CN105240024B - A kind of method of parallel shield method enlarging construction subway station - Google Patents

A kind of method of parallel shield method enlarging construction subway station Download PDF

Info

Publication number
CN105240024B
CN105240024B CN201510614057.5A CN201510614057A CN105240024B CN 105240024 B CN105240024 B CN 105240024B CN 201510614057 A CN201510614057 A CN 201510614057A CN 105240024 B CN105240024 B CN 105240024B
Authority
CN
China
Prior art keywords
shield
supporting pipeline
construction
pipeline
station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510614057.5A
Other languages
Chinese (zh)
Other versions
CN105240024A (en
Inventor
张鹏
马保松
曾聪
孔耀祖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Geosciences
Original Assignee
China University of Geosciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Geosciences filed Critical China University of Geosciences
Priority to CN201510614057.5A priority Critical patent/CN105240024B/en
Publication of CN105240024A publication Critical patent/CN105240024A/en
Application granted granted Critical
Publication of CN105240024B publication Critical patent/CN105240024B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention provides a kind of method of parallel shield method enlarging construction subway station, the shield duct piece reserved using the parallel shield method of spacing in subway station in the shield tunnel that underground space formation two is parallel to each other, two shield tunnels positioned at outside is the side wall supporting construction of subway station;Pass through supporting pipeline and lower supporting pipeline in jacking between two shield tunnels of Curve Pipe Jacking normal direction, constitute top support structure and lower support structure, top support structure and lower support structure support and connect two shield tunnels, form the peripheral supporting construction at ground body station;This method has the characteristics of efficiency of construction is high, process is simple, station is substantially reduced to excavate to urban environmental impact, improve shield subway work efficiency, save construction cost, and adapt to city shallow embedding complex geological condition, the Metro Station Structure intensity built using this method is high, and supporting is safe and reliable.

