CN108797592A - A kind of Two bors d's oeuveres channel steel applied to building structure pile foundation assists pile pulling device - Google Patents

A kind of Two bors d's oeuveres channel steel applied to building structure pile foundation assists pile pulling device Download PDF

Info

Publication number
CN108797592A
CN108797592A CN201810691370.2A CN201810691370A CN108797592A CN 108797592 A CN108797592 A CN 108797592A CN 201810691370 A CN201810691370 A CN 201810691370A CN 108797592 A CN108797592 A CN 108797592A
Authority
CN
China
Prior art keywords
channel steel
bors
pile
oeuveres
building structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810691370.2A
Other languages
Chinese (zh)
Inventor
杨生朋
侯得桃
胡金华
庞敬官
陈靖
何众
冯庆
李少俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Shanghai Dredging Co Ltd.
Original Assignee
CCCC Shanghai Dredging Co Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Shanghai Dredging Co Ltd. filed Critical CCCC Shanghai Dredging Co Ltd.
Priority to CN201810691370.2A priority Critical patent/CN108797592A/en
Publication of CN108797592A publication Critical patent/CN108797592A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/02Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention proposes that a kind of Two bors d's oeuveres channel steel applied to building structure pile foundation assists pile pulling device, including:A whole set of vibration hammer equipment and hydraulically operated fixture, and the Two bors d's oeuveres channel steel for assisting pile pulling;The Two bors d's oeuveres channel steel inside and outside wall is fixedly installed protrusion, and the edge of a wing of the single channel steel is arranged at intervals with bolt hole, and the Two bors d's oeuveres channel steel is attached by bolt.The present invention has developed a kind of Two bors d's oeuveres channel steel auxiliary pile pulling device applied to building structure pile foundation on the basis of existing pile pulling technology and method, for its defect, and core technology is the active pin that channel steel bottom can be rotated along shaft.The Two bors d's oeuveres channel steel auxiliary pile pulling device for being applied to building structure pile foundation can sink in channel steel, pile pulling during environmental protection, efficiently pull out various pile-type, and cost is relatively low, does not stay security risk.

Description

A kind of Two bors d's oeuveres channel steel applied to building structure pile foundation assists pile pulling device
Technical field
The invention belongs to construction equipment technical fields, are related to the pile foundation of building structure, more particularly to setting for pile pulling It is standby, it is mainly used for pulling out old stake in original ground, including the pile-type such as driven pile, in situ pile, static pressed pile, specially one Kind assists pile pulling device applied to the Two bors d's oeuveres channel steel of building structure pile foundation.
Background technology
Since the new century, with the deep propulsion of urbanization process, town site is more and more nervous, therefore adds The transformation of the buildings such as old town danger aging blocks room is removed soon, expands the utilization of the underground space, has become a kind of certainty Trend.In the structure foundations foundation constructions such as old town danger aging blocks room are removed in transformation, it is necessary to old to old stake in original ground Basis is pulled out, and development & construction then can be just re-started.
Percussion and grabbing method is mainly used for pulling out for old stake at present, hangs method, full-rotating drill pile pulling method and bath pile pulling method by force Equal several methods.Percussion and grabbing method noise is big, long in time limit;The strong method of hanging is easy to pull off, and can not thoroughly pull out old stake, be left to subsequent construction Security risk;Full-rotating drill pile pulling method equipment price costliness, low construction efficiency;Although bath method construction cost is relatively low, efficiency Height, but due to there is a large amount of mud contamination, is easy to make old stake holes that can not backfill closely knit, influences subsequent development utilization.
Invention content
What is provided the purpose of the present invention is the deficiency for above-mentioned pile extracting method is a kind of applied to building structure pile foundation Two bors d's oeuveres channel steel assists pile pulling device.
In order to achieve the above object, the present invention proposes that a kind of Two bors d's oeuveres channel steel auxiliary pile pulling applied to building structure pile foundation is set It is standby, including:
A whole set of vibration hammer equipment and hydraulically operated fixture, and the Two bors d's oeuveres channel steel for assisting pile pulling;
The Two bors d's oeuveres channel steel inside and outside wall is fixedly installed protrusion, and the edge of a wing of the single channel steel is arranged at intervals with bolt hole, The Two bors d's oeuveres channel steel is attached by bolt.
Further, the Two bors d's oeuveres channel steel bottom is provided with 2 rotatable active pins simultaneously, and described active pin one end, which is used, to be turned Axis is welded on channel steel web inner wall, and the other end is up-side down triangle section free end.
Further, channel steel inner wall is close to always in extruding of the active pin because of Pile side soil body during channel steel vibration-sunk And be closed, after channel steel, which is sunk down into, requires depth, promoting channel steel by hydraulically operated fixture starts pile pulling, rises in channel steel In the process, up-side down triangle section in active pin free end along fixing end shaft slides down to horizontal position because of Pile side soil body frictional force, Active pin is in the open state at this time, after channel steel is promoted to earth's surface, pile body is taken out at the top of channel steel, manually closes active pin.
Further, the fixed protrusion rounds along channel steel inside and outside wall, and section is half elliptic.
Further, the long axis of the convex cross section half elliptic is 10cm, semi-minor axis 2cm, and protrusion is arranged every 2m Together.
Further, multigroup oval hole is additionally provided on the channel steel wall.
Further, each group of pore quantity is 8, and 4, wherein each 1 of the edge of a wing, web 2 is arranged in single channel steel A, each ellipse hole long axis is 10cm, short axle 4cm.
Further, the same group of hole height of holes is identical, and is evenly arranged among twice protrusion, described hole edge Channel steel short transverse is arranged one group every 2m
Further, the channel steel diameter is bigger 20~50cm than stake diameter to be pulled out.
Further, the channel steel embedded depth 2 times of stake diameter bigger than pile body length.
Advantages and features of the invention:
The present invention has developed a kind of applied to building structure on the basis of existing pile pulling technology and method for its defect It is the active pin that channel steel bottom can be rotated along shaft that the Two bors d's oeuveres channel steel of pile foundation, which assists pile pulling device, core technology,.It should be applied to building Structure pile foundation Two bors d's oeuveres channel steel auxiliary pile pulling device can channel steel sink, pile pulling during environmental protection, efficiently pull out various stakes Type, and cost is relatively low, does not stay security risk.
The active pin is closed during channel steel vibration-sunk, and in channel steel uphill process, active pin is free End slides down to horizontal position and in the open state automatically, and active pin, which is closed, opens without being controlled by other supplementary modes, Whole process efficient quick.
The fixed lobe being arranged on the channel steel inside and outside wall can outside be native in extruded channel in channel steel sinking watching Body, the soil body and channel steel inside and outside wall distance itself of extruding increase so that and the frictional force of channel steel inside and outside wall and the soil body greatly reduces, from And pile pulling power is reduced, substantially increase pile pulling efficiency.
The multigroup oval hole being arranged on the channel steel wall can sink in channel steel and prevent in uphill process Vacuum suction acts on, and to reduce pile pulling power, improves pile pulling efficiency.
Description of the drawings
Fig. 1 is Two bors d's oeuveres channel steel structural schematic diagram.
Fig. 2 is Two bors d's oeuveres channel steel and waits for pile pulling combination diagram.
Fig. 3 is the channel steel and wait for pile pulling combination diagram that active pin is closed.
Fig. 4 is that active pin is in the channel steel of open state and waits for pile pulling combination diagram.
Fig. 5 is the channel steel bottom plan view that active pin is closed.
Fig. 6 is the channel steel bottom plan view that active pin is in open state.
Fig. 7 is the sectional detail drawing that active pin is closed.
Fig. 8 is the detailed side view that active pin is closed.
Fig. 9 is the sectional detail drawing that active pin is in open state.
Figure 10 is the detailed side view that active pin is in open state.
Figure 11 sinks for channel steel, and active pin is in the process schematic of pile pulling body in open state.
Specific implementation mode
The specific implementation mode of the present invention is provided below in conjunction with attached drawing, but the present invention is not limited to the following embodiments and the accompanying drawings.Root According to following explanation and claims, advantages and features of the invention will become apparent from.It should be noted that attached drawing be all made of it is very simple The form of change and use non-accurate ratio, be only used for conveniently, lucidly aid in illustrating the embodiment of the present invention purpose.
