corresponding position of secondary support bar 6 use bolt to be fixed connection by connecting hole 8 and adjustment hole 9 according to bottom several grades of steel cofferdams 3 to the height of base plate 1, overall length after one level of support bar 5 and secondary support bar 6 connect slightly is shorter than the height to base plate 1 bottom several grades of steel cofferdams 3, again by regulating the height of push rod 7, it is made to contact with bottom several grades of steel cofferdams 3, remove the power be applied on several grades of steel cofferdams 3 afterwards, the weight of upper end steel cofferdam 3 at different levels is all born by supporting mechanism.Finally drawn water in steel cofferdam 3 inside, PVC waterproof film is attached to outside adjacent level steel cofferdam 3 joint in pump process, inside and outside steel cofferdam 3, mineralization pressure is poor gradually, and PVC waterproof film is tightly attached to outside the joint of steel cofferdam 3 at different levels under the effect of external and internal pressure difference, prevents cofferdam seepage.
Claims (5)
1. a telescopic steel cofferdam, it is characterized in that: include base plate, guide rail, several grades of steel cofferdams and supporting mechanism, wherein several grades of steel cofferdams are socketed into an entirety successively according to diameter and can be elevated, guide rail and supporting mechanism are located on base plate, the steel cofferdam of bottom is located on guide rail, and several grades of steel cofferdams are elevated by supporting mechanism.
2. the telescopic steel cofferdam of one according to claim 1, it is characterized in that: described supporting mechanism includes pedestal, one level of support bar, secondary support bar and several sections of push rod, wherein one level of support bar is located on pedestal, secondary support bar is plugged in one level of support bar, the top of one level of support bar is provided with connecting hole, the lower end of secondary support bar is provided with several adjustment hole, one level of support bar and secondary support bar are fixed by connecting hole and adjustment hole and are connected, the height of secondary support bar is regulated by the adjustment hole of secondary support bar bottom, push rod is located at the top of secondary support bar, the upper end of push rod is resisted against bottom the steel cofferdam of the first order.
3. the telescopic steel cofferdam of one according to claim 2, is characterized in that: the material of described base plate, guide rail, pedestal, one level of support bar, secondary support bar and push rod is steel.
4. the telescopic steel cofferdam of one according to claim 2, is characterized in that: described one level of support bar and the syndeton of pedestal and pedestal and base plate are demountable structure.
5. the telescopic steel cofferdam of one according to claim 1, is characterized in that: the outside of the steel cofferdam joint of described adjacent level is pasted with PVC waterproof film.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520661137.1U CN204898696U (en) | 2015-08-28 | 2015-08-28 | Telescopic steel cofferdam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520661137.1U CN204898696U (en) | 2015-08-28 | 2015-08-28 | Telescopic steel cofferdam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204898696U true CN204898696U (en) | 2015-12-23 |
Family
ID=54920885
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520661137.1U Expired - Fee Related CN204898696U (en) | 2015-08-28 | 2015-08-28 | Telescopic steel cofferdam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204898696U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106120824A (en) * | 2016-08-22 | 2016-11-16 | 中交第二航务工程局有限公司 | A kind of absolute altitude self adaptation steel cofferdam of the end under water that can quickly remove |
CN112554263A (en) * | 2020-12-01 | 2021-03-26 | 浙江河海建设有限公司 | Cutter suction dredger dredging equipment and method |
-
2015
- 2015-08-28 CN CN201520661137.1U patent/CN204898696U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106120824A (en) * | 2016-08-22 | 2016-11-16 | 中交第二航务工程局有限公司 | A kind of absolute altitude self adaptation steel cofferdam of the end under water that can quickly remove |
CN112554263A (en) * | 2020-12-01 | 2021-03-26 | 浙江河海建设有限公司 | Cutter suction dredger dredging equipment and method |
CN112554263B (en) * | 2020-12-01 | 2022-03-08 | 浙江河海建设有限公司 | Cutter suction dredger dredging equipment and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101545462B (en) | A steel-concrete combined weight type offshore wind fan foundation structure | |
CN103510529A (en) | Steel hanging box system for underwater high-rise pile cap construction and construction technology thereof | |
CN201546227U (en) | Steel support beam for supporting foundation pit bracing piling wall and basement structure outer wall | |
CN103225304B (en) | A kind of marine foundation supporting structure and construction method thereof | |
CN201891123U (en) | Single-wall steel hanging box with concrete bottom plate | |
CN204898696U (en) | Telescopic steel cofferdam | |
CN100535264C (en) | Steel boxed cofferdam and recovery method thereof | |
CN201713827U (en) | Fan base structure of offshore wind power station | |
CN204626377U (en) | W shaped steel plate pile structure | |
CN104975607A (en) | Offshore area local deep foundation pit stanching pit construction method | |
CN104805828B (en) | W-shaped steel sheet pile structure | |
CN204212177U (en) | A kind of double doing in the hole of stand column pile cheats diaphragm wall structure | |
CN204780870U (en) | Complicated waters slope scar major diameter drilling bored concrete pile | |
CN207295746U (en) | A kind of bucket foundation steel sheet pile combined type cofferdam | |
CN203007965U (en) | Steel hanging box system for underwater high-rise pile cap construction | |
CN110670620A (en) | Cast-in-place gravity type suction caisson foundation with wing plates | |
CN202131602U (en) | Steel sheet pile cofferdam structure | |
CN201649077U (en) | Variable-pile-diameter single pile foundation | |
CN103015459A (en) | Construction method for underwater baring platform steel cover box on storm surge river mouth | |
CN204898700U (en) | Bridge foundation structure | |
CN103362123A (en) | Reverse Y-shaped filling pile and construction method thereof | |
CN207032222U (en) | A kind of prefabricated pile of assembled pile foundation support table revetment | |
CN105908773A (en) | Two-stage socketed pile wind turbine foundation for shallow covering stratum foundation of offshore wind plant and construction method | |
CN204849815U (en) | A seabed artificial foundation for gravity platform | |
CN205369301U (en) | Supporting structure of subway transfer section lid digs and props against making interval board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151223 Termination date: 20160828 |
|
CF01 | Termination of patent right due to non-payment of annual fee |