CN208668416U - A kind of Two bors d's oeuveres channel steel auxiliary pile pulling device - Google Patents
A kind of Two bors d's oeuveres channel steel auxiliary pile pulling device Download PDFInfo
- Publication number
- CN208668416U CN208668416U CN201821027568.2U CN201821027568U CN208668416U CN 208668416 U CN208668416 U CN 208668416U CN 201821027568 U CN201821027568 U CN 201821027568U CN 208668416 U CN208668416 U CN 208668416U
- Authority
- CN
- China
- Prior art keywords
- channel steel
- bors
- pile pulling
- oeuveres
- pulling device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The utility model proposes a kind of Two bors d's oeuveres channel steels to assist pile pulling device, comprising: a whole set of vibration hammer equipment and hydraulically operated fixture, and the Two bors d's oeuveres channel steel for assisting pile pulling;The Two bors d's oeuveres channel steel inside and outside wall is fixedly installed protrusion, and the edge of a wing of the single channel steel of the Two bors d's oeuveres channel steel is arranged at intervals with bolt hole, and the Two bors d's oeuveres channel steel is attached by bolt.The utility model has developed a kind of Two bors d's oeuveres channel steel auxiliary pile pulling device on the basis of existing pile pulling technology and method, for its defect, and core technology is the active pin that channel steel bottom can be rotated along shaft.Two bors d's oeuveres channel steel auxiliary pile pulling device can sink in channel steel, pile pulling during environmental protection, efficiently pull out various pile-type, and cost is relatively low, does not stay security risk.
Description
Technical field
The utility model belongs to construction equipment technical field, is related to the pile foundation of building structure, more particularly to pile pulling
Equipment, be mainly used for pulling out stake old in original ground, including the pile-type such as driven pile, in situ pile, static pressed pile, specifically
Pile pulling device is assisted for a kind of Two bors d's oeuveres channel steel.
Background technique
Since the new century, with the deep propulsion of urbanization process, town site is more and more nervous, therefore adds
The transformation of the buildings such as old town danger aging blocks room is removed fastly, expands the development and utilization of the underground space, has become a kind of certainty
Trend.It is removed in the structure foundations foundation constructions such as old town danger aging blocks room in transformation, it is necessary to old to old stake in original ground
Basis is pulled out, and development & construction then can be just re-started.
Method of mainly being hung using percussion and grabbing method, by force, full-rotating drill pile pulling method and bath pile pulling method are pulled out for old stake at present
Equal several methods.Percussion and grabbing method noise is big, long in time limit;The strong method of hanging is easy to pull off, and can not thoroughly pull out old stake, leave to subsequent construction
Security risk;Full-rotating drill pile pulling method equipment price is expensive, construction efficiency is low;Although bath method construction cost is lower, efficiency
Height, but due to there is a large amount of mud contamination, is easy to backfill old stake holes can not closely knit, influences subsequent development utilization.
Utility model content
The purpose of this utility model be for above-mentioned pile extracting method deficiency and provide a kind of Two bors d's oeuveres channel steel auxiliary pile pulling
Equipment.
In order to achieve the above object, the utility model proposes a kind of Two bors d's oeuveres channel steels to assist pile pulling device, comprising:
A whole set of vibration hammer equipment and hydraulically operated fixture, and the Two bors d's oeuveres channel steel for assisting pile pulling;
The Two bors d's oeuveres channel steel inside and outside wall is fixedly installed protrusion, the edge of a wing interval setting of the single channel steel of the Two bors d's oeuveres channel steel
There is bolt hole, the Two bors d's oeuveres channel steel is attached by bolt.
Further, the Two bors d's oeuveres channel steel bottom is provided with 2 rotatable active pins simultaneously, and described active pin one end, which is used, to be turned
Axis is welded on channel steel web inner wall, and the other end is up-side down triangle section free end.
Further, the active pin is during channel steel vibration-sunk because channel steel inner wall is close to always in the extruding of Pile side soil body
And be in close state, after channel steel, which is sunk down into, requires depth, promoting channel steel by hydraulically operated fixture starts pile pulling, rises in channel steel
In the process, up-side down triangle section in active pin free end along fixing end shaft slides down to horizontal position because of Pile side soil body frictional force,
Active pin is in the open state at this time, after channel steel is promoted to earth's surface, pile body is taken out at the top of channel steel, manually closes active pin.
Further, the protrusion of the fixation rounds along channel steel inside and outside wall, and section is half elliptic.
Further, the long axis of the convex cross section half elliptic is 10cm, semi-minor axis 2cm, and protrusion is arranged every 2m
Together.
Further, multiple groups ellipse hole is additionally provided on the channel steel wall.
Further, each group of pore quantity in the multiple groups ellipse hole is 8, and single channel steel is arranged 4,
Each 1 of the middle edge of a wing, web 2, each ellipse hole long axis is 10cm, short axle 4cm.
Further, same group of hole height of holes in the multiple groups ellipse hole is identical, and it is intermediate to be located at twice protrusion
It is evenly arranged, described hole is arranged one group every 2m along channel steel short transverse.
Further, the channel steel height is 20~50cm bigger than stake diameter to be pulled out.
Further, the channel steel embedded depth 2 times of stake diameter bigger than pile body length.
The advantages of the utility model and feature:
It is auxiliary that the utility model has developed a kind of Two bors d's oeuveres channel steel on the basis of existing pile pulling technology and method, for its defect
Pile pulling device is helped, core technology is the active pin that channel steel bottom can be rotated along shaft.The Two bors d's oeuveres channel steel assists pile pulling device can be
Channel steel sinks, pile pulling is environmentally friendly in the process, efficiently pulls out various pile-type, and cost is relatively low, does not stay security risk.
The active pin is in close state during channel steel vibration-sunk, and in channel steel uphill process, active pin is free
End slides down to horizontal position and in the open state automatically, and active pin, which is closed, opens without being controlled by other supplementary modes,
Whole process efficient quick.
The fixed lobe being arranged on the channel steel inside and outside wall can outside be native in extruded channel in channel steel sinking watching
Body, the soil body and channel steel inside and outside wall distance itself of extruding increase, so that the frictional force of channel steel inside and outside wall and the soil body greatly reduces, from
And pile pulling power is reduced, substantially increase pile pulling efficiency.
The multiple groups ellipse hole being arranged on the channel steel wall can sink in channel steel and prevent in uphill process
Vacuum suction effect improves pile pulling efficiency to reduce pile pulling power.
Detailed description of the invention
Fig. 1 is Two bors d's oeuveres channel steel structural schematic diagram.
Fig. 2 is for Two bors d's oeuveres channel steel and to pile pulling combination diagram.
Fig. 3 be the channel steel that is in close state of active pin with to pile pulling combination diagram.
Fig. 4 is for active pin channel steel in the open state and to pile pulling combination diagram.
Fig. 5 is the channel steel bottom plan view that active pin is in close state.
Fig. 6 is active pin channel steel bottom plan view in the open state.
Fig. 7 is the sectional detail drawing that active pin is in close state.
Fig. 8 is the detailed side view that active pin is in close state.
Fig. 9 is active pin sectional detail drawing in the open state.
Figure 10 is active pin detailed side view in the open state.
Figure 11 is channel steel sinking, the process schematic of active pin upper pile pulling body in the open state.
Specific embodiment
Specific embodiment of the present utility model, but the utility model implementation not limited to the following are provided below in conjunction with attached drawing
Mode.According to following explanation and claims, will be become apparent from feature the advantages of the utility model.It should be noted that attached drawing
It is all made of very simplified form and uses non-accurate ratio, be only used for convenience, lucidly aid in illustrating the utility model
The purpose of embodiment.
Fig. 1 and Fig. 2 are please referred to, Fig. 1 is Two bors d's oeuveres channel steel structural schematic diagram.Fig. 2 combines signal with to pile pulling for Two bors d's oeuveres channel steel
Figure.The utility model proposes a kind of Two bors d's oeuveres channel steels to assist pile pulling device, comprising: a whole set of vibration hammer equipment and hydraulically operated fixture, and
For assisting the Two bors d's oeuveres channel steel 01 of pile pulling;01 inside and outside wall of Two bors d's oeuveres channel steel is fixedly installed protrusion 11, the Two bors d's oeuveres channel steel
The edge of a wing of single channel steel is arranged at intervals with bolt hole 12, and the Two bors d's oeuveres channel steel 01 is attached by bolt.
