CN103334433B - A kind of construction method of pile pulling - Google Patents

A kind of construction method of pile pulling Download PDF

Info

Publication number
CN103334433B
CN103334433B CN201310253199.4A CN201310253199A CN103334433B CN 103334433 B CN103334433 B CN 103334433B CN 201310253199 A CN201310253199 A CN 201310253199A CN 103334433 B CN103334433 B CN 103334433B
Authority
CN
China
Prior art keywords
pile foundation
old
pile
pipe
drilling pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310253199.4A
Other languages
Chinese (zh)
Other versions
CN103334433A (en
Inventor
魏发利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201310253199.4A priority Critical patent/CN103334433B/en
Publication of CN103334433A publication Critical patent/CN103334433A/en
Application granted granted Critical
Publication of CN103334433B publication Critical patent/CN103334433B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention discloses a kind of construction method of pile pulling, prepare before comprising the steps: A, pile pulling; B, be separated old pile foundation; C, pile pulling.Advantage of the present invention is: require low to construction plant, efficiency of construction is high; Safe and reliable, low noise little to periphery soil disturbance, shockproof, pollution-free; Workable, do not need the main equipments such as crane, reduce construction cost.

Description

A kind of construction method of pile pulling
Technical field
The present invention relates to a kind of construction method of extracting old foundation pile of building engineering field, in particular, relate to a kind of low noise, the construction method of simple pile pulling of constructing.
Background technology
At present, along with the quickening of urban construction and development speed, original most of communal facilities can not meet user demand, particularly evident in urban traffic and housing construction, just need again to remodel and expand original building, in dismounting, reconstruction and enlarging process, the underground pile foundation all inevitably related to is removed.But due to the feature of urban renewal, near the existence of other often adjoint building and obstruction, in removal and job site, often obstruction is numerous, the main equipments such as the pipe bit machine that conventional pile pulling technology uses and crane cannot enter job site, need that the main equipments such as rear crane are cleared up to scene and just can enter construction, delay construction speed, and wasting manpower and material resources.
Summary of the invention
The present invention is directed to the deficiencies in the prior art, and provide a kind of, low noise little to periphery soil disturbance, shockproof, pollution-free, construction is flexible, the construction method of the pile pulling that efficiency of construction is high.
In order to achieve the above object, this invention takes following technical scheme:
A construction method for pile pulling, comprises the steps:
Prepare before A, pile pulling:
Select the tonnage of fork truck according to the weight of old pile foundation, fork truck is arranged on old pile foundation limit; Set up tripod, angle for tripod is fixed on ground, install movable pulley in the center of tripod, being sling by pipe bit head by movable pulley is arranged on directly over old pile foundation, drilling pipe is arranged on pipe bit head lower end, the old pile foundation center of circle of drilling pipe perpendicular alignmnet;
B, be separated old pile foundation:
Start under pipe bit head drives drilling pipe and bore, the degree of depth that drilling pipe pierces is not less than the degree of depth of old pile foundation, then extracts drilling pipe dismounting pipe bit head out;
C, pile pulling:
Steel wire loop centre position is fixed on the lower end of old pile foundation, one end of steel wire loop is fixed on the jaw of fork truck, and the other end is fixed on movable pulley; Fork truck and movable pulley alternately coordinate firmly, old pile foundation are extracted.
Described tripod is provided with base, and described base is fixed by expansion bolt and ground.The internal diameter of described drilling pipe is not less than the external diameter of old pile foundation.The position of the old pile foundation of distance of described angle steel pile is not less than 5 meters.Described steel wire loop and angle steel pile are that 8 words are overlapping fixing.
Beneficial effect of the present invention: (1) requires low to construction plant, and efficiency of construction is high; (2) safe and reliable, low noise little to periphery soil disturbance, shockproof, pollution-free; It is (3) workable, do not need the main equipments such as crane, reduce construction cost.
Accompanying drawing explanation
Fig. 1 is the schematic diagram setting up tripod of the construction method of a kind of pile pulling of the present invention;
Fig. 2 is the schematic diagram of the old pile foundation of separation of the construction method of a kind of pile pulling of the present invention;
Fig. 3 is the schematic diagram of the fixing steel wire loop of the construction method of a kind of pile pulling of the present invention;
Fig. 4 is the schematic diagram of the pile pulling process of the construction method of a kind of pile pulling of the present invention;
In figure: tripod 1, pipe bit head 2, drilling pipe 3, old pile foundation 4, movable pulley 5, angle steel pile 6, steel wire loop 7, fork truck 8.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is described in further detail.
As shown in the figure: in the construction method of a kind of pile pulling of the present invention, tripod 1, pipe bit head 2, drilling pipe 3, old pile foundation 4, movable pulley 5, angle steel pile 6, steel wire loop 7, fork truck 8.
The construction method of a kind of pile pulling of the present invention, comprises the steps:
Prepare before A, pile pulling:
Select the tonnage of fork truck 8 according to the weight of old pile foundation 4, fork truck 8 is arranged on old pile foundation 4 limit; Set up tripod 1, and an angle for tripod 1 is fixed on ground, described tripod 1, be made up of seamless steel pipe, its wall thickness and height determine according to the degree of depth preparing the old foundation pile 4 pulled out, and tripod 1 is provided with base, and described base is fixed by expansion bolt and ground.In the center of tripod 1, movable pulley 5 is installed, being sling by pipe bit head 2 by movable pulley 5 is arranged on directly over old pile foundation 4, drilling pipe 3 is arranged on pipe bit head 2 lower end, drilling pipe 3 perpendicular alignmnet old pile foundation 4 center of circle, the internal diameter of described drilling pipe 3 is not less than the external diameter of old pile foundation 4;
B, be separated old pile foundation 4:
By tripod 1, pipe bit head 2 and drilling pipe 3 suspention are lifted, the old pile foundation 4 that drilling pipe 3 mouthfuls of perpendicular alignmnets are residual, start pipe bit head 2, utilize the rotation of drilling pipe 3, press down, cut and be separated the earth of old pile foundation 4 with surrounding, the degree of depth that drilling pipe 3 pierces is not less than the degree of depth of old pile foundation 4, then extracts drilling pipe 3 out and remove pipe bit head 2; Then by two steel wire loops 7, along old pile foundation 4 head down, by the gap of cutting and separating, old pile foundation 4 is fixedly entangled firm;
C, pile pulling:
Steel wire loop 7 is fixed on the lower end of old pile foundation 4, one end of steel wire loop 7 is fixed on the jaw of fork truck 8, and the other end repeats to fix by 8 word interior extrapolation methods through movable pulley 5 and angle steel pile 6, and described angle steel pile 6 is not less than 5 meters apart from the position of old pile foundation 4; Fork truck 8 and movable pulley 5 alternately coordinate firmly, and pile pulling starts, and fork truck 8 and movable pulley 5 alternately stressed lifting, tighten up wire rope at lifting process; When fork truck 8 is lifted to certain altitude, movable pulley 5 tightens up thereupon, and make steel wire loop 7 be in stress always, at this time fork truck tightens up wire rope again, again promotes, when old proposition ground, pile foundation 4 upper end, rope to be fastened in old pile foundation 4 upper end, fell draw for extracting rear pile foundation, then old pile foundation 4 extracted, traction was fallen; The hole of the old pile foundation 4 finally stayed, will backfill in time, tamp, and prevents personnel from falling.
The construction method of a kind of pile pulling of the present invention is used in crane and the unapproachable job site of main equipment, and can carry out old pile foundation efficiently and extract work, safe and reliable, efficiency of construction is high, workable, can reduce construction cost.

