CN203270577U - Underground pile removing apparatus with door plate clamp - Google Patents

Underground pile removing apparatus with door plate clamp Download PDF

Info

Publication number
CN203270577U
CN203270577U CN2013203226481U CN201320322648U CN203270577U CN 203270577 U CN203270577 U CN 203270577U CN 2013203226481 U CN2013203226481 U CN 2013203226481U CN 201320322648 U CN201320322648 U CN 201320322648U CN 203270577 U CN203270577 U CN 203270577U
Authority
CN
China
Prior art keywords
door
pile
sleeve
door plate
plate clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013203226481U
Other languages
Chinese (zh)
Inventor
杨富
朱川鄂
邓能伟
赵海军
鲍俊捷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN2013203226481U priority Critical patent/CN203270577U/en
Application granted granted Critical
Publication of CN203270577U publication Critical patent/CN203270577U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses an underground pile removing apparatus with a door plate clamp. The underground pile removing apparatus with the door plate clamp comprise a sleeve. The underground pile removing apparatus with the door plate clamp is characterized in that the bottom of the sleeve is evenly distributed with multiple bottom doors along a side wall circumference; each bottom door is hinged with a door plate clamp; and the door plate clamp can turn over toward the sleeve and is at a horizontal supporting state. The bottom door is arranged on the sleeve bottom; when a broken pile is present or steel reinforcement cage is in shortage, the door plate clamp can be installed on the bottom door; after the installation of the door plate clamp, the casing pipe top is clamped by vibratory hammer; davit of crane sinks slowly to a middle and close to the lower part of the pile or a pile bottom; the door plate clamp stretches out to a horizontal supporting state on the pile bottom, so that pile bottom is held; air and water charging operation is performed for two or three minutes; stress is slowly applied to the crane until the pile is loosened; and then after the pulling force is reduced, the whole pile casing is lifted up, so that the whole pile is removed.

Description

Be provided with the underground pile foundation plucking device of door-plate folder
Technical field
The utility model relates to field of civil engineering, specifically a kind of plucking device for removing the obstructions such as the residual castinplace pile of underground soil layer, preformed pile, pile for prestressed pipe, underground residual old steel concrete, piece stone.
Background technology
In subway construction; shield machine advances operation often can run into the various engineering piles that old building carries over; stop the propelling of shield structure; must pull out it; in the engineering pile of leaving over, some engineering pile does not stay any engineering design, construction information owing to building the age early; the data such as the layout of the front engineering pile foundation of pile pulling construction, quantity, degree of depth length of reinforcing cage etc. all have no data available, and have so just increased the difficulty of processing stake.Existing job practices commonly used is to adopt full-sleeve double fluid high-pressure jet, jetting vibration, immersed tube clear hole method pile pulling to solve above problem, but can run into no-reinforcing-bar cage phenomenon bottom pile body fracture and pile body in actual withdrawal process, and the pile pulling device that uses in above-mentioned pile pulling method can't solve problems, causes temporal waste.
The utility model content
The utility model provides a kind of underground pile foundation plucking device for fear of the weak point that prior art exists, and this device can effectively be pulled out broken pile, residual pile body.
The utility model technical solution problem adopts following technical scheme:
A kind of underground pile foundation plucking device that is provided with the door-plate folder, comprise sleeve, its design feature is, the bottom of described sleeve circumferentially is evenly distributed with a plurality of bottom doors along sidewall, is hinged with on described bottom door and to be in the door-plate folder of horizontal support state to upset in sleeve.
The utility model design feature also is:
The sleeve lateral wall that is positioned at bottom door left and right side is provided with the rotating shaft engaging lug, and described door-plate folder is movably connected on engaging lug by rotating shaft.
Described rotating shaft and engaging lug, door-plate folder removably connect.
Described bottom door is three.
The length of described door-plate folder be sleeve diameter 1/3 to 1/2 between.
Compared with the prior art, the utility model beneficial effect is embodied in:
The utility model arranges bottom door bottom sleeve, when running into broken pile or no-reinforcing-bar cage, the door-plate folder is installed on bottom door, after installing the door-plate folder, the recycling vibrating hammer is clamped the sleeve pipe top, crane hangs slowly vibration-sunk to remaining position, pile body lower middle or pile body bottom, and door-plate is clipped in the open and flat one-tenth horizontal support state in pile body bottom, thereby carries the stake bottom; Then begin not stop the inflation bath after 2,3 minutes, slowly make loop wheel machine afterburning, until pile body is loosening, pulling force is directly mentioned whole casing after descending, and just whole pile body can be pulled out.
Description of drawings
Fig. 1 is the utility model sleeve inner structural representation.
Fig. 2 is the utility model sleeve and door-plate holder mounting structure schematic diagram.
Fig. 3 is the utility model sleeve bottom door part-structure schematic diagram.
Fig. 4 is the utility model door-plate clamping structure schematic diagram.
Number in the figure: 1 sleeve, 2 door-plate folders, 3 engaging lugs, 4 bottom doors, 5 rotating shafts.
The specific embodiment
Technical solutions of the utility model are done further by the specific embodiment below in conjunction with accompanying drawing and explained.
As shown in the figure, the pile foundation plucking device, comprise sleeve 1, sleeve 1 evenly is provided with a plurality of through holes vertically, the mixing spraying mechanism of inject high pressure gas, water under high pressure in the outer wall of sleeve is provided with from sleeve bottom to sleeve, injection equipment comprises sparge pipe, air jet pipe and nozzle (more than be existing structure, do not provide corresponding structure in figure); Bottom at sleeve circumferentially is evenly distributed with a plurality of bottom doors 4 along sidewall, is hinged with on bottom door also to be in to upset in sleeve the door-plate folder 2 of horizontal support state.
During concrete enforcement, bottom door 4 is more than three or three, and the sleeve lateral wall that is positioned at bottom door left and right side is provided with engaging lug 3, and the door-plate folder is movably connected on engaging lug 3 by rotating shaft 5; Rotating shaft 5 removably connects with engaging lug 3, door-plate folder 2.The length of door-plate folder 2 be sleeve diameter 1/3 to 1/2 between.
The pile pulling device construction method step:
(1) make steel sleeve according to long 1 metric system of adding of stake in advance, after machining sleeve pipe, connect the high-pressure water pipe tracheae to the sleeve pipe top, vibrating hammer is clamped the sleeve pipe top, and the 150t crawler crane lifts by crane sleeve pipe is slowly erect.
(2) vibrating hammer is opened by locating sleeve centrally aligned pile center, and sleeve pipe is shaken in the soil body, opens simultaneously the high-pressure water gas device in the process of shaking, and auxiliary sleeve pipe sinks, until sleeve opening is flat with the stake top.Repeated multiple times lifting sinks pile body and the soil body are broken away from fully.
(3) remove vibrating hammer, at pile crown downward 1.5 meters, wire rope is installed, loop wheel machine lifting bowden cable, the lasso trick pile body of tying tight, under the effect of high-pressure water gas, because pile body separates with the soil body, loop wheel machine only need overcome the pile body own wt can hang out sleeve pipe with pile body.
(4) when running into broken pile or no-reinforcing-bar cage pile foundation, for the pile body that remains in sleeve pipe, again sleeve pipe is mentioned, at sleeve pipe bottom installation door-plate folder, utilize vibrating hammer to clamp the sleeve pipe top, crane hangs slowly vibration-sunk to remaining position, pile body lower middle or pile body bottom, and door-plate is clipped in the pile body bottom and rotates open and flat one-tenth horizontal support state by vertical state, thereby carries the stake bottom; Then begin not stop the inflation bath after 2,3 minutes, slowly make loop wheel machine afterburning, until pile body is loosening, pulling force is directly mentioned whole casing after descending, and just whole pile body can be extracted.When getting, must utilize crane sleeve being carried to be put in ground local stably, first the door-plate pin be dismantled, after taking away three door-plates, slowly mention sleeve and possible rotation crane, broken pile is fallen down stably, accomplish safety, effectively construction.

Claims (5)

1. be provided with the underground pile foundation plucking device of door-plate folder, comprise sleeve, it is characterized in that, the bottom of described sleeve circumferentially is evenly distributed with a plurality of bottom doors along sidewall, is hinged with on described bottom door also to be in to upset in sleeve the door-plate folder of horizontal support state.
2. the underground pile foundation plucking device that is provided with door-plate folder according to claim 1, is characterized in that, the sleeve lateral wall that is positioned at bottom door left and right side is provided with the rotating shaft engaging lug, and described door-plate folder is movably connected on engaging lug by rotating shaft.
3. the underground pile foundation plucking device that is provided with the door-plate folder according to claim 1 and 2, is characterized in that, described rotating shaft and engaging lug, door-plate folder removably connect.
4. the according to claim 1 or 3 described underground pile foundation plucking devices that are provided with the door-plate folder, is characterized in that, described bottom door is three.
5. the according to claim 1 or 4 described underground pile foundation plucking devices that are provided with door-plate folder, is characterized in that, the length of described door-plate folder be sleeve diameter 1/3 to 1/2 between.
CN2013203226481U 2013-06-05 2013-06-05 Underground pile removing apparatus with door plate clamp Expired - Fee Related CN203270577U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203226481U CN203270577U (en) 2013-06-05 2013-06-05 Underground pile removing apparatus with door plate clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203226481U CN203270577U (en) 2013-06-05 2013-06-05 Underground pile removing apparatus with door plate clamp

Publications (1)

Publication Number Publication Date
CN203270577U true CN203270577U (en) 2013-11-06

Family

ID=49501018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203226481U Expired - Fee Related CN203270577U (en) 2013-06-05 2013-06-05 Underground pile removing apparatus with door plate clamp

