CN202000360U - Equipment for side slope supporting construction - Google Patents

Equipment for side slope supporting construction Download PDF

Info

Publication number
CN202000360U
CN202000360U CN2011200118541U CN201120011854U CN202000360U CN 202000360 U CN202000360 U CN 202000360U CN 2011200118541 U CN2011200118541 U CN 2011200118541U CN 201120011854 U CN201120011854 U CN 201120011854U CN 202000360 U CN202000360 U CN 202000360U
Authority
CN
China
Prior art keywords
floral tube
equipment
side slope
soil
breaking hammer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200118541U
Other languages
Chinese (zh)
Inventor
张�林
边生广
刘瑞平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011200118541U priority Critical patent/CN202000360U/en
Application granted granted Critical
Publication of CN202000360U publication Critical patent/CN202000360U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses equipment for side slope supporting construction. The equipment comprises a floral tube, a hydraulic breaking hammer and a connector, wherein the floral tube is taken as a soil nail; the hydraulic breaking hammer is used for supplying vibrating power to the floral tube; and the connector is used for connecting the hydraulic breaking hammer with the floral tube. By adopting the equipment for side slope supporting construction, the floral tube which is taken as the soil nail is inserted into a side slope in a vibrating way while drilling. The equipment for side slope supporting construction can be widely applied to soil layers such as drift sand formations, garbage soil, sand and gravel and the like, and has the advantages of high efficiency and low construction cost.