Description

A kind of method of parallel shield method enlarging construction subway station
Technical field
The present invention relates to a kind of method for extending shield-tunneling construction subway station, belong to underground engineering trenchless technology field.
Background technology
As China's economic development and the level of urbanization are improved, the key that traffic problems have become restriction urban development is asked Topic, urgent need to resolve.Shield method subway to alleviation traffic jam, is improved as the important component of Urban Public Transportation Network Urban development speed, the modernization level in lifting city play huge effect.But it is due to that shield zone distance is short, station Quantity is more, and shield often has to wait for ability transition after the completion of station, causes the improper driving time excessive, Suporting structure is utilized Rate is relatively low, causes construction delay phenomenon, increases construction cost, therefore shield station is the master for restricting subway work cycle and cost Want factor.
At present, the conventional construction method of subway station includes cut and cover method, cap excavation method and subsurface excavation method etc..Cut and cover method is applied to Broad construction site, disturbs big to urban life, traffic, the influence to environment such as noise and vibrations is blocked for a long time.Lid is dug Method stud construction joint is more, need to carry out water-proofing treatment, and inconvenience of being unearthed, work efficiency is low, and speed of application is slow.Shallow mining method work Phase is longer, and influence of the settlement of stratum to adjacent buildings security is larger, and construction risk is big, and construction costs is also very high.
The content of the invention
It is an object of the invention to solve the deficiencies in the prior art, and provide a kind of parallel shield method enlarging construction subway The method stood, this method has the characteristics of efficiency of construction is high, process is simple, substantially reduces station and excavates to urban environment shadow Ring, improve shield subway work efficiency, save construction cost, and adapt to city shallow embedding complex geological condition, use the party The Metro Station Structure intensity of method building is high, and supporting is safe and reliable.
Realize technical scheme that the object of the invention used for a kind of side of parallel shield method enlarging construction subway station Method, comprises the following steps:
(1) the shield tunnel that underground space formation two is parallel to each other is reserved using the parallel shield construction subway station of spacing Road, two shield tunnels are supported by shield duct piece;
(2) push pipe workbench is respectively mounted at the top and bottom of two shield tunnels, pacified on push pipe workbench Pipe jacking equipment is filled, simultaneously mounting hole device is used as top for drilling cutting on the top shield duct piece of the close side of two shield tunnels The originating terminal and receiving terminal of portion's push-bench, the drilling cutting conduct on the close side of the shield duct piece egative film of two shield tunnels The originating terminal and receiving terminal of bottom push-bench, are pushed up side by side between using two shield tunnels of Curve Pipe Jacking normal direction by pipe jacking equipment Enter more than 2 upper supporting pipelines and lower supporting pipeline, upper supporting pipeline and lower supporting pipeline are through two shield tunnels Stratum, two ends are connected with shield duct piece, and structure is distinguished along the upper supporting pipeline of the axially in parallel arrangement of shield tunnel and lower supporting pipeline Into top support structure and lower support structure;
(3) fill concrete into each upper supporting pipeline and lower supporting pipeline, is removed at the top and bottom of two shield tunnels Push pipe workbench, in two shield tunnel bottom construction tunnel bottom plates, vertical temporary support is installed;
(4) constructed on tunnel floor column, column top is connected with top shield duct piece, axially away along shield tunnel Top shield duct piece is located at the part below upper supporting pipeline, at the beginning of excavating the soil body being located at below upper supporting pipeline, construction vault Lining and vault two are served as a contrast;
(5) after the lining of vault two reaches design strength, along the axially away upper supporting pipeline of shield tunnel and lower supporting pipeline Between shield duct piece and the stage excavation soil body to metno station design absolute altitude is reached, remove vertical temporary support, construction supporting The tunnel floor of bottom plate, supporting bottom plate and both sides is mutually flush, and constitutes station bottom plate;
(6) the construction subway station internal structure after station bottom plate reaches design strength, completes metro station construction.
In step (2) on upper supporting pipeline and lower supporting pipeline preset injected hole, upper supporting pipeline and lower supporting pipeline Grouting and reinforcing is carried out to the soil body between pipe by injected hole after the completion of jacking, grouting and reinforcing area is formed.
Two are axially inside symmetrically installed in step (2) in upper supporting pipeline and lower supporting pipeline interconnected to freeze Pipe, two freezing pipes are symmetrically distributed in the two ends of place supporting internal diameter of the pipeline and fitted with the inwall of place supporting pipeline, on Supporting pipeline and lower supporting pipeline jacking complete to inject cryogen in backward freezing pipe, and cryogen is by freezing pipe pipe The soil body is freezed, and forms consolidation by freezing area.
The particular content served as a contrast in step (4) at the beginning of construction vault is waterproof layer and anchor at the top of being constructed in top support structure Gu vault template, the particular content that construction vault two is served as a contrast is assembling reinforcement and casting concrete in vault template.
The vertical temporary support includes left side temporary support, middle part temporary support and right side temporary support.
The station bottom plate includes bottom waterproof layer, bottom template and the armored concrete knot constructed successively from bottom to up Structure, reinforcing bar colligation is in the template of bottom.
As shown from the above technical solution, the method for the parallel shield method enlarging construction subway station that the present invention is provided, is used The parallel shield method of spacing is reserved in subway station in the shield tunnel that underground space formation two is parallel to each other, two shield tunnels Shield duct piece positioned at outside is the side wall supporting construction of subway station;By between two shield tunnels of Curve Pipe Jacking normal direction Supporting pipeline and lower supporting pipeline in jacking, constitute top support structure and lower support structure, top support structure and bottom Supporting construction support two shield tunnels of connection, form the peripheral supporting construction at ground body station;The method construction that the present invention is provided Subway station supporting construction be shield duct piece-supporting pipeline-shield duct piece structure, compared to existing supporting pipeline- Shield duct piece-supporting pipeline configuration, can obtain bigger interior space of metro station, it is adaptable to the big area of flow of the people, and structure It is more firm.
