CN201649077U - Variable-pile-diameter single pile foundation - Google Patents

Variable-pile-diameter single pile foundation Download PDF

Info

Publication number
CN201649077U
CN201649077U CN2010201657959U CN201020165795U CN201649077U CN 201649077 U CN201649077 U CN 201649077U CN 2010201657959 U CN2010201657959 U CN 2010201657959U CN 201020165795 U CN201020165795 U CN 201020165795U CN 201649077 U CN201649077 U CN 201649077U
Authority
CN
China
Prior art keywords
pile
steel pipe
pipe pile
variable
diameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201657959U
Other languages
Chinese (zh)
Inventor
郑永明
孙杏建
姜贞强
罗金平
韩伟
郇彩云
朱彬彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina East China Engineering Corp
Original Assignee
Hydrochina East China Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina East China Engineering Corp filed Critical Hydrochina East China Engineering Corp
Priority to CN2010201657959U priority Critical patent/CN201649077U/en
Application granted granted Critical
Publication of CN201649077U publication Critical patent/CN201649077U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to a variable-pile-diameter single pile foundation. The utility model aims at providing a variable-pile-diameter single pile foundation which has advantages of simple structure, fast, simple and convenient construction and is applicable to sea areas ranging from 0 to 30m, thereby achieving purposes of reducing work load, shortening construction period and decreasing construction cost. The technical scheme is as follows: the variable-pile-diameter single pile foundation is characterized by consisting of an upper steel pipe pile and a lower steel pipe pile which are connected with each other, wherein the diameter of the lower steel pipe pile is smaller than that of the upper steel pipe pile. The variable-pile-diameter single pile foundation is mainly applicable to civil engineering in marine engineering industry, especially to soft soil foundation of sea areas ranging from 0 to 30m.

Description

Become single pile basis, stake footpath
Technical field
The utility model relates to a kind of single pile foundation structure that is used for offshore wind farm unit and other marine engineerings, and single pile basis, particularly a kind of change stake footpath mainly is applicable to marine engineering industry civil engineering, especially the soft foundation sea bed in 0-30m marine site.
Background technology
Since the eighties in 20th century, offshore engineerings such as bridge, harbour, ocean platform that China has utilized the large diameter steel pipe pile structure construction, because country encourages the development and utilization to regenerative resource, offshore wind farm has obtained developing rapidly in recent years.Because the particularity of marine natural environment, marine pile foundation basis will solve a series of problems such as anti-tidewater, anti-wave, soft foundation, seawater corrosion, rapid construction.
Land wind-powered electricity generation unit basis is general adopts concreting pier structure, if be applied to offshore wind farm, then the mixing system of on-site concrete, the influence that construction is subjected to severe sea condition easily such as build, construction technology is complexity, long in time limit, also when the river rises the boat goes up thereupon for construction cost.
Summary of the invention
The technical problems to be solved in the utility model is: based on the coastal offshore wind farm ambient conditions of China, provide a kind of simple in structure, construction is fast and convenient and be applicable to the single pile basis, change stake footpath in 0~30m marine site, reduce workload to reach, shorten the construction period, reduce the purpose of construction cost.
The technical scheme that the utility model adopted is: become single pile basis, stake footpath, it is characterized in that: it is interconnected by last steel pipe pile and following steel pipe pile and forms, and wherein descends the diameter of the diameter of steel pipe pile less than last steel pipe pile.
Described steel pipe pile top is down stretched into the steel pipe pile bottom and is formed overlapping.
Described upward steel pipe pile is connected steel plate at lap by 6-15 piece parallelogram with following steel pipe pile and is welded and fused.
The described diameter of going up steel pipe pile is 3000~6000mm.
The described diameter of steel pipe pile down is 1000~3000mm.
The thickness of described connection steel plate is 20-40mm.
The beneficial effects of the utility model are: 1, whole basis can be prefabricated in the factory, and has not only guaranteed quality, and has reduced the operation on the sea amount, shortened the activity duration, thereby has reduced construction cost; 2, by analysis to suffered load and geotechnical boring, design diameter, wall thickness and the bindiny mechanism of steel pipe pile up and down, fully reduced the consumption of steel; 3, adopt one group of connection steel plate to be welded as a whole up and down between the steel pipe pile, the centre is the hollow out formula, can not cause the piling difficulty; 4, steel pipe pile adopts the steel pipe pile of ultra-large type caliber and conventional caliber respectively up and down, and single wind-powered electricity generation unit basis only needs single stake, has significantly reduced workload, has reduced the construction period, has reduced foundation cost.
Description of drawings
Fig. 1 is an elevation of the present utility model.
Fig. 2 is a plan view of the present utility model.
The specific embodiment
It is bigger to take into full account offshore wind farm unit wind load, and the characteristics that soil rigidity is had relatively high expectations can adopt superhuge steel pipe pile under the situation of conditions permit.And top layer, the coastal marine site of China weak soil is thicker, if adopt full section super-large diameter steel pipe pile, then single stake weight is excessive, and lifting, pile sinking difficulty are big, and cause very big waste.So present embodiment is divided into steel pipe pile 1 and following steel pipe pile 3 two parts with the basis, wherein go up the steel pipe pile that steel pipe pile 1 adopts the ultra-large type caliber, the stake footpath is 4.5m, and 3 of following steel pipe piles are the steel pipe pile of conventional caliber, and the stake footpath is 2.0m; Following steel pipe pile 3 head portions stretch into steel pipe pile 1 bottom and form overlapping, at this overlapping part, the parallelogram connection steel plate 2 that is 30mm by 12 thickness is welded and fused upper and lower steel pipe pile 1,3, the resistance that produces in order to reduce to drive piles, it is parallel with vertical direction to connect steel plate 2 plate faces, in order to guarantee welding quality, last steel pipe pile 1, the welding that connects between steel plate 2 and the following steel pipe pile 3 are all finished on land.
In actual use, following steel pipe pile 3 bottoms are squeezed in the following bearing stratum of sea bed face, the soil layer certain depth is stretched in last steel pipe pile 1 bottom, and the top then links to each other with the tower tube of wind-powered electricity generation unit by flange or other linkage section, constitutes the braced structures of offshore wind farm unit.
The stake footpath of up and down steel pipe pile of the present utility model, stake are long, wall thickness etc. can be specifically definite according to the load situation on wind-powered electricity generation unit basis, residing geology and hydrologic condition, and the utility model also can be used for the basis of other similar marine engineering.

Claims (6)

1. one kind becomes single pile basis, stake footpath, and it is characterized in that: it is interconnected by last steel pipe pile (1) and following steel pipe pile (3) and forms, and wherein descends the diameter of the diameter of steel pipe pile (3) less than last steel pipe pile (1).
2. single pile basis, change stake footpath according to claim 1 is characterized in that: described steel pipe pile (3) top is down stretched into steel pipe pile (1) bottom and is formed overlapping.
3. single pile basis, change stake footpath according to claim 2 is characterized in that: described upward steel pipe pile (1) is connected steel plate (2) at lap by 6-15 piece parallelogram with following steel pipe pile (3) and is welded and fused.
4. according to claim 1 or single pile basis, 2 or 3 described change stake footpath, it is characterized in that: the described diameter of going up steel pipe pile (1) is 3000~6000mm.
5. according to claim 1 or single pile basis, 2 or 3 described change stake footpath, it is characterized in that: the described diameter of steel pipe pile (3) down is 1000~3000mm.
6. single pile basis, change stake footpath according to claim 3, it is characterized in that: the thickness of described connection steel plate (2) is 20-40mm.
CN2010201657959U 2010-04-15 2010-04-15 Variable-pile-diameter single pile foundation Expired - Fee Related CN201649077U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201657959U CN201649077U (en) 2010-04-15 2010-04-15 Variable-pile-diameter single pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201657959U CN201649077U (en) 2010-04-15 2010-04-15 Variable-pile-diameter single pile foundation

Publications (1)

Publication Number Publication Date
CN201649077U true CN201649077U (en) 2010-11-24

Family

ID=43114304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201657959U Expired - Fee Related CN201649077U (en) 2010-04-15 2010-04-15 Variable-pile-diameter single pile foundation

Country Status (1)

Country Link
CN (1) CN201649077U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102677667A (en) * 2012-05-07 2012-09-19 刘杰 Concrete variable-section pipe pile
CN110067203A (en) * 2019-04-19 2019-07-30 中交二航局第二工程有限公司 A kind of pier shaft bent cap hanging bracket applied to the area rough swell Lang Didun
CN111042121A (en) * 2019-12-20 2020-04-21 深圳市蛇口招商港湾工程有限公司 Construction method of bored backfill end pile foundation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102677667A (en) * 2012-05-07 2012-09-19 刘杰 Concrete variable-section pipe pile
CN110067203A (en) * 2019-04-19 2019-07-30 中交二航局第二工程有限公司 A kind of pier shaft bent cap hanging bracket applied to the area rough swell Lang Didun
CN110067203B (en) * 2019-04-19 2021-01-26 中交二航局第二工程有限公司 Pier body bent cap hanging bracket applied to strong-surge low-pier area
CN111042121A (en) * 2019-12-20 2020-04-21 深圳市蛇口招商港湾工程有限公司 Construction method of bored backfill end pile foundation

Similar Documents

Publication Publication Date Title
CN201649118U (en) Foundation structure of jacket-type offshore wind turbine
CN201538971U (en) Basic structure of high-rise pile cap type offshore wind driven generator
CN101545462B (en) A steel-concrete combined weight type offshore wind fan foundation structure
CN201513303U (en) Offshore wind turbine generator foundation structure with multi-pile steel frame
CN202039382U (en) Ribbing seabed suction anchor
CN211646450U (en) Offshore wind power single pile-wing plate-rockfill composite foundation
CN201952809U (en) Steel truss type offshore anemometer tower foundation structure
CN102041813A (en) Offshore wind generator single pile base structure with stabilizer fin
CN202247928U (en) Multi-pile gantry type marine wind turbine generator system base structure
CN201746849U (en) Basic structure of offshore wind-power-station fan
CN201599157U (en) Offshore wind turbine infrastructure with multi-pile steel framework and without peripheral connecting pipes
CN103243732A (en) Installing method of marine anemometer tower base structure
CN201704699U (en) Steel structure foundation system of offshore fan
CN201599158U (en) Multi-stake steel framework maritime wind turbine infrastructure with central stake
CN201713827U (en) Fan base structure of offshore wind power station
CN201649077U (en) Variable-pile-diameter single pile foundation
CN201502064U (en) Offshore wind turbine steel structural foundation
CN203145066U (en) Offshore single-pile basic horizontal carrying force loading device
CN208763050U (en) Offshore wind turbine gravity caisson basis
CN201915419U (en) Single-pile foundation structure with stabilizing wings for offshore wind turbine
CN204212174U (en) Single pile adds taper pile brace type offshore wind turbine foundation structure
CN204491567U (en) Pre-manufactured steel pile tube wind power generation platform
CN209636843U (en) Offshore wind turbine suction bucket jacket large-diameter pile composite foundation
CN205116207U (en) Offshore wind farm fan combined type embedded rock pile basis
CN102628277B (en) Transition section-free monopile offshore wind turbine foundation structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101124

Termination date: 20190415