CN208668416U - A kind of Two bors d's oeuveres channel steel auxiliary pile pulling device - Google Patents

A kind of Two bors d's oeuveres channel steel auxiliary pile pulling device Download PDF

Info

Publication number
CN208668416U
CN208668416U CN201821027568.2U CN201821027568U CN208668416U CN 208668416 U CN208668416 U CN 208668416U CN 201821027568 U CN201821027568 U CN 201821027568U CN 208668416 U CN208668416 U CN 208668416U
Authority
CN
China
Prior art keywords
channel steel
bors
pile pulling
oeuveres
pulling device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821027568.2U
Other languages
Chinese (zh)
Inventor
杨生朋
侯得桃
胡金华
庞敬官
陈靖
何众
赵甲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Shanghai Dredging Co Ltd.
Original Assignee
CCCC Shanghai Dredging Co Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Shanghai Dredging Co Ltd. filed Critical CCCC Shanghai Dredging Co Ltd.
Priority to CN201821027568.2U priority Critical patent/CN208668416U/en
Application granted granted Critical
Publication of CN208668416U publication Critical patent/CN208668416U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model proposes a kind of Two bors d's oeuveres channel steels to assist pile pulling device, comprising: a whole set of vibration hammer equipment and hydraulically operated fixture, and the Two bors d's oeuveres channel steel for assisting pile pulling;The Two bors d's oeuveres channel steel inside and outside wall is fixedly installed protrusion, and the edge of a wing of the single channel steel of the Two bors d's oeuveres channel steel is arranged at intervals with bolt hole, and the Two bors d's oeuveres channel steel is attached by bolt.The utility model has developed a kind of Two bors d's oeuveres channel steel auxiliary pile pulling device on the basis of existing pile pulling technology and method, for its defect, and core technology is the active pin that channel steel bottom can be rotated along shaft.Two bors d's oeuveres channel steel auxiliary pile pulling device can sink in channel steel, pile pulling during environmental protection, efficiently pull out various pile-type, and cost is relatively low, does not stay security risk.

Description

A kind of Two bors d's oeuveres channel steel auxiliary pile pulling device
Technical field
The utility model belongs to construction equipment technical field, is related to the pile foundation of building structure, more particularly to pile pulling Equipment, be mainly used for pulling out stake old in original ground, including the pile-type such as driven pile, in situ pile, static pressed pile, specifically Pile pulling device is assisted for a kind of Two bors d's oeuveres channel steel.
Background technique
Since the new century, with the deep propulsion of urbanization process, town site is more and more nervous, therefore adds The transformation of the buildings such as old town danger aging blocks room is removed fastly, expands the development and utilization of the underground space, has become a kind of certainty Trend.It is removed in the structure foundations foundation constructions such as old town danger aging blocks room in transformation, it is necessary to old to old stake in original ground Basis is pulled out, and development & construction then can be just re-started.
Method of mainly being hung using percussion and grabbing method, by force, full-rotating drill pile pulling method and bath pile pulling method are pulled out for old stake at present Equal several methods.Percussion and grabbing method noise is big, long in time limit;The strong method of hanging is easy to pull off, and can not thoroughly pull out old stake, leave to subsequent construction Security risk;Full-rotating drill pile pulling method equipment price is expensive, construction efficiency is low;Although bath method construction cost is lower, efficiency Height, but due to there is a large amount of mud contamination, is easy to backfill old stake holes can not closely knit, influences subsequent development utilization.
Utility model content
The purpose of this utility model be for above-mentioned pile extracting method deficiency and provide a kind of Two bors d's oeuveres channel steel auxiliary pile pulling Equipment.
In order to achieve the above object, the utility model proposes a kind of Two bors d's oeuveres channel steels to assist pile pulling device, comprising:
A whole set of vibration hammer equipment and hydraulically operated fixture, and the Two bors d's oeuveres channel steel for assisting pile pulling;
The Two bors d's oeuveres channel steel inside and outside wall is fixedly installed protrusion, the edge of a wing interval setting of the single channel steel of the Two bors d's oeuveres channel steel There is bolt hole, the Two bors d's oeuveres channel steel is attached by bolt.
Further, the Two bors d's oeuveres channel steel bottom is provided with 2 rotatable active pins simultaneously, and described active pin one end, which is used, to be turned Axis is welded on channel steel web inner wall, and the other end is up-side down triangle section free end.
Further, the active pin is during channel steel vibration-sunk because channel steel inner wall is close to always in the extruding of Pile side soil body And be in close state, after channel steel, which is sunk down into, requires depth, promoting channel steel by hydraulically operated fixture starts pile pulling, rises in channel steel In the process, up-side down triangle section in active pin free end along fixing end shaft slides down to horizontal position because of Pile side soil body frictional force, Active pin is in the open state at this time, after channel steel is promoted to earth's surface, pile body is taken out at the top of channel steel, manually closes active pin.
Further, the protrusion of the fixation rounds along channel steel inside and outside wall, and section is half elliptic.
Further, the long axis of the convex cross section half elliptic is 10cm, semi-minor axis 2cm, and protrusion is arranged every 2m Together.
Further, multiple groups ellipse hole is additionally provided on the channel steel wall.
Further, each group of pore quantity in the multiple groups ellipse hole is 8, and single channel steel is arranged 4, Each 1 of the middle edge of a wing, web 2, each ellipse hole long axis is 10cm, short axle 4cm.
Further, same group of hole height of holes in the multiple groups ellipse hole is identical, and it is intermediate to be located at twice protrusion It is evenly arranged, described hole is arranged one group every 2m along channel steel short transverse.
Further, the channel steel height is 20~50cm bigger than stake diameter to be pulled out.
Further, the channel steel embedded depth 2 times of stake diameter bigger than pile body length.
The advantages of the utility model and feature:
It is auxiliary that the utility model has developed a kind of Two bors d's oeuveres channel steel on the basis of existing pile pulling technology and method, for its defect Pile pulling device is helped, core technology is the active pin that channel steel bottom can be rotated along shaft.The Two bors d's oeuveres channel steel assists pile pulling device can be Channel steel sinks, pile pulling is environmentally friendly in the process, efficiently pulls out various pile-type, and cost is relatively low, does not stay security risk.
The active pin is in close state during channel steel vibration-sunk, and in channel steel uphill process, active pin is free End slides down to horizontal position and in the open state automatically, and active pin, which is closed, opens without being controlled by other supplementary modes, Whole process efficient quick.
The fixed lobe being arranged on the channel steel inside and outside wall can outside be native in extruded channel in channel steel sinking watching Body, the soil body and channel steel inside and outside wall distance itself of extruding increase, so that the frictional force of channel steel inside and outside wall and the soil body greatly reduces, from And pile pulling power is reduced, substantially increase pile pulling efficiency.
The multiple groups ellipse hole being arranged on the channel steel wall can sink in channel steel and prevent in uphill process Vacuum suction effect improves pile pulling efficiency to reduce pile pulling power.
Detailed description of the invention
Fig. 1 is Two bors d's oeuveres channel steel structural schematic diagram.
Fig. 2 is for Two bors d's oeuveres channel steel and to pile pulling combination diagram.
Fig. 3 be the channel steel that is in close state of active pin with to pile pulling combination diagram.
Fig. 4 is for active pin channel steel in the open state and to pile pulling combination diagram.
Fig. 5 is the channel steel bottom plan view that active pin is in close state.
Fig. 6 is active pin channel steel bottom plan view in the open state.
Fig. 7 is the sectional detail drawing that active pin is in close state.
Fig. 8 is the detailed side view that active pin is in close state.
Fig. 9 is active pin sectional detail drawing in the open state.
Figure 10 is active pin detailed side view in the open state.
Figure 11 is channel steel sinking, the process schematic of active pin upper pile pulling body in the open state.
Specific embodiment
Specific embodiment of the present utility model, but the utility model implementation not limited to the following are provided below in conjunction with attached drawing Mode.According to following explanation and claims, will be become apparent from feature the advantages of the utility model.It should be noted that attached drawing It is all made of very simplified form and uses non-accurate ratio, be only used for convenience, lucidly aid in illustrating the utility model The purpose of embodiment.
Fig. 1 and Fig. 2 are please referred to, Fig. 1 is Two bors d's oeuveres channel steel structural schematic diagram.Fig. 2 combines signal with to pile pulling for Two bors d's oeuveres channel steel Figure.The utility model proposes a kind of Two bors d's oeuveres channel steels to assist pile pulling device, comprising: a whole set of vibration hammer equipment and hydraulically operated fixture, and For assisting the Two bors d's oeuveres channel steel 01 of pile pulling;01 inside and outside wall of Two bors d's oeuveres channel steel is fixedly installed protrusion 11, the Two bors d's oeuveres channel steel The edge of a wing of single channel steel is arranged at intervals with bolt hole 12, and the Two bors d's oeuveres channel steel 01 is attached by bolt.
Two bors d's oeuveres channel steel provided by the utility model assists pile pulling device, a whole set of vibration including comparative maturity in the prior art Hammer equipment and hydraulically operated fixture and one are for assisting the Two bors d's oeuveres channel steel (Two bors d's oeuveres channel steel 01) of pile pulling.The channel steel inside and outside wall is solid Surely it is provided with protrusion (protrusion 11).Multiple groups ellipse hole is additionally provided on the channel steel wall.The Two bors d's oeuveres channel steel it is single A bolt hole (bolt hole 12) is arranged every 1m in the channel steel edge of a wing, and Two bors d's oeuveres channel steel is connected by plain bolt.Which kind of rule specifically selected The channel steel of lattice, need to according to the stake of institute's pile pulling 31 long, stake diameter and geological conditions come flexible choice.A whole set of vibration hammer equipment and hydraulic It is not introduced in fixture this specification.Hydraulically operated fixture is mainly used to clamp at the top of channel steel, allows to move freely up and down.
The Two bors d's oeuveres channel steel bottom is provided with 2 rotatable active pins (active pin 41) simultaneously.Active pin one end shaft 51 are welded on channel steel web inner wall, and the other end is up-side down triangle section free end.The active pin is in channel steel vibration-sunk process It is middle to be in close state because channel steel inner wall is close in the extruding of Pile side soil body always.After channel steel, which is sunk down into, requires depth, pass through Hydraulically operated fixture promotes channel steel and starts pile pulling, and in channel steel uphill process, active pin free end up-side down triangle section is rubbed because of Pile side soil body It wipes power and slides down to horizontal position along fixing end shaft, active pin is in the open state at this time.It, will after channel steel is promoted to earth's surface Pile body takes out at the top of channel steel, manually closes active pin.
The fixed lobe rounds along channel steel inside and outside wall, and section is half elliptic, long axis 10cm, and semi-minor axis is 2cm, protrusion is every one of 2m setting.
Multiple groups ellipse hole 21 is additionally provided on the channel steel wall, each group of pore quantity is 8, and single channel steel is set 4 are set, wherein each 1 of the edge of a wing, web 2.Each ellipse hole long axis is 10cm, short axle 4cm.Multiple groups ellipse hole In same group of hole height of holes it is identical, and be located at that twice protrusion is intermediate to be evenly arranged, i.e., be arranged along channel steel short transverse every 2m One group.
The channel steel height is 20~50cm bigger than stake diameter to be pulled out, and channel steel embedded depth is 2 times bigger than pile body length Stake diameter.
Fig. 3 is the sinking of channel steel 02.
Fig. 4 is pile pulling body 31 on channel steel 02, and active pin 41 is in the open state at this time, and pile body weight transfer is to active pin 41, so Channel steel 02 is passed to by active pin 41 afterwards.
Fig. 5, Fig. 7, Fig. 8 are the channel steel 02 that active pin 41 is in close state.
Fig. 6, Fig. 9, Figure 10 are the channel steel 02 in the open state of active pin 41.
Figure 11 is the process that channel steel sinking pile body is pulled out.
Process 1: excavating stake top earthing, exposes stake top.Long, stake diameter, geological conditions, flexible choice channel steel specification according to stake. Channel steel is clamped using vibration hammer and hydraulically operated fixture, channel steel center is made to be directed at pile center, starts vibration hammer, is shaken by stake top Channel steel sinks.
Process 2: channel steel side shake edge pile body direction sink, active pin is during channel steel vibration-sunk because of stake side at this time The extruding of the soil body is close to always channel steel inner wall and is in close state, if it find that channel steel has, skewness is serious, then adjusts at any time Whole tup direction.
Process 3: when channel steel embedded depth 2 times of stake diameter bigger than pile body length, stop sinking, pile body is complete by channel steel at this time It encases entirely.It keeps in situ constant, sufficiently vibration certain time, so that fixed lobe is cut pile peripheral earth by shaking channel steel, so that The side friction of the inside and outside wall of channel steel and stake end and the cohesive force of supporting course soil greatly reduce.
Process 4: promoting channel steel by hydraulically operated fixture and start pile pulling, and in channel steel along the uphill process of pile body direction, active pin is certainly By end up-side down triangle section because Pile side soil body frictional force along fixing end shaft slides down to horizontal position, active pin is in and beats at this time Open state.Pile body and the soil body being attached on pile body self weight are born jointly by active pin and channel steel.
Process 5: when above pulling out channel steel, channel steel and pile body are above pulled out together to earth's surface.
Process 6: pile body is taken out at the top of channel steel, manually closes active pin, stake holes is backfilled and tamps, pile pulling terminates.
In conclusion the utility model has developed one kind on the basis of existing pile pulling technology and method, for its defect Two bors d's oeuveres channel steel assists pile pulling device, and core technology is the active pin that channel steel bottom can be rotated along shaft.The Two bors d's oeuveres channel steel assists pile pulling Equipment can sink in channel steel, pile pulling during environmental protection, efficiently pull out various pile-type, and cost is relatively low, does not stay security risk.
The active pin is in close state during channel steel vibration-sunk, and in channel steel uphill process, active pin is free End slides down to horizontal position and in the open state automatically, and active pin, which is closed, opens without being controlled by other supplementary modes, Whole process efficient quick.The fixed lobe being arranged on the channel steel inside and outside wall can in channel steel sinking watching extruded channel The interior outside soil body, the soil body and channel steel inside and outside wall distance itself of extruding increase, so that the frictional force of channel steel inside and outside wall and the soil body is big It is big to reduce, to reduce pile pulling power, substantially increase pile pulling efficiency.The multiple groups ellipse hole being arranged on the channel steel wall It can sink in channel steel and prevent vacuum suction effect in uphill process, to reduce pile pulling power, improve pile pulling efficiency.
Although the utility model has been disclosed with preferred embodiment as above, so it is not intended to limit the utility model.This reality It is without departing from the spirit and scope of the utility model, each when that can make with novel those of ordinary skill in the art Kind changes and retouches.Therefore, the protection scope of the utility model is subject to view those as defined in claim.

Claims (10)

1. a kind of Two bors d's oeuveres channel steel assists pile pulling device characterized by comprising
A whole set of vibration hammer equipment and hydraulically operated fixture, and the Two bors d's oeuveres channel steel for assisting pile pulling;
The Two bors d's oeuveres channel steel inside and outside wall is fixedly installed protrusion, and the edge of a wing of the single channel steel of the Two bors d's oeuveres channel steel is arranged at intervals with spiral shell Keyhole, the Two bors d's oeuveres channel steel are attached by bolt.
2. Two bors d's oeuveres channel steel according to claim 1 assists pile pulling device, which is characterized in that the Two bors d's oeuveres channel steel bottom is same When be provided with 2 rotatable active pins, described active pin one end is welded on channel steel web inner wall with shaft, and the other end is up-side down triangle Section free end.
3. Two bors d's oeuveres channel steel according to claim 2 assists pile pulling device, which is characterized in that the active pin is under channel steel vibration It is in close state during heavy because channel steel inner wall is close in the extruding of Pile side soil body always, requires depth when channel steel is sunk down into Afterwards, channel steel is promoted by hydraulically operated fixture and starts pile pulling, in channel steel uphill process, active pin free end up-side down triangle section is because of stake side Soil body frictional force slides down to horizontal position along fixing end shaft, and active pin is in the open state at this time, when channel steel is promoted to ground After table, pile body is taken out at the top of channel steel, manually closes active pin.
4. Two bors d's oeuveres channel steel according to claim 1 assists pile pulling device, which is characterized in that the protrusion of the fixation is along channel steel Inside and outside wall rounds, and section is half elliptic.
5. Two bors d's oeuveres channel steel according to claim 4 assists pile pulling device, which is characterized in that the convex cross section half elliptic Long axis be 10cm, semi-minor axis 2cm, protrusion every 2m setting together.
6. Two bors d's oeuveres channel steel according to claim 1 assists pile pulling device, which is characterized in that also set up on the channel steel wall There is multiple groups ellipse hole.
7. Two bors d's oeuveres channel steel according to claim 6 assists pile pulling device, which is characterized in that in the multiple groups ellipse hole Each group of pore quantity be 8, single channel steel is arranged 4, wherein each 1 of the edge of a wing, and web 2, each ellipse hole is long Axis is 10cm, short axle 4cm.
8. Two bors d's oeuveres channel steel according to claim 6 assists pile pulling device, which is characterized in that in the multiple groups ellipse hole Same group of hole height of holes it is identical, and be located at that twice protrusion is intermediate to be evenly arranged, described hole is along channel steel short transverse every 2m It is arranged one group.
9. Two bors d's oeuveres channel steel according to claim 1 assists pile pulling device, which is characterized in that the channel steel height ratio waits pulling out Big 20~the 50cm of stake diameter out.
10. Two bors d's oeuveres channel steel according to claim 1 assists pile pulling device, which is characterized in that the channel steel embedded depth ratio The stake diameter that big 2 times of pile body length.
CN201821027568.2U 2018-06-28 2018-06-28 A kind of Two bors d's oeuveres channel steel auxiliary pile pulling device Active CN208668416U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821027568.2U CN208668416U (en) 2018-06-28 2018-06-28 A kind of Two bors d's oeuveres channel steel auxiliary pile pulling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821027568.2U CN208668416U (en) 2018-06-28 2018-06-28 A kind of Two bors d's oeuveres channel steel auxiliary pile pulling device

Publications (1)

Publication Number Publication Date
CN208668416U true CN208668416U (en) 2019-03-29

Family

ID=65825815

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821027568.2U Active CN208668416U (en) 2018-06-28 2018-06-28 A kind of Two bors d's oeuveres channel steel auxiliary pile pulling device

Country Status (1)

Country Link
CN (1) CN208668416U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108797592A (en) * 2018-06-28 2018-11-13 中交上海航道局有限公司 A kind of Two bors d's oeuveres channel steel applied to building structure pile foundation assists pile pulling device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108797592A (en) * 2018-06-28 2018-11-13 中交上海航道局有限公司 A kind of Two bors d's oeuveres channel steel applied to building structure pile foundation assists pile pulling device

Similar Documents

Publication Publication Date Title
CN204080802U (en) A kind of flexible umbrella support anchor rod
KR100957573B1 (en) Helical-pile for direct-boring grouting and using methods thereof
KR100894988B1 (en) Reinforcing method using helical-pile for direct-boring grouting
CN206844659U (en) Basement barricade single side formwork system
KR101766165B1 (en) Column Pile Construction Method Using And Top-Down Method Using Thereof
JPWO2004035942A1 (en) Pile digging method, foundation pile structure
CN208668415U (en) A kind of list sleeve auxiliary pile pulling device
CN208668416U (en) A kind of Two bors d's oeuveres channel steel auxiliary pile pulling device
CN201802310U (en) Excavation drilling machine
CN210263066U (en) But quick installation recovery type stake anchor combines excavation supporting construction
CN207159983U (en) A kind of soft clay area building lot structure of cement mixing method combination Pulling-Resistant Anchor Rod
CN204040041U (en) A kind of front close rear thin Double-row Piles Support system being provided with vertical anchor pole
JP3140159U (en) Steel frame foundation for unit house
CN107700508A (en) A kind of shaped steel stirs the construction method of water spray soil curtain support pile
CN111364494A (en) Offshore high-pile bearing platform foundation supported by anchor cables and inclined straight piles and construction method thereof
CN108797592A (en) A kind of Two bors d's oeuveres channel steel applied to building structure pile foundation assists pile pulling device
CN202164599U (en) Reinforcing pile enabling reinforcing rib body to be recycled
CN206721868U (en) A kind of drain bar piling machine stake mouth
CN202000360U (en) Equipment for side slope supporting construction
CN210368935U (en) Miniature pile structure, crown beam structure and miniature pile foundation pit supporting system
CN212506362U (en) Offshore high-rise pile cap foundation supported by anchor cables and inclined straight piles
CN108842773A (en) A kind of single sleeve auxiliary pile pulling device applied to building structure pile foundation
CN102359107B (en) Stiffening pile for reclaiming reinforcing body
CN113089682A (en) High-strength tubular pile foundation pit supporting structure for geotechnical engineering
CN216194707U (en) Assembled stable in structure's building foundation reinforcing pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant