CN204491567U - Pre-manufactured steel pile tube wind power generation platform - Google Patents

Pre-manufactured steel pile tube wind power generation platform Download PDF

Info

Publication number
CN204491567U
CN204491567U CN201520152342.5U CN201520152342U CN204491567U CN 204491567 U CN204491567 U CN 204491567U CN 201520152342 U CN201520152342 U CN 201520152342U CN 204491567 U CN204491567 U CN 204491567U
Authority
CN
China
Prior art keywords
platform
pile
steel pile
wind power
power generation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520152342.5U
Other languages
Chinese (zh)
Inventor
张建东
王晓菲
刘朵
梁志雯
徐秀丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Gaodi Circular Economy Industrial Park Co ltd
Nanjing Tech University
Original Assignee
Nanjing Tech University
JSTI Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tech University, JSTI Group Co Ltd filed Critical Nanjing Tech University
Priority to CN201520152342.5U priority Critical patent/CN204491567U/en
Application granted granted Critical
Publication of CN204491567U publication Critical patent/CN204491567U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Landscapes

  • Wind Motors (AREA)

Abstract

The utility model discloses a kind of pre-manufactured steel pile tube wind power generation platform, include fastener for connection section, platform, preformed pile and foundation steel pile, fastener for connection section is arranged on the platform upper surface of horizontal positioned, fastener for connection section and platform perpendicular, the soffit of platform is supported by the preformed pile of multiple setting parallel to each other, is connected bottom preformed pile with foundation steel pile; Platform and preformed pile junction adopt grouting treatment, and when the absolute altitude of junction is positioned at climax more than water level, ensure bonding strength.The position that platform soffit is connected with preformed pile is provided with groove, and the top card of preformed pile is combined in described groove; Be connected by bayonet arrangement with between foundation steel pile bottom preformed pile, foundation steel pile squeezes into sea bed bearing stratum by piling machinery, and foundation steel pile top absolute altitude exceeds sea bed elevation of top.Effective solution is at present due to etching problem that seawater causes.

