face
excavation
tunnel
carries out
stability
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811051394.8A
Other languages
Chinese (zh)
Other versions
CN109209392B (en
Inventor
王志坚
许佑顶
唐可
喻渝
王明年
刘科
甘目飞
杨友元
金强国
童建军
刘雄伟
李老三
尚寒春
王微嘉
郦亚军
王毅东
李书兵
王永太
郭创科
姜军
田佳
马留闯
林三国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Kowloon Railway Passenger Dedicated Line Hubei Co ltd
Southwest Jiaotong University
China Railway Eryuan Engineering Group Co Ltd CREEC
China State Railway Group Co Ltd
CREEC Chengdu Survey Design and Research Co Ltd
Original Assignee
CREEC Chengdu Survey Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CREEC Chengdu Survey Design and Research Co Ltd filed Critical CREEC Chengdu Survey Design and Research Co Ltd
Priority to CN201811051394.8A priority Critical patent/CN109209392B/en
Publication of CN109209392A publication Critical patent/CN109209392A/en
Application granted granted Critical
Publication of CN109209392B publication Critical patent/CN109209392B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/107Reinforcing elements therefor; Holders for the reinforcing elements
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/006Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Architecture (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Soil Sciences (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of loopful excavation methods suitable for IV-V grade of country rock of large cross-section tunnel, carry out advance geologic prediction;Tunneling boring range face estimation of stability is simultaneously classified;Decide whether advance support and face reinforcement, using corresponding concrete measure until face is stablized;Drill jumbo carries out borehole drilling and powder charge in face tunneling boring, disposable to detonate;Face ventilation, gets rid of the danger, and owes digging processing, muck removal;Face after excavating to this circulation carries out mapping and determines its stability, and wet shot manipulator just sprays early high-strength concrete, and closes face;Perform system anchor bolt;Steelframe is stood using arch installation bogie frame, and carries out circumferential and longitudinally connected, multiple pneumatically placed concrete to design thickness;This excavation recycles the quarrel backfill of inverted arch region hole, carries out subsequent cycle procedures;Inverted arch is carried out using packaged type inverted arch trestle and abutment wall base concrete pours;Geotextiles, splash guard are laid with and the binding of arch wall lining cutting reinforcing bar;Arch wall lining cutting is poured and is conserved.

