CN104612722B - Tunnel gate strengthening method for starting and arriving of annular shield or annular pushing pipe - Google Patents

Tunnel gate strengthening method for starting and arriving of annular shield or annular pushing pipe Download PDF

Info

Publication number
CN104612722B
CN104612722B CN201510006724.1A CN201510006724A CN104612722B CN 104612722 B CN104612722 B CN 104612722B CN 201510006724 A CN201510006724 A CN 201510006724A CN 104612722 B CN104612722 B CN 104612722B
Authority
CN
China
Prior art keywords
annular
portal
steel ring
push pipe
enclosure wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510006724.1A
Other languages
Chinese (zh)
Other versions
CN104612722A (en
Inventor
白云
陈昂
李乔松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN201510006724.1A priority Critical patent/CN104612722B/en
Publication of CN104612722A publication Critical patent/CN104612722A/en
Application granted granted Critical
Publication of CN104612722B publication Critical patent/CN104612722B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0607Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention relates to a tunnel gate strengthening method for a starting and an arriving of an annular shield or an annular pushing pipe. The method comprises the steps that tunnel gate water stop steel ring is arranged on an enclosure wall; horizontal strengthening anchor rods are arranged in the tunnel gate of the enclosure wall; a concrete cover in two layers of the tunnel gate water stop steel ring is judged whether a rebar exists or not, if the rebar exists, the tunnel gate water stop steel ring is rearranged, if the rebar do not exist, an annular shield machine or an annular pipe pushing machine is used to explode the enclosure wall in sequence, the starting operation is completed, and a lining is formed; after a tunnel holing-through is conducted, the enclosure wall of an outer portion of the water stop steel ring is chiseled and removed, drainage for a soil body in a tunnel is conducted, the horizontal strengthening rods are removed, and an excavation of the rest soil body is conducted. Compared with the prior art, the tunnel gate strengthening method for the starting and the arriving of the annular shield or the annular pushing pipe has the advantages that the method is simple and easy, safe and reliable and the like.

Description

The portal reinforcement means that a kind of annular shield or annular push pipe originate and reach
Technical field
The present invention relates to a kind of Tunnel Engineering technical field, especially relate to a kind of annular shield or annular push pipe originate and The portal reinforcement means reaching.
Background technology
Gradually improving and saturation along with urban ground space development, the Chinese government is building resource-conserving, environment Under the background of friendly society, more and more the starting point is put in the exploitation of the underground space.Due to the underground space Exploitation there is high cost, excessive risk and irreversibility, how reasonably right with construction equipment with advanced science and technology The underground space develops and utilizes becomes the key point solving this problem.
Annular shield or annular pipe-jacking technology be a kind of differ from conventional shield or the construction technology of push bench process, it is mainly constructed Feature is the soil body first excavating in once lining place annular section, and applies once lining, treats after tunnel holing through again to one The secondary lined internal soil body carries out overall excavation, and applies secondary lining.Its major advantage is tunnel-shaped and size in theory Upper unrestricted.
Conventional shield or push pipe originate and the portal reinforcement means that reaches is mainly to soil body certain limit after portal at present Inside carry out slip casting or fender post formula is reinforced it is intended to strengthen soil strength to ensure that during export & import, excavation face is stable and plays sealing Effect.But due to being that annular section excavates when annular shield or annular jacking construction, not full face tunneling, therefore the problems referred to above can To obtain reasonable solution, but the portal within annular hole door holder water steel ring goes along with sb. to guard him wall construction due to lacking surrounding supporting, tunnel The internal soil body in road lacks support, all there is the overall danger caved in into active well, this will be a problem demanding prompt solution.
Content of the invention
The purpose of the present invention is exactly to overcome the defect of above-mentioned prior art presence to provide a kind of simple, safety The portal reinforcement means that reliably annular shield or annular push pipe originate and reach.
The purpose of the present invention can be achieved through the following technical solutions:
The portal reinforcement means that a kind of annular shield or annular push pipe originate and reach, comprises the following steps:
1) apply portal sealing steel ring on starting well, received well portal enclosure wall, this portal sealing steel ring is provided with two-layer, Its set location corresponds to inside and outside annular shield machine or annular push pipe casing body;
2) apply horizontal reinforcing anchor pole in the range of the portal sealing steel ring of inner side, and be connected with enclosure wall;
3), before annular shield or annular push pipe originate, whether judge in the concrete cover between two-layer portal sealing steel ring There is reinforcing bar, if so, then return to step 1), again apply portal sealing steel ring, if it is not, then execution step 4);
4), when annular shield or annular push pipe originate, annular shield machine or annular push-bench are advanced into cutterhead and are gone along with sb. to guard him with portal Wall contacts, and cutterhead is abolished the concrete in annular region, completed to originate operation;
5) annular shield machine or annular push-bench tunnel to received well, and enclosure wall abolished by cutterhead, forms once lining;
6), after tunnel holing through, cut the enclosure wall outside portal sealing steel ring, precipitation is carried out to the soil body in tunnel, pulls out water Flat reinforcing anchor pole, excavates the remaining soil body.
Described horizontal reinforcing anchor pole setting is multiple, and multiple horizontal reinforcing anchor poles be arranged in parallel.
The method also includes:
For short distance underpass driving, the horizontal reinforcing anchor pole in starting well and received well can be carried out to the company of drawing Connect, improve the binding effect to portal for the anchor pole.
Horizontal reinforcing anchor pole can be applied, received well portal adopts routine side in the range of a portal sealing steel ring in starting well Method is reinforced.
Compared with prior art, the method have the advantages that
(1) present invention utilizes this reinforcing mode of anchor pole to substitute the portal reinforcement means of traditional slip casting or fender post formula, Waterproof and soil mass consolidation effect can be played, the connectivity of the soil body and portal building enclosure can be increased, it is to avoid portal goes along with sb. to guard him knot again Structure causes entirety to topple due to lacking constraint, is easy to pull out simultaneously, solves annular shield or annular this new construction of push pipe The new problem that technique is brought.
(2) this method is simple to operation, cheap, and anchor pole can be reused, have higher economy and Promotional value.
Brief description
Fig. 1 is portal reinforcement means generalized section
Fig. 2 is annular shield or annular push-bench originates pushing tow to schematic diagram during building enclosure;
Fig. 3 is annular shield or the schematic diagram that portal originates propulsion abolished by annular push-bench;
Fig. 4 is annular shield or annular push-bench reaches pushing tow to schematic diagram during received well enclosed structure;
Fig. 5 is annular shield or annular push-bench is abolished portal and reached received well schematic diagram;
Fig. 6 progressively cuts portal for after tunnel holing through, the internal soil body is carried out with precipitation and pulls out anchor pole schematic diagram.
In figure: 1- cutterhead, 2- housing, 3- annular lining cutting, 4- injected hole, the pre- tunneling of 5-, 6- horizontal reinforcing anchor pole, 7- Enclosure wall, 8- portal sealing steel ring, 9- originates or receives bracket, 10- active well base plate, 11- received well base plate.
Specific embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention Premised on implemented, give detailed embodiment and specific operating process, but protection scope of the present invention be not limited to Following embodiments.
Be present invention annular shield as shown in figs 1 to 6 or annular push pipe originate and the portal reinforcement means that reaches concrete Schematic diagram, in Fig. 1, applies portal sealing steel ring 8 along portal position, applies horizontal reinforcing anchor pole 6 in the range of the steel ring of inner side;Figure In 2, when annular shield or annular push pipe originate, annular shield or annular push pipe are advanced into cutterhead 1 and are contacted with portal enclosure wall 7; In Fig. 3, the concrete in annular section abolished by cutterhead 1, and annular shield or annular push pipe complete to originate propulsion;In Fig. 4, annular shield Structure or annular push pipe complete tunnel piercing, reach received well enclosure wall 7;In Fig. 5, the concrete in annular section abolished by cutterhead 1, Annular shield or annular push pipe reach received well;In Fig. 6, after tunnel holing through, progressively cut the outside portal enclosure wall of sealing steel ring 8 7, precipitation is carried out to the tunnel internal soil body, pulls out horizontal reinforcing anchor pole 6, excavate the remaining soil body.
Annular shield that the present embodiment provides or annular push pipe originate and the portal reinforcement means that reaches specifically include following Step:
1) starting well (active well), received well and corresponding enclosure wall 7 structure are applied using conventional method, enclosure wall 7 is applied In man-hour, apply portal sealing steel ring 8 along portal position;
2) portal sealing steel ring 8 is provided with two-layer, and its set location corresponds to annular shield machine or annular push pipe casing body 2 Inside and outside;
3), after enclosure wall 7 construction terminates, inside portal sealing steel ring 8, apply horizontal reinforcing anchor pole 6 in the range of steel ring, many Individual horizontal reinforcing anchor pole 6 be arranged in parallel, and is reliably connected with enclosure wall 7 formation, as shown in Figure 1;
Horizontal reinforcing anchor pole can apply in the range of the inner side portal sealing steel ring of starting well and received well simultaneously, and will begin Send out the horizontal reinforcing anchor pole in well and received well to be attached, to drawing, improving the binding effect to portal for the anchor pole;Also dependent on tool The feature of body engineering, only arranges horizontal reinforcing anchor pole in starting well, and the portal in received well can adopt existing portal reinforcing side Method is reinforced.
4) it is respectively mounted in starting well and received well and originate or receive bracket 9, lifting annular shield machine or annular push-bench;
5), before annular shield or annular push pipe originate, whether deposit in the concrete cover between detection portal sealing steel ring 8 In reinforcing bar, if so, then return to step 1), again apply portal sealing steel ring 8, if it is not, then execution step 6);
6), when annular shield or annular push pipe originate, annular shield or annular push pipe are advanced into cutterhead 1 and portal enclosure wall 7 Contact, as shown in Figure 2;
7) concrete in annular section abolished by cutterhead 1, and annular shield or annular push pipe complete to originate propulsion, as Fig. 3 institute Show;
8), when annular shield or annular push pipe tunnel, thixotropic slurry is from injected hole 4 note of rear annular lining cutting 3 surfaces externally and internally Enter the gap between annular lining cutting 3 and the soil body;
9) annular shield or annular push pipe tunnel to received well enclosure wall 7, as shown in Figure 4;
10) concrete in annular section abolished by cutterhead 1, and annular shield or annular push pipe reach received well, as Fig. 5 institute Show;
11), after tunnel holing through, progressively cut the portal enclosure wall 7 outside sealing steel ring 8, the tunnel internal soil body is dropped Water, pulls out horizontal reinforcing anchor pole 6, excavates the remaining soil body, as shown in Figure 6.