Description

The equipment that is used for the slope retaining construction
Technical field
The utility model relates to the stable construction equipment that is used to keep side slope or slope of building engineering field, is specifically related to a kind of equipment that is used for the slope retaining construction.
Background technology
In the engineering construction process, often need excavation pit, for the side slope that makes foundation ditch keeps stable, need carry out consolidation process to the side slope of foundation ditch usually.
In the prior art, the normal soil nailing that adopts carries out support reinforcement to side slope, its work progress is generally: at first adopt luoyang spade or hole on side slope with jumbolter, put into soil nailing then, slip casting is hidden, couple together a plurality of soil nailings are set on the side slope by steel mesh reinforcement at last, just formed firm overcoat behind the concreting.
Prior art problems is, when running into side slope and be drift sand formation, refuse soil, sand pebble layer, utilizes existing method to be difficult in pore-forming on the side slope, even if can pore-forming, the degree of depth of pore-forming, angle all be difficult to guarantee, cause construction slow, the construction costs height.There is following different problem when on the side slope of drift sand formation, refuse soil, sand pebble layer, holing.
1, drift sand formation: when the slope construction of drift sand formation, because the soil in the drift sand formation is comparatively loose, the hole of collapsing easily during boring, luoyang spade can't pore-forming; Use after the jumbolter boring, drilling rod can't be extracted, even also can collapse the hole after extracting immediately, make as the reinforcing bar of soil nailing can't patchhole in.When running into the side slope of drift sand formation at present, use with the pipe bit machine and hole, soil nailing is along with the drilling rod of boring inserts soil layer, and still with the use cost height of pipe bit machine, operation is loaded down with trivial details, and construction speed is slow.
2, refuse soil: because have some flexible barrier in the refuse soil, luoyang spade can't be constructed when the slope construction of refuse soil; After the drilling rod of jumbolter pierces, because flexible barrier can be wrapped on the drilling rod, cause bit freezing, can't hole smoothly.
3, sand pebble layer: when the slope construction of sand pebble layer, the maximum depth of pore forming of luoyang spade is no more than 4m, and the aperture behind the pore-forming becomes orifice angle obliquely, the slip casting difficulty generally all about 500~600mm.Because have stone in the sand pebble layer, jumbolter can't be holed smoothly, to use a large amount of water when using, and after in the hole, injecting a large amount of water, can influence the stable of side slope with pipe bit machine drill hole.
The utility model content
At the above-mentioned defective that prior art exists, the technical problems to be solved in the utility model provides a kind of equipment that is used for the slope retaining construction, utilizes this equipment can insert soil nailing smoothly on soil layers such as drift sand formation, refuse soil, sand pebble layer.
For addressing the above problem, the utility model provides a kind of equipment that is used for the slope retaining construction, comprises floral tube as soil nailing, the hydraulic breaking hammer and the connector that is used to be connected described hydraulic breaking hammer and floral tube of vibration power are provided for described floral tube.
As preferably, the wall of described floral tube is provided with a plurality of excessive slurries hole.
Further, as preferably, a plurality of described excessive slurries hole shape in the shape of a spiral is distributed on the wall of described floral tube.
Further, as preferably, described excessive slurry hole is a circular hole, and the aperture in described excessive slurry hole is 5-8mm, and the pitch of holes in described excessive slurry hole is 500-1000mm.
As preferably, described floral tube adopts steel matter to make.
As preferably, an end of described connector is provided with the column that is used to insert in the described floral tube; The other end of described connector is provided with the connecting hole that inserts for the drill rod on the described hydraulic breaking hammer.
The equipment that is used for the slope retaining construction of the present utility model inserts the floral tube vibration as soil nailing in the side slope in boring, can be widely used in having the efficient height, the advantage that construction cost is low in the soil layers such as drift sand formation, refuse soil, sand pebble layer.
Description of drawings
Structural representation when Fig. 1 works for the equipment that is used for the slope retaining construction of embodiment of the present utility model;
Fig. 2 is the structural representation of the floral tube among Fig. 1;
Fig. 3 looks schematic diagram for the master of the connector among Fig. 1;
Fig. 4 is the left view of Fig. 3;
Fig. 5 is the right view of Fig. 3.
The specific embodiment
Describe embodiment of the present utility model with reference to the accompanying drawings in detail.
Structural representation when Fig. 1 works for the equipment that is used for the slope retaining construction of embodiment of the present utility model.As shown in Figure 1, the equipment that is used for slope retaining construction of embodiment of the present utility model comprises floral tube 1 as soil nailing, the hydraulic breaking hammer 2 of vibration power is provided and is used to be connected the connector 4 of hydraulic breaking hammer 2 and floral tube 1 for floral tube 1.The two ends of connector 4 respectively with hydraulic breaking hammer 2 on drill rod 21 be connected with floral tube 1.In the present embodiment, the power of hydraulic breaking hammer 2 provides by being positioned at the excavator 5 of the model of excavation on the ground 200 for PC-60, and hydraulic breaking hammer 2 is installed on the curved boom 51 of excavator 5, and the drill rod 21 on the termination of hydraulic breaking hammer 2 can vibrate and advance.Wherein, the hydraulic test on the excavator 5 can drive drill rod 21 vibration by devices such as hydraulic motors, and the curved boom 51 of excavator 5 can promote drill rod 21 and travel forward, and then drives floral tube 1 and advance toward side slope 100, and floral tube 1 is being vibrated in the insertion side slope 100.
Fig. 2 is the structural representation of the floral tube among Fig. 1.As shown in Figure 2, in the present embodiment, the wall of floral tube 1 is provided with a plurality of excessive slurries hole 11, and the aperture in the slurry hole 11 of overflowing is 5-8mm, and the pitch of holes in the slurry hole of overflowing is 500-1000mm.Floral tube 1 is made by steel matter, uses as soil nailing simultaneously, after floral tube 1 inserts side slope 100, injects concrete by the slurry filling machine (not shown) in floral tube 1, and concrete overflows in the slurry hole 11 of overflowing, and firmly is connected with on every side soil layer.In order to make floral tube 1 combine closelyr with on every side soil layer, overflow slurry hole 11 in the shape of a spiral shape be distributed on the wall of floral tube 1, concrete just can overflow from floral tube 1 all directions on every side like this, more closely combines with on every side soil layer, reaches the purpose of reinforcing side slope.In the present embodiment,, after inserting side slope 100, no longer extract, when boring,, the hole of collapsing can not occur, guarantee smooth construction if run into drift sand formation because floral tube 1 uses as soil nailing.When the side slope of rubbish soil layer is constructed, if run into flexible barrier,, do not need rotation because floral tube 1 vibrating insertion, can not cause the winding of flexible barrier and floral tube 1, the vibration by floral tube 1 can penetrate flexible barrier.When sand pebble layer is constructed, if run into stone, stir stone by the vibration of floral tube 1, floral tube 1 can insert in the soil layer from the slit of stone smoothly.
Fig. 3 looks schematic diagram for the master of the connector among Fig. 1; Fig. 4 is the left view of Fig. 3; Fig. 5 is the right view of Fig. 3.As shown in Figure 3-Figure 5, as preferably, in the present embodiment, an end of connector 4 is provided with the column 41 that is used to insert in the floral tube 1; The other end of connector 4 is provided with the connecting hole 42 that is used to insert the drill rod 21 on the hydraulic breaking hammer 2.All take this insertion ways of connecting between connector 4 and floral tube 1 and the drill rod 21, have advantage simple in structure, easy to connect.When the beginning operation, the column 41 of connector 4 is inserted in the floral tube 1, then drill rod 21 is inserted connecting hole 42, because the drill rod 21 of hydraulic breaking hammer 2 withstands on the connector 4 always, can realize stable connection the between floral tube 1 and the hydraulic breaking hammer 2, hydraulic breaking hammer 2 withdraws from after also being convenient to operation simultaneously and finishing.
In side slope 100, insert after a plurality of floral tubes 1, the steel mesh reinforcement that welds respectively with a plurality of floral tubes 1 is set, just form stable overcoat after the concreting, guarantee the stable of side slope 100 on its surface.
The equipment that is used for the slope retaining construction of the present utility model inserts the floral tube as soil nailing in the side slope in boring, only need load onto hydraulic breaking hammer on mini-excavator, does not need extra equipment, has floor space advantage little, easy to use.Hydraulic test on the usage mining machine can guarantee the required power of holing as power source simultaneously.By connector floral tube is vibrated the soil body that inserts side slope, can in cohesive soil, silt, drift sand formation, refuse soil, sand-pebble layer, use, especially when drift sand formation, refuse soil, sand-pebble layer use, having the efficient height, the advantage that construction cost is low.
Certainly; the above is a preferred implementation of the present utility model; should be understood that; for those skilled in the art; under the prerequisite that does not break away from the utility model principle; can also make some improvements and modifications, these improvements and modifications also are considered as protection domain of the present utility model.

Claims (6)

1. an equipment that is used for slope retaining construction is characterized in that, comprises floral tube as soil nailing, the hydraulic breaking hammer and the connector that is used to be connected described hydraulic breaking hammer and floral tube of vibration power are provided for described floral tube.
2. the equipment that is used for the slope retaining construction as claimed in claim 1 is characterized in that the wall of described floral tube is provided with a plurality of excessive slurries hole.
3. the equipment that is used for the slope retaining construction as claimed in claim 2 is characterized in that a plurality of described excessive slurries hole shape in the shape of a spiral is distributed on the wall of described floral tube.
4. as claim 2 or the 3 described equipment that are used for the slope retaining construction, it is characterized in that described excessive slurry hole is circular, the aperture in described excessive slurry hole is 5-8mm, and the pitch of holes in described excessive slurry hole is 500-1000mm.
5. the equipment that is used for the slope retaining construction as claimed in claim 1 is characterized in that, described floral tube adopts steel matter to make.
6. the equipment that is used for the slope retaining construction as claimed in claim 1 is characterized in that, an end of described connector is provided with the column that is used to insert in the described floral tube; The other end of described connector is provided with the connecting hole that inserts for the drill rod on the described hydraulic breaking hammer.
CN2011200118541U 2011-01-14 2011-01-14 Equipment for side slope supporting construction Expired - Fee Related CN202000360U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200118541U CN202000360U (en) 2011-01-14 2011-01-14 Equipment for side slope supporting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200118541U CN202000360U (en) 2011-01-14 2011-01-14 Equipment for side slope supporting construction