Country Status (1)

Country Link
CN (1) CN203270577U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790397A (en) * 2015-05-05 2015-07-22 张继红 Sleeve method damaged pile treatment and construction method and construction device using same
CN105625429A (en) * 2016-03-11 2016-06-01 上海建工二建集团有限公司 Pile pulling device and application method thereof
CN107268626A (en) * 2017-05-25 2017-10-20 上海建工四建集团有限公司 High-pressure jet, jetting type vibration sinking tube are removed obstacles method
CN108425361A (en) * 2018-05-09 2018-08-21 上海建工四建集团有限公司 Pile pulling device and its application process
CN108797592A (en) * 2018-06-28 2018-11-13 中交上海航道局有限公司 A kind of Two bors d's oeuveres channel steel applied to building structure pile foundation assists pile pulling device
CN108842773A (en) * 2018-06-28 2018-11-20 中交上海航道局有限公司 A kind of single sleeve auxiliary pile pulling device applied to building structure pile foundation
CN109024660A (en) * 2018-07-17 2018-12-18 中国能源建设集团广东省电力设计研究院有限公司 Pile foundation method for dismounting and offshore foundation method for dismounting
CN112832241A (en) * 2021-01-05 2021-05-25 北京建工土木工程有限公司 Small-diameter rapid pile pulling device for civil engineering and application method thereof

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790397A (en) * 2015-05-05 2015-07-22 张继红 Sleeve method damaged pile treatment and construction method and construction device using same
CN105625429A (en) * 2016-03-11 2016-06-01 上海建工二建集团有限公司 Pile pulling device and application method thereof
CN107268626A (en) * 2017-05-25 2017-10-20 上海建工四建集团有限公司 High-pressure jet, jetting type vibration sinking tube are removed obstacles method
CN108425361A (en) * 2018-05-09 2018-08-21 上海建工四建集团有限公司 Pile pulling device and its application process
CN108425361B (en) * 2018-05-09 2023-09-22 上海建工四建集团有限公司 Pile pulling device and application method thereof
CN108797592A (en) * 2018-06-28 2018-11-13 中交上海航道局有限公司 A kind of Two bors d's oeuveres channel steel applied to building structure pile foundation assists pile pulling device
CN108842773A (en) * 2018-06-28 2018-11-20 中交上海航道局有限公司 A kind of single sleeve auxiliary pile pulling device applied to building structure pile foundation
CN109024660A (en) * 2018-07-17 2018-12-18 中国能源建设集团广东省电力设计研究院有限公司 Pile foundation method for dismounting and offshore foundation method for dismounting
CN112832241A (en) * 2021-01-05 2021-05-25 北京建工土木工程有限公司 Small-diameter rapid pile pulling device for civil engineering and application method thereof
CN112832241B (en) * 2021-01-05 2022-04-15 北京建工土木工程有限公司 Small-diameter rapid pile pulling device for civil engineering and application method thereof

Similar Documents

Publication Publication Date Title
CN203270577U (en) Underground pile removing apparatus with door plate clamp
CN104763328A (en) Hydraulic reaming circulation drilling machine and reaming pile construction technology thereof
CN1963044A (en) Construction method for withdrawal of waste pile
CN204000830U (en) Merogenesis take-over type sand drain machine
CN102352628A (en) Filling pile concrete guide pipe assembling and disassembling device and construction method thereof
CN202323950U (en) Rotary casing connecting structure of rotary pile extractor
CN106930274B (en) A kind of a full set of cylinder rotatory boring castinplace pile construction method that reinforcing bar cage location is fixed
CN103422499B (en) Casing construction method inside and outside a kind of permafrost region pile foundation
CN206173957U (en) Pore -forming is with protecting a section of thick bamboo
CN202090349U (en) Device for removing square pile
CN208105272U (en) One kind preventing superfilled device
JP4366597B2 (en) Cutting and removing existing piles
CN106677176B (en) A kind of steel pile casting device convenient for recycling
CN204982894U (en) High pressure is washed by water and is pulled out device of old engineering stake in underground
CN202730756U (en) Sleeve connection device for drilling cast-in-situ bored pipe construction
CN204551494U (en) Construction equipment is transferred in a kind of steel sheet-pile cofferdam inner support superposition
CN209482299U (en) The bolt-type hangs muscle component that can be reused
CN201495548U (en) Manual hole digging filling pile protective wall concrete material receiving platform
CN210887212U (en) Combined device for breaking pile head of bored pile foundation
CN110004925B (en) Broken bored pile processing device and construction method
CN102296610B (en) Device for removing square pile and construction method thereof
CN202706038U (en) Guide pipe reinsertion protector for underwater concreting of pile foundation
CN103205963A (en) Construction method of partly recyclable steel sleeve cast-in-situ bored pile
CN201962677U (en) Pile pulling device
CN206186053U (en) Arch prefabricated mould

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131106

Termination date: 20150605

EXPY Termination of patent right or utility model