Compared with prior art, the construction method that the present invention is provided has the following advantages that:
(1) missed the stop in advance using the parallel shield method of spacing, form Parallel Tunnel, it is to avoid station construction is to shield driving shadow Ring, improve the utilization rate of equipment;
(2) Curve Pipe Jacking technology construction supporting pipe is used, compared to other support construction methods, with efficiency of construction Surrounding enviroment are influenceed small advantage by height;
(3) originating terminal and receiving terminal of supporting pipeline and lower supporting pipeline are respectively positioned in shield tunnel on, without taking volume Outer construction site and city earth excavation, on urban transportation without influence;
(4) it is equal using supporting pipeline in Curve Pipe Jacking method jacking and lower supporting pipeline, therefore the top support structure formed Domed with lower support structure, arch adds the lifting surface area of supporting pipeline while expanding station space, and supporting The stress of pipeline is more reasonable;
(5) vault of subway station lining and lining of vault two at the beginning of top support structure (upper supporting pipeline group), vault is constituted, Compared to sidepiece and bottom, the soil body is relatively thin above vault therefore intensity is less than station sidepiece and bottom, at the beginning of existing vault lining and The upper supporting pipeline group of increase, can greatly promote slip casting between the intensity of vault, and upper supporting pipeline in the structure that vault two is served as a contrast Reinforcing forms grouting and reinforcing area, on the one hand increases intensity between upper supporting pipeline pipe, while good waterproof effect is played, for ground Launching stress is larger or during poor grouting consolidation effect, can install freezing pipe, two in upper supporting pipeline and lower supporting pipeline The two ends of supporting internal diameter of the pipeline where freezing pipe is symmetrically distributed in, and fitted with the inwall of place supporting pipeline, to freezing pipe Middle injection cryogen, cryogen is flowed into and from another freezing pipe in place supporting pipeline in a freezing pipe therefrom Total outflow, freezes to the soil body of adjacent two supporting pipeline enclosures, plays the soil body between sealing, consolidation by freezing pipe, therefore This method is not required to the extra dewatering operation carried out for sealing;
(6) the side wall of subway station is the shield duct piece for being located at outside in two shield tunnels, therefore shield tunnel construction The side wall supporting construction of subway station is formed during completion, this method eliminates the work for side wall supporting construction of constructing in the prior art Sequence, has simplified the working procedure of subway station, has shortened construction period significantly;
(7) bottom plate of subway station is made up of the supporting bottom plate and the tunnel floor of both sides being mutually flush, bottom support knot Structure (lower supporting pipeline group) is located at below supporting bottom plate, greatly strengthen the intensity for the supporting bottom plate waited for pedestrian;
(8) equal fill concrete in each supporting pipeline, the rigidity of structure is big, and stability is good, reduces follow-up station excavation and causes Surrounding soil deformation;
(9) present invention is provided first lining, two are lined with and bottom plate is set up defences in water layer and template in and assembling reinforcement and poured The structure of concrete is built, waterproof layer plays a part of secondary waterproof, and template, reinforcing bar and concrete pour into a mould the rigidity of structure to be formed Greatly, stability well has good durability simultaneously.
Brief description of the drawings
The Construction Principle figure of the method for the parallel shield method enlarging construction subway station that Fig. 1 provides for the present invention.
Fig. 2 is the A-A profiles of top support structure in embodiment 1.
Fig. 3 is the schematic diagram of the parallel shield construction Parallel Tunnel of spacing.
Fig. 4 is the schematic diagram of Curve Pipe Jacking method construction top support structure and lower support structure.
Fig. 5 is the schematic diagram of fill concrete.
Fig. 6 is the schematic diagram of the vertical temporary support of construction.
Fig. 7 is the schematic diagram of construction column.
The schematic diagram that Fig. 8 lining and vault two at the beginning of construction vault are served as a contrast.
Fig. 9 is excavation soil at both sides to the schematic diagram for reaching metno station design absolute altitude.
Figure 10 is the schematic diagram of construction bottom plate.
Figure 11 is the schematic diagram of construction subway station internal structure.
Figure 12 is the structural representation for the subway station for removing column.
Figure 13 is the A-A profiles of top support structure in embodiment 2.
Wherein, propped up under shield duct piece in the middle part of 1- top flats, 2- tops shield duct piece, 3-, 4- egative films, the upper supporting pipelines of 5-, 6- Temporary support on the right side of temporary support in the middle part of temporary support on the left of pillar road, 7- tunnel floors, 8-, 9-, 10-, 11- columns, 12- arches Top two is served as a contrast, 13- supporting bottom plates, 14- platforms, the upper jacking construction platforms of 15-, jacking construction platform under 16-, 17- grouting and reinforcings area, 18- injected holes, 19- concrete, 20- freezing pipes, 21- consolidations by freezing area.
Embodiment
The present invention is illustrated in detail with reference to the accompanying drawings and examples, present disclosure is not limited to following Embodiment.
Embodiment 1:
The method for the parallel shield method enlarging construction subway station that the present invention is provided, Construction Principle is as shown in figure 1, including such as Lower step:
(1) the shield tunnel that underground space formation two is parallel to each other is reserved using the parallel shield construction subway station of spacing Road, two shield tunnels are supported by shield duct piece, and shield duct piece includes top flat 1, top shield duct piece 2, middle part shield duct piece With egative film 4, as shown in Figure 3;
(2) push pipe workbench is respectively mounted at the top and bottom of two shield tunnels, respectively upper jacking construction is put down Platform 15 and lower jacking construction platform 16, installed on upper jacking construction platform 15 at the top of push-bench, on lower jacking construction platform 16 Bottom push-bench is installed, drilling cutting and mounting hole device on the top shield duct piece 2 of the close side of two shield tunnels As the originating terminal and receiving terminal of top push-bench, drill and cut on the close side of the shield duct piece egative film of two shield tunnels The originating terminal and receiving terminal as bottom push-bench are cut, by pipe jacking equipment using between two shield tunnels of Curve Pipe Jacking normal direction The upper supporting pipelines 5 of jacking more than 2 and lower supporting pipeline 6 side by side, upper supporting pipeline 5 and lower supporting pipeline 6 are through two shields Stratum between tunnel, two ends are connected with shield duct piece, upper supporting pipeline 5 and lower supporting along the axially in parallel arrangement of shield tunnel Pipeline 6 respectively constitutes top support structure and lower support structure, as shown in figure 4, in upper supporting pipeline 5 and lower supporting before jacking Entered after the completion of preset injected hole 18 on pipeline 6, upper supporting pipeline 5 and the lower jacking of supporting pipeline 6 by injected hole to the soil body between pipe Row grouting and reinforcing, forms grouting and reinforcing area 17, as shown in Figure 2;
