CN106759377A - The construction method of recyclable building enclosure - Google Patents

The construction method of recyclable building enclosure Download PDF

Info

Publication number
CN106759377A
CN106759377A CN201611209233.8A CN201611209233A CN106759377A CN 106759377 A CN106759377 A CN 106759377A CN 201611209233 A CN201611209233 A CN 201611209233A CN 106759377 A CN106759377 A CN 106759377A
Authority
CN
China
Prior art keywords
building enclosure
hole
construction method
construction
recyclable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611209233.8A
Other languages
Chinese (zh)
Inventor
陈越
周盛全
刘全林
杜晓丽
陈亮
朱芳建
程琳
华小满
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui University of Science and Technology
Original Assignee
Anhui University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui University of Science and Technology filed Critical Anhui University of Science and Technology
Priority to CN201611209233.8A priority Critical patent/CN106759377A/en
Publication of CN106759377A publication Critical patent/CN106759377A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D11/00Methods or apparatus specially adapted for both placing and removing sheet pile bulkheads, piles, or mould-pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention discloses a kind of construction method of recyclable building enclosure, specific steps include:Selection is drawn bore dia, surveying setting-out excavation guide groove, rig water spray and draws hole, proposes brill, lifting building enclosure, sinking building enclosure and backfill, after excavation of foundation pit completes and backfills and terminate, building enclosure is transferred to and reclaimed using crane gear, building waste, sandstone or clay material are backfilled in hole.The present invention draws hole by drilling equipment, reduces the penetration resistance and soil-squeezing action of building enclosure, stirs the soil body on the spot in work progress, without mud emission;Stirring soil or mud ensure to draw shaping and the quality in hole, while the frictional force that will reduce building enclosure and the soil body, is easy to the construction and recovery of building enclosure.

Description

The construction method of recyclable building enclosure
Technical field
The present invention relates to Foundation Pit Construction technical field, and in particular to a kind of construction method of recyclable building enclosure.
Background technology
In the prior art, foundation pit enclosure stake is generally using bored concrete pile, engineering method stake or prefabricated pile, but is sent out by practice for many years It is existing:The construction cost of bored concrete pile is higher, need to use heavy mechanical equipment, and construction technology is relative complex;Engineering method stake relies on rigid pile Carry, rigid pile is usually shaped steel, often due to shaped steel deforms after the completion of foundation pit construction, it is difficult to realize recycling, it is economical Depth generally 8m or so is gone along with sb. to guard him, is restricted within the specific limits;Common construction of prefabricated piles process causes soil compaction effect, makees During for fender post, larger moment of flexure and shearing are subjected to, and existing pile extension technology is difficult to ensure that the quality of pile extension, existing construction skill Art largely limits the popularization of prefabricated pile, it is difficult to realize the recycling of prefabricated pile.
The content of the invention
It is an object of the invention to overcome the above-mentioned problems in the prior art, there is provided a kind of recyclable building enclosure Construction method, is easy to the recycling of building enclosure after construction.
To realize above-mentioned technical purpose, above-mentioned technique effect is reached, the present invention is to be achieved through the following technical solutions:
A kind of construction method of recyclable building enclosure, comprises the following steps:
A. building enclosure pattern and rigidity are determined according to design requirement, according to soil layer situation and the size selection of building enclosure Draw bore dia, into well width;
B. preparation of construction operation, the transport and carrying of building enclosure, surveying setting-out excavates guide groove, according to soil layer property and leading The depth of groove determines whether to install guide groove retaining wall or casing, can suitably fetch earth if necessary, and set construction marker;
C. draw hole operation, rig is in place, opens water pump, start rig water spray and draw hole, draw hole speed mechanical according to hole is drawn Type, soil layer property, irrigation pressure and traffic conditions comprehensively determine, appropriate according to rig type selecting when run of steel is not enough Drill method and extension drill rod;
D. when hole arrival projected depth is drawn, stopping is drawn hole drill and is entered, and draws hole for a drilling and forming hole or multiple drilling and forming hole;
E. after pore-forming terminates, lift building enclosure, it is determined that and correct the perpendicularity of building enclosure, inserted hole center is drawn Enter building enclosure, then sink down into projected depth in deadweight or auxiliary equipment effect;
F. after excavation of foundation pit completes and backfills and terminate, building enclosure is transferred to and is reclaimed using crane gear, backfilled in hole Building waste, sandstone or clay material.
Further, the building enclosure is for ease of assembling, the fender member of spreading and dismounting, including prefabricated pile, assembling At least one in formula ground-connecting-wall, large-scale steel reinforced concrete I-beam, steel tube concrete pile.
Further, in the step b, more than the width of building enclosure, the depth of guide groove is according to going along with sb. to guard him for the width of guide groove The depth and replacement rate of structure determine that guide groove determines whether to install dado structure, armlet knot according to soil layer property and channel depths Structure is the one kind in circular casing, square casing, steel plate pile wall, can suitably be fetched earth if necessary.
Further, in the step c, draw hole equipment for single shaft or multiple-rotor mixer, rotary churning pile machine, down-the-hole drill, into One kind in scouring machine, draw there is in the equipment drilling process of hole jet, water spray, whitewash at least one function.
Further, in the step c, draw the diameter or width in hole and determined according to soil layer property, more than or equal to going along with sb. to guard him knot The diameter or width of structure, while drawing hole using the one kind in equal diameter or width, variable diameters or width, the cantilever end for drawing hole is inclined Greatly, position of fixity is less than normal.
Further, in the step c, when hole is drawn using whitewashing, building enclosure periphery solidified earth mutually overlaps to be formed Water-stop curtain, building enclosure surface smear is easy to the anti-friction agent that building enclosure is reclaimed.
Further, in the step e, building enclosure deadweight or auxiliary equipment effect sink down into designed elevation when, its Top is higher by designed elevation 0.4m-0.6m, and when building enclosure bottom soil body property is poor, being provided with around building enclosure prevents it The fixed structure of sinking.
Further, in the step e, supporting construction goes along with sb. to guard him foundation ditch jointly alone or in combination after the completion of building enclosure construction Safety, supporting construction include prestress anchorage cable, bracing members, prefabricated PC fish belly sill, concrete support system at least It is a kind of.
The beneficial effects of the invention are as follows:
Hole is drawn by drilling equipment, the penetration resistance and soil-squeezing action of building enclosure is reduced, by the soil body in work progress Stir on the spot, without mud emission;Stirring soil or mud ensure to draw shaping and the quality in hole, while building enclosure and the soil body will be reduced Frictional force, be easy to the construction and recovery of building enclosure.When building enclosure quality is smaller, without large scale equipment, by deadweight Or auxiliary equipment sinks down into projected depth, the duration is greatly shortened, with preferably economical and environmentally friendly effect.