Claims (3)

1. a construction method for pile pulling, is characterized in that, comprises the steps:
Prepare before A, pile pulling:
Select the tonnage of fork truck (8) according to the weight of old pile foundation (4), fork truck (8) is arranged on old pile foundation (4) limit; Set up tripod (1), an angle for tripod (1) is fixed on ground, in the center of tripod (1), movable pulley (5) is installed, being sling by pipe bit head (2) by movable pulley (5) is arranged on directly over old pile foundation (4), drilling pipe (3) is arranged on pipe bit head (2) lower end, drilling pipe (3) perpendicular alignmnet old pile foundation (4) center of circle;
B, be separated old pile foundation (4):
Start under pipe bit head (2) drives drilling pipe (3) and bore, the degree of depth that drilling pipe (3) pierces is not less than the degree of depth of old pile foundation (4), then extracts drilling pipe (3) dismounting pipe bit head (2) out;
C, pile pulling:
Steel wire loop (7) centre position is fixed on the lower end of old pile foundation (4), one end of steel wire loop (7) is fixed on the jaw of fork truck (8), the other end is fixed on angle steel pile (6) by movable pulley (5), steel wire loop (7) and angle steel pile (6) are that 8 words are overlapping fixing, and described angle steel pile (6) is not less than 5 meters apart from the position of old pile foundation (4); Then fork truck (8) and movable pulley (5) alternately coordinate firmly, old pile foundation (4) are extracted.
2. the construction method of pile pulling according to claim 1, is characterized in that, described tripod (1) is provided with base, and described base is fixed by expansion bolt and ground.
3. the construction method of pile pulling according to claim 1, is characterized in that, the internal diameter of described drilling pipe (3) is not less than the external diameter of old pile foundation (4).
CN201310253199.4A 2013-06-25 2013-06-25 A kind of construction method of pile pulling Active CN103334433B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310253199.4A CN103334433B (en) 2013-06-25 2013-06-25 A kind of construction method of pile pulling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310253199.4A CN103334433B (en) 2013-06-25 2013-06-25 A kind of construction method of pile pulling

