CN101982614A - Method for drilling rocks into pile by utilizing all casing drill - Google Patents

Method for drilling rocks into pile by utilizing all casing drill Download PDF

Info

Publication number
CN101982614A
CN101982614A CN 201010502655 CN201010502655A CN101982614A CN 101982614 A CN101982614 A CN 101982614A CN 201010502655 CN201010502655 CN 201010502655 CN 201010502655 A CN201010502655 A CN 201010502655A CN 101982614 A CN101982614 A CN 101982614A
Authority
CN
China
Prior art keywords
rock
steel sleeve
hole
pile
casing drill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010502655
Other languages
Chinese (zh)
Inventor
刘富华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming Jiecheng Foundation Engineering & Machine Co Ltd
Original Assignee
Kunming Jiecheng Foundation Engineering & Machine Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming Jiecheng Foundation Engineering & Machine Co Ltd filed Critical Kunming Jiecheng Foundation Engineering & Machine Co Ltd
Priority to CN 201010502655 priority Critical patent/CN101982614A/en
Publication of CN101982614A publication Critical patent/CN101982614A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention relates to a building construction method, in particular to a high-efficiency combined construction method suitable for drilling a rock stratum into a pile by utilizing an all casing drill. The method comprises the following steps: 1, positioning a pile position, and placing the all casing drill to a right position; 2, pressing in a steel sleeve, and taking soil to the rock surface in the sleeve by percussion and grabbing or rotary drilling; 3, lifting a down-hole hammer, and mounting the down-hole hammer to the steel sleeve; 4, starting the down-hole hammer to drill the rock to a projected depth, and clearing the hole; 5, mounting a reinforcement cage and pouring concrete; and 6, pouring concrete, and simultaneously pulling up the steel sleeve until the steel sleeve is completely pulled out. The method has the advantages of simple and practical operation, small damage to the ground, no collapse during construction, good piling quality, good water proof effect, high piling efficiency, low construction cost, no pollution during construction and efficient and quick rock drilling.