Certainly, implement any product of the invention to it is not absolutely required to while reaching all the above advantage.
Brief description of the drawings
Technical scheme in order to illustrate more clearly the embodiments of the present invention, uses required for being described to embodiment below Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for ability For the those of ordinary skill of domain, on the premise of not paying creative work, can also obtain other attached according to these accompanying drawings Figure.
Fig. 1 draws drilling machine schematic diagram in place for of the invention;
Fig. 2 is retaining wall of the invention or casing Duan Yinkong schematic diagrames;
Fig. 3 is installation retaining wall or casing schematic diagram of the invention;
Fig. 4 is the schematic diagram that fetches earth of the invention;
Fig. 5 draws hole schematic diagram for building enclosure of the invention;
Fig. 6 is rig of the invention displacement and building enclosure scheme of installation;
Fig. 7 sinks down into projected depth schematic diagram for building enclosure of the invention;
Fig. 8 is that retaining wall of the invention or casing reclaim schematic diagram;
Fig. 9 is excavation of foundation pit schematic diagram of the invention;
Figure 10 is that foundation ditch of the invention backfills schematic diagram;
Figure 11 is that building enclosure of the invention is reclaimed and hole backfill schematic diagram.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is all other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Refer to shown in Fig. 1-11, the present embodiment is a kind of construction method of recyclable building enclosure, is comprised the following steps:
A. building enclosure pattern and rigidity are determined according to design requirement, according to soil layer situation and the size selection of building enclosure Draw bore dia, into well width;
B. preparation of construction operation, the transport and carrying of building enclosure, surveying setting-out excavates guide groove, according to soil layer property and leading The depth of groove determines whether to install guide groove retaining wall or casing, can suitably fetch earth if necessary, and set construction marker;
C. draw hole operation, rig is in place, opens water pump, start rig water spray and draw hole, draw hole speed mechanical according to hole is drawn Type, soil layer property, irrigation pressure and traffic conditions comprehensively determine, appropriate according to rig type selecting when run of steel is not enough Drill method and extension drill rod;
D. when hole arrival projected depth is drawn, stopping is drawn hole drill and is entered, and draws hole for a drilling and forming hole or multiple drilling and forming hole;
E. after pore-forming terminates, lift building enclosure, it is determined that and correct the perpendicularity of building enclosure, inserted hole center is drawn Enter building enclosure, then sink down into projected depth in deadweight or auxiliary equipment effect;
F. after excavation of foundation pit completes and backfills and terminate, building enclosure is transferred to and is reclaimed using crane or tower crane, returned in hole Fill out building waste, sandstone or clay material.
Building enclosure is for ease of assembling, the fender member of spreading and dismounting including prefabricated pile, assembled ground-connecting-wall, large-scale At least one in steel reinforced concrete I-beam, steel tube concrete pile.
In step b, more than the width of building enclosure, the depth of guide groove is according to the depth of building enclosure and puts for the width of guide groove Rate determination is changed, guide groove determines whether to install dado structure according to soil layer property and channel depths, and armlet structure is circular casing, side One kind in shape casing, steel plate pile wall, can suitably fetch earth if necessary.
In step c, it is the one kind in single shaft or multiple-rotor mixer, rotary churning pile machine, down-the-hole drill, chute forming machine to draw hole equipment, Draw there is in the equipment drilling process of hole jet, water spray, whitewash at least one function.
In step c, the diameter or width for drawing hole determines according to soil layer property, more than or equal to the diameter or width of building enclosure Degree, while drawing hole using the one kind in equal diameter or width, variable diameters or width, the cantilever end for drawing hole is bigger than normal, and position of fixity is less than normal.
In step c, when hole is drawn using whitewashing, building enclosure periphery solidified earth mutually overlaps to form water-stop curtain, goes along with sb. to guard him Body structure surface smears the anti-friction agent for being easy to building enclosure to reclaim.
In step e, when deadweight or auxiliary equipment effect sink down into designed elevation, its top is higher by design mark to building enclosure 0.5m high or so, when building enclosure bottom soil body property is poor, is provided with the fixed structure for preventing it from sinking around building enclosure.
In step e, supporting construction goes along with sb. to guard him deep pit monitor, supporting construction jointly alone or in combination after the completion of building enclosure construction Including at least one in prestress anchorage cable, bracing members, prefabricated PC fish belly sill, concrete support system.
In step f, after excavation of foundation pit is completed and backfilled, building enclosure is extracted and returned using crane or tower crane crane gear Receive, building enclosure reclaims aperture after hole and backfilled in time.
Present invention disclosed above preferred embodiment is only intended to help and illustrates the present invention.Preferred embodiment is not detailed All of details is described, it is only described specific embodiment that the invention is not limited yet.Obviously, according to the content of this specification, Can make many modifications and variations.This specification is chosen and specifically describes these embodiments, is to preferably explain the present invention Principle and practical application so that skilled artisan can be best understood by and utilize the present invention.The present invention is only Limited by claims and its four corner and equivalent.

Claims (8)

1. a kind of construction method of recyclable building enclosure, it is characterised in that comprise the following steps:
A. building enclosure pattern and rigidity are determined according to design requirement, the size selection according to soil layer situation and building enclosure draws hole Diameter, into well width;
B. preparation of construction operation, the transport and carrying of building enclosure, surveying setting-out excavates guide groove, according to soil layer property and guide groove Depth determines whether to install guide groove retaining wall or casing, can suitably fetch earth if necessary, and set construction marker;
C. draw hole operation, rig is in place, open water pump, start rig water spray and draw hole, draw hole speed according to drawing hole mechanical type, soil Layer property, irrigation pressure and traffic conditions comprehensively determine, when run of steel is not enough, according to the appropriate drill method of rig type selecting And extension drill rod;
D. when hole arrival projected depth is drawn, stopping is drawn hole drill and is entered, and draws hole for a drilling and forming hole or multiple drilling and forming hole;
E. after pore-forming terminates, lift building enclosure, it is determined that and correct the perpendicularity of building enclosure, enclosed the insertion of hole center is drawn Protection structure, then sinks down into projected depth in deadweight or auxiliary equipment effect;
F. after excavation of foundation pit completes and backfills and terminate, building enclosure is transferred to and is reclaimed using crane gear, building is backfilled in hole Rubbish, sandstone or clay material.
2. the construction method of recyclable building enclosure according to claim 1, it is characterised in that:The building enclosure is for just In the fender member of assembling, spreading and dismounting, including prefabricated pile, assembled ground-connecting-wall, large-scale steel reinforced concrete I-beam, concrete filled steel tube At least one in stake.
3. the construction method of recyclable building enclosure according to claim 1, it is characterised in that:In the step b, guide groove Width of the width more than building enclosure, the depth of guide groove determines that guide groove is according to soil according to the depth and replacement rate of building enclosure Layer property and channel depths determine whether to install dado structure, and armlet structure is in circular casing, square casing, steel plate pile wall One kind, can suitably fetch earth if necessary.
4. the construction method of recyclable building enclosure according to claim 1, it is characterised in that:In the step c, draw hole Equipment is the one kind in single shaft or multiple-rotor mixer, rotary churning pile machine, down-the-hole drill, chute forming machine, draws tool in the equipment drilling process of hole There is at least one function in jet, water spray, whitewashing.
5. the construction method of recyclable building enclosure according to claim 1, it is characterised in that:In the step c, draw hole Diameter or width according to soil layer property determine, more than or equal to the diameter or width of building enclosure, while drawing hole uses equal diameter Or the one kind in width, variable diameters or width, the cantilever end for drawing hole is bigger than normal, and position of fixity is less than normal.
6. the construction method of recyclable building enclosure according to claim 1, it is characterised in that:In the step c, when adopting When drawing hole with whitewashing, building enclosure periphery solidified earth mutually overlaps to form water-stop curtain, and building enclosure surface smear is easy to go along with sb. to guard him The anti-friction agent that structure is reclaimed.
7. the construction method of recyclable building enclosure according to claim 1, it is characterised in that:In the step e, go along with sb. to guard him When deadweight or auxiliary equipment effect sink down into designed elevation, its top is higher by designed elevation 0.4m-0.6m to structure, when going along with sb. to guard him knot The fixed structure for preventing it from sinking is provided with when structure bottom soil body property is poor, around building enclosure.
8. the construction method of recyclable building enclosure according to claim 1, it is characterised in that:In the step e, go along with sb. to guard him Supporting construction goes along with sb. to guard him deep pit monitor jointly alone or in combination after the completion of structure construction, and supporting construction includes prestress anchorage cable, steel branch At least one in support, prefabricated PC fish belly sill, concrete support system.
CN201611209233.8A 2016-12-23 2016-12-23 The construction method of recyclable building enclosure Pending CN106759377A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611209233.8A CN106759377A (en) 2016-12-23 2016-12-23 The construction method of recyclable building enclosure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611209233.8A CN106759377A (en) 2016-12-23 2016-12-23 The construction method of recyclable building enclosure

Publications (1)

Publication Number Publication Date
CN106759377A true CN106759377A (en) 2017-05-31

Family

ID=58919200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611209233.8A Pending CN106759377A (en) 2016-12-23 2016-12-23 The construction method of recyclable building enclosure

Country Status (1)

Country Link
CN (1) CN106759377A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108411905A (en) * 2018-03-12 2018-08-17 中国电建集团华东勘测设计研究院有限公司 Mitigate the method that pile driving construction influences surrounding enviroment
CN114775664A (en) * 2022-05-24 2022-07-22 中铁一局集团有限公司 Steel sheet pile cofferdam construction method for deep foundation pit and steel sheet pile cofferdam

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4316824A1 (en) * 1993-05-19 1994-11-24 Sbh Tiefbautechnik Gmbh Machine for driving in and withdrawing retaining-wall elements during the driving of trenches
CN101487261A (en) * 2009-01-21 2009-07-22 浙江中成建工集团有限公司 Profiled bar freezing wall foundation ditch combined enclosure method and its structure
CN101560771A (en) * 2009-05-11 2009-10-21 周治国 Reclaimable foundation pit bracing system and construction method thereof
CN101929158A (en) * 2010-09-13 2010-12-29 天津天一建设集团有限公司 Statically pressed pile high-pressure whirl jet lead hole construction method
CN105178332A (en) * 2015-09-25 2015-12-23 上海十三冶建设有限公司 Recyclable steel pipe bundle foundation pit enclosing structure and constructing method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4316824A1 (en) * 1993-05-19 1994-11-24 Sbh Tiefbautechnik Gmbh Machine for driving in and withdrawing retaining-wall elements during the driving of trenches
CN101487261A (en) * 2009-01-21 2009-07-22 浙江中成建工集团有限公司 Profiled bar freezing wall foundation ditch combined enclosure method and its structure
CN101560771A (en) * 2009-05-11 2009-10-21 周治国 Reclaimable foundation pit bracing system and construction method thereof
CN101929158A (en) * 2010-09-13 2010-12-29 天津天一建设集团有限公司 Statically pressed pile high-pressure whirl jet lead hole construction method
CN105178332A (en) * 2015-09-25 2015-12-23 上海十三冶建设有限公司 Recyclable steel pipe bundle foundation pit enclosing structure and constructing method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108411905A (en) * 2018-03-12 2018-08-17 中国电建集团华东勘测设计研究院有限公司 Mitigate the method that pile driving construction influences surrounding enviroment
CN108411905B (en) * 2018-03-12 2020-05-05 中国电建集团华东勘测设计研究院有限公司 Method for reducing influence of pile construction on surrounding environment
CN114775664A (en) * 2022-05-24 2022-07-22 中铁一局集团有限公司 Steel sheet pile cofferdam construction method for deep foundation pit and steel sheet pile cofferdam

Similar Documents

Publication Publication Date Title
CN101328712A (en) Construction method of interlocking pile for soft soil and soil layer with obstacle
CN102286984A (en) Water-stop curtain and construction method thereof
CN108166483A (en) Bored pile construction method
CN105155516B (en) The method of construction drill bored concrete pile before making an overall screening underground obstacle
CN111395330B (en) Construction method for concrete cast-in-situ bored pile complete steel casing penetrating through underground gallery
CN108978644A (en) Energy saving and environment friendly bored pile construction method
CN206646497U (en) A kind of clad steel casing structure
CN110629747A (en) Full-casing full-rotation construction process for pile foundation under complex geological conditions
CN104746519A (en) Obstacle clearing construction method
CN110984133A (en) Construction method for foundation of deep-water shallow-covering-layer trestle
CN104805831A (en) Pore-forming method of hard rock foundation pile with large diameter
CN113668527A (en) Construction method for inserting long steel pile casing under rotary digging pile construction of deep rockfill silt stratum
CN105442605A (en) Construction method for drawing out prestress high concrete (PHC) pile and reusing PHC pile for retaining in deep excavation
CN110735432A (en) Method for clearing pile foundation and controlling parameters in shield tunneling machine over-invasion limit tunnel range
CN105155519A (en) Rotary-excavating under-reamed bored pile constructing method
CN108842802A (en) Piles in Karst Region base construction method
CN104532853A (en) Deep foundation pit supporting method and system characterized by steel reinforced cement-soil piles, bolts easy to detach and automatic monitoring and early warning
CN106759377A (en) The construction method of recyclable building enclosure
CN107700508A (en) A kind of shaped steel stirs the construction method of water spray soil curtain support pile
CN111485549A (en) Rotary drilling and buried drilling treatment method
CN208396651U (en) Rectangle pile foundation drilling construction equipment
CN103015435A (en) Long auger down hole hammer vibration rotary-jet steel reinforced cement-soil pile foundation pit water-resisting and supporting method
CN103074887A (en) Drilling/spraying integrated foundation treatment method and special drilling rig component
CN110273413A (en) A kind of efficient construction method of prefabricated pile
CN108842788A (en) Stiff-core cement soil mixing pile construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhou Shengquan

Inventor after: Chen Yue

Inventor after: Liu Quanlin

Inventor after: Du Xiaoli

Inventor after: Chen Liang

Inventor after: Zhu Fangjian

Inventor after: Cheng Lin

Inventor after: Hua Xiaoman

Inventor before: Chen Yue

Inventor before: Zhou Shengquan

Inventor before: Liu Quanlin

Inventor before: Du Xiaoli

Inventor before: Chen Liang

Inventor before: Zhu Fangjian

Inventor before: Cheng Lin

Inventor before: Hua Xiaoman

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531