Publications (2)

Publication Number Publication Date
CN103334433A CN103334433A (en) 2013-10-02
CN103334433B true CN103334433B (en) 2015-11-18

Family

ID=49242632

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310253199.4A Active CN103334433B (en) 2013-06-25 2013-06-25 A kind of construction method of pile pulling

Country Status (1)

Country Link
CN (1) CN103334433B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6284253B1 (en) * 2017-06-15 2018-02-28 株式会社徳永組 Pile catcher and pile removal method using pile catcher
JP6284255B1 (en) * 2017-11-15 2018-02-28 株式会社徳永組 Pile cap and pile drawing method
CN114482048B (en) * 2022-02-17 2024-05-03 天津市津水建筑工程有限公司 Pile extractor for hydraulic engineering

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007332559A (en) * 2006-06-12 2007-12-27 Riyouken Kiso Kk Removal method for existing underground pile
CN101130988A (en) * 2007-08-16 2008-02-27 江苏华东建设基础工程总公司 Pile extractor and construction method thereof
CN101173517A (en) * 2006-10-31 2008-05-07 上海市基础工程公司 Pile-pulling construction method
CN101358452A (en) * 2007-07-30 2009-02-04 王薇 Construction method and construction equipment of total rotary rapid cutting barrier clearance and pile extracting
JP3159275U (en) * 2010-02-24 2010-05-13 博 小野寺 Pile extraction jig
CN202090349U (en) * 2011-05-19 2011-12-28 中天建设集团有限公司 Device for removing square pile

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007332559A (en) * 2006-06-12 2007-12-27 Riyouken Kiso Kk Removal method for existing underground pile
CN101173517A (en) * 2006-10-31 2008-05-07 上海市基础工程公司 Pile-pulling construction method
CN101358452A (en) * 2007-07-30 2009-02-04 王薇 Construction method and construction equipment of total rotary rapid cutting barrier clearance and pile extracting
CN101130988A (en) * 2007-08-16 2008-02-27 江苏华东建设基础工程总公司 Pile extractor and construction method thereof
JP3159275U (en) * 2010-02-24 2010-05-13 博 小野寺 Pile extraction jig
CN202090349U (en) * 2011-05-19 2011-12-28 中天建设集团有限公司 Device for removing square pile

Also Published As

Publication number Publication date
CN103334433A (en) 2013-10-02

Similar Documents

Publication Publication Date Title
CN101736746B (en) Construction method for vibrator pipe sinking high-pressure grouting underpinning pile extracting
CN110409461A (en) A kind of base pit stand construction based on assembled large-diameter tubular pile
CN101838988B (en) Comprehensive construction method for extracting anchor cable
CN101886390A (en) All casing static pressure pile pulling technology in narrow space
CN103541352B (en) A kind of at ground, sandy soil stratum major diameter Vertical spots underground continuous construction method
CN103334433B (en) A kind of construction method of pile pulling
CN101982614A (en) Method for drilling rocks into pile by utilizing all casing drill
CN103643673B (en) Steel-pipe pile and construction method can be recycled in self-advancing type
CN104612722B (en) Tunnel gate strengthening method for starting and arriving of annular shield or annular pushing pipe
CN103485344A (en) Method for extracting construction engineering pile foundation
CN203270578U (en) Underground pile foundation pulling device with steel wire rope sleeve clamp
CN106759432A (en) A kind of construction method of offshore wind farm super-large diameter piling bar
CN202090349U (en) Device for removing square pile
CN201635074U (en) Ground anchor
CN201671104U (en) Combined tower type crane base
CN102852157B (en) Manual hole pile digging method employing top-fixing water drilling method
CN203247580U (en) Construction structure of cast-in-place concrete pile of deep soft soil foundation bridge girder
CN201915839U (en) Drilling tool of salvage rotary drilling rig
CN202108046U (en) Portable ground anchor for moving drilling machine
CN204780894U (en) Can dismantle steel protects wound packages and puts
CN203559420U (en) Pile splicing construction device under quicksand geological conditions
CN202645430U (en) Vibration punching device
CN102817364A (en) Construction method for deep foundation pit steel sheet pile and anchor rope timbering system
CN203270575U (en) Bored concrete pile pile-head breaking combined loosening device
CN102296610B (en) Device for removing square pile and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant