CN101982614A - Method for drilling rocks into pile by utilizing all casing drill - Google Patents
Method for drilling rocks into pile by utilizing all casing drill Download PDFInfo
- Publication number
- CN101982614A CN101982614A CN 201010502655 CN201010502655A CN101982614A CN 101982614 A CN101982614 A CN 101982614A CN 201010502655 CN201010502655 CN 201010502655 CN 201010502655 A CN201010502655 A CN 201010502655A CN 101982614 A CN101982614 A CN 101982614A
- Authority
- CN
- China
- Prior art keywords
- rock
- steel sleeve
- hole
- pile
- casing drill
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The invention relates to a building construction method, in particular to a high-efficiency combined construction method suitable for drilling a rock stratum into a pile by utilizing an all casing drill. The method comprises the following steps: 1, positioning a pile position, and placing the all casing drill to a right position; 2, pressing in a steel sleeve, and taking soil to the rock surface in the sleeve by percussion and grabbing or rotary drilling; 3, lifting a down-hole hammer, and mounting the down-hole hammer to the steel sleeve; 4, starting the down-hole hammer to drill the rock to a projected depth, and clearing the hole; 5, mounting a reinforcement cage and pouring concrete; and 6, pouring concrete, and simultaneously pulling up the steel sleeve until the steel sleeve is completely pulled out. The method has the advantages of simple and practical operation, small damage to the ground, no collapse during construction, good piling quality, good water proof effect, high piling efficiency, low construction cost, no pollution during construction and efficient and quick rock drilling.
Description
Technical field
The present invention relates to a kind of construction techniques, particularly a kind of all casing drill combination constructing method thereof that is adapted at rock stratum high efficiency boring and pile.
Background technology
Worker's method of all casing drill is a most frequently used piling method during present city secondary is built, its advantage is that excavation, construction area are little, influences little, pollution-free to the underground soil body, construction surrounding enviroment, when removing obstacles, can irritate pile driving construction, avoid the excavation that repeats of a plurality of operations, and since the retaining wall effect of steel sleeve, the hole quality height, the hole can not collapse, the verticality height, the reaming size is little, the efficiency of construction height.Have residual stake because the depth of building of city secondary construction is higher and deep layer is underground, so this employing worker method will inevitably run into competent bed or residual stake.Worker's method of all casing drill is applicable to soil layer or incompetent bed very much, go into then difficulty of hard rock, meet greater than half boulder intractability of stake footpath big, though in practical operation, can adopt supporting facility to cut rock, but therefore efficiency of construction can reduce greatly, and operation is also comparatively complicated.
Downhole hammer rock drilling machine has used comparatively ripe abroad, its advantage is the construction that penetrates that is specially adapted to hard rock stratum such as lithosphere, boulder bed, but play whole machine cost height, the combined no outer tube of crane, its retaining wall effect is undesirable, the hole that still can collapse, and construction pollution is big, being used for getting the above soil of lithosphere has the sense of wasting one's talent on a petty job, and can increase construction cost.
Technical scheme
Technical problem to be solved by this invention provides the method that a kind of all casing drill cutter is got the hard rock pile, operation is simple for it, do not collapse that hole, pile quality are good in, the construction little to the ground breakage, good water-proof effect, pile efficient height, cost is low, construction is pollution-free, and can cut a hole the brill hard rock efficiently, fast.
Realize that the technical scheme that the object of the invention adopted is:
Processing step is as follows
1. fixed stake position, all casing drill is in place;
2. be pressed into steel sleeve, take soil to rock face towards grabbing or revolving in the pipe;
3. hang in down-the-hole hammer assembly and be installed on the steel sleeve;
4. start downhole hammer rock to projected depth, clear hole;
5. reinforcing cage is installed and is poured into concrete;
6. pour into concrete on one side, pull out steel sleeve on one side simultaneously, until all extracting steel sleeve.