It please refers to Fig.1 and Fig. 2, Fig. 1 is Two bors d's oeuveres channel steel structural schematic diagram.Fig. 2 is that Two bors d's oeuveres channel steel combines signal with pile pulling is waited for Figure.The present invention proposes that a kind of Two bors d's oeuveres channel steel applied to building structure pile foundation assists pile pulling device, including:A whole set of vibration hammer equipment And hydraulically operated fixture, and the Two bors d's oeuveres channel steel 01 for assisting pile pulling;01 inside and outside wall of Two bors d's oeuveres channel steel is fixedly installed protrusion 11, The edge of a wing of the single channel steel is arranged at intervals with bolt hole 12, and the Two bors d's oeuveres channel steel 01 is attached by bolt.
Two bors d's oeuveres channel steel provided by the invention applied to building structure pile foundation assists pile pulling device, including compares in the prior art More ripe a whole set of vibration hammer equipment and hydraulically operated fixture and a Two bors d's oeuveres channel steel (Two bors d's oeuveres channel steel 01) for assisting pile pulling.Institute The channel steel inside and outside wall stated is fixedly installed protrusion (protrusion 11).Multigroup oval hole is additionally provided on the channel steel wall.Institute A bolt hole (bolt hole 12) is arranged every 1m in the single channel steel edge of a wing stated, and Two bors d's oeuveres channel steel is connected by plain bolt.Specific choosing Which kind of with the channel steel of specification, long, stake diameter and geological conditions need to flexibly be selected according to the stake of institute's pile pulling 31.A whole set of vibration hammer is set It is not introduced in standby and hydraulically operated fixture this specification.Hydraulically operated fixture is mainly used to clamp at the top of channel steel so that it can up and down It moves freely.
The Two bors d's oeuveres channel steel bottom is provided with 2 rotatable active pins (active pin 41) simultaneously.Active pin one end shaft 51 are welded on channel steel web inner wall, and the other end is up-side down triangle section free end.The active pin is in channel steel vibration-sunk process It is middle to be closed because channel steel inner wall is close in the extruding of Pile side soil body always.After channel steel, which is sunk down into, requires depth, pass through Hydraulically operated fixture promotes channel steel and starts pile pulling, and in channel steel uphill process, active pin free end up-side down triangle section is rubbed because of Pile side soil body It wipes power and slides down to horizontal position along fixing end shaft, active pin is in the open state at this time.It, will after channel steel is promoted to earth's surface Pile body takes out at the top of channel steel, manually closes active pin.
The fixed lobe rounds along channel steel inside and outside wall, and section is half elliptic, long axis 10cm, and semi-minor axis is 2cm, protrusion is every one of 2m settings.
Multigroup oval hole 21 is additionally provided on the channel steel wall, one group of pore quantity is 8, single channel steel setting 4, wherein each 1 of the edge of a wing, web 2.Each ellipse hole long axis is 10cm, short axle 4cm.Same group of hole height of holes phase Together, and among twice protrusion it is evenly arranged, i.e., is arranged one group every 2m along channel steel short transverse.
The channel steel height is bigger 20~50cm than stake diameter to be pulled out, and channel steel embedded depth is 2 times bigger than pile body length Stake diameter.
Fig. 3 sinks for channel steel 02.
Fig. 4 is pile pulling body 31 on channel steel 02, and active pin 41 is in open state at this time, and pile body weight transfer is to active pin 41, so Channel steel 02 is passed to by active pin 41 afterwards.
Fig. 5, Fig. 7, Fig. 8 are the channel steel 02 that active pin 41 is closed.
Fig. 6, Fig. 9, Figure 10 are the channel steel 02 that active pin 41 is in open state.
Figure 11 is the process that channel steel sinking pile body is pulled out.
Process 1:Excavate stake top earthing, exposes stake top.Long, stake diameter, geological conditions according to stake, flexibly select channel steel specification. Channel steel is clamped using vibration hammer and hydraulically operated fixture, channel steel center is made to be directed at pile center, Vibration on Start-up hammer shakes by stake top Channel steel sinks.
Process 2:Channel steel side vibrations edge pile body direction sinking, at this time active pin during channel steel vibration-sunk because of stake side The extruding of the soil body is close to always channel steel inner wall and is closed, if it find that channel steel has, skewness is serious, then adjusts at any time Whole tup direction.
Process 3:When channel steel embedded depth 2 times of stake diameter bigger than pile body length, stop sinking, pile body is complete by channel steel at this time It encases entirely.It keeps in situ constant, fully shakes certain time, so that fixed lobe is cut pile peripheral earth by shaking channel steel so that The side friction of the inside and outside wall of channel steel and stake end and the cohesive force of supporting course soil greatly reduce.
Process 4:Channel steel is promoted by hydraulically operated fixture and starts pile pulling, and in channel steel along the uphill process of pile body direction, active pin is certainly By end up-side down triangle section because Pile side soil body frictional force along fixing end shaft slides down to horizontal position, active pin is in and beats at this time Open state.Pile body and the soil body dead weight being attached on pile body are born jointly by active pin and channel steel.
Process 5:On when pulling out channel steel, channel steel and pile body are above pulled out together to earth's surface.
Process 6:Pile body is taken out at the top of channel steel, manually closes active pin, stake holes is backfilled and tamps, pile pulling terminates.
In conclusion the present invention has developed a kind of application on the basis of existing pile pulling technology and method, for its defect It is the active pin that channel steel bottom can be rotated along shaft to assist pile pulling device, core technology in the Two bors d's oeuveres channel steel of building structure pile foundation.It should Applied to building structure pile foundation Two bors d's oeuveres channel steel auxiliary pile pulling device can channel steel sink, pile pulling during environmental protection, efficiently Various pile-type are pulled out, and cost is relatively low, does not stay security risk.
The active pin is closed during channel steel vibration-sunk, and in channel steel uphill process, active pin is free End slides down to horizontal position and in the open state automatically, and active pin, which is closed, opens without being controlled by other supplementary modes, Whole process efficient quick.The fixed lobe being arranged on the channel steel inside and outside wall can in channel steel sinking watching extruded channel The interior outside soil body, the soil body and channel steel inside and outside wall distance itself of extruding increase so that the frictional force of channel steel inside and outside wall and the soil body is big It is big to reduce, to reduce pile pulling power, substantially increase pile pulling efficiency.The multigroup oval hole being arranged on the channel steel wall It can sink in channel steel and prevent vacuum suction effect in uphill process, to reduce pile pulling power, improve pile pulling efficiency.
Although the present invention has been disclosed as a preferred embodiment, however, it is not to limit the invention.Skill belonging to the present invention Has usually intellectual in art field, without departing from the spirit and scope of the present invention, when can be used for a variety of modifications and variations.Cause This, the scope of protection of the present invention is defined by those of the claims.

Claims (10)

1. a kind of Two bors d's oeuveres channel steel applied to building structure pile foundation assists pile pulling device, which is characterized in that including:
A whole set of vibration hammer equipment and hydraulically operated fixture, and the Two bors d's oeuveres channel steel for assisting pile pulling;
The Two bors d's oeuveres channel steel inside and outside wall is fixedly installed protrusion, and the edge of a wing of the single channel steel is arranged at intervals with bolt hole, described Two bors d's oeuveres channel steel is attached by bolt.
2. the Two bors d's oeuveres channel steel according to claim 1 applied to building structure pile foundation assists pile pulling device, which is characterized in that The Two bors d's oeuveres channel steel bottom is provided with 2 rotatable active pins simultaneously, and described active pin one end is welded on channel steel web with shaft Inner wall, the other end are up-side down triangle section free end.
3. the Two bors d's oeuveres channel steel according to claim 2 applied to building structure pile foundation assists pile pulling device, which is characterized in that The active pin is closed during channel steel vibration-sunk because channel steel inner wall is close in the extruding of Pile side soil body always, when Channel steel is sunk down into require depth after, by hydraulically operated fixture promoted channel steel start pile pulling, in channel steel uphill process, active pin free end Up-side down triangle section is because Pile side soil body frictional force along fixing end shaft slides down to horizontal position, and active pin is in open shape at this time Pile body is taken out at the top of channel steel after channel steel is promoted to earth's surface, manually closes active pin by state.
4. the Two bors d's oeuveres channel steel according to claim 1 applied to building structure pile foundation assists pile pulling device, which is characterized in that The fixed protrusion rounds along channel steel inside and outside wall, and section is half elliptic.
5. the Two bors d's oeuveres channel steel according to claim 4 applied to building structure pile foundation assists pile pulling device, which is characterized in that The long axis of the convex cross section half elliptic is 10cm, semi-minor axis 2cm, and protrusion is every one of 2m settings.
6. the Two bors d's oeuveres channel steel according to claim 1 applied to building structure pile foundation assists pile pulling device, which is characterized in that Multigroup oval hole is additionally provided on the channel steel wall.
7. the Two bors d's oeuveres channel steel according to claim 6 applied to building structure pile foundation assists pile pulling device, which is characterized in that The each group of pore quantity is 8, and 4, wherein each 1 of the edge of a wing, web 2, each ellipse hole is arranged in single channel steel Long axis is 10cm, short axle 4cm.
8. the Two bors d's oeuveres channel steel according to claim 6 applied to building structure pile foundation assists pile pulling device, which is characterized in that The same group of hole height of holes is identical, and is evenly arranged positioned at twice protrusion is intermediate, described hole along channel steel short transverse every 2m is arranged one group.
9. the Two bors d's oeuveres channel steel according to claim 1 applied to building structure pile foundation assists pile pulling device, which is characterized in that The channel steel height is bigger 20~50cm than stake diameter to be pulled out.
10. the Two bors d's oeuveres channel steel according to claim 1 applied to building structure pile foundation assists pile pulling device, feature to exist In channel steel embedded depth 2 times of the stake diameter bigger than pile body length.
CN201810691370.2A 2018-06-28 2018-06-28 A kind of Two bors d's oeuveres channel steel applied to building structure pile foundation assists pile pulling device Withdrawn CN108797592A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810691370.2A CN108797592A (en) 2018-06-28 2018-06-28 A kind of Two bors d's oeuveres channel steel applied to building structure pile foundation assists pile pulling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810691370.2A CN108797592A (en) 2018-06-28 2018-06-28 A kind of Two bors d's oeuveres channel steel applied to building structure pile foundation assists pile pulling device