Description

Loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel
Technical field
The present invention relates to tunnel construction technical fields, in particular to a kind of to enclose suitable for IV-V grade of large cross-section tunnel The loopful excavation method of rock.
Background technique
Since 21st century, China's Tunnel Engineering technology has obtained quick development, has benefited from high-speed railway in recent years Rapid emergence.Tunnel Engineering technology has become the important a part of high-speed rail technology, especially in western railway construction, tunnel Accounting is larger, often controls the duration of entire engineering.Railway such as is being built into blue line overall length about 457km, and wherein 32, tunnel is total about 332km, tunnel line ratio about 72.6%;For another example to the 130km range of east part of Sichuan, tunnel overall length is more than ten thousand high-speed rail Hubei Section Baokang of Zheng 120km, tunnel line is than up to 90% or more, like high speed subway.Ended for the end of the year 2015, the high-speed rail tunnel that the country is open to the traffic More than 2200, the super 3200km of overall length is more than 10000km in the high-speed rail tunnel overall length built and planned.
Currently, in the construction of large-scale Railway Tunnel for many years, preliminarily formed high-speed railway mountain tunnel at The construction method of set, i.e. Mining Method build technology, especially in western mountainous areas.Traditional mining method construction is mainly quick-fried using manually boring Mode carries out excavation driving, drills and installs from advance support, borehole is crept into and powder charge, armature boring and installation, injection coagulation The processes such as native operation, inverted arch perform, splash guard is laid with, secondary lining reinforcing bar and concreting, groove perform, multi-process operation A large amount of human and material resources are put into.Simultaneously as Railway Tunnel is usually one-tunnel two-tracks tunnel, excavated section area compared with Greatly, other than II, III grade of country rock is using full section method, in IV, V grade of country rock that surrounding rock stability is poor, it is contemplated that construction peace Quan Xing generallys use partial excavation method, i.e., entire excavated section is divided into multiple portions and excavated, and each excavation part can Parallel operations are carried out to independently form flow chart, including benching tunnelling method, three step of remaining core soil in advance starting working system, step are interim The interim inverted arch method of stull method, step, CD method (i.e. interval wall approach), CRD method (i.e. intersection interval wall approach), two side-wall pilot tunnel.It adopts When with the above partial excavation method, to guarantee that tunnel surrounding is stablized, gib plays a significant role, such as step plus interim inverted arch Method is mainly used for V grade of weak surrounding rock stratum, and construction method needs perform based on profile steel frame, steel mesh, pneumatically placed concrete Gib.
But existing constructing tunnel excavation method has the following problems:
1, adaptability of the existing tunneling boring with the disposable excavation method of inverted arch is poor, at present only in II, III grade of country rock Duan Yingyong, and inefficiency, IV, V grade of weak surrounding rock section are all made of the construction of partial excavation method, i.e., by entire tunnel cross-section point Drill-blast tunnelling is carried out at multiple regions, and the vibration that every one region of Blasting Excavation generates i.e. can be to not excavating zone-perturbation one nearby Secondary, multiple disturbance will be generated by repeatedly excavating, serious to reduce tunnel trunk stability, so that plastic zone of surrounding rock and relaxation zone are significant Increase, cause the load in shoulder bed effects supporting in the early stage to increase, Supporting Structure deformation is caused to increase, needs stronger supporting It is able to maintain tunnel stabilization safety;
2, tunnel cross-section is divided into several zonules and individually excavated by the method for existing partial excavation, since space limits, Not being available Large Construction equipment it is even more impossible to use big machinery matching operation leads to that all kinds of of construction efficiency can be improved Mechanized equipment is unable to get effective utilization;Meanwhile the flow chart of partial excavation method is more, and mutually closes between each process Connection, once some process is impacted, it will other processes are influenced, to cause construction speed slow, construction period is longer;
3, partial excavation method needs to perform a large amount of gib to control the surrouding rock deformation in each region, such as interim Pneumatically placed concrete, interim steelframe, interim steel mesh, interim anchor pole etc., will then be removed after stablizing, in addition to part interim steelframe It can reuse, remaining gib cannot utilize again, and material and investment waste are larger;
4, it using artificial partial excavation method, being influenced by artificial subjective factor, it is larger that supporting construction performs quality discreteness, And since manual operation efficiency is lower, preliminary bracing is performed and not in time after each region development blasting, so that country rock becomes Shape is larger;Simultaneously as the limitation of partial excavation, excavates region at first and finally excavates region at a distance from tunnel longitudinal extension It is larger, lead to preliminary bracing closing cyclization not in time, deformation controlling for rock surrounding gateways not in time, violates New Austrian Tunneling Method theory about control country rock The requirement of two elements " immediate support, quick closure cyclization " of deformation, may cause the increase of country rock convergent deformation;
5, it is constructed, is manually put into larger while right using traditional artificial excavation method in IV, V grade of Support System in Soft Rock Tunnels The stability of every circulation face simultaneously thinks little of, and face landslide accident is easily caused when wall rock condition is poor and threatens area The personal safety of operating personnel near face;
6, traditional artificial partial excavation method is used in IV, V grade of Support System in Soft Rock Tunnels, think little of actively reinforcing country rock, Active control surrouding rock deformation, but simply using the method for passive strengthening supporting structural strength come deformation controlling for rock surrounding gateways, in this way It is easy to cause deformation excessive and cave in accident is caused to happen occasionally, and disease during operation is easy to cause to take place frequently.
Summary of the invention
The drawbacks of it is an object of the invention to overcome the traditional artificial partial excavation method in the presence of the prior art it is upper Deficiency is stated, is integrally considered from constructing tunnel, is provided a kind of suitable for the safe, quick, high-quality of IV-V grade of country rock of large cross-section tunnel Measure the excavation method of mechanization loopful.
In order to achieve the above-mentioned object of the invention, the present invention provides following technical schemes:
A kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel, comprising the following steps:
Step 1, it is pre- using geology sketch, geophysical prospecting, Advance Drilling method or drill jumbo MWD geotechnical boring cloud atlas One or more of survey, carry out advance geologic prediction;
Drill jumbo MWD (Measure While Drilling, measurement while drilling) geotechnical boring Cloud image prediction is with complete Computer multi-arm drill jumbo, using every circulation trolley borehole creep into when, by obtain drilling machine drilling when fltting speed, push away Into parameters such as pressure, surge, rotation pressures, geology cloud atlas is formed according to the set procedure, the geology cloud atlas is according to display Different colours can the soft or hard degree of a certain range of rock mass of preliminary judgement front of tunnel heading, integrated degree etc., to face The a certain range of country rock in front carries out Geological Prediction;
Step 2, according to advance geologic prediction as a result, commenting the area face stability within the scope of full section of tunnel Valence, and be A-E class by face analysis of stability, in which:
A class is hard rock, includes A-1 unstable;
B class is soft rockmass, includes that B-1 is more stable, B-2 is more stable, B-3 is unstable, B-4 is unstable;
C class concordant bias unfavorable geology includes that C-1 is stable, C-2 is more stable, C-3 is more stable to unstable, C-4 is more steady It is fixed extremely unstable;
D class is fault belt, includes that D-1 is unstable, D-2 is unstable;
E class is karst intense development limestone, and face is unstable when meeting solution cavity;
Evaluation and classification standard are as shown in table 1;
Table 1, face estimation of stability and classification chart
Step 3, according to tunnel face face stability evaluation and classification results, decide whether to be propped up in advance If desired shield and face reinforcement carry out advance support and face reinforcement, then according to face A-E classification using corresponding tool Body measure, advance support measure is as shown in table 2, and face reinforcement solutions measure is as shown in table 3;
Table 2, advance support measure classification chart
Table 3, face treatment measures classification chart
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized Borehole drilling and powder charge, then band inverted arch disposably detonates;
Step 5 is aerated face near zone, and is carried out using excavator to face and rigid burst region Digging processing is got rid of the danger and owed to danger stone, utilizes fortune quarrel vehicle muck removal;
Step 6, the face after excavating to this excavation circulation carry out mapping, and determine this excavation circulation palm immediately The stability in sub- face performs the preliminary bracing after this excavation circulation is excavated, and using the progress of wet shot manipulator, just spray is mixed for preliminary bracing Solidifying soil, concrete grade are at least C30, and the concrete of injection is the higher concrete of early strength, and one day age strength is at least For 15MPa, its object is to as early as possible, active control surrouding rock deformation, while closing face, it should be noted that this excavation follows The face mapping result that ring is carried out answers advance support measure and face reinforcement measure in reversed verification step three;
Step 7 recycles progress system anchor bolt to this excavation and performs, and tunnel arch range is used with mechanical swollen shell head Lower-prestressed hollow grouting anchor, which anchors country rock using mechanical swollen shell head after being inserted into bolthole, and applies number A few tons of initial tensioning force, at the first time fasten hole around rock, active control surrouding rock deformation, meanwhile, slip casting condensation after can mention For later period anchor force, the deformation of country rock later period is controlled, uses grouting rock bolt within the scope of tunnel side wall;
Step 8, when precasting steel frame every circumferentially spaced several casings of welding of Pin steelframe, trolley pair is installed using arch Prefabricated steelframe carries out erection installation, carries out the node fastening of circumferential unit, is inserted on adjacent two Pin steelframe using U-shaped steel muscle Corresponding casing, all steelframes are longitudinally connected along tunnel, enhance steelframe longitudinal stability, then again pneumatically placed concrete to setting Count thickness;
Step 9 is lagging behind this excavation circulation a distance, is being cut backfill inverted arch region as operation platform using hole, and As next workbench for excavating circulation drill jumbo, after this step of this excavation circulation, carries out next excavation and follow Ring procedures;
Step 10, in order not to interfere next operation for excavating circulation, next excavation recycles rock drilling in lagging behind step 9 Workbench a distance of trolley removes the hole quarrel of backfill, carries out inverted arch and abutment wall basis using packaged type inverted arch trestle Concrete (or armored concrete) pour, perfusion inverted arch fill concrete is to setting after inverted arch and the initial set of abutment wall base concrete Meter height;
Step 11, is laid with using splash guard and reinforcing steel bar-binding bench vehicle carries out geotextiles, the laying of splash guard and arch wall and serves as a contrast Build the binding of reinforcing bar;
Step 12 carries out pouring and conserving for arch wall lining cutting using lining trolley.
Preferably, after implementing the step 3, area face stability is evaluated again, if being unsatisfactory for needing to continue described in implementation Step 3, until face is stablized, it is therefore an objective to guarantee face stabilization or keeps stable state in next excavation circulation time limit, To meet needs of constructing.
Preferably, in the step 4, in order to enhance the stability of face, when every circulation is excavated by face explosion at Inclined-plane with certain slope, or the spheroform surface with certain curvature.
Preferably, in the step 7, anchor pole, which is performed, bores note all-in-one machine or drill jumbo operation using anchor pole, according to Anchor pole bores note all-in-one machine, then can be automatically finished rockbolt installation, when using drill jumbo operation, manning's less important work.
Preferably, every Pin steelframe circumferentially welds the casing of a φ 30- φ 32 at interval of 1m-1.5m.
Preferably, the U-shaped steel muscle is U-shaped spiral.
Preferably, the diameter of the U-shaped steel muscle is φ 20- φ 25.
Preferably, the cross-sectional area of the large cross-section tunnel is 130m2-170m2
In conclusion by adopting the above-described technical solution, the beneficial effects of the present invention are:
1, with a kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel of the present invention, Quan Duan The method of face blasting in once-through driving, every circulation blasting vibration is primary, and the disturbance number to country rock is reduced to once, significantly Reduce plastic zone of surrounding rock and relaxation zone range, reduce the load in shoulder bed effects supporting in the early stage, reduces Supporting Structure deformation, mention Tunnel safety is risen, is especially constructed in IV, V grade of weak surrounding rock section using this method, significant effect;
It 2, is every with a kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel of the present invention A working procedure provides working space using do mechanization operation, so that all kinds of mechanized equipments can be efficiently used, using this Method, construction speed are largely improved, according to after live practical use as a result, IV, V grade of country rock is opened every month Degree of digging into has reached 115m, 80m, and about 44%, 45% has been respectively increased in drill footage per month 80m, 55m compared to conventional method., work efficiency It is promoted significant;
3, with a kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel of the present invention, Quan Duan Face is disposably tunneled forward, without performing a large amount of not reproducible gib measure utilized, such as interim pneumatically placed concrete, steel Frame, steel mesh, anchor pole etc. can largely save engineering material, can save great amount of investment, and economic impacts are significant;
4, it with a kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel of the present invention, uses Fully-mechanized operation, can avoid artificial subjective factor influence supporting construction performs quality, and supporting construction performs in time, initial stage Supporting can be cyclic rapidly in the shortest time, and timely to the Deformation control of country rock, this method has been agreed with completely in New Austrian Tunneling Method theory The requirement of " immediate support, quick closure cyclization ", is the trend of future tunnel construction method development;
5, it with a kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel of the present invention, uses Mechanical work can largely reduce face operating personnel nearby, human cost be greatlyd save, in the present that human cost is gradually increased It, has preferable economy, secondly, this method extremely payes attention to the stability of face, near stability is directly related to The personal safety of operating personnel, this method by area face stability carry out classification processing, when encountering different situations according to Its standard directly decides whether to take measures, and takes which kind of measure, has and defines, this is the pass of this method success or not In place of key;
6, it with a kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel of the present invention, uses The measure of two active control surrouding rock deformation, first is that using early strength and the higher concrete of final set strength, second is that using band There is the lower-prestressed hollow grouting anchor of mechanical swollen shell head, by two measures, on the one hand forms surrounding rock consolidation circle and promoted Surrounding Rock Strength, on the other hand by performing high-intensitive supporting construction in time, can timely deformation controlling for rock surrounding gateways, greatly reduce because becoming Shape supporting causes surrouding rock deformation is excessive cave in accident is caused to be controlled especially on IV, V grade of weak surrounding rock stratum by active not in time Surrouding rock deformation processed makes it reach stable state as early as possible, and non-passive strengthening supporting structure bearing load, reduction run branch because long-term Protection structure deterioration leads to the probability of its cracking destruction threat traffic safety;
7, adjacent with a kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel of the present invention Two Pin steelframes the are longitudinally connected casing that welds when connecting precasting steel frame using U-shaped steel muscle, connection is simple, and speed is fast, stable connection, It works well, has abandoned in traditional hole and welded, reduced in-cavity construction security risk.
Detailed description of the invention
Fig. 1 is a kind of process of the loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel of the present invention Schematic diagram.
Specific embodiment
Below with reference to test example and specific embodiment, the present invention is described in further detail.But this should not be understood It is all that this is belonged to based on the technology that the content of present invention is realized for the scope of the above subject matter of the present invention is limited to the following embodiments The range of invention.
Embodiment 1
As shown in Figure 1, a kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel of the present invention, The following steps are included:
Step 1, it is pre- using geology sketch, geophysical prospecting, Advance Drilling method or drill jumbo MWD geotechnical boring cloud atlas One or more of survey, carry out advance geologic prediction;
Step 2, according to advance geologic prediction as a result, the face within the scope of full section of tunnel is rich water, crushing hard There is collapsing, chip off-falling in rock, face, and fender graded is IV grade, and non-support face estimation of stability is unstable, as A-1 Class;
Step 3, according to tunnel face face stability evaluation and classification results, using length greater than 5m φ 42 it is small Conduit carries out advance support, carries out local pneumatically placed concrete closing and local setting fiber anchor rod to face, again the evaluation palm Sub- face stability, if being unsatisfactory for needing to continue to implement this step, until face is stablized;