Description

Pre-manufactured steel pile tube wind power generation platform
Technical field
The utility model relates to a kind of offshore wind power generation basic facility, particularly relates to a kind of pre-manufactured steel pile tube wind power generation platform.
Background technology
Wind-powered electricity generation is new forms of energy with the fastest developing speed in world wide, up to the present, China in the Inner Mongol, Xinjiang, Gansu, northeast and the coastal region in east China built up large quantities of land wind energy turbine set.But along with the fast development of wind-powered electricity generation industry, land wind-resources has used totally, and offshore wind farm is imperative, and China has very long coastline, and abundant offshore wind energy resource, offshore wind farm will obtain tremendous development.Showing in following 2 years according to the data of National Energy Board's announcement to have 44 offshore wind farm projects to go into operation, and the coming years, offshore wind farm market prospects were very wide as can be seen here.
Usual land wind power foundation is mainly divided into concrete spread footing and pile foundation, offshore wind power generation basic and land wind power foundation have obvious difference, because seabed generally is the soft foundation of mucky soil or flour sand great soil group, bearing capacity of foundation soil is generally on the low side, and offshore wind power generation basic also will consider the impact of wave, containing a large amount of sulfate ions and chlorion in seawater, therefore offshore wind power generation basic will consider the etching problem of seawater.
Existing Oversea wind power generation platform pile foundation structure is substantially all piling bar, and steel corrosion phenomenon always in the seawater is the key factor affecting platform application life, and platform needs a large amount of cast in situs operation, and site work amount is large, and operation inconvenience, efficiency is low.Along with increasing Oversea wind power generation platform comes into operation, studying a kind of mode effectively extending platform application life and the on-the-spot efficiency of raising has major and immediate significance.
Utility model content
Main purpose of the present utility model is, overcomes the defect that existing offshore wind power platform exists, and provides a kind of novel prefabricated steel pipe pile wind power generation platform, extends the application life of platform, thus is more suitable for practicality, and have the value in industry.
The purpose of this utility model and solve its technical problem and realize by the following technical solutions.According to the pre-manufactured steel pile tube wind power generation platform that the utility model proposes, include fastener for connection section, platform, preformed pile and foundation steel pile,
Described fastener for connection section is arranged on the platform upper surface of horizontal positioned, described fastener for connection section and described platform perpendicular,
The soffit of described platform is supported by the preformed pile of multiple setting parallel to each other, is connected bottom described preformed pile with foundation steel pile; Described platform and preformed pile junction adopt grouting treatment, ensure bonding strength, and when the absolute altitude of junction is positioned at climax more than water level, avoid seawater corrosion.
The position that described platform soffit is connected with preformed pile is provided with groove, and the top card of described preformed pile is combined in described groove;
Be connected by bayonet arrangement with between foundation steel pile bottom described preformed pile, described foundation steel pile squeezes into sea bed bearing stratum by piling machinery, and foundation steel pile top absolute altitude exceeds sea bed elevation of top.
Further, aforesaid pre-manufactured steel pile tube wind power generation platform, described platform is triangular structure, and described groove is separately positioned on the gable top place of the soffit of described platform, and described preformed pile is arranged in described groove, makes connection more firm.
Further, aforesaid pre-manufactured steel pile tube wind power generation platform, described preformed pile is combining structure, the inner reinforcing bar for arranging perpendicular to described platform, the external surface of described reinforcing bar is provided with external wrapping concrete, more effectively stops the etching problem that a large amount of sulfate ion comprised in seawater and chlorion bring, preformed pile adopts prefabrication, only need integral hoisting during construction at the scene, save on-site construction operations difficulty, raise the efficiency.
Further, aforesaid pre-manufactured steel pile tube wind power generation platform, the bottom of described preformed pile is provided with bayonet arrangement.
Further, aforesaid pre-manufactured steel pile tube wind power generation platform, the internal diameter of described bayonet arrangement is greater than the external diameter of described foundation steel pile, the top of described foundation steel pile is arranged in the bayonet socket of described bayonet arrangement, connecting portion adopts grouting treatment, and connecting portion is higher than sea bed absolute altitude, is arranged in seawater.
Further, aforesaid pre-manufactured steel pile tube wind power generation platform, also includes junction plate, and described junction plate is cirque structure, and described junction plate is welded on the outside of described fastener for connection section, is bolted and fixes on the platform.
Further, aforesaid pre-manufactured steel pile tube wind power generation platform, what the external surface of described fastener for connection section tilted is fixedly installed bracing members, and described bracing members is multiple, is preferably 3.
Further, aforesaid pre-manufactured steel pile tube wind power generation platform, in 30 ° ~ 60 ° angles between described bracing members and horizontal plane, is preferably 30 ° or 45 °.
By technique scheme, pre-manufactured steel pile tube wind power generation platform of the present utility model at least has following advantages:
