CN102330433A - Structure node for fast dismounting steel sleeve box of seaborne cushion cap on water - Google Patents

Structure node for fast dismounting steel sleeve box of seaborne cushion cap on water Download PDF

Info

Publication number
CN102330433A
CN102330433A CN2010102231125A CN201010223112A CN102330433A CN 102330433 A CN102330433 A CN 102330433A CN 2010102231125 A CN2010102231125 A CN 2010102231125A CN 201010223112 A CN201010223112 A CN 201010223112A CN 102330433 A CN102330433 A CN 102330433A
Authority
CN
China
Prior art keywords
flange
steel sleeve
bed die
steel bushing
sleeve box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010102231125A
Other languages
Chinese (zh)
Inventor
姚志军
刘志祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG YAOSHENG STEEL CO Ltd
Original Assignee
NANTONG YAOSHENG STEEL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG YAOSHENG STEEL CO Ltd filed Critical NANTONG YAOSHENG STEEL CO Ltd
Priority to CN2010102231125A priority Critical patent/CN102330433A/en
Publication of CN102330433A publication Critical patent/CN102330433A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a structure node for fast dismounting a steel sleeve box of a seaborne cushion cap on water, which comprises a steel sleeve box upper mold side plate and a steel sleeve box lower mold bottom plate, and is characterized in that the steel sleeve box upper mold side plate is provided with an upper template upper flange and an upper template lower flange, the steel sleeve box lower mold bottom plate is provided with a bottom mold flange, the lower end surface of the bottom mold flange is provided with a lower screw nut fixedly arranged through welding, a protection steel sleeve is sheathed outside the lower screw nut, the protection steel sleeve is welded and fixed with the lower end surface of the bottom mold flange, a lengthened double-head screw penetrates through the middle of the upper template upper flange, the upper template lower flange and the bottom mold flange, the upper end of the lengthened double-head screw is welded with an upper screw nut, the lower end of the lengthened double-head screw is screwed with the lower screw nut and extends into the protection steel sleeve, a steel sleeve is sheathed outside the lengthened double-head screw, and a water stop rubber strip is arranged between the upper template lower flange and the bottom mold flange. The structure node for fast dismounting the steel sleeve box of the seaborne cushion cap on the water has the advantages that the in-site construction schedule is accelerated, the life safety of construction personnel is guaranteed, and the cost is saved.

Description

The structure node of marine pile cap steel casing fast Demolition waterborne
Technical field
The present invention relates to a kind of structure node, what be specifically related to is the structure node of a kind of marine pile cap steel casing fast Demolition waterborne.
Background technology
In existing river, river, marine pile cap steel casing be used for generally guaranteeing that bearing platform construction does not receive the influence of tidal fluctuations.The steel bushing steel can guarantee that bearing platform construction does not receive the influence of tidal fluctuations in practice of construction; But install, remove the influence that steel bushing case patrix can receive tidal fluctuations; Generally all be to utilize diver's underwater operation coordinative construction to install, remove the steel bushing case when big morning and evening tides, high water level; Because factor in confused situation etc. under water, diver's underwater operation has been full of unsafe factor, the bolt of having to sometimes cut under water; Increased the difficulty of construction, and the best way be personnel on the water operation just can accomplish the script diver work of operation under water.
Summary of the invention
Goal of the invention: the present invention is in order to solve the deficiency of prior art, provide a kind of safe, practice thrift the structure node of the marine pile cap steel casing fast Demolition waterborne of cost.
Technical scheme: the structure node of marine pile cap steel casing of the present invention fast Demolition waterborne, its objective is such realization: the structure node of a kind of marine pile cap steel casing fast Demolition waterborne comprises baffle plate under steel bushing case patrix side plate, the steel bushing case; Steel bushing case patrix side plate is established cope match-plate pattern upper flange and cope match-plate pattern lower flange, and baffle plate is established the bed die flange under the steel bushing case, and bed die flange lower surface central authorities are welded with lower nut; The lower nut outside is with the protection steel bushing; Protection steel bushing and the welding of bed die flange lower surface are fixing, in the middle of cope match-plate pattern upper flange, cope match-plate pattern lower flange and bed die flange, are connected with the lengthening double-threaded screw, the upper end of lengthening double-threaded screw and top nut welding; The lower end and the lower nut of lengthening double-threaded screw are spirally connected; And extending protection steel bushing inside, the outside of lengthening double-threaded screw is with steel sleeve, is provided with the water stop rubber bar between cope match-plate pattern lower flange and the bed die flange; Through turning top nut, bed die flange and template lower flange are tightly fit together.
As optimization: the inside of the protection steel bushing of bed die flange lower surface is filled with butter.
In addition, the lengthening stud can reuse through cleaning.
Beneficial effect: the structure node of marine pile cap steel casing of the present invention fast Demolition waterborne, accelerated the site operation progress, ensured constructor's life security, practiced thrift cost.
Description of drawings
Accompanying drawing 1 is a structural representation of the present invention;
Accompanying drawing 2 is local enlarged diagrams of the present invention.
The specific embodiment
Below in conjunction with accompanying drawing the present invention is described further:
The structure node of a kind of marine pile cap steel casing fast Demolition waterborne is characterized in that: steel bushing case patrix side plate is established cope match-plate pattern upper flange and cope match-plate pattern lower flange, and baffle plate is established the bed die flange under the steel bushing case; Bed die flange lower surface is welded with lower nut, and the lower nut outside is with the protection steel bushing, and protection steel bushing and the welding of bed die flange lower surface are fixing; In the middle of cope match-plate pattern upper flange, cope match-plate pattern lower flange and bed die flange, be connected with the lengthening double-threaded screw; The upper end of lengthening double-threaded screw and top nut welding, the lower end and the lower nut of lengthening double-threaded screw are spirally connected, and extend protection steel bushing inside; The outside of lengthening double-threaded screw is with steel sleeve; Be provided with the water stop rubber bar between cope match-plate pattern lower flange and the bed die flange,, bed die flange and template lower flange tightly fit together through turning top nut.The inside of the protection steel bushing of bed die flange lower surface is filled with butter.