In aforesaid operations of the present invention, down-the-hole hammer assembly overlaps all casing drills and is used with many, and rock drilling directly lifts on the other steel sleeve in scene with pedrail crane during to projected depth; The steel sleeve upper end is equipped with Connection Card, and the mesopore of Connection Card is to the sleeve pipe radial location of down-the-hole hammer assembly.
When the aperture behind the downhole hammer rock does not meet design requirement, should adopt jump bit or Spiral digging machine to add and be pressed into sleeve pipe the petrosal foramen deburring, repair the hole to meeting design requirement to extremely.
The invention has the beneficial effects as follows: all casing drill and the unification of downhole hammer rock drilling machine two machines, to make the most of the advantage separately, all casing drill performance steel sleeve is pressed into and retaining wall, fetch earth fast to rock face, down-the-hole hammer assembly is platform with all casing drill with the sleeve pipe that is pressed into, and carries out quick rock drill and gets, and the hole does not therefore collapse in construction, pile quality is good, good water-proof effect, pile efficient height, cost is low, it is pollution-free to construct, and has again simultaneously to cut a hole efficiently, apace to bore hard rock.
Description of drawings
Fig. 1 is a process flow diagram of the present invention;
Fig. 2 is an equipment overall schematic of the present invention.
Among the figure: Connection Card 1, unit head 2, muck removal pipe 3, electrical control cubicles 4, pneumatics unit 5, rock face 6, down-the-hole hammer assembly 7, steel sleeve 8.
The specific embodiment
Referring to each figure, processing step of the present invention is as follows:
1. fixed stake position, all casing drill is in place;
2. be pressed into steel sleeve 8, adopt in the pipe to dash to grab or revolve to take soil to rock face;
3. on the Connection Card 1 that hangs in down-the-hole hammer assembly 7 and be installed to, make the centring ring above the Connection Card 1 do radial location to the sleeve pipe of down-the-hole hammer assembly, Connection Card 1 following collar is enclosed within steel sleeve 8 upper end bolt;
4. start downhole hammer rock to projected depth, measure hole depth and aperture, when the aperture behind the downhole hammer rock does not meet design requirement, should adopt jump bit or Spiral digging machine to add and be pressed into sleeve pipe, repair the hole to meeting design requirement to extremely clear hole to the petrosal foramen deburring; Simultaneously down-the-hole being hammered into shape assembly directly lifts on the other steel sleeve in scene with pedrail crane and carries out same operation;
5. reinforcing cage is installed and is poured into concrete;
6. pour into concrete on one side, pull out steel sleeve on one side simultaneously, until all extracting steel sleeve.
Claims (3)
1. an all casing drill is cut a hole the method for getting the rock pile, it is characterized in that processing step is as follows:
1. fixed stake position, all casing drill is in place;
2. be pressed into steel sleeve, take soil to rock face towards grabbing or revolving in the pipe;
3. hang in down-the-hole hammer assembly and be installed on the steel sleeve;
4. start downhole hammer rock to projected depth, clear hole;
5. reinforcing cage is installed and is poured into concrete;
6. pour into concrete on one side, pull out steel sleeve on one side simultaneously, until all extracting steel sleeve.
2. the method for getting the rock pile by the described all casing drill of claim 1 cutter is characterized in that: down-the-hole hammer assembly overlaps all casing drills and is used with many, and rock drilling directly lifts in the other steel sleeve in scene with pedrail crane during to projected depth; The steel sleeve upper end is equipped with Connection Card, and the mesopore of Connection Card is to the sleeve pipe radial location of down-the-hole hammer assembly.
3. cut a hole the method for getting the rock pile by the described all casing drill of claim 2, it is characterized in that: when the aperture behind the downhole hammer rock does not meet design requirement, should adopt jump bit or Spiral digging machine to add and be pressed into sleeve pipe, repair the hole to meeting design requirement to extremely to the petrosal foramen deburring.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010502655 CN101982614A (en) | 2010-10-11 | 2010-10-11 | Method for drilling rocks into pile by utilizing all casing drill |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010502655 CN101982614A (en) | 2010-10-11 | 2010-10-11 | Method for drilling rocks into pile by utilizing all casing drill |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101982614A true CN101982614A (en) | 2011-03-02 |
Family
ID=43619521
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010502655 Pending CN101982614A (en) | 2010-10-11 | 2010-10-11 | Method for drilling rocks into pile by utilizing all casing drill |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101982614A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102400460A (en) * | 2011-11-30 | 2012-04-04 | 昆明捷程桩工有限责任公司 | Construction method for preventing pile diameter variation of cast-in-place concrete pile |
CN102434097A (en) * | 2011-08-23 | 2012-05-02 | 谢清光 | Quick pile forming process |
CN102839653A (en) * | 2012-08-02 | 2012-12-26 | 天津二十冶建设有限公司 | Construction method for concrete pouring pile for soft soil foundation with built-in block rock layer |
CN102979090A (en) * | 2012-12-13 | 2013-03-20 | 中铁上海工程局第二工程有限公司 | Construction method for fixing steel casing on covering-free steep bare rock in deepwater and rapid stream |
CN108130904A (en) * | 2017-12-25 | 2018-06-08 | 浙江大学城市学院 | A kind of construction method of the composite bushing drill-pouring pilework of neighbouring existing subway |
CN109403326A (en) * | 2018-12-14 | 2019-03-01 | 张成瑞 | Serious collapse hole occurs based on drilled pile and takes out steel reinforcement cage method |
CN113668492A (en) * | 2021-08-31 | 2021-11-19 | 上海市基础工程集团有限公司 | Ultra-deep cemented soil coring construction process |
CN116163307A (en) * | 2023-02-23 | 2023-05-26 | 华侨大学 | Construction method for pre-drilling core reaming implanted pile for boulder stratum |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB827549A (en) * | 1955-12-09 | 1960-02-10 | Benoto Sa | Improvements relating to an earth boring machine incorporating means for positioningand handling boring tubes |
GB925421A (en) * | 1959-06-19 | 1963-05-08 | Benoto Sa | A widening or enlarging device for a boring machine |
CN2356137Y (en) * | 1998-11-13 | 1999-12-29 | 宣化-英格索兰矿山工程机械有限公司 | Drilling device for central hole enlarging sleeve follow-up down-the-hole hammer drill |
CN1293291A (en) * | 1999-10-18 | 2001-05-02 | 柳建国 | Construction method of large-diameter fully-sleeved filled pile |
CN1419034A (en) * | 2002-11-29 | 2003-05-21 | 赵大军 | Down-the-hole hammer percussion static-pressure cased-drilling method for unconsolided and broken formation |
CN1766277A (en) * | 2005-11-02 | 2006-05-03 | 中国水电顾问集团成都勘测设计研究院 | Air down-the-hole hammer coring casing drill |
-
2010
- 2010-10-11 CN CN 201010502655 patent/CN101982614A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB827549A (en) * | 1955-12-09 | 1960-02-10 | Benoto Sa | Improvements relating to an earth boring machine incorporating means for positioningand handling boring tubes |
GB925421A (en) * | 1959-06-19 | 1963-05-08 | Benoto Sa | A widening or enlarging device for a boring machine |
CN2356137Y (en) * | 1998-11-13 | 1999-12-29 | 宣化-英格索兰矿山工程机械有限公司 | Drilling device for central hole enlarging sleeve follow-up down-the-hole hammer drill |
CN1293291A (en) * | 1999-10-18 | 2001-05-02 | 柳建国 | Construction method of large-diameter fully-sleeved filled pile |
CN1419034A (en) * | 2002-11-29 | 2003-05-21 | 赵大军 | Down-the-hole hammer percussion static-pressure cased-drilling method for unconsolided and broken formation |
CN1766277A (en) * | 2005-11-02 | 2006-05-03 | 中国水电顾问集团成都勘测设计研究院 | Air down-the-hole hammer coring casing drill |
Non-Patent Citations (1)
Title |
---|
《市政技术》 20090930 刘军等 北京卵漂石地层灌注桩机械成孔的适宜性研究 说明书第530第2栏-531页、图7-8 1-3 , 第05期 2 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102434097A (en) * | 2011-08-23 | 2012-05-02 | 谢清光 | Quick pile forming process |
CN102400460A (en) * | 2011-11-30 | 2012-04-04 | 昆明捷程桩工有限责任公司 | Construction method for preventing pile diameter variation of cast-in-place concrete pile |
CN102839653A (en) * | 2012-08-02 | 2012-12-26 | 天津二十冶建设有限公司 | Construction method for concrete pouring pile for soft soil foundation with built-in block rock layer |
CN102979090A (en) * | 2012-12-13 | 2013-03-20 | 中铁上海工程局第二工程有限公司 | Construction method for fixing steel casing on covering-free steep bare rock in deepwater and rapid stream |
CN108130904A (en) * | 2017-12-25 | 2018-06-08 | 浙江大学城市学院 | A kind of construction method of the composite bushing drill-pouring pilework of neighbouring existing subway |
CN109403326A (en) * | 2018-12-14 | 2019-03-01 | 张成瑞 | Serious collapse hole occurs based on drilled pile and takes out steel reinforcement cage method |
CN113668492A (en) * | 2021-08-31 | 2021-11-19 | 上海市基础工程集团有限公司 | Ultra-deep cemented soil coring construction process |
CN116163307A (en) * | 2023-02-23 | 2023-05-26 | 华侨大学 | Construction method for pre-drilling core reaming implanted pile for boulder stratum |
CN116163307B (en) * | 2023-02-23 | 2024-06-07 | 华侨大学 | Construction method for pre-drilling core reaming implanted pile for boulder stratum |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101982614A (en) | Method for drilling rocks into pile by utilizing all casing drill | |
CN105649083B (en) | The clear stake device of the disposable rotary-cutting type of full-sleeve and its clear piling method | |
CN105649012B (en) | Upper-soft lower-hard ground subway station building enclosure drilled pile construction method | |
CN103603342B (en) | Major diameter assembled casing super-long filling pile construction method | |
CN203808822U (en) | Full-hydraulic double power head device of rotary drilling rig | |
CN102587380A (en) | Construction method for wholly removing drilling pile head | |
CN101328712A (en) | Construction method of interlocking pile for soft soil and soil layer with obstacle | |
CN101851922B (en) | Method for eliminating underground anchor rope/rod by using all casing drill | |
JP6144542B2 (en) | Nakabori excavator | |
CN104775433B (en) | A kind of method of pile pulling construction | |
CN105569560A (en) | Full casing long-spiral bored pile machine and method of using same for construction | |
CN101838988B (en) | Comprehensive construction method for extracting anchor cable | |
CN105239564A (en) | Construction method of cast-in-place pile with combination of full-sleeve and mud protecting wall | |
CN109322301B (en) | Quincuncial pore-forming construction method for rotary excavating bored concrete pile of large-diameter ultra-deep and ultra-thick rock stratum | |
CN110273413A (en) | A kind of efficient construction method of prefabricated pile | |
CN103243712A (en) | Caterpillar end-expanded filling pile with pneumatic down-the-hole hammer and quick construction method of caterpillar end-expanded filling pile | |
CN204299468U (en) | A kind of positioning and guiding system and device of hidden hole drilling boring | |
CN103485344A (en) | Method for extracting construction engineering pile foundation | |
CN104975734B (en) | Method for installing casing of casting machine well | |
CN104141455A (en) | Drilling rig apparatus and drilling method of drilling rig | |
CN110886577A (en) | Construction method for perpendicularity control of rotary excavating hard secant pile in deep and thick rockfill area | |
JP2007332559A (en) | Removal method for existing underground pile | |
CN202946012U (en) | Sleeving spiral drilling machine for pile head processing | |
CN108005065A (en) | The constructing structure and construction method of PHC static pressure pipe piles | |
CN201817809U (en) | DTH hammer and all casing drill combined machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20110302 |