Loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel
Technical field
The present invention relates to tunnel construction technical fields, in particular to a kind of to enclose suitable for IV-V grade of large cross-section tunnel
The loopful excavation method of rock.
Background technique
Since 21st century, China's Tunnel Engineering technology has obtained quick development, has benefited from high-speed railway in recent years
Rapid emergence.Tunnel Engineering technology has become the important a part of high-speed rail technology, especially in western railway construction, tunnel
Accounting is larger, often controls the duration of entire engineering.Railway such as is being built into blue line overall length about 457km, and wherein 32, tunnel is total about
332km, tunnel line ratio about 72.6%;For another example to the 130km range of east part of Sichuan, tunnel overall length is more than ten thousand high-speed rail Hubei Section Baokang of Zheng
120km, tunnel line is than up to 90% or more, like high speed subway.Ended for the end of the year 2015, the high-speed rail tunnel that the country is open to the traffic
More than 2200, the super 3200km of overall length is more than 10000km in the high-speed rail tunnel overall length built and planned.
Currently, in the construction of large-scale Railway Tunnel for many years, preliminarily formed high-speed railway mountain tunnel at
The construction method of set, i.e. Mining Method build technology, especially in western mountainous areas.Traditional mining method construction is mainly quick-fried using manually boring
Mode carries out excavation driving, drills and installs from advance support, borehole is crept into and powder charge, armature boring and installation, injection coagulation
The processes such as native operation, inverted arch perform, splash guard is laid with, secondary lining reinforcing bar and concreting, groove perform, multi-process operation
A large amount of human and material resources are put into.Simultaneously as Railway Tunnel is usually one-tunnel two-tracks tunnel, excavated section area compared with
Greatly, other than II, III grade of country rock is using full section method, in IV, V grade of country rock that surrounding rock stability is poor, it is contemplated that construction peace
Quan Xing generallys use partial excavation method, i.e., entire excavated section is divided into multiple portions and excavated, and each excavation part can
Parallel operations are carried out to independently form flow chart, including benching tunnelling method, three step of remaining core soil in advance starting working system, step are interim
The interim inverted arch method of stull method, step, CD method (i.e. interval wall approach), CRD method (i.e. intersection interval wall approach), two side-wall pilot tunnel.It adopts
When with the above partial excavation method, to guarantee that tunnel surrounding is stablized, gib plays a significant role, such as step plus interim inverted arch
Method is mainly used for V grade of weak surrounding rock stratum, and construction method needs perform based on profile steel frame, steel mesh, pneumatically placed concrete
Gib.
But existing constructing tunnel excavation method has the following problems:
1, adaptability of the existing tunneling boring with the disposable excavation method of inverted arch is poor, at present only in II, III grade of country rock
Duan Yingyong, and inefficiency, IV, V grade of weak surrounding rock section are all made of the construction of partial excavation method, i.e., by entire tunnel cross-section point
Drill-blast tunnelling is carried out at multiple regions, and the vibration that every one region of Blasting Excavation generates i.e. can be to not excavating zone-perturbation one nearby
Secondary, multiple disturbance will be generated by repeatedly excavating, serious to reduce tunnel trunk stability, so that plastic zone of surrounding rock and relaxation zone are significant
Increase, cause the load in shoulder bed effects supporting in the early stage to increase, Supporting Structure deformation is caused to increase, needs stronger supporting
It is able to maintain tunnel stabilization safety;
2, tunnel cross-section is divided into several zonules and individually excavated by the method for existing partial excavation, since space limits,
Not being available Large Construction equipment it is even more impossible to use big machinery matching operation leads to that all kinds of of construction efficiency can be improved
Mechanized equipment is unable to get effective utilization;Meanwhile the flow chart of partial excavation method is more, and mutually closes between each process
Connection, once some process is impacted, it will other processes are influenced, to cause construction speed slow, construction period is longer;
3, partial excavation method needs to perform a large amount of gib to control the surrouding rock deformation in each region, such as interim
Pneumatically placed concrete, interim steelframe, interim steel mesh, interim anchor pole etc., will then be removed after stablizing, in addition to part interim steelframe
It can reuse, remaining gib cannot utilize again, and material and investment waste are larger;
4, it using artificial partial excavation method, being influenced by artificial subjective factor, it is larger that supporting construction performs quality discreteness,
And since manual operation efficiency is lower, preliminary bracing is performed and not in time after each region development blasting, so that country rock becomes
Shape is larger;Simultaneously as the limitation of partial excavation, excavates region at first and finally excavates region at a distance from tunnel longitudinal extension
It is larger, lead to preliminary bracing closing cyclization not in time, deformation controlling for rock surrounding gateways not in time, violates New Austrian Tunneling Method theory about control country rock
The requirement of two elements " immediate support, quick closure cyclization " of deformation, may cause the increase of country rock convergent deformation;
5, it is constructed, is manually put into larger while right using traditional artificial excavation method in IV, V grade of Support System in Soft Rock Tunnels
The stability of every circulation face simultaneously thinks little of, and face landslide accident is easily caused when wall rock condition is poor and threatens area
The personal safety of operating personnel near face;
6, traditional artificial partial excavation method is used in IV, V grade of Support System in Soft Rock Tunnels, think little of actively reinforcing country rock,
Active control surrouding rock deformation, but simply using the method for passive strengthening supporting structural strength come deformation controlling for rock surrounding gateways, in this way
It is easy to cause deformation excessive and cave in accident is caused to happen occasionally, and disease during operation is easy to cause to take place frequently.
Summary of the invention
The drawbacks of it is an object of the invention to overcome the traditional artificial partial excavation method in the presence of the prior art it is upper
Deficiency is stated, is integrally considered from constructing tunnel, is provided a kind of suitable for the safe, quick, high-quality of IV-V grade of country rock of large cross-section tunnel
Measure the excavation method of mechanization loopful.
In order to achieve the above-mentioned object of the invention, the present invention provides following technical schemes:
A kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel, comprising the following steps:
Step 1, it is pre- using geology sketch, geophysical prospecting, Advance Drilling method or drill jumbo MWD geotechnical boring cloud atlas
One or more of survey, carry out advance geologic prediction;
Drill jumbo MWD (Measure While Drilling, measurement while drilling) geotechnical boring Cloud image prediction is with complete
Computer multi-arm drill jumbo, using every circulation trolley borehole creep into when, by obtain drilling machine drilling when fltting speed, push away
Into parameters such as pressure, surge, rotation pressures, geology cloud atlas is formed according to the set procedure, the geology cloud atlas is according to display
Different colours can the soft or hard degree of a certain range of rock mass of preliminary judgement front of tunnel heading, integrated degree etc., to face
The a certain range of country rock in front carries out Geological Prediction;
Step 2, according to advance geologic prediction as a result, commenting the area face stability within the scope of full section of tunnel
Valence, and be A-E class by face analysis of stability, in which:
A class is hard rock, includes A-1 unstable;
B class is soft rockmass, includes that B-1 is more stable, B-2 is more stable, B-3 is unstable, B-4 is unstable;
C class concordant bias unfavorable geology includes that C-1 is stable, C-2 is more stable, C-3 is more stable to unstable, C-4 is more steady
It is fixed extremely unstable;
D class is fault belt, includes that D-1 is unstable, D-2 is unstable;
E class is karst intense development limestone, and face is unstable when meeting solution cavity;
Evaluation and classification standard are as shown in table 1;
Table 1, face estimation of stability and classification chart
Step 3, according to tunnel face face stability evaluation and classification results, decide whether to be propped up in advance