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized Borehole drilling and powder charge, then band inverted arch disposably detonates, in order to enhance the stability of face, by area when every circulation is excavated Face explosion is at the inclined-plane with certain slope, or the spheroform surface with certain curvature;
Step 5 is aerated face near zone, and is carried out using excavator to face and rigid burst region Digging processing is got rid of the danger and owed to danger stone, utilizes fortune quarrel vehicle muck removal;
Step 6, the face after excavating to this excavation circulation carry out mapping, and determine this excavation circulation palm immediately The stability in sub- face performs the preliminary bracing after this excavation circulation is excavated, and using the progress of wet shot manipulator, just spray is mixed for preliminary bracing Solidifying soil, concrete grade are at least C30, and the concrete of injection is the higher concrete of early strength, and one day age strength is at least For 15MPa, its object is to as early as possible, active control surrouding rock deformation, while closing face, it should be noted that this excavation follows The face mapping result that ring is carried out answers advance support measure and face reinforcement measure in reversed verification step three;
Step 7 recycles progress system anchor bolt to this excavation and performs, and tunnel arch range is used with mechanical swollen shell head Lower-prestressed hollow grouting anchor, which anchors country rock using mechanical swollen shell head after being inserted into bolthole, and applies number A few tons of initial tensioning force, at the first time fasten hole around rock, active control surrouding rock deformation, meanwhile, slip casting condensation after can mention For later period anchor force, the deformation of country rock later period is controlled, uses grouting rock bolt within the scope of tunnel side wall;
Wherein, anchor pole, which is performed, bores note all-in-one machine or drill jumbo operation using anchor pole, bores note all-in-one machine according to anchor pole, It can be then automatically finished rockbolt installation, when using drill jumbo operation, manning's less important work;
Step 8, when precasting steel frame, every Pin steelframe circumferentially welded the casing of a φ 32 at interval of 1.2m, using arch Installation trolley carries out erection installation to prefabricated steelframe, the node fastening of circumferential unit is carried out, using the U-shaped screw-thread steel of φ 22 Muscle is inserted into corresponding casing on adjacent two Pin steelframe, and all steelframes are longitudinally connected along tunnel, enhances steelframe longitudinal stability Property, then again pneumatically placed concrete to design thickness;
Step 9 is lagging behind this excavation circulation a distance, is being cut backfill inverted arch region as operation platform using hole, and As next workbench for excavating circulation drill jumbo, after this step of this excavation circulation, carries out next excavation and follow Ring procedures;
Step 10, in order not to interfere next operation for excavating circulation, next excavation recycles rock drilling in lagging behind step 9 Workbench a distance of trolley removes the hole quarrel of backfill, carries out inverted arch and abutment wall basis using packaged type inverted arch trestle Concrete (or armored concrete) pour, inverted arch fill concrete is perfused after inverted arch concrete initial set to design height;
Step 11, is laid with using splash guard and reinforcing steel bar-binding bench vehicle carries out geotextiles, the laying of splash guard and arch wall and serves as a contrast Build the binding of reinforcing bar;
Step 12 carries out pouring and conserving for arch wall lining cutting using lining trolley.
Embodiment 2
A kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel, exists with the difference of embodiment 1 In after carrying out the first step:
Step 2, according to advance geologic prediction as a result, the face within the scope of full section of tunnel is anhydrous, complete soft Rock, face part chip off-falling, fender graded are IV grade, and non-support face estimation of stability is more stable, as B-1 class;
Step 3, according to tunnel face face stability evaluation and classification results, using length greater than 5m φ 42 it is small Conduit carries out advance support, carries out local pneumatically placed concrete closing to face, evaluates area face stability again, if being unsatisfactory for needing Continue to implement this step, until face is stablized;
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized Borehole drilling and powder charge, then band inverted arch disposably detonates, in order to enhance the stability of face, by area when every circulation is excavated Face explosion is at the inclined-plane with certain slope, or the spheroform surface with certain curvature;
Subsequent step is carried out again.
Embodiment 3
A kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel, exists with the difference of embodiment 1 In after carrying out the first step:
Step 2, according to advance geologic prediction as a result, face within the scope of full section of tunnel be rich water, it is complete soft Rock, face soft-rock slope, local chip off-falling, fender graded are IV grade, non-support face estimation of stability be it is more stable, as B-2 class;
Step 3, according to tunnel face face stability evaluation and classification results, using length greater than 5m φ 42 it is small Conduit carries out advance support, carries out local pneumatically placed concrete closing and local setting fiber anchor rod to face, again the evaluation palm Sub- face stability, if being unsatisfactory for needing to continue to implement this step, until face is stablized;
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized Borehole drilling and powder charge, then band inverted arch disposably detonates, in order to enhance the stability of face, by area when every circulation is excavated Face explosion is at the inclined-plane with certain slope, or the spheroform surface with certain curvature;
Subsequent step is carried out again.
Embodiment 4
A kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel, exists with the difference of embodiment 1 In after carrying out the first step:
Step 2, according to advance geologic prediction as a result, face within the scope of full section of tunnel be it is anhydrous, be crushed it is soft There is collapsing, chip off-falling in rock, face, and fender graded is IV grade, and non-support face estimation of stability is unstable, as B-3 Class;
Step 3, according to tunnel face face stability evaluation and classification results, using length greater than 6m φ 42 it is small Conduit carries out advance support, carries out pneumatically placed concrete closing to face and fiber anchor rod is arranged in upper section, evaluate area again Face stability, if being unsatisfactory for needing to continue to implement this step, until face is stablized;
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized Borehole drilling and powder charge, then band inverted arch disposably detonates, in order to enhance the stability of face, by area when every circulation is excavated Face explosion is at the inclined-plane with certain slope, or the spheroform surface with certain curvature;
Subsequent step is carried out again.
Embodiment 5
A kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel, exists with the difference of embodiment 1 In after carrying out the first step:
Step 2, according to advance geologic prediction as a result, face within the scope of full section of tunnel be rich water, be crushed it is soft There is collapsing, chip off-falling, soft-rock slope, face protrusion, the prominent mud of gushing water in rock, face, and fender graded is V grade, non-support area Face stability is evaluated as unstable, as B-4 class;
Step 3, according to tunnel face face stability evaluation and classification results, using in the φ 60 of length 9m-15m Pipe canopy carries out advance support, carries out pneumatically placed concrete closing and grouting reinforcement to face, evaluates area face stability again, if It is unsatisfactory for needing to continue to implement this step, until face is stablized;
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized Borehole drilling and powder charge, then band inverted arch disposably detonates, in order to enhance the stability of face, by area when every circulation is excavated Face explosion is at the inclined-plane with certain slope, or the spheroform surface with certain curvature;
Subsequent step is carried out again.
Embodiment 6
A kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel, exists with the difference of embodiment 1 In after carrying out the first step:
Step 2, according to advance geologic prediction as a result, the face within the scope of full section of tunnel is concordant bias hard Collapsing, chip off-falling easily occur for rock, face biased side, and IV, V grade of fender graded, non-support face estimation of stability is steady Determine, as C-1 class;
Step 3, according to tunnel face face stability evaluation and classification results:
For IV grade of country rock, 42 ductule of φ using length greater than 6m carries out advance support, and biased side suitably encrypts super Preceding supporting circumferential direction spacing carries out local pneumatically placed concrete closing to face, area face stability is evaluated again, if being unsatisfactory for needing Continue to implement this step, until face is stablized;
For V grade of country rock, advance support is carried out using pipe canopy in the φ 60 of length 9m-15m, biased side suitably encrypts super Preceding supporting circumferential direction spacing carries out local pneumatically placed concrete closing to face, area face stability is evaluated again, if being unsatisfactory for needing Continue to implement this step, until face is stablized;