Publications (1)

Publication Number Publication Date
CN108797592A true CN108797592A (en) 2018-11-13

Family

ID=64072493

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810691370.2A Withdrawn CN108797592A (en) 2018-06-28 2018-06-28 A kind of Two bors d's oeuveres channel steel applied to building structure pile foundation assists pile pulling device

Country Status (1)

Country Link
CN (1) CN108797592A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11172674A (en) * 1997-12-15 1999-06-29 Maeda Corp Pile extraction jig and pile extraction method
CN203270577U (en) * 2013-06-05 2013-11-06 中铁四局集团有限公司 Underground pile removing apparatus with door plate clamp
CN204298820U (en) * 2014-11-17 2015-04-29 天津市勘察院 A kind of single sleeve pile pulling device
CN107338794A (en) * 2016-12-26 2017-11-10 上海宝力通基础工程有限公司 Static pile press pile pulling steel sleeve and pile extracting method
CN206986892U (en) * 2017-05-05 2018-02-09 上海易谦岩土工程有限公司 Detain tubular type pile extractor
CN208668416U (en) * 2018-06-28 2019-03-29 中交上海航道局有限公司 A kind of Two bors d's oeuveres channel steel auxiliary pile pulling device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11172674A (en) * 1997-12-15 1999-06-29 Maeda Corp Pile extraction jig and pile extraction method
CN203270577U (en) * 2013-06-05 2013-11-06 中铁四局集团有限公司 Underground pile removing apparatus with door plate clamp
CN204298820U (en) * 2014-11-17 2015-04-29 天津市勘察院 A kind of single sleeve pile pulling device
CN107338794A (en) * 2016-12-26 2017-11-10 上海宝力通基础工程有限公司 Static pile press pile pulling steel sleeve and pile extracting method
CN206986892U (en) * 2017-05-05 2018-02-09 上海易谦岩土工程有限公司 Detain tubular type pile extractor
CN208668416U (en) * 2018-06-28 2019-03-29 中交上海航道局有限公司 A kind of Two bors d's oeuveres channel steel auxiliary pile pulling device

Similar Documents

Publication Publication Date Title
CN201172818Y (en) Pile of twist drill
CN109208585B (en) Manual hole digging pile construction process for quicksand geology
CN212200443U (en) Deep foundation pit supporting structure for soft soil foundation
JPWO2004035942A1 (en) Pile digging method, foundation pile structure
CN208668415U (en) A kind of list sleeve auxiliary pile pulling device
CN208668416U (en) A kind of Two bors d's oeuveres channel steel auxiliary pile pulling device
KR20120005184A (en) Expansion anchor body structure and execution a method
CN108797592A (en) A kind of Two bors d's oeuveres channel steel applied to building structure pile foundation assists pile pulling device
JP3140159U (en) Steel frame foundation for unit house
KR101055531B1 (en) Apparatus for installing micro pile with lateral load resistance capability and installing method of the same
CN206721868U (en) A kind of drain bar piling machine stake mouth
CN108842773A (en) A kind of single sleeve auxiliary pile pulling device applied to building structure pile foundation
CN210368935U (en) Miniature pile structure, crown beam structure and miniature pile foundation pit supporting system
CN207469238U (en) Prefabricated flaring stake
CN216194707U (en) Assembled stable in structure's building foundation reinforcing pile
RU2089706C1 (en) Pile frozen into permafrost and method of erection of pile frozen into permafrost
CN205954609U (en) High frequency compaction grooving bridge type ground is wall construction professional equipment even
CN211818465U (en) Expansion fixing base
CN219863488U (en) Assembled shear wall structure
CN204608777U (en) For the mechanical release cable wire of supporting
CN214328850U (en) Foundation pile structure of foundation engineering
CN220927846U (en) Old stake of hinge type double pin steel cylinder boots pulls out system
KR102578665B1 (en) Concrete Reinforcing Method Using Reaction Anchor
CN214301764U (en) Support arrangement for prevent frozen soil foundation ditch deformation
CN115012422B (en) Supporting structure convenient to assemble and used for foundation pit construction and operation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20181113

WW01 Invention patent application withdrawn after publication