If desired shield and face reinforcement carry out advance support and face reinforcement, then according to face A-E classification using corresponding tool
Body measure, advance support measure is as shown in table 2, and face reinforcement solutions measure is as shown in table 3;
Table 2, advance support measure classification chart
Table 3, face treatment measures classification chart
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized
Borehole drilling and powder charge, then band inverted arch disposably detonates;
Step 5 is aerated face near zone, and is carried out using excavator to face and rigid burst region
Digging processing is got rid of the danger and owed to danger stone, utilizes fortune quarrel vehicle muck removal;
Step 6, the face after excavating to this excavation circulation carry out mapping, and determine this excavation circulation palm immediately
The stability in sub- face performs the preliminary bracing after this excavation circulation is excavated, and using the progress of wet shot manipulator, just spray is mixed for preliminary bracing
Solidifying soil, concrete grade are at least C30, and the concrete of injection is the higher concrete of early strength, and one day age strength is at least
For 15MPa, its object is to as early as possible, active control surrouding rock deformation, while closing face, it should be noted that this excavation follows
The face mapping result that ring is carried out answers advance support measure and face reinforcement measure in reversed verification step three;
Step 7 recycles progress system anchor bolt to this excavation and performs, and tunnel arch range is used with mechanical swollen shell head
Lower-prestressed hollow grouting anchor, which anchors country rock using mechanical swollen shell head after being inserted into bolthole, and applies number
A few tons of initial tensioning force, at the first time fasten hole around rock, active control surrouding rock deformation, meanwhile, slip casting condensation after can mention
For later period anchor force, the deformation of country rock later period is controlled, uses grouting rock bolt within the scope of tunnel side wall;
Step 8, when precasting steel frame every circumferentially spaced several casings of welding of Pin steelframe, trolley pair is installed using arch
Prefabricated steelframe carries out erection installation, carries out the node fastening of circumferential unit, is inserted on adjacent two Pin steelframe using U-shaped steel muscle
Corresponding casing, all steelframes are longitudinally connected along tunnel, enhance steelframe longitudinal stability, then again pneumatically placed concrete to setting
Count thickness;
Step 9 is lagging behind this excavation circulation a distance, is being cut backfill inverted arch region as operation platform using hole, and
As next workbench for excavating circulation drill jumbo, after this step of this excavation circulation, carries out next excavation and follow
Ring procedures;
Step 10, in order not to interfere next operation for excavating circulation, next excavation recycles rock drilling in lagging behind step 9
Workbench a distance of trolley removes the hole quarrel of backfill, carries out inverted arch and abutment wall basis using packaged type inverted arch trestle
Concrete (or armored concrete) pour, perfusion inverted arch fill concrete is to setting after inverted arch and the initial set of abutment wall base concrete
Meter height;
Step 11, is laid with using splash guard and reinforcing steel bar-binding bench vehicle carries out geotextiles, the laying of splash guard and arch wall and serves as a contrast
Build the binding of reinforcing bar;
Step 12 carries out pouring and conserving for arch wall lining cutting using lining trolley.
Preferably, after implementing the step 3, area face stability is evaluated again, if being unsatisfactory for needing to continue described in implementation
Step 3, until face is stablized, it is therefore an objective to guarantee face stabilization or keeps stable state in next excavation circulation time limit,
To meet needs of constructing.
Preferably, in the step 4, in order to enhance the stability of face, when every circulation is excavated by face explosion at
Inclined-plane with certain slope, or the spheroform surface with certain curvature.
Preferably, in the step 7, anchor pole, which is performed, bores note all-in-one machine or drill jumbo operation using anchor pole, according to
Anchor pole bores note all-in-one machine, then can be automatically finished rockbolt installation, when using drill jumbo operation, manning's less important work.
Preferably, every Pin steelframe circumferentially welds the casing of a φ 30- φ 32 at interval of 1m-1.5m.
Preferably, the U-shaped steel muscle is U-shaped spiral.
Preferably, the diameter of the U-shaped steel muscle is φ 20- φ 25.
Preferably, the cross-sectional area of the large cross-section tunnel is 130m2-170m2。
In conclusion by adopting the above-described technical solution, the beneficial effects of the present invention are:
1, with a kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel of the present invention, Quan Duan
The method of face blasting in once-through driving, every circulation blasting vibration is primary, and the disturbance number to country rock is reduced to once, significantly
Reduce plastic zone of surrounding rock and relaxation zone range, reduce the load in shoulder bed effects supporting in the early stage, reduces Supporting Structure deformation, mention
Tunnel safety is risen, is especially constructed in IV, V grade of weak surrounding rock section using this method, significant effect;
It 2, is every with a kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel of the present invention
A working procedure provides working space using do mechanization operation, so that all kinds of mechanized equipments can be efficiently used, using this
Method, construction speed are largely improved, according to after live practical use as a result, IV, V grade of country rock is opened every month
Degree of digging into has reached 115m, 80m, and about 44%, 45% has been respectively increased in drill footage per month 80m, 55m compared to conventional method., work efficiency
It is promoted significant;
3, with a kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel of the present invention, Quan Duan
Face is disposably tunneled forward, without performing a large amount of not reproducible gib measure utilized, such as interim pneumatically placed concrete, steel
Frame, steel mesh, anchor pole etc. can largely save engineering material, can save great amount of investment, and economic impacts are significant;
4, it with a kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel of the present invention, uses
Fully-mechanized operation, can avoid artificial subjective factor influence supporting construction performs quality, and supporting construction performs in time, initial stage
Supporting can be cyclic rapidly in the shortest time, and timely to the Deformation control of country rock, this method has been agreed with completely in New Austrian Tunneling Method theory
The requirement of " immediate support, quick closure cyclization ", is the trend of future tunnel construction method development;
5, it with a kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel of the present invention, uses
Mechanical work can largely reduce face operating personnel nearby, human cost be greatlyd save, in the present that human cost is gradually increased
It, has preferable economy, secondly, this method extremely payes attention to the stability of face, near stability is directly related to
The personal safety of operating personnel, this method by area face stability carry out classification processing, when encountering different situations according to
Its standard directly decides whether to take measures, and takes which kind of measure, has and defines, this is the pass of this method success or not
In place of key;
6, it with a kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel of the present invention, uses
The measure of two active control surrouding rock deformation, first is that using early strength and the higher concrete of final set strength, second is that using band
There is the lower-prestressed hollow grouting anchor of mechanical swollen shell head, by two measures, on the one hand forms surrounding rock consolidation circle and promoted
Surrounding Rock Strength, on the other hand by performing high-intensitive supporting construction in time, can timely deformation controlling for rock surrounding gateways, greatly reduce because becoming
Shape supporting causes surrouding rock deformation is excessive cave in accident is caused to be controlled especially on IV, V grade of weak surrounding rock stratum by active not in time
Surrouding rock deformation processed makes it reach stable state as early as possible, and non-passive strengthening supporting structure bearing load, reduction run branch because long-term
Protection structure deterioration leads to the probability of its cracking destruction threat traffic safety;
7, adjacent with a kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel of the present invention
Two Pin steelframes the are longitudinally connected casing that welds when connecting precasting steel frame using U-shaped steel muscle, connection is simple, and speed is fast, stable connection,
It works well, has abandoned in traditional hole and welded, reduced in-cavity construction security risk.
Detailed description of the invention
Fig. 1 is a kind of process of the loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel of the present invention
Schematic diagram.
Specific embodiment
Below with reference to test example and specific embodiment, the present invention is described in further detail.But this should not be understood
It is all that this is belonged to based on the technology that the content of present invention is realized for the scope of the above subject matter of the present invention is limited to the following embodiments
The range of invention.
Embodiment 1
As shown in Figure 1, a kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel of the present invention,
The following steps are included:
Step 1, it is pre- using geology sketch, geophysical prospecting, Advance Drilling method or drill jumbo MWD geotechnical boring cloud atlas
One or more of survey, carry out advance geologic prediction;
Step 2, according to advance geologic prediction as a result, the face within the scope of full section of tunnel is rich water, crushing hard
There is collapsing, chip off-falling in rock, face, and fender graded is IV grade, and non-support face estimation of stability is unstable, as A-1
Class;
Step 3, according to tunnel face face stability evaluation and classification results, using length greater than 5m φ 42 it is small
Conduit carries out advance support, carries out local pneumatically placed concrete closing and local setting fiber anchor rod to face, again the evaluation palm
Sub- face stability, if being unsatisfactory for needing to continue to implement this step, until face is stablized;
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized
Borehole drilling and powder charge, then band inverted arch disposably detonates, in order to enhance the stability of face, by area when every circulation is excavated
Face explosion is at the inclined-plane with certain slope, or the spheroform surface with certain curvature;
Step 5 is aerated face near zone, and is carried out using excavator to face and rigid burst region
Digging processing is got rid of the danger and owed to danger stone, utilizes fortune quarrel vehicle muck removal;
Step 6, the face after excavating to this excavation circulation carry out mapping, and determine this excavation circulation palm immediately
The stability in sub- face performs the preliminary bracing after this excavation circulation is excavated, and using the progress of wet shot manipulator, just spray is mixed for preliminary bracing
Solidifying soil, concrete grade are at least C30, and the concrete of injection is the higher concrete of early strength, and one day age strength is at least
For 15MPa, its object is to as early as possible, active control surrouding rock deformation, while closing face, it should be noted that this excavation follows
The face mapping result that ring is carried out answers advance support measure and face reinforcement measure in reversed verification step three;
Step 7 recycles progress system anchor bolt to this excavation and performs, and tunnel arch range is used with mechanical swollen shell head
Lower-prestressed hollow grouting anchor, which anchors country rock using mechanical swollen shell head after being inserted into bolthole, and applies number
A few tons of initial tensioning force, at the first time fasten hole around rock, active control surrouding rock deformation, meanwhile, slip casting condensation after can mention
For later period anchor force, the deformation of country rock later period is controlled, uses grouting rock bolt within the scope of tunnel side wall;
Wherein, anchor pole, which is performed, bores note all-in-one machine or drill jumbo operation using anchor pole, bores note all-in-one machine according to anchor pole,
It can be then automatically finished rockbolt installation, when using drill jumbo operation, manning's less important work;
Step 8, when precasting steel frame, every Pin steelframe circumferentially welded the casing of a φ 32 at interval of 1.2m, using arch
Installation trolley carries out erection installation to prefabricated steelframe, the node fastening of circumferential unit is carried out, using the U-shaped screw-thread steel of φ 22
Muscle is inserted into corresponding casing on adjacent two Pin steelframe, and all steelframes are longitudinally connected along tunnel, enhances steelframe longitudinal stability
Property, then again pneumatically placed concrete to design thickness;
Step 9 is lagging behind this excavation circulation a distance, is being cut backfill inverted arch region as operation platform using hole, and
As next workbench for excavating circulation drill jumbo, after this step of this excavation circulation, carries out next excavation and follow
Ring procedures;
Step 10, in order not to interfere next operation for excavating circulation, next excavation recycles rock drilling in lagging behind step 9
Workbench a distance of trolley removes the hole quarrel of backfill, carries out inverted arch and abutment wall basis using packaged type inverted arch trestle
Concrete (or armored concrete) pour, inverted arch fill concrete is perfused after inverted arch concrete initial set to design height;
Step 11, is laid with using splash guard and reinforcing steel bar-binding bench vehicle carries out geotextiles, the laying of splash guard and arch wall and serves as a contrast
Build the binding of reinforcing bar;
Step 12 carries out pouring and conserving for arch wall lining cutting using lining trolley.
Embodiment 2
A kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel, exists with the difference of embodiment 1
In after carrying out the first step:
Step 2, according to advance geologic prediction as a result, the face within the scope of full section of tunnel is anhydrous, complete soft
Rock, face part chip off-falling, fender graded are IV grade, and non-support face estimation of stability is more stable, as B-1 class;
Step 3, according to tunnel face face stability evaluation and classification results, using length greater than 5m φ 42 it is small
Conduit carries out advance support, carries out local pneumatically placed concrete closing to face, evaluates area face stability again, if being unsatisfactory for needing
Continue to implement this step, until face is stablized;
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized
Borehole drilling and powder charge, then band inverted arch disposably detonates, in order to enhance the stability of face, by area when every circulation is excavated
Face explosion is at the inclined-plane with certain slope, or the spheroform surface with certain curvature;
Subsequent step is carried out again.
Embodiment 3
A kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel, exists with the difference of embodiment 1
In after carrying out the first step:
Step 2, according to advance geologic prediction as a result, face within the scope of full section of tunnel be rich water, it is complete soft
Rock, face soft-rock slope, local chip off-falling, fender graded are IV grade, non-support face estimation of stability be it is more stable, as
B-2 class;
Step 3, according to tunnel face face stability evaluation and classification results, using length greater than 5m φ 42 it is small
Conduit carries out advance support, carries out local pneumatically placed concrete closing and local setting fiber anchor rod to face, again the evaluation palm
Sub- face stability, if being unsatisfactory for needing to continue to implement this step, until face is stablized;
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized
Borehole drilling and powder charge, then band inverted arch disposably detonates, in order to enhance the stability of face, by area when every circulation is excavated
Face explosion is at the inclined-plane with certain slope, or the spheroform surface with certain curvature;
Subsequent step is carried out again.
Embodiment 4
A kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel, exists with the difference of embodiment 1
In after carrying out the first step:
Step 2, according to advance geologic prediction as a result, face within the scope of full section of tunnel be it is anhydrous, be crushed it is soft
There is collapsing, chip off-falling in rock, face, and fender graded is IV grade, and non-support face estimation of stability is unstable, as B-3
Class;
Step 3, according to tunnel face face stability evaluation and classification results, using length greater than 6m φ 42 it is small
Conduit carries out advance support, carries out pneumatically placed concrete closing to face and fiber anchor rod is arranged in upper section, evaluate area again
Face stability, if being unsatisfactory for needing to continue to implement this step, until face is stablized;
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized
Borehole drilling and powder charge, then band inverted arch disposably detonates, in order to enhance the stability of face, by area when every circulation is excavated
Face explosion is at the inclined-plane with certain slope, or the spheroform surface with certain curvature;
Subsequent step is carried out again.
Embodiment 5
A kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel, exists with the difference of embodiment 1
In after carrying out the first step:
Step 2, according to advance geologic prediction as a result, face within the scope of full section of tunnel be rich water, be crushed it is soft
There is collapsing, chip off-falling, soft-rock slope, face protrusion, the prominent mud of gushing water in rock, face, and fender graded is V grade, non-support area
Face stability is evaluated as unstable, as B-4 class;
Step 3, according to tunnel face face stability evaluation and classification results, using in the φ 60 of length 9m-15m
Pipe canopy carries out advance support, carries out pneumatically placed concrete closing and grouting reinforcement to face, evaluates area face stability again, if
It is unsatisfactory for needing to continue to implement this step, until face is stablized;
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized
Borehole drilling and powder charge, then band inverted arch disposably detonates, in order to enhance the stability of face, by area when every circulation is excavated
Face explosion is at the inclined-plane with certain slope, or the spheroform surface with certain curvature;
Subsequent step is carried out again.
Embodiment 6
A kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel, exists with the difference of embodiment 1
In after carrying out the first step:
Step 2, according to advance geologic prediction as a result, the face within the scope of full section of tunnel is concordant bias hard
Collapsing, chip off-falling easily occur for rock, face biased side, and IV, V grade of fender graded, non-support face estimation of stability is steady
Determine, as C-1 class;
Step 3, according to tunnel face face stability evaluation and classification results:
For IV grade of country rock, 42 ductule of φ using length greater than 6m carries out advance support, and biased side suitably encrypts super
Preceding supporting circumferential direction spacing carries out local pneumatically placed concrete closing to face, area face stability is evaluated again, if being unsatisfactory for needing
Continue to implement this step, until face is stablized;
For V grade of country rock, advance support is carried out using pipe canopy in the φ 60 of length 9m-15m, biased side suitably encrypts super
Preceding supporting circumferential direction spacing carries out local pneumatically placed concrete closing to face, area face stability is evaluated again, if being unsatisfactory for needing
Continue to implement this step, until face is stablized;
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized
Borehole drilling and powder charge, then band inverted arch disposably detonates, in order to enhance the stability of face, by area when every circulation is excavated
Face explosion is at the inclined-plane with certain slope, or the spheroform surface with certain curvature;
Subsequent step is carried out again.