Publications (1)

Publication Number Publication Date
CN202000360U true CN202000360U (en) 2011-10-05

Family

ID=44703105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200118541U Expired - Fee Related CN202000360U (en) 2011-01-14 2011-01-14 Equipment for side slope supporting construction

Country Status (1)

Country Link
CN (1) CN202000360U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102953388A (en) * 2012-10-20 2013-03-06 博乐公路管理局博乐分局 Road shoulder side slope soil feeding vehicle
CN105386480A (en) * 2015-12-11 2016-03-09 神翼航空器科技(天津)有限公司 Pore-forming device for breaking hammer type cast-in-place pile
CN105927231A (en) * 2016-05-24 2016-09-07 中国矿业大学 Cyclic induction curtain grouting method for inclined shaft to penetrate through water-enriched compact quicksand stratum

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102953388A (en) * 2012-10-20 2013-03-06 博乐公路管理局博乐分局 Road shoulder side slope soil feeding vehicle
CN102953388B (en) * 2012-10-20 2014-12-10 博乐公路管理局博乐分局 Road shoulder side slope soil feeding vehicle
CN105386480A (en) * 2015-12-11 2016-03-09 神翼航空器科技(天津)有限公司 Pore-forming device for breaking hammer type cast-in-place pile
CN105927231A (en) * 2016-05-24 2016-09-07 中国矿业大学 Cyclic induction curtain grouting method for inclined shaft to penetrate through water-enriched compact quicksand stratum
CN105927231B (en) * 2016-05-24 2018-06-29 中国矿业大学 Inclined shaft passes through rich water densification drifting sand layer circulation-induced curtain-grouting method

Similar Documents

Publication Publication Date Title
CN105714834B (en) A kind of construction technology of hardpan preexisting hole grouting behind shaft or drift lining H profile steel stake
CN103437348B (en) Construction device and method of pile peripheral cemented soil cast-in-place stiffness core pile
CN108166483A (en) Bored pile construction method
CN108643214B (en) Backfill mixed soil composite foundation structure and construction method thereof
JP2008057184A (en) Method of constructing underground wall by using h-shaped pc pile
CN1963044A (en) Construction method for withdrawal of waste pile
KR20100086146A (en) Construction method for composite pile using digging and hardenning
CN202000360U (en) Equipment for side slope supporting construction
KR101021915B1 (en) A method for constructing cut-off temporary structure for sheathing work
CN203403404U (en) High-efficiency cast-in-place pile device
CN203007934U (en) Construction device capable of drilling to the bottom of stratum with hard lower portion and unconsolidated upper portion
JP5351125B2 (en) Open shield machine start method of open shield method
CN102434718B (en) Method for reinforcing originating end of push bench
CN201874008U (en) Discontinuous concrete grouting pile and wall structure
CN104452776B (en) Meet with the one construction Treatment Methods of diaphragm wall during boulder
JP2013159960A (en) Sheet pile pulled-out part filling method
CN205399410U (en) Dig first slip casting club -footed pile of drilling soon
JP4450135B2 (en) Cutting and drawing method and equipment for existing piles
JP4074198B2 (en) How to remove existing piles
CN106759377A (en) The construction method of recyclable building enclosure
CN111549794A (en) Miniature supporting method and miniature pile supporting structure suitable for soft foundation treatment
CN208379624U (en) A kind of miscellaneous native composite foundation structure of backfill
CN109653193B (en) Reverse construction method for underground continuous wall
KR101345457B1 (en) Driving piles pressure device and using the device driving pile method
JP4400700B2 (en) Cutting and drawing method and equipment for existing piles

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111005

Termination date: 20120114