Two bors d's oeuveres channel steel provided by the utility model assists pile pulling device, a whole set of vibration including comparative maturity in the prior art
Hammer equipment and hydraulically operated fixture and one are for assisting the Two bors d's oeuveres channel steel (Two bors d's oeuveres channel steel 01) of pile pulling.The channel steel inside and outside wall is solid
Surely it is provided with protrusion (protrusion 11).Multiple groups ellipse hole is additionally provided on the channel steel wall.The Two bors d's oeuveres channel steel it is single
A bolt hole (bolt hole 12) is arranged every 1m in the channel steel edge of a wing, and Two bors d's oeuveres channel steel is connected by plain bolt.Which kind of rule specifically selected
The channel steel of lattice, need to according to the stake of institute's pile pulling 31 long, stake diameter and geological conditions come flexible choice.A whole set of vibration hammer equipment and hydraulic
It is not introduced in fixture this specification.Hydraulically operated fixture is mainly used to clamp at the top of channel steel, allows to move freely up and down.
The Two bors d's oeuveres channel steel bottom is provided with 2 rotatable active pins (active pin 41) simultaneously.Active pin one end shaft
51 are welded on channel steel web inner wall, and the other end is up-side down triangle section free end.The active pin is in channel steel vibration-sunk process
It is middle to be in close state because channel steel inner wall is close in the extruding of Pile side soil body always.After channel steel, which is sunk down into, requires depth, pass through
Hydraulically operated fixture promotes channel steel and starts pile pulling, and in channel steel uphill process, active pin free end up-side down triangle section is rubbed because of Pile side soil body
It wipes power and slides down to horizontal position along fixing end shaft, active pin is in the open state at this time.It, will after channel steel is promoted to earth's surface
Pile body takes out at the top of channel steel, manually closes active pin.
The fixed lobe rounds along channel steel inside and outside wall, and section is half elliptic, long axis 10cm, and semi-minor axis is
2cm, protrusion is every one of 2m setting.
Multiple groups ellipse hole 21 is additionally provided on the channel steel wall, each group of pore quantity is 8, and single channel steel is set
4 are set, wherein each 1 of the edge of a wing, web 2.Each ellipse hole long axis is 10cm, short axle 4cm.Multiple groups ellipse hole
In same group of hole height of holes it is identical, and be located at that twice protrusion is intermediate to be evenly arranged, i.e., be arranged along channel steel short transverse every 2m
One group.
The channel steel height is 20~50cm bigger than stake diameter to be pulled out, and channel steel embedded depth is 2 times bigger than pile body length
Stake diameter.
Fig. 3 is the sinking of channel steel 02.
Fig. 4 is pile pulling body 31 on channel steel 02, and active pin 41 is in the open state at this time, and pile body weight transfer is to active pin 41, so
Channel steel 02 is passed to by active pin 41 afterwards.
Fig. 5, Fig. 7, Fig. 8 are the channel steel 02 that active pin 41 is in close state.
Fig. 6, Fig. 9, Figure 10 are the channel steel 02 in the open state of active pin 41.
Figure 11 is the process that channel steel sinking pile body is pulled out.
Process 1: excavating stake top earthing, exposes stake top.Long, stake diameter, geological conditions, flexible choice channel steel specification according to stake.
Channel steel is clamped using vibration hammer and hydraulically operated fixture, channel steel center is made to be directed at pile center, starts vibration hammer, is shaken by stake top
Channel steel sinks.
Process 2: channel steel side shake edge pile body direction sink, active pin is during channel steel vibration-sunk because of stake side at this time
The extruding of the soil body is close to always channel steel inner wall and is in close state, if it find that channel steel has, skewness is serious, then adjusts at any time
Whole tup direction.
Process 3: when channel steel embedded depth 2 times of stake diameter bigger than pile body length, stop sinking, pile body is complete by channel steel at this time
It encases entirely.It keeps in situ constant, sufficiently vibration certain time, so that fixed lobe is cut pile peripheral earth by shaking channel steel, so that
The side friction of the inside and outside wall of channel steel and stake end and the cohesive force of supporting course soil greatly reduce.
Process 4: promoting channel steel by hydraulically operated fixture and start pile pulling, and in channel steel along the uphill process of pile body direction, active pin is certainly
By end up-side down triangle section because Pile side soil body frictional force along fixing end shaft slides down to horizontal position, active pin is in and beats at this time
Open state.Pile body and the soil body being attached on pile body self weight are born jointly by active pin and channel steel.
Process 5: when above pulling out channel steel, channel steel and pile body are above pulled out together to earth's surface.
Process 6: pile body is taken out at the top of channel steel, manually closes active pin, stake holes is backfilled and tamps, pile pulling terminates.
In conclusion the utility model has developed one kind on the basis of existing pile pulling technology and method, for its defect
Two bors d's oeuveres channel steel assists pile pulling device, and core technology is the active pin that channel steel bottom can be rotated along shaft.The Two bors d's oeuveres channel steel assists pile pulling
Equipment can sink in channel steel, pile pulling during environmental protection, efficiently pull out various pile-type, and cost is relatively low, does not stay security risk.
The active pin is in close state during channel steel vibration-sunk, and in channel steel uphill process, active pin is free
End slides down to horizontal position and in the open state automatically, and active pin, which is closed, opens without being controlled by other supplementary modes,
Whole process efficient quick.The fixed lobe being arranged on the channel steel inside and outside wall can in channel steel sinking watching extruded channel
The interior outside soil body, the soil body and channel steel inside and outside wall distance itself of extruding increase, so that the frictional force of channel steel inside and outside wall and the soil body is big
It is big to reduce, to reduce pile pulling power, substantially increase pile pulling efficiency.The multiple groups ellipse hole being arranged on the channel steel wall
It can sink in channel steel and prevent vacuum suction effect in uphill process, to reduce pile pulling power, improve pile pulling efficiency.
Although the utility model has been disclosed with preferred embodiment as above, so it is not intended to limit the utility model.This reality
It is without departing from the spirit and scope of the utility model, each when that can make with novel those of ordinary skill in the art
Kind changes and retouches.Therefore, the protection scope of the utility model is subject to view those as defined in claim.
Claims (10)
1. a kind of Two bors d's oeuveres channel steel assists pile pulling device characterized by comprising
A whole set of vibration hammer equipment and hydraulically operated fixture, and the Two bors d's oeuveres channel steel for assisting pile pulling;
The Two bors d's oeuveres channel steel inside and outside wall is fixedly installed protrusion, and the edge of a wing of the single channel steel of the Two bors d's oeuveres channel steel is arranged at intervals with spiral shell
Keyhole, the Two bors d's oeuveres channel steel are attached by bolt.
2. Two bors d's oeuveres channel steel according to claim 1 assists pile pulling device, which is characterized in that the Two bors d's oeuveres channel steel bottom is same
When be provided with 2 rotatable active pins, described active pin one end is welded on channel steel web inner wall with shaft, and the other end is up-side down triangle
Section free end.
3. Two bors d's oeuveres channel steel according to claim 2 assists pile pulling device, which is characterized in that the active pin is under channel steel vibration
It is in close state during heavy because channel steel inner wall is close in the extruding of Pile side soil body always, requires depth when channel steel is sunk down into
Afterwards, channel steel is promoted by hydraulically operated fixture and starts pile pulling, in channel steel uphill process, active pin free end up-side down triangle section is because of stake side
Soil body frictional force slides down to horizontal position along fixing end shaft, and active pin is in the open state at this time, when channel steel is promoted to ground
After table, pile body is taken out at the top of channel steel, manually closes active pin.
4. Two bors d's oeuveres channel steel according to claim 1 assists pile pulling device, which is characterized in that the protrusion of the fixation is along channel steel
Inside and outside wall rounds, and section is half elliptic.
5. Two bors d's oeuveres channel steel according to claim 4 assists pile pulling device, which is characterized in that the convex cross section half elliptic
Long axis be 10cm, semi-minor axis 2cm, protrusion every 2m setting together.
6. Two bors d's oeuveres channel steel according to claim 1 assists pile pulling device, which is characterized in that also set up on the channel steel wall
There is multiple groups ellipse hole.
7. Two bors d's oeuveres channel steel according to claim 6 assists pile pulling device, which is characterized in that in the multiple groups ellipse hole
Each group of pore quantity be 8, single channel steel is arranged 4, wherein each 1 of the edge of a wing, and web 2, each ellipse hole is long
Axis is 10cm, short axle 4cm.