Embodiment 7
A kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel, exists with the difference of embodiment 1
In after carrying out the first step:
Step 2, according to advance geologic prediction as a result, the face within the scope of full section of tunnel is that concordant bias is soft
Rock, face biased side easily occur collapse, chip off-falling, local deformation, IV, V grade of fender graded, non-support area face stability
It is evaluated as more stable, as C-2 class;
Step 3, according to tunnel face face stability evaluation and classification results:
For IV grade of country rock, 42 ductule of φ using length greater than 6m carries out advance support, and biased side suitably encrypts super
Preceding supporting circumferential direction spacing carries out local pneumatically placed concrete closing and local setting fiber anchor rod to face, evaluates area again
Face stability, if being unsatisfactory for needing to continue to implement this step, until face is stablized;
For V grade of country rock, advance support is carried out using pipe canopy in the φ 60 of length 9m-15m, biased side suitably encrypts super
Preceding supporting circumferential direction spacing carries out local pneumatically placed concrete closing and local setting fiber anchor rod to face, evaluates area again
Face stability, if being unsatisfactory for needing to continue to implement this step, until face is stablized;
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized
Borehole drilling and powder charge, then band inverted arch disposably detonates, in order to enhance the stability of face, by area when every circulation is excavated
Face explosion is at the inclined-plane with certain slope, or the spheroform surface with certain curvature;
Subsequent step is carried out again.
Embodiment 8
A kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel, exists with the difference of embodiment 1
In after carrying out the first step:
Step 2, according to advance geologic prediction as a result, the face within the scope of full section of tunnel is that concordant bias is soft
Rock, face biased side easily occur collapsing, chip off-falling, become greatly, IV, V grade of fender graded, non-support face estimation of stability
It is more stable to unstable, as C-3 class;
Step 3, according to tunnel face face stability evaluation and classification results:
For IV grade of country rock, 42 ductule of φ using length greater than 6m carries out advance support, and biased side suitably encrypts super
Preceding supporting circumferential direction spacing carries out local pneumatically placed concrete closing and local setting fiber anchor rod to more stable face, to shakiness
Determine face and carry out pneumatically placed concrete closing and upper section/tunneling boring setting fiber anchor rod, evaluates area face stability again, if
It is unsatisfactory for needing to continue to implement this step, until face is stablized;
For V grade of country rock, advance support is carried out using pipe canopy in the φ 76 of length 9m-15m, biased side suitably encrypts super
Preceding supporting circumferential direction spacing carries out local pneumatically placed concrete closing and local setting fiber anchor rod to more stable face, to shakiness
Determine face and carry out pneumatically placed concrete closing and upper section/tunneling boring setting fiber anchor rod, evaluates area face stability again, if
It is unsatisfactory for needing to continue to implement this step, until face is stablized;
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized
Borehole drilling and powder charge, then band inverted arch disposably detonates, in order to enhance the stability of face, by area when every circulation is excavated
Face explosion is at the inclined-plane with certain slope, or the spheroform surface with certain curvature;
Subsequent step is carried out again.