(3) fill concrete 19 into each upper supporting pipeline 5 and lower supporting pipeline 6, as shown in figure 5, removing two shields The upper jacking construction platform 15 in tunnel and lower jacking construction platform 16, bottom of being constructed successively from bottom to up two shield tunnel bottoms Portion's waterproof layer, bottom template and reinforced concrete structure are installed as tunnel floor 7, wherein reinforcing bar colligation in the template of bottom Left side temporary support 8, middle part temporary support 9 and right side temporary support 10, as shown in Figure 6;
(4) in tunnel floor both sides symmetrical construction column 11, the top of column 11 is connected with top shield duct piece 2, support two The upper supporting pipeline 5 and lower supporting pipeline 6 between column are arranged, as shown in Figure 7;
(5) it is located at the part of the upper lower section of supporting pipeline 5 along the axially away top shield duct piece 2 of shield tunnel, excavation is located at The soil body below upper supporting pipeline, waterproof layer and vault template is anchored as at the beginning of vault in top support structure at the top of construction Lining, assembling reinforcement and casting concrete formation vault two lining 12 in vault template, as shown in Figure 8;
(6) after the lining of vault two reaches design strength, along the axially away upper supporting pipeline 5 of shield tunnel and lower supporting pipeline Shield duct piece and the stage excavation soil body between 6 is to metno station design absolute altitude is reached, as shown in figure 9, removing the interim branch in left side Support 8, middle part temporary support 9 and right side temporary support 10, bottom waterproof layer of being constructed successively from bottom to up in lower support structure, Bottom template and reinforced concrete structure as tunnel floor 13, wherein reinforcing bar colligation in the template of bottom, supporting bottom plate 13 with The tunnel floor 7 of both sides is mutually flush, and constitutes station bottom plate, as shown in Figure 10;
(7) the construction subway station internal structure after station bottom plate reaches design strength, completes metro station construction, such as schemes Shown in 11 and 12.
Embodiment 2:
The method for the parallel shield method enlarging construction subway station that the present invention is provided, Construction Principle is as shown in figure 1, including such as Lower step:
(1) the shield tunnel that underground space formation two is parallel to each other is reserved using the parallel shield construction subway station of spacing Road, two shield tunnels are supported by shield duct piece, and shield duct piece includes top flat 1, top shield duct piece 2, middle part shield duct piece With egative film 4, as shown in Figure 3;
(2) push pipe workbench is respectively mounted at the top and bottom of two shield tunnels, respectively upper jacking construction is put down Platform 15 and lower jacking construction platform 16, installed on upper jacking construction platform 15 at the top of push-bench, on lower jacking construction platform 16 Bottom push-bench is installed, drilling cutting and mounting hole device on the top shield duct piece 2 of the close side of two shield tunnels As the originating terminal and receiving terminal of top push-bench, drill and cut on the close side of the shield duct piece egative film of two shield tunnels The originating terminal and receiving terminal as bottom push-bench are cut, by pipe jacking equipment using between two shield tunnels of Curve Pipe Jacking normal direction The upper supporting pipelines 5 of jacking more than 2 and lower supporting pipeline 6 side by side, upper supporting pipeline 5 and lower supporting pipeline 6 are through two shields Stratum between tunnel, two ends are connected with shield duct piece, upper supporting pipeline 5 and lower supporting along the axially in parallel arrangement of shield tunnel Pipeline 6 respectively constitutes top support structure and lower support structure, as shown in figure 4, in upper supporting pipeline 5 and lower supporting before jacking Pipeline 6 is axially inside symmetrically installed two freezing pipes 20, the two of supporting internal diameter of the pipeline where two freezing pipes are symmetrically distributed in Hold and fitted with the inwall of place supporting pipeline, after the completion of upper supporting pipeline 5 and the lower jacking of supporting pipeline 6 in backward freezing pipe Cryogen is injected, cryogen is flowed into and total from another freezing pipe in place supporting pipeline in a freezing pipe therefrom Outflow, is freezed by freezing pipe the soil body pipe, forms consolidation by freezing area 21, as shown in figure 13;
(3) fill concrete 19 into each upper supporting pipeline 5 and lower supporting pipeline 6, as shown in figure 5, removing two shields The upper jacking construction platform 15 in tunnel and lower jacking construction platform 16, bottom of being constructed successively from bottom to up two shield tunnel bottoms Portion's waterproof layer, bottom template and reinforced concrete structure are installed as tunnel floor 7, wherein reinforcing bar colligation in the template of bottom Left side temporary support 8, middle part temporary support 9 and right side temporary support 10, as shown in Figure 6;
(4) in tunnel floor both sides symmetrical construction column 11, the top of column 11 is connected with top shield duct piece 2, support two The upper supporting pipeline 5 and lower supporting pipeline 6 between column are arranged, as shown in Figure 7;
(5) it is located at the part of the upper lower section of supporting pipeline 5 along the axially away top shield duct piece 2 of shield tunnel, excavation is located at The soil body below upper supporting pipeline, waterproof layer and vault template is anchored as at the beginning of vault in top support structure at the top of construction Lining, assembling reinforcement and casting concrete formation vault two lining 12 in vault template, as shown in Figure 8;
(6) after the lining of vault two reaches design strength, along the axially away upper supporting pipeline 5 of shield tunnel and lower supporting pipeline Shield duct piece and the stage excavation soil body between 6 is to metno station design absolute altitude is reached, as shown in figure 9, removing the interim branch in left side Support 8, middle part temporary support 9 and right side temporary support 10, bottom waterproof layer of being constructed successively from bottom to up in lower support structure, Bottom template and reinforced concrete structure as tunnel floor 13, wherein reinforcing bar colligation in the template of bottom, supporting bottom plate 13 with The tunnel floor 7 of both sides is mutually flush, and constitutes station bottom plate, as shown in Figure 10;
(7) the construction subway station internal structure after station bottom plate reaches design strength, completes metro station construction, such as schemes Shown in 11 and 12.