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized Borehole drilling and powder charge, then band inverted arch disposably detonates, in order to enhance the stability of face, by area when every circulation is excavated Face explosion is at the inclined-plane with certain slope, or the spheroform surface with certain curvature;
Subsequent step is carried out again.
Embodiment 7
A kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel, exists with the difference of embodiment 1 In after carrying out the first step:
Step 2, according to advance geologic prediction as a result, the face within the scope of full section of tunnel is that concordant bias is soft Rock, face biased side easily occur collapse, chip off-falling, local deformation, IV, V grade of fender graded, non-support area face stability It is evaluated as more stable, as C-2 class;
Step 3, according to tunnel face face stability evaluation and classification results:
For IV grade of country rock, 42 ductule of φ using length greater than 6m carries out advance support, and biased side suitably encrypts super Preceding supporting circumferential direction spacing carries out local pneumatically placed concrete closing and local setting fiber anchor rod to face, evaluates area again Face stability, if being unsatisfactory for needing to continue to implement this step, until face is stablized;
For V grade of country rock, advance support is carried out using pipe canopy in the φ 60 of length 9m-15m, biased side suitably encrypts super Preceding supporting circumferential direction spacing carries out local pneumatically placed concrete closing and local setting fiber anchor rod to face, evaluates area again Face stability, if being unsatisfactory for needing to continue to implement this step, until face is stablized;
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized Borehole drilling and powder charge, then band inverted arch disposably detonates, in order to enhance the stability of face, by area when every circulation is excavated Face explosion is at the inclined-plane with certain slope, or the spheroform surface with certain curvature;
Subsequent step is carried out again.
Embodiment 8
A kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel, exists with the difference of embodiment 1 In after carrying out the first step:
Step 2, according to advance geologic prediction as a result, the face within the scope of full section of tunnel is that concordant bias is soft Rock, face biased side easily occur collapsing, chip off-falling, become greatly, IV, V grade of fender graded, non-support face estimation of stability It is more stable to unstable, as C-3 class;
Step 3, according to tunnel face face stability evaluation and classification results:
For IV grade of country rock, 42 ductule of φ using length greater than 6m carries out advance support, and biased side suitably encrypts super Preceding supporting circumferential direction spacing carries out local pneumatically placed concrete closing and local setting fiber anchor rod to more stable face, to shakiness Determine face and carry out pneumatically placed concrete closing and upper section/tunneling boring setting fiber anchor rod, evaluates area face stability again, if It is unsatisfactory for needing to continue to implement this step, until face is stablized;
For V grade of country rock, advance support is carried out using pipe canopy in the φ 76 of length 9m-15m, biased side suitably encrypts super Preceding supporting circumferential direction spacing carries out local pneumatically placed concrete closing and local setting fiber anchor rod to more stable face, to shakiness Determine face and carry out pneumatically placed concrete closing and upper section/tunneling boring setting fiber anchor rod, evaluates area face stability again, if It is unsatisfactory for needing to continue to implement this step, until face is stablized;
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized Borehole drilling and powder charge, then band inverted arch disposably detonates, in order to enhance the stability of face, by area when every circulation is excavated Face explosion is at the inclined-plane with certain slope, or the spheroform surface with certain curvature;
Subsequent step is carried out again.
Embodiment 9
A kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel, exists with the difference of embodiment 1 In after carrying out the first step:
Step 2, according to advance geologic prediction as a result, the face within the scope of full section of tunnel is that concordant bias is soft Collapsing, chip off-falling, large deformation easily occur for rock, face biased side, and IV, V grade of fender graded, non-support area face stability is commented Valence is more stable to unstable, as C-4 class;
Step 3, according to tunnel face face stability evaluation and classification results:
For IV grade of country rock, 42 ductule of φ using length greater than 6m carries out advance support, and biased side suitably encrypts super Preceding supporting circumferential direction spacing carries out local pneumatically placed concrete closing and local setting fiber anchor rod to more stable face, to shakiness Determine face and carry out pneumatically placed concrete closing and upper section/tunneling boring setting fiber anchor rod, evaluates area face stability again, if It is unsatisfactory for needing to continue to implement this step, until face is stablized;
For V grade of country rock, advance support is carried out using pipe canopy in the φ 76 of length 9m-15m, biased side suitably encrypts super Preceding supporting circumferential direction spacing carries out local pneumatically placed concrete closing and local setting fiber anchor rod to more stable face, to shakiness Determine face and carry out pneumatically placed concrete closing and upper section/tunneling boring setting fiber anchor rod, evaluates area face stability again, if It is unsatisfactory for needing to continue to implement this step, until face is stablized;
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized Borehole drilling and powder charge, then band inverted arch disposably detonates, in order to enhance the stability of face, by area when every circulation is excavated Face explosion is at the inclined-plane with certain slope, or the spheroform surface with certain curvature;
Subsequent step is carried out again.
Embodiment 10
A kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel, exists with the difference of embodiment 1 In after carrying out the first step:
Step 2, according to advance geologic prediction as a result, the face within the scope of full section of tunnel is that anhydrous construction is broken There is collapsing, chip off-falling in band, face, and fender graded is V grade, and non-support face estimation of stability is unstable, as D-1 Class;
Step 3, according to tunnel face face stability evaluation and classification results, using length be greater than 20m φ 108 Steel tube shed carries out advance support, carries out pneumatically placed concrete closing and grouting reinforcement to face, evaluates area face stability again, If being unsatisfactory for needing to continue to implement this step, until face is stablized;
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized Borehole drilling and powder charge, then band inverted arch disposably detonates, in order to enhance the stability of face, by area when every circulation is excavated Face explosion is at the inclined-plane with certain slope, or the spheroform surface with certain curvature;
Subsequent step is carried out again.
Embodiment 11
A kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel, exists with the difference of embodiment 1 In after carrying out the first step:
Step 2, according to advance geologic prediction as a result, the face within the scope of full section of tunnel is that rich water construction is broken There is collapsing, chip off-falling, face protrusion, the prominent mud of gushing water in band, face, and fender graded is V grade, non-support area face stability It is evaluated as unstable, as D-2 class;
Step 3, according to tunnel face face stability evaluation and classification results, using length be greater than 20m φ 108 Steel tube shed carries out advance support, carries out pneumatically placed concrete closing to face and tunneling boring curtain-grouting consolidates, again the evaluation palm Sub- face stability, if being unsatisfactory for needing to continue to implement this step, until face is stablized;
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized Borehole drilling and powder charge, then band inverted arch disposably detonates, in order to enhance the stability of face, by area when every circulation is excavated Face explosion is at the inclined-plane with certain slope, or the spheroform surface with certain curvature;
Subsequent step is carried out again.
Embodiment 12
A kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel, exists with the difference of embodiment 1 In after carrying out the first step:
Step 2, according to advance geologic prediction as a result, the face within the scope of full section of tunnel is karst intense development There is chip off-falling, gushing water, prominent mud in limestone, face, and IV, V grade of fender graded, face is not when non-support face chance solution cavity Stablize, as E class;
Step 3, according to tunnel face face stability evaluation and classification results, it is big greater than the φ 89 of 20m using length Pipe canopy carries out advance support, and IV, V grade of country rock carries out pneumatically placed concrete closing to face, evaluates area face stability again, if It is unsatisfactory for needing to continue to implement this step, until face is stablized;
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized Borehole drilling and powder charge, then band inverted arch disposably detonates, in order to enhance the stability of face, by area when every circulation is excavated Face explosion is at the inclined-plane with certain slope, or the spheroform surface with certain curvature;
Subsequent step is carried out again.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (3)

1. a kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel, which comprises the following steps:
Step 1, using in geology sketch, geophysical prospecting, Advance Drilling method or drill jumbo MWD geotechnical boring Cloud image prediction One or more, carry out advance geologic prediction;
Step 2, according to advance geologic prediction as a result, evaluate the area face stability within the scope of full section of tunnel, and It is A-E class by face analysis of stability, in which:
A class includes A-1 unstable;
B class includes that B-1 is more stable, B-2 is more stable, B-3 is unstable, B-4 is unstable;
C class includes that C-1 is stable, C-2 is more stable, C-3 is more stable to unstable, C-4 is more stable to unstable;
D class includes that D-1 is unstable, D-2 is unstable;
E class, face is unstable when meeting solution cavity;
Step 3, according to tunnel face face stability evaluation and classification results, decide whether carry out advance support and If desired face reinforcement carries out advance support and face reinforcement, then used according to face A-E classification and specifically arranged accordingly It applies;
Step 4 carries out borehole in face tunneling boring range using drill jumbo after face in the step 3 is stablized Simultaneously powder charge is crept into, then band inverted arch disposably detonates;
Step 5 is aerated face near zone, and carries out danger stone to face and rigid burst region using excavator Digging processing is got rid of the danger and owed, fortune quarrel vehicle muck removal is utilized;
Step 6, the face after excavating to this excavation circulation carry out mapping, and determine that this excavation recycles face immediately Stability, perform this excavation circulation excavate after preliminary bracing, preliminary bracing using wet shot manipulator carry out just pneumatically placed concrete, Concrete grade is at least C30, and the concrete of injection is the higher concrete of early strength, and age strength is at least within one day 15MPa, while closing face;
Step 7 recycles progress system anchor bolt to this excavation and performs, and tunnel arch range is used with the low of mechanical swollen shell head Prestressing force hollow grouting anchor uses grouting rock bolt within the scope of tunnel side wall;
Step 8, when precasting steel frame every circumferentially spaced several casings of welding of Pin steelframe, using arch installation trolley to prefabricated Good steelframe carries out erection installation, carries out the node fastening of circumferential unit, is inserted into using U-shaped steel muscle corresponding on adjacent two Pin steelframe Casing, all steelframes are longitudinally connected along tunnel, enhance steelframe longitudinal stability, then again pneumatically placed concrete to designing thickness Degree;
Step 9 is lagging behind this excavation circulation a distance, is being cut backfill inverted arch region as operation platform using hole, and conduct Next workbench for excavating circulation drill jumbo carries out next excavation circulation industrial after this step of this excavation circulation Sequence operation;
Step 10, in order not to interfere next operation for excavating circulation, next excavation recycles drill jumbo in lagging behind step 9 Workbench a distance, remove the hole quarrel of backfill, the mixed of inverted arch and abutment wall basis carried out using packaged type inverted arch trestle Solidifying soil (or armored concrete) pours, and perfusion inverted arch fill concrete is to designing height after inverted arch and abutment wall base concrete initial set Degree;
Step 11, is laid with using splash guard and reinforcing steel bar-binding bench vehicle carries out geotextiles, the laying of splash guard and arch wall lining cutting steel The binding of muscle;
Step 12 carries out pouring and conserving for arch wall lining cutting using lining trolley.
2. excavation method according to claim 1, which is characterized in that after implementing the step 3, evaluate face again Stability, if being unsatisfactory for needing to continue to implement the step 3, until face is stablized.
3. excavation method according to claim 1, which is characterized in that in the step 4, by area when every circulation is excavated Face explosion is at the inclined-plane with certain slope, or the spheroform surface with certain curvature.
CN201811051394.8A 2018-09-10 2018-09-10 Full-ring excavation method suitable for IV-V-grade surrounding rock of large-section tunnel Expired - Fee Related CN109209392B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811051394.8A CN109209392B (en) 2018-09-10 2018-09-10 Full-ring excavation method suitable for IV-V-grade surrounding rock of large-section tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811051394.8A CN109209392B (en) 2018-09-10 2018-09-10 Full-ring excavation method suitable for IV-V-grade surrounding rock of large-section tunnel