Claims (2)

1. the structure node of a marine pile cap steel casing fast Demolition waterborne; It is characterized in that: steel bushing case patrix side plate (1) is established cope match-plate pattern upper flange (3) and cope match-plate pattern lower flange (4); Baffle plate under the steel bushing case (2) is established bed die flange (5); Bed die flange (5) lower surface is welded with lower nut (6), and lower nut (6) outside is with protection steel bushing (7), and protection steel bushing (7) is fixing with the lower surface welding of bed die flange (5); In the middle of cope match-plate pattern upper flange (3), cope match-plate pattern lower flange (4) and bed die flange (5), be connected with lengthening double-threaded screw (8); The upper end of lengthening double-threaded screw (8) and top nut (9) welding, the lower end and the lower nut (6) of lengthening double-threaded screw (8) are spirally connected, and extend protection steel bushing (7) inside; The outside of lengthening double-threaded screw (8) is with steel sleeve (10), is provided with water stop rubber bar (11) between cope match-plate pattern lower flange (4) and the bed die flange (5).
2. the structure node of marine pile cap steel casing according to claim 1 fast Demolition waterborne is characterized in that: the inside of the protection steel bushing (7) of bed die flange (5) lower surface is filled with butter (12).
CN2010102231125A 2010-07-12 2010-07-12 Structure node for fast dismounting steel sleeve box of seaborne cushion cap on water Pending CN102330433A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102231125A CN102330433A (en) 2010-07-12 2010-07-12 Structure node for fast dismounting steel sleeve box of seaborne cushion cap on water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102231125A CN102330433A (en) 2010-07-12 2010-07-12 Structure node for fast dismounting steel sleeve box of seaborne cushion cap on water

Publications (1)

Publication Number Publication Date
CN102330433A true CN102330433A (en) 2012-01-25

Family

ID=45482379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102231125A Pending CN102330433A (en) 2010-07-12 2010-07-12 Structure node for fast dismounting steel sleeve box of seaborne cushion cap on water

Country Status (1)

Country Link
CN (1) CN102330433A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015459A (en) * 2012-12-20 2013-04-03 浙江省第一水电建设集团股份有限公司 Construction method for underwater baring platform steel cover box on storm surge river mouth

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015459A (en) * 2012-12-20 2013-04-03 浙江省第一水电建设集团股份有限公司 Construction method for underwater baring platform steel cover box on storm surge river mouth

Similar Documents

Publication Publication Date Title
CN102277878B (en) Floating foundation and construction method thereof
CN108612071B (en) Semi-submersible type ocean platform anti-overturning device
CN104264704A (en) Combination type hexagon buoyancy tank foundation for seaborne anemometer tower
CN205131593U (en) Ultrahigh molecular weight polyethylene light beacon
CN102745315A (en) Swaying fender device for mounting large modules in a floatover manner
CN206143719U (en) Concrete depends on ship components are installed supporting platform
CN103835304B (en) A kind of High-Rise Pile Cap Foundation structure
CN203889012U (en) Marine hydraulic gangplank
CN102330433A (en) Structure node for fast dismounting steel sleeve box of seaborne cushion cap on water
CN204803864U (en) Marine booster stations structure in flange formula single pile basis
CN201778328U (en) Quickly removed overwater structural joint of offshore pile cap steel boxed cofferdam
CN201863994U (en) Ship hanging basket suspension mechanism
CN202416334U (en) Thin-walled steel box
CN203238655U (en) Offshore wind power single pile foundation-based tidal current energy power generation foundation structure
KR101066891B1 (en) Power supply device of excavator to electricity as power source
CN211522908U (en) Bridge construction platform on water
CN204282609U (en) A kind of separate type precast truss frame floor support plate
CN104594319B (en) The lifting installation method of integral of deep water ocean platform pump pillar
CN203684191U (en) Fan construction system of offshore intertidal zone
CN202530461U (en) Outer jetting mechanism of pile
CN202925911U (en) Vertical pre-stress rib tensioning auxiliary tool
CN201817199U (en) Automatic leveling device for semisubmersible barge crane platform
KR20120004251U (en) jig for fixing leg during motion of jack-up vessel
CN202118379U (en) Marine cable bracket
CN103821117B (en) Marine tidal-current energy generating pile-column platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120125

WD01 Invention patent application deemed withdrawn after publication