Claims (6)

1. a kind of method of parallel shield method enlarging construction subway station, it is characterised in that comprise the following steps:
(1) shield tunnel that underground space formation two is parallel to each other is reserved using the parallel shield construction subway station of spacing, Two shield tunnel is supported by shield duct piece;
(2) push pipe workbench is respectively mounted at the top and bottom of two shield tunnels, top is installed on push pipe workbench Tube apparatus, simultaneously mounting hole device is pushed up as top for drilling cutting on the top shield duct piece of the close side of two shield tunnels The originating terminal and receiving terminal of pipe machine, drilling cutting is used as bottom on the close side of the shield duct piece egative film of two shield tunnels The originating terminal and receiving terminal of push-bench, jacking 2 side by side between two shield tunnels of Curve Pipe Jacking normal direction are used by pipe jacking equipment More than root upper supporting pipeline and lower supporting pipeline, the ground of upper supporting pipeline and lower supporting pipeline through two shield tunnels Layer, two ends are connected with shield duct piece, respectively constituted along the upper supporting pipeline and lower supporting pipeline of the axially in parallel arrangement of shield tunnel Top support structure and lower support structure;
(3) fill concrete into each upper supporting pipeline and lower supporting pipeline, removes the top at the top and bottom of two shield tunnels Pipe workbench, in two shield tunnel bottom construction tunnel bottom plates, installs vertical temporary support;
(4) constructed on tunnel floor column, column top is connected with top shield duct piece, along the axially away top of shield tunnel Shield duct piece be located at upper supporting pipeline below part, excavate be located at upper supporting pipeline below the soil body, construction vault at the beginning of lining and Vault two is served as a contrast;
(5) after the lining of vault two reaches design strength, along between the axially away upper supporting pipeline of shield tunnel and lower supporting pipeline Shield duct piece and the stage excavation soil body to metno station design absolute altitude is reached, remove vertical temporary support, construction supporting bottom plate, Supporting bottom plate and the tunnel floor of both sides are mutually flush, and constitute station bottom plate;
(6) the construction subway station internal structure after station bottom plate reaches design strength, completes metro station construction.
2. the method for parallel shield method enlarging construction subway station according to claim 1, it is characterised in that:Step (2) In on upper supporting pipeline and lower supporting pipeline after the completion of preset injected hole, upper supporting pipeline and lower supporting pipeline jacking pass through note The soil body carries out grouting and reinforcing between starching Kong Xiangguan, forms grouting and reinforcing area.
3. the method for parallel shield method enlarging construction subway station according to claim 1, it is characterised in that:Step (2) In be axially inside symmetrically installed two interconnected freezing pipes, two freezing pipes pair in upper supporting pipeline and lower supporting pipeline Claim the two ends of supporting internal diameter of the pipeline where being distributed in and fitted with the inwall of place supporting pipeline, upper supporting pipeline and lower supporting Pipeline jacking completes to inject cryogen in backward freezing pipe, and cryogen is freezed by freezing pipe the soil body pipe, shape Into freezing stabilization zone.
4. the method for parallel shield method enlarging construction subway station according to claim 1, it is characterised in that:Step (4) The particular content served as a contrast at the beginning of middle construction vault is waterproof layer at the top of being constructed in top support structure and anchors vault template, constructs The particular content that vault two is served as a contrast is assembling reinforcement and casting concrete in vault template.
5. the method for parallel shield method enlarging construction subway station according to claim 1, it is characterised in that:It is described vertical Temporary support includes left side temporary support, middle part temporary support and right side temporary support.
6. the method for parallel shield method enlarging construction subway station according to claim 1, it is characterised in that:The station Bottom plate includes bottom waterproof layer, bottom template and the reinforced concrete structure constructed successively from bottom to up, and reinforcing bar colligation is in bottom In template.
CN201510614057.5A 2015-09-23 2015-09-23 A kind of method of parallel shield method enlarging construction subway station Expired - Fee Related CN105240024B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510614057.5A CN105240024B (en) 2015-09-23 2015-09-23 A kind of method of parallel shield method enlarging construction subway station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510614057.5A CN105240024B (en) 2015-09-23 2015-09-23 A kind of method of parallel shield method enlarging construction subway station

Publications (2)

Publication Number Publication Date
CN105240024A CN105240024A (en) 2016-01-13
CN105240024B true CN105240024B (en) 2017-08-25

Family

ID=55037815

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510614057.5A Expired - Fee Related CN105240024B (en) 2015-09-23 2015-09-23 A kind of method of parallel shield method enlarging construction subway station

Country Status (1)

Country Link
CN (1) CN105240024B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6619710B2 (en) * 2016-08-23 2019-12-11 鹿島建設株式会社 Tunnel widening method and tunnel reinforcement device
CN106837357B (en) * 2017-03-24 2019-07-12 山东大学 A kind of no-dig technique pipe-roof method using curve pipe canopy
CN107460887A (en) * 2017-08-18 2017-12-12 中铁隧道勘测设计院有限公司 A kind of subway station of shield two layer of space combination
CN108119151A (en) * 2018-01-24 2018-06-05 中铁工程装备集团有限公司 A kind of Metro Station Structure built using push bench process and its construction method
CN110985044B (en) * 2019-12-26 2021-07-30 中铁工程装备集团有限公司 Segment splicing supporting structure and construction method for three-round shield tunnel construction
CN111411968B (en) * 2020-03-04 2021-08-03 中国建筑第二工程局有限公司 Expanding excavation structure for shield tunnel foundation and construction method thereof
CN111305851B (en) * 2020-04-15 2021-10-19 石家庄铁道大学 Soft soil layer subway station extension method and structure based on inserted beam freezing method
CN111456765A (en) * 2020-04-24 2020-07-28 河北工程大学 Extremely-broken roadway thin-thick shell supporting structure and construction method
CN112302666A (en) * 2020-11-05 2021-02-02 中铁第一勘察设计院集团有限公司 Subway station extension method and structure based on concrete filled steel tube beam inserting method
CN113266375A (en) * 2021-04-25 2021-08-17 中铁第一勘察设计院集团有限公司 Cover-digging construction method for constructing subway station by means of shield tunnel