8. Two bors d's oeuveres channel steel according to claim 6 assists pile pulling device, which is characterized in that in the multiple groups ellipse hole
Same group of hole height of holes it is identical, and be located at that twice protrusion is intermediate to be evenly arranged, described hole is along channel steel short transverse every 2m
It is arranged one group.
9. Two bors d's oeuveres channel steel according to claim 1 assists pile pulling device, which is characterized in that the channel steel height ratio waits pulling out
Big 20~the 50cm of stake diameter out.
10. Two bors d's oeuveres channel steel according to claim 1 assists pile pulling device, which is characterized in that the channel steel embedded depth ratio
The stake diameter that big 2 times of pile body length.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821027568.2U CN208668416U (en) | 2018-06-28 | 2018-06-28 | A kind of Two bors d's oeuveres channel steel auxiliary pile pulling device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821027568.2U CN208668416U (en) | 2018-06-28 | 2018-06-28 | A kind of Two bors d's oeuveres channel steel auxiliary pile pulling device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208668416U true CN208668416U (en) | 2019-03-29 |
Family
ID=65825815
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821027568.2U Active CN208668416U (en) | 2018-06-28 | 2018-06-28 | A kind of Two bors d's oeuveres channel steel auxiliary pile pulling device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208668416U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797592A (en) * | 2018-06-28 | 2018-11-13 | 中交上海航道局有限公司 | A kind of Two bors d's oeuveres channel steel applied to building structure pile foundation assists pile pulling device |
-
2018
- 2018-06-28 CN CN201821027568.2U patent/CN208668416U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797592A (en) * | 2018-06-28 | 2018-11-13 | 中交上海航道局有限公司 | A kind of Two bors d's oeuveres channel steel applied to building structure pile foundation assists pile pulling device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204080802U (en) | A kind of flexible umbrella support anchor rod | |
KR100957573B1 (en) | Helical-pile for direct-boring grouting and using methods thereof | |
KR100894988B1 (en) | Reinforcing method using helical-pile for direct-boring grouting | |
CN206844659U (en) | Basement barricade single side formwork system | |
KR101766165B1 (en) | Column Pile Construction Method Using And Top-Down Method Using Thereof | |
JPWO2004035942A1 (en) | Pile digging method, foundation pile structure | |
CN208668415U (en) | A kind of list sleeve auxiliary pile pulling device | |
CN208668416U (en) | A kind of Two bors d's oeuveres channel steel auxiliary pile pulling device | |
CN201802310U (en) | Excavation drilling machine | |
CN210263066U (en) | But quick installation recovery type stake anchor combines excavation supporting construction | |
CN207159983U (en) | A kind of soft clay area building lot structure of cement mixing method combination Pulling-Resistant Anchor Rod | |
CN204040041U (en) | A kind of front close rear thin Double-row Piles Support system being provided with vertical anchor pole | |
JP3140159U (en) | Steel frame foundation for unit house | |
CN107700508A (en) | A kind of shaped steel stirs the construction method of water spray soil curtain support pile | |
CN111364494A (en) | Offshore high-pile bearing platform foundation supported by anchor cables and inclined straight piles and construction method thereof | |
CN108797592A (en) | A kind of Two bors d's oeuveres channel steel applied to building structure pile foundation assists pile pulling device | |
CN202164599U (en) | Reinforcing pile enabling reinforcing rib body to be recycled | |
CN206721868U (en) | A kind of drain bar piling machine stake mouth | |
CN202000360U (en) | Equipment for side slope supporting construction | |
CN210368935U (en) | Miniature pile structure, crown beam structure and miniature pile foundation pit supporting system | |
CN212506362U (en) | Offshore high-rise pile cap foundation supported by anchor cables and inclined straight piles | |
CN108842773A (en) | A kind of single sleeve auxiliary pile pulling device applied to building structure pile foundation | |
CN102359107B (en) | Stiffening pile for reclaiming reinforcing body | |
CN113089682A (en) | High-strength tubular pile foundation pit supporting structure for geotechnical engineering | |
CN216194707U (en) | Assembled stable in structure's building foundation reinforcing pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |