CN207714309U - Borehole filling pile cage of reinforcement - Google Patents

Borehole filling pile cage of reinforcement Download PDF

Info

Publication number
CN207714309U
CN207714309U CN201721488142.2U CN201721488142U CN207714309U CN 207714309 U CN207714309 U CN 207714309U CN 201721488142 U CN201721488142 U CN 201721488142U CN 207714309 U CN207714309 U CN 207714309U
Authority
CN
China
Prior art keywords
reinforcement
main
muscle
tie hoop
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721488142.2U
Other languages
Chinese (zh)
Inventor
王子波
周立
钱耀辉
王小生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ARCHITECTURAL AND ENGINEERING CONSULTANTS Co Ltd
Original Assignee
SHANGHAI ARCHITECTURAL AND ENGINEERING CONSULTANTS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ARCHITECTURAL AND ENGINEERING CONSULTANTS Co Ltd filed Critical SHANGHAI ARCHITECTURAL AND ENGINEERING CONSULTANTS Co Ltd
Priority to CN201721488142.2U priority Critical patent/CN207714309U/en
Application granted granted Critical
Publication of CN207714309U publication Critical patent/CN207714309U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Borehole filling pile cage of reinforcement, including vertical main-bar (2), top funnel type tie hoop (3), central tubular tie hoop (5), the vertical muscle (6) of reinforcement, hypomere tubular helical stirrup (7), main vertical muscle (8), sound detecting pipe (9), bottom frustum type tie hoop (10), interior oblique main reinforcement (11) and gasket ring (13);Innovation setting reinforcement cage structure, reasonable Arrangement reinforcing bar density, evenly dispersed load; it prevents from occurring pouring when concreting not in place; it vibrates uncompacted situation, reduces construction noise and vibrations, the diameter bigger than prefabricated pile can be built; construction quality is easily controllable; it can be used on various grounds, reducing construction quality influences the bearing capacity of pile foundation, quick pile; it saves working hour, protection construction public environment.

Description

Borehole filling pile cage of reinforcement
Technical field
The utility model is related to the improved technologies of borehole filling pile cage of reinforcement, especially borehole filling pile cage of reinforcement.
Background technology
Bored concrete pile system refer to engineering site by machine drilling, steel pipe soil compaction or manpower excavate etc. means in foundation soil Stake holes is formed, and in its interior stake placed steel reinforcement cage and concrete perfusion and made, according to forming hole method difference, bored concrete pile again may be used It is divided into several classes such as driven cast-in-place pile, cast-in-situ bored pile and digging hole filling pile.
The construction of cast-in-situ bored pile has mud off mode method and a full set of pipe construction because of the difference that retaining wall selected by it is formed Two kinds of method.Wherein, percussive drilling, drilling is grabbed in punching and abrasion drill is whittled into hole etc. and mud off construction method can be used.The construction method Process be:Smooth location → slurrying → embedded casing → laying workbench → rigging up simultaneously positions → drilling and forming hole → borehole cleaning simultaneously checks that hole quality → decentralization steel reinforcement cage → pouring underwater concrete → extraction casing → is checked on the quality.Wherein, it protects Cylinder also has isolation surface water, protection aperture ground, spud pile hole site and drill bit guiding role in addition to playing the role of this Deng.The work progress of full-sleeve construction method is:Flat field, be laid with workbench, rigging up, pressing sleeve pipe, drilling and forming hole, placement Steel reinforcement cage puts conduit, cast concrete, drawing casing, checks pile quality.
In the above engineering method, it should be noted that avoid there is a phenomenon where steel reinforcement cage installations from not being inconsistent with designed elevation, precautionary measures Including:After the completion of fabrication of reinforcing cage, pay attention to preventing its torsional deformation, steel reinforcement cage to keep vertical, concrete cover when entering hole installation Cushion block setting spacing should not be too large, and hangs muscle length accurately calculates, and crosschecks inspection when mounted.In addition, also to avoid out The floating of existing steel reinforcement cage, the precautionary measures of rising of steel cage include:Stringent control concrete quality, the slump are controlled in 20 ± 2cm, concrete Workability will be got well.After concrete enters steel reinforcement cage, concrete rises should not be too fast, and conduit buried depth in concrete should not be too large, in strict accordance with specification Control is between 2-6m, unsuitable too fast when promoting conduit, conduit hook steel reinforcement cage is prevented, by it with first-class.
Utility model content
The purpose of this utility model is to provide borehole filling pile cage of reinforcement, solves the above technical problem.
The purpose of this utility model will be realized by following technical measures:Including vertical main-bar 2, top funnel type spiral hoop Muscle 3, central tubular tie hoop 5 are reinforced indulging muscle 6, hypomere tubular helical stirrup 7, main vertical muscle 8, sound detecting pipe 9, bottom frustum type Tie hoop 10, interior oblique main reinforcement 11 and gasket ring 13;Cyclic annular 2 inside of vertical main-bar being evenly arranged is erect to weld with the gasket ring 13 of annular Fixed support constitutes top funnel steel bar frame, and top funnel is welded and fixed in this top funnel steel bar frame housing dress Type tie hoop 3, meanwhile, with vertical main-bar 2, connection reinforcement indulges muscle 6 one by one on the downside of this funnel type steel bar framework, likewise, It erects the support of gasket ring 13 that vertical 6 inside of muscle of the cyclic annular reinforcement being evenly arranged is welded and fixed second group of annular and constitutes epimere cast reinforcing bar Frame is welded and fixed central tubular tie hoop 5, similarly in the epimere cast steel in epimere cast steel bar framework housing dress Muscle framework underside, part reinforce vertical 6 lower end of muscle and connect main vertical muscle 8, and erectting, the vertical 8 inside welding of muscle of master that ring-type is evenly arranged is solid The support of gasket ring 13 for determining third group annular constitutes hypomere cast steel bar framework, is connect in the hypomere cast steel bar framework housing welding equipment solid A section tubular helical stirrup 7 is fixed, likewise, the tiltedly main reinforcement 11 in main vertical 8 lower end of muscle connects one by one, is evenly arranged erectting ring-type The inside of interior oblique main reinforcement 11 be welded and fixed the support of gasket ring 13 of the 4th group of annular and constitute bottom frustum type steel bar framework, in the bottom Frustum type steel bar framework housing welding equipment connects bottom frustum type tie hoop 10, and fixed sound test tube is erect in the inside of these gasket rings 13 9。
Especially, it erects in central tubular tie hoop 5 and 7 outside of hypomere tubular helical stirrup and is welded and fixed spacer bar Ring 4, in same level section, spacer bar ring 4 is no less than 3 and is uniformly circular layout.
Especially, it is M that vertical main-bar 2 is identical as vertical 6 quantity of muscle is reinforced, and main vertical muscle 8 is identical as interior 11 quantity of oblique main reinforcement For M/2.
Especially, vertical main-bar 2, main vertical muscle 8 identical as interior 11 height of oblique main reinforcement are h, reinforce indulging 6 height of muscle being H, H= 2h。
Especially, it is s that the screw pitch of top funnel type tie hoop 3 is identical as the screw pitch of central tubular tie hoop 5, under The screw pitch of section tubular helical stirrup 7 identical as the screw pitch of bottom frustum type tie hoop 10 is S, S=2s.
Especially, four sound detecting pipes 9 are symmetrically arranged.
The advantages of the utility model and effect:Innovation setting reinforcement cage structure, reasonable Arrangement reinforcing bar density, evenly dispersed load Lotus prevents from occurring pouring not in place, uncompacted situation of vibrating when concreting, reduces construction noise and vibrations, can build Than the diameter bigger of prefabricated pile, construction quality is easily controllable, can be used on various grounds, reduces construction quality to pile foundation Bearing capacity influences, quick pile, saves working hour, protection construction public environment.
Description of the drawings
Fig. 1 is 1 structural schematic diagram of the utility model embodiment.
Fig. 2 is A-A structural schematic diagrams in Fig. 1.
Reference numeral includes:
Cushion cap 1, top funnel type tie hoop 3, spacer bar ring 4, central tubular tie hoop 5, is reinforced vertical main-bar 2 Vertical muscle 6, hypomere tubular helical stirrup 7, main vertical muscle 8, sound detecting pipe 9, bottom frustum type tie hoop 10, interior oblique main reinforcement 11, retaining wall Pipe 12, gasket ring 13.
Specific implementation mode
The utility model principle is that steel reinforcement cage mainly plays drawing-resistant function, the compression strength height but tensile strength of concrete It is very low.Steel reinforcement cage plays the role of constraint to pile concrete, makes it to bear certain horizontal force.Water mill drilling is as deep as to setting Meter requires, and then transfers steel reinforcement cage to stake holes, is inserted into conduit and carries out concrete cast.In addition, when concrete structure is column When shape or strip component, the center portion thereof point does not need arrangement of reinforcement, only the configuration reinforcement under the face of concrete component ingress of air, The steel bar framework of the cast-in-situ bored pile of individual member is suitable for the good steel reinforcement cage of pre-production.
The utility model includes:Vertical main-bar 2, central tubular tie hoop 5, is reinforced indulging muscle top funnel type tie hoop 3 6, hypomere tubular helical stirrup 7, main vertical muscle 8, sound detecting pipe 9, bottom frustum type tie hoop 10, interior oblique main reinforcement 11 and gasket ring 13.
The utility model is described in further detail with reference to the accompanying drawings and examples.
Embodiment 1:As shown in figure 1 and 2, cyclic annular 2 inside of vertical main-bar being evenly arranged is erect to weld with the gasket ring 13 of annular It connects fixed support and constitutes top funnel steel bar frame, top leakage is welded and fixed in this top funnel steel bar frame housing dress Bucket type tie hoop 3, meanwhile, with vertical main-bar 2, connection reinforcement indulges muscle 6 one by one on the downside of this funnel type steel bar framework, likewise, Epimere cast steel is constituted erectting the support of gasket ring 13 that vertical 6 inside of muscle of the cyclic annular reinforcement being evenly arranged is welded and fixed second group of annular Muscle frame is welded and fixed central tubular tie hoop 5, similarly in the epimere cast in epimere cast steel bar framework housing dress On the downside of steel bar framework, part is reinforced indulging the main vertical muscle 8 of 6 lower end of muscle connection, and 8 inside welding of muscle is indulged erectting the cyclic annular master being evenly arranged The support of gasket ring 13 of fixed third group annular constitutes hypomere cast steel bar framework, is connect in the hypomere cast steel bar framework housing welding equipment Fixed hypomere tubular helical stirrup 7, likewise, the tiltedly main reinforcement 11 in main vertical 8 lower end of muscle connects one by one, is erectting cyclic annular uniform cloth The support of gasket ring 13 that 11 inside of interior oblique main reinforcement set is welded and fixed the 4th group of annular constitutes bottom frustum type steel bar framework, at the bottom Portion's frustum type steel bar framework housing welding equipment connects bottom frustum type tie hoop 10, erects fixed sound in the inside of these gasket rings 13 and surveys Pipe 9.
In aforementioned, erect in central tubular tie hoop 5 and 7 outside of hypomere tubular helical stirrup and be welded and fixed spacer bar Ring 4, in same level section, spacer bar ring 4 is no less than 3 and is uniformly circular layout.
In aforementioned, it is M that vertical main-bar 2 is identical as vertical 6 quantity of muscle is reinforced, and main vertical muscle 8 is identical as interior 11 quantity of oblique main reinforcement For M/2.
In aforementioned, vertical main-bar 2, main vertical muscle 8 identical as interior 11 height of oblique main reinforcement are h, reinforce indulging 6 height of muscle being H, H= 2h。
In aforementioned, the screw pitch of top funnel type tie hoop 3 identical as the screw pitch of central tubular tie hoop 5 is s, under The screw pitch of section tubular helical stirrup 7 identical as the screw pitch of bottom frustum type tie hoop 10 is S, S=2s.
In aforementioned, four sound detecting pipes 9 are circumferential symmetrically to be arranged.
In the utility model embodiment, the net protective layer of main reinforcement is not less than 70mm.N4 is to reinforce stirrup, is bound in main reinforcement Side, one of every 2m settings from stake top.
In the utility model embodiment, sound detecting pipe is sonic detecting tube, and a pile can be detected using sound detecting pipe Quality, sound detecting pipe are that probe enters the channel inside pile body when bored concrete pile carries out supersonic testing method.The choosing of sound detecting pipe material It selects, it is larger with entrant sound rate, be easily installed and expense is relatively low for principle.Ping is sent out from transmitting transducer, is arrived by coupling water Up to the interface of water and sound detecting pipe tube wall, then by the interface of tube wall arrival sounding tube wall and concrete, after concrete again It needs guiding through two interfaces of another sound detecting pipe and reaches reception energy converter.
In the utility model embodiment, wall protection pipe 12 is installed in underground after drilling construction is perfused, and reinforcing bar cage hoisting is put Enter in wall protection pipe, carrying out cushion cap 1 above pile foundation after carrying out concreting molding to bored concrete pile constructs.
In the utility model embodiment, makes and Installation Considerations include:
(1) when fabrication of reinforcing cage, as main reinforcement, vertical main-bar 2 is reinforced indulging muscle 6, and main indulge is made between muscle 8 and interior oblique main reinforcement 11 Connector for the corresponding main reinforcement connection of pile body longitudinal stress should be arranged in pile body stress smaller part;Joint location preferably mutually staggers, And splice must not exceed the 50% of number of steel bars within the scope of the same terminal connection section of 35d;Main reinforcement and top funnel Between type tie hoop 3, central tubular tie hoop 5, hypomere tubular helical stirrup 7 and bottom frustum type tie hoop 10 into Row spot welding connects.
(2) steel reinforcement cage answers integral hoisting, and when lifting must not clashing and breaking wall protection pipe 12 and hole wall.By being set in 2 upper end of vertical main-bar Suspension centre is set, before steel reinforcement cage is hung, it is necessary to remove slot bottom sediment, 12 bottoms of wall protection pipe, that is, bottom hole sediment thickness≤200mm.Steel reinforcement cage When hanging onto design position, its horizontal position should be detected and whether elevation reaches design requirement, should be fixed immediately after detection is qualified Steel reinforcement cage, steel reinforcement cage enter time that Kong Houzhi casting concretes finish and are no more than 4 hours.
(3) steel reinforcement cage should take effective measures in making, transport, hoisting process prevents steel reinforcement cage from deforming.
(4) having on steel reinforcement cage should use polyethylene foam sheet to cover built-in fitting at embedded bar, be dug when in order to need Go out built-in fitting.

Claims (6)

1. borehole filling pile cage of reinforcement, including vertical main-bar (2), top funnel type tie hoop (3), central tubular tie hoop (5), reinforce indulging muscle (6), hypomere tubular helical stirrup (7), main vertical muscle (8), sound detecting pipe (9), bottom frustum type tie hoop (10), interior oblique main reinforcement (11) and gasket ring (13);It is characterized in that, erectting on the inside of the cyclic annular vertical main-bar (2) being evenly arranged with annular Gasket ring (13) be welded and fixed support constitute top funnel steel bar frame, in this top funnel steel bar frame housing welding equipment Fixed top funnel type tie hoop (3) is connect, meanwhile, it is connected one by one with vertical main-bar (2) on the downside of this funnel type steel bar framework Reinforce indulging muscle (6), likewise, erectting the pad for being welded and fixed second group of annular on the inside of the vertical muscle (6) of the cyclic annular reinforcement being evenly arranged Ring (13) support constitutes epimere cast steel bar framework, and central tubular spiral is welded and fixed in epimere cast steel bar framework housing dress Stirrup (5), similarly on the downside of the epimere cast steel bar framework, part is reinforced indulging the main vertical muscle (8) of muscle (6) lower end connection, perpendicular The master that vertical ring-type is evenly arranged indulges gasket ring (13) the support composition hypomere cast reinforcing bar that third group annular is welded and fixed on the inside of muscle (8) Frame is welded and fixed hypomere tubular helical stirrup (7) in hypomere cast steel bar framework housing dress, likewise, in main vertical muscle (8) Lower end connects interior tiltedly main reinforcement (11) one by one, and the 4th group of ring is welded and fixed erectting oblique main reinforcement (11) inside in cyclic annular be evenly arranged Gasket ring (13) support of shape constitutes bottom frustum type steel bar framework, and in the bottom, frustum type steel bar framework housing welding equipment connects bottom cone Bench-type tie hoop (10) erects fixed sound test tube (9) in the inside of these gasket rings (13).
2. borehole filling pile cage of reinforcement as described in claim 1, which is characterized in that central tubular tie hoop (5) and under It is erect on the outside of section tubular helical stirrup (7) and is welded and fixed spacer bar ring (4), in same level section, spacer bar ring (4) It no less than 3 and is uniformly circular layout.
3. borehole filling pile cage of reinforcement as described in claim 1, which is characterized in that vertical main-bar (2) indulges muscle (6) quantity with reinforcement Identical is M, and main vertical muscle (8) identical as interior oblique main reinforcement (11) quantity is M/2.
4. borehole filling pile cage of reinforcement as described in claim 1, which is characterized in that vertical main-bar (2), main vertical muscle (8) with it is interior tiltedly Identical main reinforcement (11) height is h, reinforces indulging muscle (6) highly being H, H=2h.
5. borehole filling pile cage of reinforcement as described in claim 1, which is characterized in that the spiral shell of top funnel type tie hoop (3) Away from it is identical as the screw pitch of central tubular tie hoop (5) be s, screw pitch and the bottom frustum type of hypomere tubular helical stirrup (7) The identical screw pitch of tie hoop (10) is S, S=2s.
6. borehole filling pile cage of reinforcement as described in claim 1, which is characterized in that four sound detecting pipes (9) are circumferential symmetrically Arrangement.
CN201721488142.2U 2017-11-09 2017-11-09 Borehole filling pile cage of reinforcement Expired - Fee Related CN207714309U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721488142.2U CN207714309U (en) 2017-11-09 2017-11-09 Borehole filling pile cage of reinforcement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721488142.2U CN207714309U (en) 2017-11-09 2017-11-09 Borehole filling pile cage of reinforcement

Publications (1)

Publication Number Publication Date
CN207714309U true CN207714309U (en) 2018-08-10

Family

ID=63061077

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721488142.2U Expired - Fee Related CN207714309U (en) 2017-11-09 2017-11-09 Borehole filling pile cage of reinforcement

Country Status (1)

Country Link
CN (1) CN207714309U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110042829A (en) * 2019-05-30 2019-07-23 中铁十一局集团第三工程有限公司 A kind of pile foundation steel bar cage device
CN110144885A (en) * 2019-04-09 2019-08-20 中铁大桥局集团有限公司 A kind of three-stage large diameter bored pile structure
CN111622216A (en) * 2020-06-05 2020-09-04 成都建工集团有限公司 Construction method of pile foundation joist weighing type retaining wall
CN112324149A (en) * 2020-09-16 2021-02-05 国网山东省电力公司建设公司 Constructional column stirrup fixing and self-locking device
CN113914319A (en) * 2021-11-26 2022-01-11 中国二十冶集团有限公司 Connecting method of grouting pipes
WO2023010631A1 (en) * 2021-08-06 2023-02-09 中铁大桥勘测设计院集团有限公司 Deepwater group pile foundation

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110144885A (en) * 2019-04-09 2019-08-20 中铁大桥局集团有限公司 A kind of three-stage large diameter bored pile structure
CN110042829A (en) * 2019-05-30 2019-07-23 中铁十一局集团第三工程有限公司 A kind of pile foundation steel bar cage device
CN111622216A (en) * 2020-06-05 2020-09-04 成都建工集团有限公司 Construction method of pile foundation joist weighing type retaining wall
CN112324149A (en) * 2020-09-16 2021-02-05 国网山东省电力公司建设公司 Constructional column stirrup fixing and self-locking device
WO2023010631A1 (en) * 2021-08-06 2023-02-09 中铁大桥勘测设计院集团有限公司 Deepwater group pile foundation
CN113914319A (en) * 2021-11-26 2022-01-11 中国二十冶集团有限公司 Connecting method of grouting pipes

Similar Documents

Publication Publication Date Title
CN207714309U (en) Borehole filling pile cage of reinforcement
CN110528511A (en) A kind of the impact drilling pile construction method
CN102535529A (en) Construction method of self-balancing method pile foundation bearing capacity test device
JP2007126846A (en) Reinforcing cage, construction method for cast-in-place concrete pile, and cast-in-place concrete pile
CN106245628B (en) A kind of method for filling of the underwater large diameter drill hole pile of corrosion geology
CN110629747A (en) Full-casing full-rotation construction process for pile foundation under complex geological conditions
CN108842758A (en) Rotary digging drilling hole bored concrete pile construction method
KR101751418B1 (en) Grouting device using a reinforced network is equipped with a small steel pipe
CN108457275A (en) Cast-in-place pile concrete tamping equipment and its construction method
CN109763507B (en) Double-wall corrugated pipe foundation and construction process thereof
CN106480876A (en) A kind of inclined hole steel pipe piles set into rock construction
CN107675700A (en) The construction method of diaphram wall
CN209722952U (en) Pile foundation provisions for grouting
CN108360524A (en) One kind preventing superfilled device and its application method
CN211113669U (en) Prestressed reinforced concrete breast wall pile
CN211080280U (en) Large-diameter pile foundation enclosure miniature pile group
CN207160016U (en) Underwater grouting pile leader vibrator
CN208309549U (en) It is waterborne to fill sand steel tube pile embeded in rock workbench
CN210151718U (en) Reinforced concrete base
CN212335996U (en) Resistance to compression resistance to plucking variable diameter steel reinforcement cage club-footed pile
CN205954609U (en) High frequency compaction grooving bridge type ground is wall construction professional equipment even
CN110144882A (en) A kind of method for preventing bored concrete pile from floating cage and reinforced concrete footing used
CN112160316B (en) Construction method of immersed tube cast-in-place pile
CN216108512U (en) Synchronous hoisting structure for multiple lengthened sounding pipes of foundation pit reverse construction method cast-in-place pile
CN213233468U (en) Concrete pouring equipment for constructing dry-method hole-forming cast-in-place pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180810

CF01 Termination of patent right due to non-payment of annual fee