Pre-manufactured steel pile tube wind power generation platform infrastructure of the present utility model, what be arranged in seawater is steel reinforced concrete preformed pile, by arranging concrete in reinforcing bar outer wrapping, the etching problem that a large amount of sulfate ion of comprising in seawater and chlorion bring can be solved to greatest extent, by working platform, steel reinforced concrete preformed pile are adopted prefabricate operation, greatly reduce the workload of marine site operation, raise the efficiency; The lower outside welding of fastener for connection section arranges junction plate, can increase the bonding strength of fastener for connection section and platform; That tilts in the periphery of fastener for connection section arranges multiple bracing members, for supporting steel pipe linkage section, more effectively ensures its fixed effect.
Above-mentioned explanation is only the general introduction of technical solutions of the utility model, in order to better understand technological means of the present utility model, and can be implemented according to the content of manual, coordinates accompanying drawing to be described in detail as follows below with preferred embodiment of the present utility model.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model pre-manufactured steel pile tube wind power generation platform;
Fig. 2 is the top view of the utility model pre-manufactured steel pile tube wind power generation platform;
Implication is marked: 1. fastener for connection section, 2. bracing members, 3. junction plate, 4. platform, 5. seawater, 6. sea bed, 7. bolt, 8. groove, 9. reinforcing bar, 10. preformed pile, 11. foundation steel pile, 12. external wrapping concretes, 13. bayonet arrangement in figure.
Detailed description of the invention
For further setting forth the utility model for the technological means reaching predetermined utility model object and take and effect, below in conjunction with accompanying drawing and preferred embodiment, detailed description of the invention of the present utility model is described in detail as follows.
The structural representation of pre-manufactured steel pile tube wind power generation platform of the present utility model as shown in Figure 1 and Figure 2, includes fastener for connection section 1, bracing members 2, junction plate 3, platform 4, seawater 5, sea bed 6, bolt 7, groove 8, reinforcing bar 9, preformed pile 10, foundation steel pile 11, external wrapping concrete 12 and bayonet arrangement 13.
Fastener for connection section 1 and the perpendicular setting of horizontally disposed platform 4, be positioned at the upper surface centre position of platform 4, wherein junction plate 3 is a cirque structure, and annular junction plate 3 is welded on bottom the excircle of fastener for connection section 1, is fixed on platform 4 by bolt 4.The excircle of fastener for connection section 1 is provided with three bracing members 2 uniformly, bracing members 2 one end connecting platform 4 upper surface, the excircle of one end joint steel pipe linkage section 1, wherein bracing members 2 is arranged horizontal by 45 ° of angles, effective its fixing stability that ensures.
Wherein platform 4 is reinforced concrete prefabricated structural member, shape is triangle, the bottom lower surface of platform 4 is provided with circular groove 8, the diameter of circular groove 8 is slightly larger than the external diameter of preformed pile 10, be fixed in groove 8 structure of preformed pile 10 top being inserted in platform 4 bottom, thus support platform 4, connecting portion adopts grouting treatment, and more than the water level of absolute altitude when being positioned at climax, effectively avoid the corrosion of seawater.
The cross section of preformed pile 10 is circular, and adopt factory process prefabricated, only need integral installation time at the construction field (site), preformed pile 10 forms primarily of reinforcing bar 9, the commercially available external wrapping concrete 12 with anticorrosion ability and bottom bayonet arrangement 13.Preformed pile 10 top is connected with platform 4, and bottom is connected with foundation steel pile 11.Wherein the bayonet socket internal diameter of preformed pile 10 lower end bayonet arrangement 13 is slightly larger than the external diameter of foundation steel pile 11, during connection, the top of foundation steel pile 11 is fastened in the bayonet socket of bayonet arrangement 13, wherein bayonet socket junction is arranged in seawater 5, adopts underwater grouting process, ensures the intensity of junction.
Foundation steel pile 11 is round steel pipe, and its top absolute altitude is positioned at more than the elevation of top of sea bed 6, is driven into sea bed 6 bearing stratum by piling machinery, to ensure the firmness fixed.
When concrete fitting operation, foundation steel pile 11 is driven into sea bed 6 bearing stratum and fixes by piling machinery, preformed pile 10 integral hoisting factory process completed is to foundation steel pile 11 end face elevation location, by preformed pile 10 lower end bayonet arrangement 13, preformed pile 10 is fixed on foundation steel pile 11 upper end, and carry out underwater grouting process in junction, ensure installation strength.
After preformed pile 10 installation and junction, lower end have some strength, prefabricate reinforced concrete platform 4 is lifted to preformed pile 10 end face absolute altitude place, groove 8 and the preformed pile 10 end face one_to_one corresponding of platform 4, and adopt grouting treatment in groove 8 junction, strengthen connection function.
After the installation of reinforced concrete prefabricated platform 4, top steel pipe linkage section 1 is connected on platform 4 by stone bolt 7, after having connected, three bracing members 2 is set uniformly at fastener for connection section 1 excircle, ensures its stability.Wind power tower drum carries out corresponding connection to fastener for connection section 1 by flange.
The above, it is only preferred embodiment of the present utility model, not any pro forma restriction is done to the utility model, although the utility model discloses as above with preferred embodiment, but and be not used to limit the utility model, any those skilled in the art, do not departing within the scope of technical solutions of the utility model, make a little change when the technology contents of above-mentioned announcement can be utilized or be modified to the Equivalent embodiments of equivalent variations, in every case be the content not departing from technical solutions of the utility model, according to any simple modification that technical spirit of the present utility model is done above embodiment, equivalent variations and modification, all still belong in the scope of technical solutions of the utility model.

Claims (8)

1. a pre-manufactured steel pile tube wind power generation platform, is characterized in that: include fastener for connection section (1), platform (4), preformed pile (10) and foundation steel pile (11),
Described fastener for connection section (1) is arranged on platform (4) upper surface of horizontal positioned, and described fastener for connection section (1) is perpendicular with described platform (4),
The soffit of described platform (4) is supported by the preformed pile (10) of multiple setting parallel to each other, and described preformed pile (10) bottom is connected with foundation steel pile (11);
The position that described platform (4) soffit is connected with preformed pile (10) is provided with groove (8), and the top card of described preformed pile (10) is combined in described groove (8);
Described preformed pile (10) bottom is connected by bayonet arrangement (13) with between foundation steel pile (11).
2. pre-manufactured steel pile tube wind power generation platform according to claim 1, it is characterized in that: described platform (4) is triangular structure, described groove (8) is separately positioned on the gable top place of the soffit of described platform (4), and described preformed pile (10) is arranged in described groove (8).
3. pre-manufactured steel pile tube wind power generation platform according to claim 1 and 2, it is characterized in that: described preformed pile (10) is combining structure, the inner reinforcing bar (9) for arranging perpendicular to described platform (4), the external surface of described reinforcing bar (9) is provided with external wrapping concrete (12).
4. pre-manufactured steel pile tube wind power generation platform according to claim 3, is characterized in that: the bottom of described preformed pile (10) is provided with bayonet arrangement (13).
5. the pre-manufactured steel pile tube wind power generation platform according to claim 1 or 4, it is characterized in that: the internal diameter of described bayonet arrangement (13) is greater than the external diameter of described foundation steel pile (11), and the top of described foundation steel pile (11) is arranged in the bayonet socket of described bayonet arrangement (13).
6. pre-manufactured steel pile tube wind power generation platform according to claim 1, it is characterized in that: also include junction plate (3), described junction plate (3) is cirque structure, described junction plate (3) is welded on the outside of described fastener for connection section (1), is bolted and is fixed on described platform (4).
7. the pre-manufactured steel pile tube wind power generation platform according to claim 1 or 6, is characterized in that: what the external surface of described fastener for connection section (1) tilted is fixedly installed bracing members (2), and described bracing members (2) is for multiple.
8. pre-manufactured steel pile tube wind power generation platform according to claim 7, is characterized in that: in 30 ° ~ 60 ° angles between described bracing members (2) and horizontal plane.
CN201520152342.5U 2015-03-17 2015-03-17 Pre-manufactured steel pile tube wind power generation platform Expired - Fee Related CN204491567U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520152342.5U CN204491567U (en) 2015-03-17 2015-03-17 Pre-manufactured steel pile tube wind power generation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520152342.5U CN204491567U (en) 2015-03-17 2015-03-17 Pre-manufactured steel pile tube wind power generation platform

Publications (1)

Publication Number Publication Date
CN204491567U true CN204491567U (en) 2015-07-22