Claims (5)

1. a kind of annular shield or annular push pipe originate and the portal reinforcement means that reaches is it is characterised in that comprise the following steps:
1) apply portal sealing steel ring on starting well, received well portal enclosure wall, this portal sealing steel ring is provided with two-layer, and it sets Seated position corresponds to inside and outside annular shield machine or annular push pipe casing body;
2) apply horizontal reinforcing anchor pole in the range of the portal sealing steel ring of inner side, and be connected with enclosure wall;
3), before annular shield or annular push pipe originate, judge to whether there is in the concrete cover between two-layer portal sealing steel ring Reinforcing bar, if so, then return to step 1), again apply portal sealing steel ring, if it is not, then execution step 4);
4), when annular shield or annular push pipe originate, annular shield machine or annular push-bench are advanced into cutterhead and are connect with portal enclosure wall Touch, the concrete in annular region abolished by cutterhead, completes to originate operation;
5) annular shield machine or annular push-bench tunnel to received well, and enclosure wall abolished by cutterhead, forms once lining;
6), after tunnel holing through, cut the enclosure wall outside portal sealing steel ring, precipitation is carried out to the soil body in tunnel, the level of pulling out adds Gu anchor pole, excavate the remaining soil body.
2. the portal reinforcement means that annular shield according to claim 1 or annular push pipe originate and reach, its feature exists In described horizontal reinforcing anchor pole setting is multiple, and multiple horizontal reinforcing anchor poles be arranged in parallel.
3. the portal reinforcement means that annular shield according to claim 1 or annular push pipe originate and reach, its feature exists In applying horizontal reinforcing anchor pole in the range of the inner side portal sealing steel ring of starting well and received well simultaneously.
4. the portal reinforcement means that annular shield according to claim 3 or annular push pipe originate and reach, its feature exists In also including:
For short distance underpass driving, the horizontal reinforcing anchor pole in starting well and received well is carried out to drawing connection.
5. the portal reinforcement means that annular shield according to claim 1 or annular push pipe originate and reach, its feature exists In only applying horizontal reinforcing anchor pole in the range of the inner side portal sealing steel ring of starting well, received well portal adopts conventional method Reinforce.
CN201510006724.1A 2015-01-07 2015-01-07 Tunnel gate strengthening method for starting and arriving of annular shield or annular pushing pipe Expired - Fee Related CN104612722B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510006724.1A CN104612722B (en) 2015-01-07 2015-01-07 Tunnel gate strengthening method for starting and arriving of annular shield or annular pushing pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510006724.1A CN104612722B (en) 2015-01-07 2015-01-07 Tunnel gate strengthening method for starting and arriving of annular shield or annular pushing pipe

Publications (2)

Publication Number Publication Date
CN104612722A CN104612722A (en) 2015-05-13
CN104612722B true CN104612722B (en) 2017-01-25

Family

ID=53147347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510006724.1A Expired - Fee Related CN104612722B (en) 2015-01-07 2015-01-07 Tunnel gate strengthening method for starting and arriving of annular shield or annular pushing pipe

Country Status (1)

Country Link
CN (1) CN104612722B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105863673B (en) * 2016-05-24 2019-03-26 长江勘测规划设计研究有限责任公司 Pusher fuselage can return to formula pipe jacking construction method and constructing structure
CN108729469B (en) * 2017-04-14 2020-10-20 植村技研工业株式会社 Construction method of underground structure
JP6933520B2 (en) * 2017-07-25 2021-09-08 積水化学工業株式会社 Reinforcement anchor
JP7032143B2 (en) * 2018-01-11 2022-03-08 積水化学工業株式会社 Reinforcing anchor
CN111677518B (en) * 2020-07-08 2022-05-13 北京建工土木工程有限公司 Shield receiving end reinforcing structure, reinforcing method and shield receiving method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1862637B1 (en) * 2006-05-30 2009-07-15 DYWIDAG Bau GmbH Device and method for a shield driving start-up and extension
CN101608551A (en) * 2009-06-15 2009-12-23 广东华隧建设股份有限公司 The job practices of a kind of shield machine closed origin and arrival
CN102022118A (en) * 2010-12-15 2011-04-20 广东华隧建设股份有限公司 Method for realizing balanced arrival of shield machine
CN102425423A (en) * 2011-12-31 2012-04-25 上海市机械施工有限公司 Constructing method for shield entering into hole while passing through pipeline
CN103790592A (en) * 2014-01-27 2014-05-14 中铁二十二局集团第一工程有限公司 End soil mass reinforcement system and method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009046959A (en) * 2007-08-16 2009-03-05 Hiroaki Fujii Construction method for underground pipe line

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1862637B1 (en) * 2006-05-30 2009-07-15 DYWIDAG Bau GmbH Device and method for a shield driving start-up and extension
CN101608551A (en) * 2009-06-15 2009-12-23 广东华隧建设股份有限公司 The job practices of a kind of shield machine closed origin and arrival
CN102022118A (en) * 2010-12-15 2011-04-20 广东华隧建设股份有限公司 Method for realizing balanced arrival of shield machine
CN102425423A (en) * 2011-12-31 2012-04-25 上海市机械施工有限公司 Constructing method for shield entering into hole while passing through pipeline
CN103790592A (en) * 2014-01-27 2014-05-14 中铁二十二局集团第一工程有限公司 End soil mass reinforcement system and method

Also Published As

Publication number Publication date
CN104612722A (en) 2015-05-13

Similar Documents

Publication Publication Date Title
CN104612722B (en) Tunnel gate strengthening method for starting and arriving of annular shield or annular pushing pipe
CN105888703B (en) Super Shallow Covered Metro Station construction method under lateral canopy lid is performed in micro- pilot tunnel
CN101775988B (en) Construction method for inclined shaft to main tunnel of weak surrounding rock
CN102493822B (en) Method for performing curtain grouting construction on tunnel by water rich fault influence zone
CN104278993B (en) A kind of bias voltage Skew Tunnel enters the constructional method in hole
CN105240024B (en) A kind of method of parallel shield method enlarging construction subway station
CN104047623B (en) A kind of big across cavern excavation construction method
CN103306680B (en) Existing single-track tunnel enlarging is the construction method of multiple track tunnel
CN102155234B (en) Excavation construction method for unsymmetrical small-space tunnel
CN101781991B (en) Double-well type reinforcement method of shield arrival or starting end and double-well type shield arrival method
CN202117686U (en) Surrounding rock advanced support structure for railway tunnel at deep-buried watery and weak stratums
CN109736827B (en) Method for excavating urban subway hard rock stratum communication channel by high-pressure gas expansion fracturing
CN107218045B (en) The rapid constructing method of rocky stratum tunneling subway station entrance tunneling section
CN103485790A (en) Shallow tunneling method for pipe-proof-supporting structure combined system
CN105065009B (en) A kind of method extending shield-tunneling construction subway station
CN103114857A (en) Shield tunnel construction method
CN105041322A (en) Method and system for reinforcing hole for push bench to go in and out
CN109209392A (en) Loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel
CN104675405B (en) Rectangular pipe jacking machine tunnel entering auxiliary structure and construction method
CN102817621B (en) Comprehensive construction method applicable to controlling arch basement sedimentation for tunnel in unfavorable geological conditions
CN107165661A (en) A kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction method
CN102182464A (en) Construction structure and construction method of channel structure
CN106321142A (en) Rock cross-cut coal uncovering method combining microwave-assisted extraction with grouting reinforcement
CN105240023B (en) A kind of method of Curve Pipe Jacking supporting construction enlarging shield-tunneling construction subway station
CN109356193B (en) Prefabricated piping lane propelling movement construction equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170125

Termination date: 20200107