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101086209A (en) * 2007-07-23 2007-12-12 北京交通大学 Shield tunneling and shallow tunneling combined construction method for building underground station
CN103437789A (en) * 2013-08-15 2013-12-11 北京市轨道交通设计研究院有限公司 Method for constructing water proof structure and constructing underground construction in water proof mode
CN103953363A (en) * 2014-04-13 2014-07-30 北京工业大学 Method for connecting shield tunnel pipe sheet and transverse passage structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3801229B2 (en) * 1995-02-15 2006-07-26 鉄建建設株式会社 Underground bending member and its construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101086209A (en) * 2007-07-23 2007-12-12 北京交通大学 Shield tunneling and shallow tunneling combined construction method for building underground station
CN103437789A (en) * 2013-08-15 2013-12-11 北京市轨道交通设计研究院有限公司 Method for constructing water proof structure and constructing underground construction in water proof mode
CN103953363A (en) * 2014-04-13 2014-07-30 北京工业大学 Method for connecting shield tunnel pipe sheet and transverse passage structure

Also Published As

Publication number Publication date
CN105240024A (en) 2016-01-13

Similar Documents

Publication Publication Date Title
CN105240024B (en) A kind of method of parallel shield method enlarging construction subway station
CN110821503B (en) Construction method for main body of ultra-deep shield section air shaft after tunnel advance
CN109026064B (en) Construction method for large-span multi-arch tunnel with semi-bright and semi-dark
WO2020248596A1 (en) Protection structure for preventing ground heave caused by tunnel grouting reinforcement and grouting method
CN109208637A (en) Increase the construction method of open-cut station newly on the basis of existing tunnel
CN110905530B (en) Stability control construction method for water-rich soft rock tunnel penetrating fault fracture zone
CN105201516B (en) A kind of main structure of subway station and its tetrad arch PBA excavating construction methods
CN106567717A (en) Construction oblique channel structure utilizing subway exit and entrance and construction method
CN105065009B (en) A kind of method extending shield-tunneling construction subway station
CN103775110A (en) Underground excavation construction method for multilayer underground space of soft soil area
CN103835723A (en) Comprehensive pretreatment method for shaft penetration in mined-out area stratum
CN110700860B (en) Construction method of soil-stone boundary tunnel crossing loess valley
CN110847929B (en) Tunnel portal section pre-reinforcing and excavating construction method based on partition blasting
CN105240023B (en) A kind of method of Curve Pipe Jacking supporting construction enlarging shield-tunneling construction subway station
CN106930768B (en) Tunnel Construction and application
JP4132442B2 (en) Tunnel construction method
CN111322089A (en) Vault prefabricated assembled tunnel and construction method
CN205036380U (en) Block of four encircles PBA and secretly digs subway station major structure
CN102619521B (en) Construction method for vertical shaft bedrock section wall structure
CN204492847U (en) A kind of supporting and protection structure of underground space reverse construction
CN204941551U (en) A kind of subway station of Curve Pipe Jacking supporting and protection structure enlarging shield-tunneling construction
CN110761795B (en) Construction method of shallow tunnel in loess gully
CN104863613A (en) High-side-wall anchored primary support structure for rock strata underground excavation underground structure, and construction method of high-side-wall anchored primary support structure
CN205036388U (en) Block of four encircles knot hunch construction structures that PBA secretly dug subway station
CN111734450A (en) Safe and rapid tunneling and supporting method for water-rich fault zone tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170825

Termination date: 20180923

CF01 Termination of patent right due to non-payment of annual fee