CN210887212U - Combined device for breaking pile head of bored pile foundation - Google Patents

Combined device for breaking pile head of bored pile foundation Download PDF

Info

Publication number
CN210887212U
CN210887212U CN201921599436.1U CN201921599436U CN210887212U CN 210887212 U CN210887212 U CN 210887212U CN 201921599436 U CN201921599436 U CN 201921599436U CN 210887212 U CN210887212 U CN 210887212U
Authority
CN
China
Prior art keywords
pile
bored
pile foundation
foundation
head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921599436.1U
Other languages
Chinese (zh)
Inventor
祖海兵
隗合新
顾佳亮
王柏石
樊云鹏
杨志明
骆茜伊
刘碧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Installation Engineering Co Ltd
Original Assignee
China Construction Sixth Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Installation Engineering Co Ltd filed Critical China Construction Sixth Installation Engineering Co Ltd
Priority to CN201921599436.1U priority Critical patent/CN210887212U/en
Application granted granted Critical
Publication of CN210887212U publication Critical patent/CN210887212U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a drilled pile foundation breaks off integrated equipment for pile head, including a plurality of vertical sleeves, its characterized in that, the sleeve pipe box is on drilled pile head's pile foundation reinforcing bar, leaves the clearance that is used for breaking away from between sleeve pipe and the pile foundation reinforcing bar, and the sheathed tube lower extreme gos deep into 10cm below the pile bolck design elevation, and the drilled pile overcoat is equipped with the fixed bolster, is fixed with a plurality of rings and rock drill on the fixed bolster, and the aircraft nose circumference equipartition of rock drill is around drilled pile, and is located drilled pile bolck design elevation department. The utility model discloses can not disturb the original pile foundation reinforcing bar of pile foundation, the drilling pile head unnecessary part is rejected the back outward appearance and is clean and tidy, saves the labour. The cost for removing the pile head of the drilled pile is low, and the mechanical construction degree is improved.

Description

Combined device for breaking pile head of bored pile foundation
Technical Field
The utility model relates to a building technical field especially relates to a drilled pile foundation breaks off combination unit for pile head.
Background
A bored pile, also called a bored pile, is a pile formed by forming a pile hole in foundation soil through mechanical drilling, steel pipe soil extrusion, or manual excavation, and placing a pile foundation reinforcement cage and cast-in-place concrete therein.
The cast-in-situ bored pile has reliable quality and strong stratum adaptability, and is widely applied to high-rise building engineering; on the other hand, the cast-in-situ bored pile of the high-rise building has the characteristics of large diameter and much excess irrigation, so that the pile head breaking of the large-diameter pile foundation is always a difficult problem. The traditional breaking method has low technical content, relies on manpower to carry out rigid breaking, wastes time, labor and money, and has great damage and disturbance to the original pile foundation reinforcing steel bars of the pile foundation
Disclosure of Invention
The utility model aims at solving the defects of the prior art and provides a combined device for breaking pile heads of a drilling pile foundation.
The utility model discloses a realize above-mentioned purpose, adopt following technical scheme: a combined device for breaking a pile head of a bored pile foundation comprises a plurality of vertical sleeves, and is characterized in that the sleeves are sleeved on pile foundation reinforcing steel bars of the bored pile head, a gap for separation is reserved between the sleeves and the pile foundation reinforcing steel bars, the lower ends of the sleeves extend into the pile top below a designed elevation by 10cm, a fixed support is sleeved outside the bored pile, a plurality of hanging rings and rock drills are fixed on the fixed support, the circumferences of machine heads of the rock drills are uniformly distributed around the bored pile and located at the designed elevation of the pile top of the bored pile;
the lifting sling comprises a lifting sling ring and a plurality of hooks matched with the lifting ring, and the hooks are fixed on the lifting sling ring.
The sleeve is a PVC pipe.
The 5cm position in sleeve pipe lower part is with the clearance of foaming glue shutoff between sleeve pipe and the pile foundation reinforcing bar to make the sealed not hourglass thick liquid of sleeve pipe lower extreme, sleeve pipe upper portion is equipped with the lid, and the lid passes through the glue that coats with glue and fixes on the sleeve pipe.
The hook is fixed on the sling ring through the hanging chain.
The foaming glue is polyurethane foaming glue.
The utility model has the advantages that: the utility model discloses can not disturb the original pile foundation reinforcing bar of pile foundation, the drilling pile head unnecessary part is rejected the back outward appearance and is clean and tidy, saves the labour. The cost for removing the pile head of the drilled pile is low, and the mechanical construction degree is improved.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the construction of the sling;
in the figure: 1-a sleeve; 2-drilling a pile; 3-pile foundation steel bars; 4-fixing the bracket; 5-hoisting rings; 6-a rock drill; 7-lifting slings; 8-suspension grommet; 9-hanging hooks;
the following detailed description will be made in conjunction with embodiments of the present invention with reference to the accompanying drawings.
Detailed Description
The invention will be further explained with reference to the following figures and examples:
as shown in fig. 1 to 2, a combined device for breaking and removing pile heads of a bored pile foundation comprises a plurality of vertical sleeves 1, and is characterized in that the sleeves 1 are sleeved on pile foundation steel bars 3 of pile heads of bored piles 2, a gap for separation is reserved between the sleeves 1 and the pile foundation steel bars 3, the lower ends of the sleeves 1 extend into the pile tops to be 10cm below the designed elevation, a fixed support 4 is sleeved outside the bored piles 2, a plurality of lifting rings 5 and rock drills 6 are fixed on the fixed support 4, the circumferences of machine heads of the rock drills 6 are uniformly distributed around the bored piles 2 and are positioned at the designed elevation of the pile tops of the bored piles 2;
the lifting sling 7 comprises a lifting sling ring 8 and a plurality of hooks 9 matched with the lifting rings 5, and the hooks 9 are fixed on the lifting sling ring 8.
The sleeve 1 is a PVC pipe.
The 5cm position in sleeve pipe 1 lower part is with the clearance between foaming glue shutoff sleeve pipe 1 and the pile foundation reinforcing bar 3 to make 1 lower extreme of sleeve pipe sealed not leak thick liquid, sleeve pipe 1 upper portion is equipped with the lid, and the lid is fixed on sleeve pipe 1 through the glue-spreading water.
The hook 9 is fixed on the sling ring 8 through a hanging chain.
The foaming glue is polyurethane foaming glue.
The utility model discloses during operation, before bored pile 2 perfusion concrete, break the position at bored pile 2 pile foundation's pile foundation reinforcing bar 3 upper portion and install sleeve pipe 1, sleeve pipe 1 is PVC tubular product, and the diameter accords with pile foundation reinforcing bar 3 and sound survey pipe diameter requirement; the PVC pipe penetrates into the pile top of the drilled pile 2 to be 10cm below the designed elevation, the PVC pipe is tightly sealed at the position 5cm below the PVC pipe after being installed by using foaming glue without leaking slurry, and the upper end of the PVC pipe is sealed by using a cover with glue at the upper part; measuring the elevation by a measurer after pile forming, drawing a marking line along the circumference of the pile body of the bored pile 2, slotting and removing along the marking line by using a hand-held concrete cutting machine to expose the PVC pipe, and manually breaking the PVC pipe; the truck crane head is fixed with a sling 7, a hook 9 of the sling 7 is used for hanging a sling 5, so that a rock drill 6 is positioned around the pile body of the drilled pile 2, the rock drill 6 punches holes at the periphery of the pile body of the drilled pile 2 along a slotting position, the pile head of the drilled pile 2 is broken by an expansion plug, the rock drill 6 is moved up by the truck crane, four holes are punched on the pile head of the drilled pile 2, reinforcing steel bars for fixing are inserted into the four holes, the rock drill 6 is placed on the ground, the hook 9 of the sling 7 is used for hanging the reinforcing steel bars for fixing, and the pile head is moved away from the drilled pile 2 by the truck crane. The utility model discloses can not disturb original pile foundation reinforcing bar 3 of pile foundation, the 2 pile heads of bored pile are unnecessary the part and are rejected the back outward appearance clean and tidy, save the labour. The pile head breaking cost of the drilled pile 2 is low, and the mechanical construction degree is improved.
The present invention has been described above with reference to the accompanying drawings, and it is obvious that the present invention is not limited by the above embodiments, and various improvements made by the method concept and technical solution of the present invention or directly applied to other occasions without improvement are all within the protection scope of the present invention.

Claims (5)

1. A combined device for breaking and removing pile heads of a bored pile foundation comprises a plurality of vertical sleeves (1) and is characterized in that the sleeves (1) are sleeved on pile foundation reinforcing steel bars (3) of the pile heads of bored piles (2), a gap for separation is reserved between the sleeves (1) and the pile foundation reinforcing steel bars (3), the lower ends of the sleeves (1) extend into the pile tops to be 10cm below the designed elevation, fixing supports (4) are sleeved outside the bored piles (2), a plurality of lifting rings (5) and rock drills (6) are fixed on the fixing supports (4), the circumferences of machine heads of the rock drills (6) are uniformly distributed around the bored piles (2) and are positioned at the designed elevation of the pile tops of the bored piles (2);
the lifting sling (7) comprises a lifting sling ring (8) and a plurality of hooks (9) matched with the lifting rings (5), and the hooks (9) are fixed on the lifting sling ring (8).
2. The combination unit for foundation breaking pile head of bored pile according to claim 1, characterized in that the casing (1) is PVC pipe.
3. The combination unit for removing the pile head of the bored pile foundation according to claim 1, wherein the gap between the sleeve (1) and the pile foundation reinforcing steel bar (3) is sealed by the foaming glue at the position of 5cm lower part of the sleeve (1) so that the lower end of the sleeve (1) is sealed without leaking the grout, the upper part of the sleeve (1) is provided with a cover, and the cover is fixed on the sleeve (1) by the glue.
4. The combination unit for foundation removal of bored piles according to claim 1, wherein the hook (9) is fixed to the suspension cable loop (8) by a chain.
5. The combination unit for a bored pile foundation demolition pile head according to claim 3, wherein the foam rubber is polyurethane foam rubber.
CN201921599436.1U 2019-09-25 2019-09-25 Combined device for breaking pile head of bored pile foundation Expired - Fee Related CN210887212U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921599436.1U CN210887212U (en) 2019-09-25 2019-09-25 Combined device for breaking pile head of bored pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921599436.1U CN210887212U (en) 2019-09-25 2019-09-25 Combined device for breaking pile head of bored pile foundation

Publications (1)

Publication Number Publication Date
CN210887212U true CN210887212U (en) 2020-06-30

Family

ID=71330244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921599436.1U Expired - Fee Related CN210887212U (en) 2019-09-25 2019-09-25 Combined device for breaking pile head of bored pile foundation

Country Status (1)

Country Link
CN (1) CN210887212U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114086555A (en) * 2021-11-25 2022-02-25 中铁三局集团有限公司 Combined device for breaking pile head of bored pile foundation and pile head breaking construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114086555A (en) * 2021-11-25 2022-02-25 中铁三局集团有限公司 Combined device for breaking pile head of bored pile foundation and pile head breaking construction method

Similar Documents

Publication Publication Date Title
CN105297729B (en) Bridge pile foundation pile head breaking device and method
CN207714309U (en) Borehole filling pile cage of reinforcement
CN102587380A (en) Construction method for wholly removing drilling pile head
JP2003193785A (en) Boring device and method
JP5632981B1 (en) Method for extracting buried pile buried in the ground, and drilling casing structure used therefor
CN210887212U (en) Combined device for breaking pile head of bored pile foundation
CN109629563B (en) Pile foundation enclosure construction method
CN114086555A (en) Combined device for breaking pile head of bored pile foundation and pile head breaking construction method
CN106703034A (en) Construction device and construction method for pulling out piles through cooperation of rotating drilling machine and sleeve drill bit
CN114232628A (en) Cutting hoop for integrally breaking pile head of cast-in-situ bored pile and construction method
CN105507324A (en) Detachable hanging reinforcement and construction method thereof
CN107237322B (en) A kind of method that long auger rear inserting cage bored concrete pile is efficiently inserted into vibrating tube
CN208105272U (en) One kind preventing superfilled device
CN209368877U (en) Contrary sequence method steel pipe column and the movable attachment device of steel reinforcement cage
CN110820728A (en) Cast-in-situ bored pile construction method for penetrating underground deep-buried waste pipeline
CN108360524A (en) One kind preventing superfilled device and its application method
CN215563862U (en) Reinforcing cage structure of karst cavity district drilling bored concrete pile
CN113089654B (en) Construction process of hole digging pile in complex soil layer and steel casing for construction
CN211973465U (en) Portable separation disc for pile breaking head
CN114657974A (en) Method for quickly splicing cast-in-place pile under complex geological condition
CN108775036A (en) A kind of construction method for replacing bored concrete pile
CN115075249A (en) Pile foundation clearing device and pile foundation clearing process
CN210507443U (en) Pile pulling device
JP4137173B1 (en) Reinforcing bar construction in cast-in-place pile
CN217500213U (en) Water cutter full-casing device for removing old pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200630