CN203270578U - Underground pile foundation pulling device with steel wire rope sleeve clamp - Google Patents

Underground pile foundation pulling device with steel wire rope sleeve clamp Download PDF

Info

Publication number
CN203270578U
CN203270578U CN2013203233998U CN201320323399U CN203270578U CN 203270578 U CN203270578 U CN 203270578U CN 2013203233998 U CN2013203233998 U CN 2013203233998U CN 201320323399 U CN201320323399 U CN 201320323399U CN 203270578 U CN203270578 U CN 203270578U
Authority
CN
China
Prior art keywords
sleeve
wire rope
steel wire
pile
pile body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013203233998U
Other languages
Chinese (zh)
Inventor
杨富
朱川鄂
邓能伟
赵海军
鲍俊捷
颜科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN2013203233998U priority Critical patent/CN203270578U/en
Application granted granted Critical
Publication of CN203270578U publication Critical patent/CN203270578U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses an underground pile foundation removing device with a steel wire rope sleeve clamp, which comprises a sleeve and is characterized in that the steel wire rope sleeve clamp is arranged on the inner wall of the sleeve which is 1.5m below the top of the sleeve; the steel wire rope sleeve clamping devices are a plurality of U-shaped clamps fixed on the circumferential direction of the inner wall of the sleeve, and bayonets of the U-shaped clamps face upwards. The utility model discloses be equipped with wire rope cover fixture in the sleeve, when meetting pile body lower part fracture or the pile body is whole to sink, can't tie wire rope, utilize fixture to fix wire rope in advance in the sleeve, make wire rope reach the locking position that will pull out the pile body along with the sleeve, recycle the crane pulling force, break away from the sleeve with wire rope to entangle the pile body, make the pile body or disconnected pile whole pull out.

Description

A kind of underground pile foundation plucking device that is provided with the steel wire loop jig
Technical field
The utility model relates to field of civil engineering, specifically a kind of plucking device for removing the obstructions such as the residual castinplace pile of underground soil layer, preformed pile, pile for prestressed pipe, underground residual old steel concrete, piece stone.
Background technology
In subway construction, the shield structure interval of track traffic can run into some discarded building pile foundations.In the shield driving scope, pile foundation embeds the tunnel, can't pass through, and needs to pull out the discarded pile foundation of colliding before shield machine passes through.Existing conventional way is to choose full-sleeve double fluid high-pressure jet, the clear hole method pile pulling of jetting vibration sinking tube, adopt the pile pulling device of the method use when running into the pile body sinking, can't the bolt wire rope, can only first deep pit excavation until the fracture pile crown expose, just can carry out pile pulling, not only time-consuming but also require great effort, and safety does not reach requirement.When pile pulling runs into broken pile, residual broken pile is difficult to pull out especially, can only rush its pile body that can't extract broken or pour 1 meter of tunnel bottom with upper/lower positions by a punching stake method, but this method might be rushed pile body partially or reinforcing bar is pounded and be bloomed, like that just more run counter to desire, can bring very burden to construction.
The utility model content
The utility model provides a kind of underground pile foundation plucking device that is provided with the steel wire loop jig for fear of the weak point that prior art exists.
The utility model technical solution problem adopts following technical scheme:
A kind of underground pile foundation plucking device that is provided with the steel wire loop jig, comprise sleeve, described sleeve evenly is provided with a plurality of through holes vertically, the mixing spraying mechanism of inject high pressure gas, water under high pressure in the outer wall of described sleeve is provided with from sleeve bottom to sleeve, its design feature is, is being provided with the steel wire loop jig on the sleeve lining below sleeve top 1.5m; Described steel wire loop jig is comprised of a plurality of buckles that are provided with bayonet socket that make progress in sleeve lining week that are fixed on.
The utility model design feature also is:
The bayonet socket of described buckle up.
Described sleeve is along the jig that vertically is provided with a plurality of differing heights distributions.
Compared with the prior art, the utility model beneficial effect is embodied in:
Be provided with the steel wire loop jig in the utility model sleeve, when running into pile body bottom fracture or the whole sinking of pile body, in the time of can't the bolt wire rope, utilize jig to be fixed in advance wire rope in sleeve, make wire rope reach the locked position that will pull out pile body with sleeve, recycling crane pulling force breaks away from sleeve with wire rope, thereby entangle pile body, pile body or broken pile integral body are extracted.
Description of drawings
Fig. 1 is the utility model sleeve inner structural representation.
Number in the figure: 1, sleeve; 2, U-shaped card; 3 rope slings.
Technical solutions of the utility model are done further by the specific embodiment below in conjunction with accompanying drawing and explained.
The specific embodiment
As shown in the figure, the pile foundation plucking device, comprise sleeve 1, sleeve 1 evenly is provided with a plurality of through holes vertically, the mixing spraying mechanism of inject high pressure gas, water under high pressure in the outer wall of sleeve is provided with from sleeve bottom to sleeve, spraying mechanism comprises sparge pipe, air jet pipe and nozzle (more than be the prior art architectural feature, do not provide corresponding accompanying drawing), is being provided with the steel wire loop jig on the sleeve lining below sleeve top 1.5m; The steel wire loop jig is a plurality of U-shaped cards 2 that make progress in sleeve lining week that are fixed on, and the bayonet socket of U-shaped card up.
Further, sleeve 1 is along the jig that vertically is provided with a plurality of differing heights and distributes, and is used at the fixing rope sling 3 of differing heights.
When adopting the utility model device to carry out pile pulling, its construction sequence is as follows:
(1) make steel sleeve according to long 1 metric system of adding of stake in advance, after machining sleeve pipe, connect the high-pressure water pipe tracheae to the sleeve pipe top, vibrating hammer is clamped the sleeve pipe top, and the 150t crawler belt is sling sleeve pipe is slowly erect.
(2) vibrating hammer is opened by locating sleeve centrally aligned pile center, and sleeve pipe is shaken in the soil body, opens simultaneously the high-pressure water gas device in the process of shaking, and auxiliary sleeve pipe sinks, until sleeve pipe is suitable for reading flat with the stake top.Repeated multiple times lifting sinks pile body and the soil body are broken away from fully.
(3) remove vibrating hammer, at pile crown downward 1.5 meters, wire rope is installed, loop wheel machine lifting bowden cable, the lasso trick pile body of tying tight, under the effect of high-pressure water gas, because pile body separates with the soil body, loop wheel machine only need overcome the pile body own wt can hang out sleeve pipe with pile body.
(4) however the fracture of pile body bottom or pile body are whole to sink running into, in the time of can't the bolt wire rope, utilize jig to be fixed in advance steel wire loop in sleeve, make steel wire loop reach the locked position that to pull out pile body with sleeve, recycling crane pulling force, wire rope is broken away from sleeve, thereby entangle pile body, pile body or broken pile integral body are extracted.

Claims (3)

1. a underground pile foundation plucking device that is provided with the steel wire loop jig, comprise sleeve, it is characterized in that, is being provided with the steel wire loop jig on the sleeve lining below sleeve top 1.5m; Described steel wire loop jig is comprised of a plurality of buckles that are provided with bayonet socket that make progress in sleeve lining week that are fixed on.
2. a kind of underground pile foundation plucking device that is provided with the steel wire loop jig according to claim 1, is characterized in that, the bayonet socket of described buckle up.
3. a kind of underground pile foundation plucking device that is provided with the steel wire loop jig according to claim 1, is characterized in that, described sleeve is along the jig that vertically is provided with a plurality of differing heights distributions.
CN2013203233998U 2013-06-05 2013-06-05 Underground pile foundation pulling device with steel wire rope sleeve clamp Expired - Fee Related CN203270578U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203233998U CN203270578U (en) 2013-06-05 2013-06-05 Underground pile foundation pulling device with steel wire rope sleeve clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203233998U CN203270578U (en) 2013-06-05 2013-06-05 Underground pile foundation pulling device with steel wire rope sleeve clamp

Publications (1)

Publication Number Publication Date
CN203270578U true CN203270578U (en) 2013-11-06

Family

ID=49501019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203233998U Expired - Fee Related CN203270578U (en) 2013-06-05 2013-06-05 Underground pile foundation pulling device with steel wire rope sleeve clamp

Country Status (1)

Country Link
CN (1) CN203270578U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104005406A (en) * 2014-01-29 2014-08-27 陈东曙 Tubular pile construction method and pile tube structure of tubular pile
CN105297730A (en) * 2015-10-30 2016-02-03 中国建筑第八工程局有限公司 Multi-functional pile pulling sleeve and pile pulling construction method adopting multi-functional pile pulling sleeve
CN106869126A (en) * 2017-03-20 2017-06-20 大成科创基础建设股份有限公司 The quick green construction remove device on the waste and old basis in city
CN110306553A (en) * 2019-04-28 2019-10-08 中国一冶集团有限公司 Piling bar removes device and method in water
CN113522444A (en) * 2021-07-23 2021-10-22 杨奔奔 Building energy-concerving and environment-protective concrete recovery unit that uses

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104005406A (en) * 2014-01-29 2014-08-27 陈东曙 Tubular pile construction method and pile tube structure of tubular pile
CN105297730A (en) * 2015-10-30 2016-02-03 中国建筑第八工程局有限公司 Multi-functional pile pulling sleeve and pile pulling construction method adopting multi-functional pile pulling sleeve
CN106869126A (en) * 2017-03-20 2017-06-20 大成科创基础建设股份有限公司 The quick green construction remove device on the waste and old basis in city
CN106869126B (en) * 2017-03-20 2019-02-26 大成科创基础建设股份有限公司 The quick green construction remove device on the waste and old basis in city
CN110306553A (en) * 2019-04-28 2019-10-08 中国一冶集团有限公司 Piling bar removes device and method in water
CN110306553B (en) * 2019-04-28 2021-06-29 中国一冶集团有限公司 Underwater steel pile dismantling device and method
CN113522444A (en) * 2021-07-23 2021-10-22 杨奔奔 Building energy-concerving and environment-protective concrete recovery unit that uses

Similar Documents

Publication Publication Date Title
CN203270578U (en) Underground pile foundation pulling device with steel wire rope sleeve clamp
CN100535261C (en) Pile extractor and construction method thereof
CN101736746B (en) Construction method for vibrator pipe sinking high-pressure grouting underpinning pile extracting
CN110158582A (en) A method of trestle steel pipe pile is set on intectate riverbed
CN100591859C (en) Pile pulling construction method for pile pulling machine
CN203270577U (en) Underground pile foundation pulling device with door plate clamp
CN106245931A (en) The underpinning device of load bearing wall and construction method in brick mix structure
CN1963044A (en) Construction method for withdrawal of waste pile
CN102518132A (en) Tensioned self-locking umbrella type anchor and soil slope reinforcement method
CN104895072A (en) A pre-stressed anchor cable and a pre-stressed anchor cable one-time forming construction method
CN204000830U (en) Merogenesis take-over type sand drain machine
CN102747729A (en) Sleeve connection device for bored cast-in-place pile construction
CN105862862A (en) Salvage method for large-diameter pile buried hammer
CN202492847U (en) High-pressure water jet casing pipe pile pulling tool
CN201087421Y (en) Pile extractor
CN202401460U (en) Sleeve pipe moisture injection process type steel sleeve pipe
CN102747725B (en) Bored pile construction method with tiny disturbance
CN202090349U (en) Device for removing square pile
CN107059872B (en) Inclined cable pile pulling method and inclined cable pile pulling system
CN103334433B (en) A kind of construction method of pile pulling
CN204982894U (en) High pressure is washed by water and is pulled out device of old engineering stake in underground
CN109403326A (en) Serious collapse hole occurs based on drilled pile and takes out steel reinforcement cage method
CN204899958U (en) Antiskid anchor rope
CN203756204U (en) Recyclable anchor cable lock device
CN104453966B (en) Large mining height end is adopted fully-mechanized digging machine and is removed frame passage passing sunk pillars on full frame acnemia canopy construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131106

Termination date: 20150605

EXPY Termination of patent right or utility model