Publications (2)

Publication Number Publication Date
CN109209392A true CN109209392A (en) 2019-01-15
CN109209392B CN109209392B (en) 2020-05-19

Family

ID=64987936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811051394.8A Expired - Fee Related CN109209392B (en) 2018-09-10 2018-09-10 Full-ring excavation method suitable for IV-V-grade surrounding rock of large-section tunnel

Country Status (1)

Country Link
CN (1) CN109209392B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067564A (en) * 2019-04-19 2019-07-30 中铁五局集团成都工程有限责任公司 A kind of soft rock large cross-section tunnel big machinery melts cut construction method
CN110210069A (en) * 2019-05-09 2019-09-06 西南交通大学 Tunnel advanced support System Design method and tunnel advanced support design method
CN110617069A (en) * 2019-09-24 2019-12-27 中铁隧道集团三处有限公司 Full-circle excavation construction method
CN111396095A (en) * 2020-04-21 2020-07-10 中铁二院工程集团有限责任公司 Tunnel simply-supported arch open cut tunnel structure penetrating through giant karst cave and construction method thereof
CN111553000A (en) * 2020-03-23 2020-08-18 西南交通大学 Intelligent construction method of tunnel by drilling and blasting method
CN111912307A (en) * 2020-07-23 2020-11-10 中交上海航道局有限公司 Blasting excavation method of V-level surrounding rock large-section granite tunnel
CN111963202A (en) * 2020-07-03 2020-11-20 铜陵有色金属集团股份有限公司 Wet concrete spraying process for non-coal underground mine
CN113266372A (en) * 2021-06-16 2021-08-17 交通运输部公路科学研究所 Construction method for soft rock super-large section tunnel step in karst cave development stratum
CN113719296A (en) * 2021-08-16 2021-11-30 北京市市政一建设工程有限责任公司 Vibration reduction drilling and blasting construction process
CN114991781A (en) * 2022-06-23 2022-09-02 中铁九局集团第三建设有限公司 Tunnel excavation construction method suitable for IV-level and V-level surrounding rocks

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103513293A (en) * 2013-10-12 2014-01-15 广西大学 Tunnel geology comprehensive advanced forecasting expert system and implementation method thereof
CN103698817A (en) * 2013-12-27 2014-04-02 上海川海信息科技有限公司 Method for rapidly and safely predicting tunnel face of underground cavity on basis of image
CN104790978A (en) * 2015-03-10 2015-07-22 中铁九局集团有限公司 Small-clear-distance grade separation tunnel annular guide pit construction method
CN107526098A (en) * 2017-10-19 2017-12-29 云南省水利水电勘测设计研究院 A kind of construction method for carrying out advance geologic prediction
CN108266193A (en) * 2018-03-12 2018-07-10 中铁十二局集团有限公司 IVth, the construction method in V grade of weak surrounding rock tunneling boring tunnel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103513293A (en) * 2013-10-12 2014-01-15 广西大学 Tunnel geology comprehensive advanced forecasting expert system and implementation method thereof
CN103698817A (en) * 2013-12-27 2014-04-02 上海川海信息科技有限公司 Method for rapidly and safely predicting tunnel face of underground cavity on basis of image
CN104790978A (en) * 2015-03-10 2015-07-22 中铁九局集团有限公司 Small-clear-distance grade separation tunnel annular guide pit construction method
CN107526098A (en) * 2017-10-19 2017-12-29 云南省水利水电勘测设计研究院 A kind of construction method for carrying out advance geologic prediction
CN108266193A (en) * 2018-03-12 2018-07-10 中铁十二局集团有限公司 IVth, the construction method in V grade of weak surrounding rock tunneling boring tunnel

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067564A (en) * 2019-04-19 2019-07-30 中铁五局集团成都工程有限责任公司 A kind of soft rock large cross-section tunnel big machinery melts cut construction method
CN110210069B (en) * 2019-05-09 2023-04-18 西南交通大学 Tunnel advanced support system design method and tunnel advanced support design method
CN110210069A (en) * 2019-05-09 2019-09-06 西南交通大学 Tunnel advanced support System Design method and tunnel advanced support design method
CN110617069A (en) * 2019-09-24 2019-12-27 中铁隧道集团三处有限公司 Full-circle excavation construction method
CN111553000A (en) * 2020-03-23 2020-08-18 西南交通大学 Intelligent construction method of tunnel by drilling and blasting method
CN111396095A (en) * 2020-04-21 2020-07-10 中铁二院工程集团有限责任公司 Tunnel simply-supported arch open cut tunnel structure penetrating through giant karst cave and construction method thereof
CN111396095B (en) * 2020-04-21 2024-05-24 中铁二院工程集团有限责任公司 Tunnel simple arch open cut tunnel structure penetrating through huge karst cave and construction method thereof
CN111963202A (en) * 2020-07-03 2020-11-20 铜陵有色金属集团股份有限公司 Wet concrete spraying process for non-coal underground mine
CN111912307B (en) * 2020-07-23 2022-09-09 中交上海航道局有限公司 Blasting excavation method for V-level surrounding rock large-section granite tunnel
CN111912307A (en) * 2020-07-23 2020-11-10 中交上海航道局有限公司 Blasting excavation method of V-level surrounding rock large-section granite tunnel
CN113266372A (en) * 2021-06-16 2021-08-17 交通运输部公路科学研究所 Construction method for soft rock super-large section tunnel step in karst cave development stratum
CN113719296A (en) * 2021-08-16 2021-11-30 北京市市政一建设工程有限责任公司 Vibration reduction drilling and blasting construction process
CN114991781A (en) * 2022-06-23 2022-09-02 中铁九局集团第三建设有限公司 Tunnel excavation construction method suitable for IV-level and V-level surrounding rocks

Also Published As

Publication number Publication date
CN109209392B (en) 2020-05-19

Similar Documents

Publication Publication Date Title
CN109209391A (en) Tiny step excavation method suitable for IV-V grade of country rock of large cross-section tunnel
CN109209392A (en) Loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel
CN106869944B (en) The extra small clear-distance tunnel construction method in underground interchange intersection under complex environment
CN103089275B (en) Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections
CN104790978B (en) The tunnel ring-shaped base tunnel construction method of small interval crossings on different level
CN106761778B (en) A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground
CN103306687B (en) Soft rock tunnel long cantilever horizontal jet grouting Deformation control construction method
CN104453921B (en) A kind of Soft Rock Tunnel Excavation construction technology
RU2581587C1 (en) Method of filling hole under anchor, drilled in roof of mine working cartridges with resin
CN102287198B (en) Construction method for river-crossing shield tunnel crushed stratum communication channel
CN103244133B (en) The milling of coal measure strata tunnel is dug and is combined construction with explosion
CN105781571A (en) Construction method for soft rock deformation tunnel lining support dismantling-replacing arch
CN103899318B (en) The milling of medium ground tunnel is dug and supporting machinery construction
CN105781573A (en) Railway down-traversing highway tunnel double-layer casing pipe reinforcement double-pipe shed follow-pipe drilling construction method
CN105065037A (en) Double-layer arch center support construction method for highway soft rock tunnel
CN106121675A (en) Small-sized solution cavity is positioned at tunnel excavation and karst cave treatment method time at the bottom of tunneling inverted arch
CN111997639B (en) Method for getting rid of trouble and reinforcing and improving geology of TBM construction tunnel bad geology section card machine
CN104141500B (en) One hardens sand and gravel stratum cavern con struction method
CN104632249A (en) Tunnel system supporting technology used in loose and soft broken surrounding rock
CN102383813A (en) Construction method for ultralong loess accumulative roc tunnel
CN108756901B (en) Former times lattice reach special formation Shallow Tunnel Construction method
CN109057802A (en) Shallow tunnel with big cross-section underpass of freeways construction method
CN108222976A (en) Diversion tunnel pole weak surrounding rock section constructing method
CN214273663U (en) Weak surrounding rock tunnel geological disaster punishment structure
CN113982639B (en) Tunnel lining full-ring dismantling and replacing construction method in unfavorable geological region

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190807

Address after: 610000 No. 3 Tongjin Road, Chengdu City, Sichuan Province

Applicant after: CHINA RAILWAY ERYUAN ENGINEERING GROUP Co.,Ltd.

Applicant after: CHINA RAILWAY Corp.

Applicant after: Wuhan-Kowloon Railway Passenger Dedicated Line Hubei Co.,Ltd.

Applicant after: CREEC (CHENGDU) SURVEY, DESIGN AND RESEARCH Co.,Ltd.

Applicant after: SOUTHWEST JIAOTONG University

Address before: 610081 No. 4, West Second Lane, North Railway Station, Jinniu District, Chengdu City, Sichuan Province

Applicant before: CREEC (CHENGDU) SURVEY, DESIGN AND RESEARCH Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200519