Family

ID=53570868

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520152342.5U Expired - Fee Related CN204491567U (en) 2015-03-17 2015-03-17 Pre-manufactured steel pile tube wind power generation platform

Country Status (1)

Country Link
CN (1) CN204491567U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104695411A (en) * 2015-03-17 2015-06-10 苏交科集团股份有限公司 Prefabricated combined structure steel pipe pile wind power generation platform
CN106759441A (en) * 2017-01-03 2017-05-31 广州电力设计院 Prefabricated assembled foundation structure and its construction method
CN108999754A (en) * 2018-09-26 2018-12-14 大连君方科技有限公司 A kind of anticorrosive offshore wind farm unit and anticorrosive method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104695411A (en) * 2015-03-17 2015-06-10 苏交科集团股份有限公司 Prefabricated combined structure steel pipe pile wind power generation platform
CN106759441A (en) * 2017-01-03 2017-05-31 广州电力设计院 Prefabricated assembled foundation structure and its construction method
CN106759441B (en) * 2017-01-03 2019-09-27 广州电力设计院 Prefabricated assembled foundation structure and its construction method
CN108999754A (en) * 2018-09-26 2018-12-14 大连君方科技有限公司 A kind of anticorrosive offshore wind farm unit and anticorrosive method

Similar Documents

Publication Publication Date Title
CN210031889U (en) Offshore wind turbine single pile-suction barrel combined foundation
CN201649118U (en) Foundation structure of jacket-type offshore wind turbine
CN108867688A (en) A kind of offshore wind turbine gravity type foundation and its installation method
CN205152976U (en) Marine precast concrete cushion cap wind turbine foundation
CN104389318B (en) Reinforced concrete-steel structure hybrid gravity foundation for offshore wind power and construction method thereof
CN201513303U (en) Offshore wind turbine generator foundation structure with multi-pile steel frame
CN106245671B (en) A kind of combined type offshore wind power foundation and its construction method
CN211646450U (en) Offshore wind power single pile-wing plate-rockfill composite foundation
CN202732247U (en) Trussed type offshore wind generating set base structure
CN109853609A (en) A kind of offshore wind farm combination foundation
CN109469089A (en) A kind of interpolation type offshore wind farm jacket basis carrying steady pipe casing and construction method
CN202247928U (en) Multi-pile gantry type marine wind turbine generator system base structure
CN201952809U (en) Steel truss type offshore anemometer tower foundation structure
CN204491567U (en) Pre-manufactured steel pile tube wind power generation platform
CN204608815U (en) Raft plate gravity offshore wind turbine foundation
CN202416341U (en) Steel truss automatically-standing seaborne anemometer tower
CN209603168U (en) A kind of offshore wind farm combination foundation
CN201599157U (en) Offshore wind turbine infrastructure with multi-pile steel framework and without peripheral connecting pipes
CN209538210U (en) A kind of interpolation type offshore wind farm jacket basis carrying steady pipe casing
CN201599158U (en) Multi-stake steel framework maritime wind turbine infrastructure with central stake
CN208763050U (en) Offshore wind turbine gravity caisson basis
CN212336069U (en) Deep sea wind power generation jacket type single pile composite structure
CN102628277B (en) Transition section-free monopile offshore wind turbine foundation structure
CN208917861U (en) A kind of offshore wind turbine gravity type foundation
CN204282390U (en) For the steel concrete-steel structure mixing gravity type foundation of offshore wind farm

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200630

Address after: 230000 Economic Development Zone, Yu'an District, Lu'an City, Anhui Province

Co-patentee after: NANJING University OF TECHNOLOGY

Patentee after: Anhui Gaodi circular economy Industrial Park Co.,Ltd.

Address before: 211112, No. 2200, good faith Road, Jiangning District, Jiangsu, Nanjing

Co-patentee before: NANJING University OF TECHNOLOGY

Patentee before: JSTI GROUP Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150722