Description

The method that all casing drill cutter is got the rock pile
Technical field
The present invention relates to a kind of construction techniques, particularly a kind of all casing drill combination constructing method thereof that is adapted at rock stratum high efficiency boring and pile.
Background technology
Worker's method of all casing drill is a most frequently used piling method during present city secondary is built, its advantage is that excavation, construction area are little, influences little, pollution-free to the underground soil body, construction surrounding enviroment, when removing obstacles, can irritate pile driving construction, avoid the excavation that repeats of a plurality of operations, and since the retaining wall effect of steel sleeve, the hole quality height, the hole can not collapse, the verticality height, the reaming size is little, the efficiency of construction height.Have residual stake because the depth of building of city secondary construction is higher and deep layer is underground, so this employing worker method will inevitably run into competent bed or residual stake.Worker's method of all casing drill is applicable to soil layer or incompetent bed very much, go into then difficulty of hard rock, meet greater than half boulder intractability of stake footpath big, though in practical operation, can adopt supporting facility to cut rock, but therefore efficiency of construction can reduce greatly, and operation is also comparatively complicated.
Downhole hammer rock drilling machine has used comparatively ripe abroad, its advantage is the construction that penetrates that is specially adapted to hard rock stratum such as lithosphere, boulder bed, but play whole machine cost height, the combined no outer tube of crane, its retaining wall effect is undesirable, the hole that still can collapse, and construction pollution is big, being used for getting the above soil of lithosphere has the sense of wasting one's talent on a petty job, and can increase construction cost.
Technical scheme
Technical problem to be solved by this invention provides the method that a kind of all casing drill cutter is got the hard rock pile, operation is simple for it, do not collapse that hole, pile quality are good in, the construction little to the ground breakage, good water-proof effect, pile efficient height, cost is low, construction is pollution-free, and can cut a hole the brill hard rock efficiently, fast.
Realize that the technical scheme that the object of the invention adopted is:
Processing step is as follows
1. fixed stake position, all casing drill is in place;
2. be pressed into steel sleeve, take soil to rock face towards grabbing or revolving in the pipe;
3. hang in down-the-hole hammer assembly and be installed on the steel sleeve;
4. start downhole hammer rock to projected depth, clear hole;
5. reinforcing cage is installed and is poured into concrete;
6. pour into concrete on one side, pull out steel sleeve on one side simultaneously, until all extracting steel sleeve.
In aforesaid operations of the present invention, down-the-hole hammer assembly overlaps all casing drills and is used with many, and rock drilling directly lifts on the other steel sleeve in scene with pedrail crane during to projected depth; The steel sleeve upper end is equipped with Connection Card, and the mesopore of Connection Card is to the sleeve pipe radial location of down-the-hole hammer assembly.
When the aperture behind the downhole hammer rock does not meet design requirement, should adopt jump bit or Spiral digging machine to add and be pressed into sleeve pipe the petrosal foramen deburring, repair the hole to meeting design requirement to extremely.
The invention has the beneficial effects as follows: all casing drill and the unification of downhole hammer rock drilling machine two machines, to make the most of the advantage separately, all casing drill performance steel sleeve is pressed into and retaining wall, fetch earth fast to rock face, down-the-hole hammer assembly is platform with all casing drill with the sleeve pipe that is pressed into, and carries out quick rock drill and gets, and the hole does not therefore collapse in construction, pile quality is good, good water-proof effect, pile efficient height, cost is low, it is pollution-free to construct, and has again simultaneously to cut a hole efficiently, apace to bore hard rock.
Description of drawings
Fig. 1 is a process flow diagram of the present invention;
Fig. 2 is an equipment overall schematic of the present invention.
Among the figure: Connection Card 1, unit head 2, muck removal pipe 3, electrical control cubicles 4, pneumatics unit 5, rock face 6, down-the-hole hammer assembly 7, steel sleeve 8.
The specific embodiment
Referring to each figure, processing step of the present invention is as follows:
1. fixed stake position, all casing drill is in place;
2. be pressed into steel sleeve 8, adopt in the pipe to dash to grab or revolve to take soil to rock face;
3. on the Connection Card 1 that hangs in down-the-hole hammer assembly 7 and be installed to, make the centring ring above the Connection Card 1 do radial location to the sleeve pipe of down-the-hole hammer assembly, Connection Card 1 following collar is enclosed within steel sleeve 8 upper end bolt;
4. start downhole hammer rock to projected depth, measure hole depth and aperture, when the aperture behind the downhole hammer rock does not meet design requirement, should adopt jump bit or Spiral digging machine to add and be pressed into sleeve pipe, repair the hole to meeting design requirement to extremely clear hole to the petrosal foramen deburring; Simultaneously down-the-hole being hammered into shape assembly directly lifts on the other steel sleeve in scene with pedrail crane and carries out same operation;
5. reinforcing cage is installed and is poured into concrete;
6. pour into concrete on one side, pull out steel sleeve on one side simultaneously, until all extracting steel sleeve.

Claims (3)

1. an all casing drill is cut a hole the method for getting the rock pile, it is characterized in that processing step is as follows:
1. fixed stake position, all casing drill is in place;
2. be pressed into steel sleeve, take soil to rock face towards grabbing or revolving in the pipe;
3. hang in down-the-hole hammer assembly and be installed on the steel sleeve;
4. start downhole hammer rock to projected depth, clear hole;
5. reinforcing cage is installed and is poured into concrete;
6. pour into concrete on one side, pull out steel sleeve on one side simultaneously, until all extracting steel sleeve.
2. the method for getting the rock pile by the described all casing drill of claim 1 cutter is characterized in that: down-the-hole hammer assembly overlaps all casing drills and is used with many, and rock drilling directly lifts in the other steel sleeve in scene with pedrail crane during to projected depth; The steel sleeve upper end is equipped with Connection Card, and the mesopore of Connection Card is to the sleeve pipe radial location of down-the-hole hammer assembly.
3. cut a hole the method for getting the rock pile by the described all casing drill of claim 2, it is characterized in that: when the aperture behind the downhole hammer rock does not meet design requirement, should adopt jump bit or Spiral digging machine to add and be pressed into sleeve pipe, repair the hole to meeting design requirement to extremely to the petrosal foramen deburring.
CN 201010502655 2010-10-11 2010-10-11 Method for drilling rocks into pile by utilizing all casing drill Pending CN101982614A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010502655 CN101982614A (en) 2010-10-11 2010-10-11 Method for drilling rocks into pile by utilizing all casing drill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010502655 CN101982614A (en) 2010-10-11 2010-10-11 Method for drilling rocks into pile by utilizing all casing drill

Publications (1)

Publication Number Publication Date
CN101982614A true CN101982614A (en) 2011-03-02

Family

ID=43619521

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010502655 Pending CN101982614A (en) 2010-10-11 2010-10-11 Method for drilling rocks into pile by utilizing all casing drill

Country Status (1)

Country Link
CN (1) CN101982614A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102400460A (en) * 2011-11-30 2012-04-04 昆明捷程桩工有限责任公司 Construction method for preventing pile diameter of concrete pouring pile from being varied
CN102434097A (en) * 2011-08-23 2012-05-02 谢清光 Rapid piling process
CN102839653A (en) * 2012-08-02 2012-12-26 天津二十冶建设有限公司 Construction method for concrete pouring pile for soft soil foundation with built-in block rock layer
CN102979090A (en) * 2012-12-13 2013-03-20 中铁上海工程局第二工程有限公司 Construction method for fixing steel casing on covering-free steep bare rock in deepwater and rapid stream
CN108130904A (en) * 2017-12-25 2018-06-08 浙江大学城市学院 A kind of construction method of the composite bushing drill-pouring pilework of neighbouring existing subway
CN109403326A (en) * 2018-12-14 2019-03-01 张成瑞 Serious collapse hole occurs based on drilled pile and takes out steel reinforcement cage method
CN113668492A (en) * 2021-08-31 2021-11-19 上海市基础工程集团有限公司 Ultra-deep cemented soil coring construction process
CN116163307A (en) * 2023-02-23 2023-05-26 华侨大学 Construction method for pre-drilling core reaming implanted pile for boulder stratum

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB827549A (en) * 1955-12-09 1960-02-10 Benoto Sa Improvements relating to an earth boring machine incorporating means for positioningand handling boring tubes
GB925421A (en) * 1959-06-19 1963-05-08 Benoto Sa A widening or enlarging device for a boring machine
CN2356137Y (en) * 1998-11-13 1999-12-29 宣化-英格索兰矿山工程机械有限公司 Drilling device for central hole enlarging sleeve follow-up down-the-hole hammer drill
CN1293291A (en) * 1999-10-18 2001-05-02 柳建国 Construction method of large-diameter fully-sleeved filled pile
CN1419034A (en) * 2002-11-29 2003-05-21 赵大军 Down-the-hole hammer percussion static-pressure cased-drilling method for unconsolided and broken formation
CN1766277A (en) * 2005-11-02 2006-05-03 中国水电顾问集团成都勘测设计研究院 Air down-the-hole hammer coring casing drill

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB827549A (en) * 1955-12-09 1960-02-10 Benoto Sa Improvements relating to an earth boring machine incorporating means for positioningand handling boring tubes
GB925421A (en) * 1959-06-19 1963-05-08 Benoto Sa A widening or enlarging device for a boring machine
CN2356137Y (en) * 1998-11-13 1999-12-29 宣化-英格索兰矿山工程机械有限公司 Drilling device for central hole enlarging sleeve follow-up down-the-hole hammer drill
CN1293291A (en) * 1999-10-18 2001-05-02 柳建国 Construction method of large-diameter fully-sleeved filled pile
CN1419034A (en) * 2002-11-29 2003-05-21 赵大军 Down-the-hole hammer percussion static-pressure cased-drilling method for unconsolided and broken formation
CN1766277A (en) * 2005-11-02 2006-05-03 中国水电顾问集团成都勘测设计研究院 Air down-the-hole hammer coring casing drill

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《市政技术》 20090930 刘军等 北京卵漂石地层灌注桩机械成孔的适宜性研究 说明书第530第2栏-531页、图7-8 1-3 , 第05期 2 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102434097A (en) * 2011-08-23 2012-05-02 谢清光 Rapid piling process
CN102400460A (en) * 2011-11-30 2012-04-04 昆明捷程桩工有限责任公司 Construction method for preventing pile diameter of concrete pouring pile from being varied
CN102839653A (en) * 2012-08-02 2012-12-26 天津二十冶建设有限公司 Construction method for concrete pouring pile for soft soil foundation with built-in block rock layer
CN102979090A (en) * 2012-12-13 2013-03-20 中铁上海工程局第二工程有限公司 Construction method for fixing steel casing on covering-free steep bare rock in deepwater and rapid stream
CN108130904A (en) * 2017-12-25 2018-06-08 浙江大学城市学院 A kind of construction method of the composite bushing drill-pouring pilework of neighbouring existing subway
CN109403326A (en) * 2018-12-14 2019-03-01 张成瑞 Serious collapse hole occurs based on drilled pile and takes out steel reinforcement cage method
CN113668492A (en) * 2021-08-31 2021-11-19 上海市基础工程集团有限公司 Ultra-deep cemented soil coring construction process
CN116163307A (en) * 2023-02-23 2023-05-26 华侨大学 Construction method for pre-drilling core reaming implanted pile for boulder stratum
CN116163307B (en) * 2023-02-23 2024-06-07 华侨大学 Construction method for pre-drilling core reaming implanted pile for boulder stratum

Similar Documents

Publication Publication Date Title
CN101982614A (en) Method for drilling rocks into pile by utilizing all casing drill
CN105649083B (en) The clear stake device of the disposable rotary-cutting type of full-sleeve and its clear piling method
CN105649012B (en) Upper-soft lower-hard ground subway station building enclosure drilled pile construction method
CN103603342B (en) Major diameter assembled casing super-long filling pile construction method
CN203808822U (en) Full-hydraulic double power head device of rotary drilling rig
CN102587380A (en) Construction method for wholly removing drilling pile head
CN101851922B (en) Method for eliminating underground anchor rope/rod by using all casing drill
CN101328712A (en) Construction method of interlocking pile for soft soil and soil layer with obstacle
JP6144542B2 (en) Nakabori excavator
CN104775433B (en) A kind of method of pile pulling construction
CN105569560A (en) Full casing long-spiral bored pile machine and method of using same for construction
CN101838988B (en) Comprehensive construction method for extracting anchor cable
CN109322301B (en) Quincuncial pore-forming construction method for rotary excavating bored concrete pile of large-diameter ultra-deep and ultra-thick rock stratum
CN105239564A (en) Construction method of cast-in-place pile with combination of full-sleeve and mud protecting wall
CN103243712A (en) Caterpillar end-expanded filling pile with pneumatic down-the-hole hammer and quick construction method of caterpillar end-expanded filling pile
CN204299468U (en) A kind of positioning and guiding system and device of hidden hole drilling boring
CN103485344A (en) Method for extracting construction engineering pile foundation
CN110886577A (en) Construction method for perpendicularity control of rotary excavating hard secant pile in deep and thick rockfill area
CN104975734B (en) Method for installing casing of casting machine well
CN104141455A (en) Drilling rig apparatus and drilling method of drilling rig
JP2007332559A (en) Removal method for existing underground pile
CN104264679A (en) Construction method of tower transmission iron tower foundation large-diameter underwater cast-in-place piles
CN201817809U (en) DTH hammer and all casing drill combined machine
CN102002943B (en) Construction method of rock-socketed secant filling pile
CN101338560A (en) Construction method for reinforced concrete pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20110302