Embodiment 9
A kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel, exists with the difference of embodiment 1
In after carrying out the first step:
Step 2, according to advance geologic prediction as a result, the face within the scope of full section of tunnel is that concordant bias is soft
Collapsing, chip off-falling, large deformation easily occur for rock, face biased side, and IV, V grade of fender graded, non-support area face stability is commented
Valence is more stable to unstable, as C-4 class;
Step 3, according to tunnel face face stability evaluation and classification results:
For IV grade of country rock, 42 ductule of φ using length greater than 6m carries out advance support, and biased side suitably encrypts super
Preceding supporting circumferential direction spacing carries out local pneumatically placed concrete closing and local setting fiber anchor rod to more stable face, to shakiness
Determine face and carry out pneumatically placed concrete closing and upper section/tunneling boring setting fiber anchor rod, evaluates area face stability again, if
It is unsatisfactory for needing to continue to implement this step, until face is stablized;
For V grade of country rock, advance support is carried out using pipe canopy in the φ 76 of length 9m-15m, biased side suitably encrypts super
Preceding supporting circumferential direction spacing carries out local pneumatically placed concrete closing and local setting fiber anchor rod to more stable face, to shakiness
Determine face and carry out pneumatically placed concrete closing and upper section/tunneling boring setting fiber anchor rod, evaluates area face stability again, if
It is unsatisfactory for needing to continue to implement this step, until face is stablized;
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized
Borehole drilling and powder charge, then band inverted arch disposably detonates, in order to enhance the stability of face, by area when every circulation is excavated
Face explosion is at the inclined-plane with certain slope, or the spheroform surface with certain curvature;
Subsequent step is carried out again.
Embodiment 10
A kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel, exists with the difference of embodiment 1
In after carrying out the first step:
Step 2, according to advance geologic prediction as a result, the face within the scope of full section of tunnel is that anhydrous construction is broken
There is collapsing, chip off-falling in band, face, and fender graded is V grade, and non-support face estimation of stability is unstable, as D-1
Class;
Step 3, according to tunnel face face stability evaluation and classification results, using length be greater than 20m φ 108
Steel tube shed carries out advance support, carries out pneumatically placed concrete closing and grouting reinforcement to face, evaluates area face stability again,
If being unsatisfactory for needing to continue to implement this step, until face is stablized;
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized
Borehole drilling and powder charge, then band inverted arch disposably detonates, in order to enhance the stability of face, by area when every circulation is excavated
Face explosion is at the inclined-plane with certain slope, or the spheroform surface with certain curvature;
Subsequent step is carried out again.
Embodiment 11
A kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel, exists with the difference of embodiment 1
In after carrying out the first step:
Step 2, according to advance geologic prediction as a result, the face within the scope of full section of tunnel is that rich water construction is broken
There is collapsing, chip off-falling, face protrusion, the prominent mud of gushing water in band, face, and fender graded is V grade, non-support area face stability
It is evaluated as unstable, as D-2 class;
Step 3, according to tunnel face face stability evaluation and classification results, using length be greater than 20m φ 108
Steel tube shed carries out advance support, carries out pneumatically placed concrete closing to face and tunneling boring curtain-grouting consolidates, again the evaluation palm
Sub- face stability, if being unsatisfactory for needing to continue to implement this step, until face is stablized;
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized
Borehole drilling and powder charge, then band inverted arch disposably detonates, in order to enhance the stability of face, by area when every circulation is excavated
Face explosion is at the inclined-plane with certain slope, or the spheroform surface with certain curvature;
Subsequent step is carried out again.
Embodiment 12
A kind of loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel, exists with the difference of embodiment 1
In after carrying out the first step:
Step 2, according to advance geologic prediction as a result, the face within the scope of full section of tunnel is karst intense development
There is chip off-falling, gushing water, prominent mud in limestone, face, and IV, V grade of fender graded, face is not when non-support face chance solution cavity
Stablize, as E class;
Step 3, according to tunnel face face stability evaluation and classification results, it is big greater than the φ 89 of 20m using length
Pipe canopy carries out advance support, and IV, V grade of country rock carries out pneumatically placed concrete closing to face, evaluates area face stability again, if
It is unsatisfactory for needing to continue to implement this step, until face is stablized;
Step 4 is carried out using drill jumbo in face tunneling boring range after face in the step 3 is stablized
Borehole drilling and powder charge, then band inverted arch disposably detonates, in order to enhance the stability of face, by area when every circulation is excavated
Face explosion is at the inclined-plane with certain slope, or the spheroform surface with certain curvature;
Subsequent step is carried out again.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.