CN108425361A - Pile pulling device and its application process - Google Patents

Pile pulling device and its application process Download PDF

Info

Publication number
CN108425361A
CN108425361A CN201810437148.XA CN201810437148A CN108425361A CN 108425361 A CN108425361 A CN 108425361A CN 201810437148 A CN201810437148 A CN 201810437148A CN 108425361 A CN108425361 A CN 108425361A
Authority
CN
China
Prior art keywords
immersed tube
pile
bearing bar
sliding slot
oblique sliding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810437148.XA
Other languages
Chinese (zh)
Other versions
CN108425361B (en
Inventor
马晓辉
周红兵
尹晓洁
沈君旗
宋炜
景皓莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 4 Group Co Ltd
Original Assignee
Shanghai Construction No 4 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 4 Group Co Ltd filed Critical Shanghai Construction No 4 Group Co Ltd
Priority to CN201810437148.XA priority Critical patent/CN108425361B/en
Publication of CN108425361A publication Critical patent/CN108425361A/en
Application granted granted Critical
Publication of CN108425361B publication Critical patent/CN108425361B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/02Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing

Abstract

The present invention relates to a kind of pile pulling device and its application processes.The pile pulling device includes immersed tube, two oblique sliding slots and bearing bar, and immersed tube includes the first end and second end being oppositely arranged;Two oblique sliding slots are symmetrically opened in the inner wall of immersed tube, and direction of the oblique sliding slot from close to the position of second end towards far from second end extends;Bearing bar is located inside immersed tube, and the both ends of bearing bar are located on two oblique sliding slots and diagonally sliding slot slides.Above-mentioned pile pulling device by immersed tube end set can diagonally sliding slot sliding bearing bar, bearing bar can slide into the bottom of engineering pile and the column bottom of the quasi- engineering pile pulled out of stud, bearing bar is driven to move up using when being pulled out on immersed tube, and then achieve the purpose that pile pulling is removed obstacles, pile pulling is reduced in the process to the breadth and depth of Pile side soil body disturbing influence.In addition, the application construction method step of above-mentioned pile pulling device is simple and convenient to operate, it is suitable for popularization and application.

Description

Pile pulling device and its application process
Technical field
The present invention relates to the realm of building construction, more particularly to pile pulling device and its application process.
Background technology
Engineering pile, using the stake that finally stress works between floors, has been widely used in city as in engineering In construction.However, as the public visual field is increasingly stepped into urban renewal, reconstruction of building and extension project are also persistently overheating, Yuan Youjian Bearing capacity (stake long, quantity), the settling amount for building object foundation engineering stake cannot be satisfied new building demand, cause newly-increased or more work as a substitute The position of journey stake and the case that original old stake is collided are increasing.
Usually, common engineering pile technology of removing obstacles mainly has that the high-pressure water vapor cutting of side, heavy excavation is removed obstacles and stake top Hold hydraulic lifting etc..However, above-mentioned engineering pile is removed obstacles, there is the disturbing influences to Pile side soil body during pile pulling for technology Larger problem.
Invention content
Based on this, it is necessary to which, for problem larger to Pile side soil body disturbing influence during pile pulling, providing one kind can Pile pulling is reduced in the process to the pile pulling device and its application process of Pile side soil body disturbing influence.
A kind of pile pulling device, including:
Immersed tube, including the first end and second end that is oppositely arranged;
Two oblique sliding slots are symmetrically opened in the inner wall of the immersed tube, and the oblique sliding slot is from close to the second end Position extends towards the direction far from the second end;
Bearing bar is located inside the immersed tube, and the both ends of the bearing bar are located in two oblique sliding slots simultaneously It is slided along the oblique sliding slot.
In one embodiment, further include banking stop, the banking stop is sheathed on the end of the bearing bar.
In one embodiment, the shape of the cross section of the immersed tube is circle, the maximum between two oblique sliding slots Distance is equal to the internal diameter of the immersed tube.
In one embodiment, the shape of the cross section of the immersed tube is rectangle, the distance between two oblique sliding slots Equal to the side length of the rectangle.
In one embodiment, the cross section of the line between the bottom and top of the oblique sliding slot and the immersed tube it Between angle be 40 ° -50 °.
In one embodiment, the bearing bar is steel pin.
The application construction method of above-mentioned pile pulling device, includes the following steps:
The position for determining the quasi- engineering pile pulled out, the immersed tube is sunk;
When the second end of the immersed tube touches the engineering pile, continue to sink with the immersed tube, the load-bearing Bar squeezes the top that oblique sliding slot described in lower edge is moved upward to the oblique sliding slot in the soil body;
When the bearing bar sinks to the column bottom elevation location of the engineering pile with the immersed tube, with the immersed tube On pull out, the bearing bar moves under the soil body and the gravity of the engineering stake body from the top of the oblique sliding slot described The bottom of oblique sliding slot;
When pulling out on the immersed tube continues, the bearing bar holds the bottom of the engineering pile, and then completes the engineering Stake is pulled out.
Above-mentioned pile pulling device sinks immersed tube in use, according to the position of engineering pile to be pulled out, when the second termination of immersed tube When contacting the quasi- engineering pile pulled out, bearing bar moves up and is close to along oblique sliding slot under the extruding of the soil body and engineering pile The side of engineering pile is moved down with immersed tube, when bearing bar sinks to the position of engineering pile elevation of bottom, on immersed tube It pulls out, by bearing bar, diagonally sliding slot is squeezed to the bottom end of oblique sliding slot the gravity of the soil body and engineering stake body, that is, close to immersed tube the The position at two ends, when being pulled out on immersed tube, bearing bar holds up engineering pile, and forming an entirety with immersed tube pulls out engineering pile backing. Above-mentioned pile pulling device by immersed tube end set can diagonally sliding slot sliding bearing bar, as immersed tube is pulled out along quasi- After the stake side of engineering pile sinks to column bottom, bearing bar can slide into the column of the bottom of engineering pile and the quasi- engineering pile pulled out of stud Bottom drives bearing bar to move up, and then achievees the purpose that pile pulling is removed obstacles using when being pulled out on immersed tube, reduces pile pulling in the process to stake side The breadth and depth that soil disturbance influences, has saved processing cost, and the risk of broken pile can be also easy to produce to avoid end pile pulling. In addition, the application construction method step of above-mentioned pile pulling device is simple and convenient to operate, it is suitable for popularization and application.
Description of the drawings
Fig. 1 is the sectional view of the pile pulling device of an embodiment;
Fig. 2 is the vertical view of the positions A-A of pile pulling device shown in FIG. 1;
Fig. 3 is the vertical view of the positions A-A of the pile pulling device of another embodiment shown in FIG. 1;
Fig. 4 a-4d are the application and construction block diagram of the pile pulling device of an embodiment.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts all other Embodiment shall fall within the protection scope of the present invention.
As Figure 1-Figure 2, the pile pulling device 10 of an embodiment includes immersed tube 100, two oblique sliding slots 110 and load-bearing Bar 120, immersed tube 100 include the first end 100a being oppositely arranged and second end 100b;It is heavy that two oblique sliding slots 110 are symmetrically opened in The inner wall of pipe 100, direction of the oblique sliding slot 110 from close to the position of second end 100b towards far from second end 100b extend;Load-bearing Bar 120 is located inside immersed tube 100, and the both ends of bearing bar 120 are located in two oblique sliding slots 110 and diagonally sliding slot 110 Sliding.
Above-mentioned pile pulling device 10 sinks immersed tube 100 in use, according to the position of engineering pile to be pulled out, when immersed tube 100 When second end 100b touches the quasi- engineering pile pulled out, bearing bar 120 is under the extruding of the soil body and engineering pile along oblique cunning Slot 110 moves up and is close to the side of engineering pile as immersed tube 100 moves down, when bearing bar 120 sinks to engineering pile bottom When the position of portion's absolute altitude, with being pulled out on immersed tube 100, the gravity of the soil body and engineering stake body is by diagonally sliding slot 110 of bearing bar 120 It squeezes to the bottom of oblique sliding slot 110, that is, close to the position of 100 second end 100b of immersed tube, when being pulled out on immersed tube 100, bearing bar 120 hold up engineering pile, and forming an entirety with immersed tube 100 pulls out engineering pile backing.Above-mentioned pile pulling device 10 is by immersed tube 100 end set can bearing bar 120 that diagonally sliding slot 110 slides, as immersed tube 100 is along the stake of the quasi- engineering pile pulled out After side sinks to column bottom, bearing bar 120 can slide into the column bottom of the quasi- engineering pile pulled out of the bottom of engineering pile and stud, using heavy It drives bearing bar 120 to move up when being pulled out on pipe 100, and then achievees the purpose that pile pulling is removed obstacles, reduce pile pulling in the process to Pile side soil The breadth and depth of body disturbing influence has saved processing cost, and can be also easy to produce the risk of broken pile to avoid end pile pulling.
Immersed tube 100 is generally hollow tubular, is matched with the shape of the quasi- engineering pile pulled out.For example, when the shape of engineering pile When being cylindric, the cross section of immersed tube 100 also mutually should be round (as shown in Figure 2).And when the shape of engineering pile is cuboid When, the rectangular immersed tube 100 (as shown in Figure 3) in selection cross section.During pile pulling, immersed tube 100 is to be sheathed on engineering pile Outside, therefore, the outer diameter that the internal diameter of immersed tube 100 should be slightly larger than engineering pile (for when immersed tube 100 is cylinder barrel shaped), with convenient The sinking of immersed tube 100 and be the certain space of the mobile reservation of bearing bar 120.
Please continue to refer to Fig. 1 and Fig. 2, immersed tube 100 includes the first end 100a being oppositely arranged and second end 100b, in reality In application, immersed tube 100 is moved down from second end 100b, it is then sheathed on the outside of engineering pile.Two oblique sliding slots 110 open up In the inner wall of immersed tube 100, wherein the bottom of oblique sliding slot 110 close to immersed tube 100 second end 100b, and from bottom towards remote Direction from the second end 100b extends.The width of oblique sliding slot 110 is matched with the outer diameter of bearing bar 120 so that bearing bar 120 can slide under the effect of external force along oblique sliding slot 110.Wherein, 110 bottom of oblique sliding slot and 100 bottom of immersed tube it Between distance can be selected according to actual needs.
Further, in the present embodiment, as shown in Fig. 2, when the shape of the cross section of immersed tube 100 is round, two Maximum distance between the oblique sliding slot of item 110 is equal to the internal diameter of immersed tube 100.That is, two 110 bottom ends of oblique sliding slot are located at immersed tube The both ends of 100 internal diameters.Therefore, when the both ends of bearing bar 120 are located at the bottom of two oblique sliding slots 110, bearing bar 120 It is located just on the center line of 100 bottom of immersed tube, when pulling out engineering pile on immersed tube 100, bearing bar 120 is also located just at engineering pile The centre position of bottom, can more stably propping works stake, reduce pile pulling during eccentric force.
In addition, as shown in figure 3, in other embodiments, the shape of the cross section of immersed tube 100 is rectangle, two oblique cunnings Distance between slot 110 is equal to the side length of rectangle.When immersed tube 100 is hollow rectangular-shape, it is symmetrically opened in immersed tube 100 Two oblique sliding slots 110 of inner wall are mutually parallel, and the bottom end of oblique sliding slot 110 is located at the center line of 100 cross section of immersed tube On.Bearing bar 120 is located just at the bottom of engineering pile when such setting can to pull out on engineering pile, and then is provided for engineering pile More stable supporting force.
When immersed tube 100 sinks, bearing bar 120 is upward along oblique sliding slot 110 under the extruding of the soil body and engineering pile Mobile, until moving to the top of oblique sliding slot 110, in the sinking watching of immersed tube 100, bearing bar 120 is close to engineering pile It moves in outside.And when bearing bar 120 is moved to the elevation of bottom position of engineering pile, the extruding of engineering pile is just lost, certainly Bearing bar 120 can be moved down along oblique sliding slot 110 under the gravity of body, until being moved to the bottom of oblique sliding slot 110.At this In embodiment, the angle between line and the cross section of immersed tube 100 between the bottom and top of oblique sliding slot 110 is 40 °- 50°.At this point, the horizontal force and vertical force of bearing bar 120 are essentially identical, it is automatic under gravity to be conducive to bearing bar 120 It is mobile.If oblique sliding slot 110 is relatively steep, that is, line between the bottom and top of oblique sliding slot 110 is transversal with immersed tube 100 Angle between face is more than 50 ° so that the slotting length of oblique sliding slot 110 is longer, and cutting workload is larger, and is unfavorable for sinking The stability of pipe 100.And if oblique sliding slot 110 is relatively slow, that is, line between the bottom and top of oblique sliding slot 110 with it is heavy Angle between the cross section of pipe 100 is less than 40 °, and the bottom that bearing bar 120 is displaced downwardly to oblique sliding slot 110 can be made relatively more tired It is difficult.In the present embodiment, the angle between the line between the bottom and top of oblique sliding slot 110 and the lateral face of immersed tube 100 It is 45 °.In addition, the length of oblique sliding slot 110 can according to actual needs and the size of immersed tube 100 is selected.
Please refer to Fig. 1 and Fig. 2, in the present embodiment, pile pulling device 10 further includes banking stop 130,130 sets of banking stop Set on the end of bearing bar 120.The both ends of bearing bar 120 are located on two oblique sliding slots 110 and stretch out outside immersed tube 100, Banking stop 130 is sheathed on the end of bearing bar 120, that is, banking stop 130 is located at the outside of the outer wall of immersed tube 100.Banking stop 130 It can prevent bearing bar 120 from being removed from oblique sliding slot 110.In the present embodiment, banking stop 130 is steel plate.Bearing bar 120 is Steel pin.
The application of pile pulling device 10 is illustrated below in conjunction with Fig. 1 and Fig. 4 a-4d, in one embodiment, above-mentioned pile pulling The application process of device 10 includes the following steps:
Step 1 determines the position of the quasi- engineering pile 20 pulled out, immersed tube 100 is sunk.For example, in fig.4, in immersed tube 100 second end 100b sinks down into ground P hereinafter, and being moved to close to the direction of engineering pile 20.
Step 2 continues to sink, hold when the second end 100b of immersed tube 100 touches engineering pile 20 with immersed tube 100 Diagonally sliding slot 110 is moved upward to the top of oblique sliding slot 110 to weight bar 120 under soil body extruding.As shown in fig. 4 a, bearing bar 120 are extruded into the top of oblique sliding slot 110, and are close to the lateral wall of engineering pile 20.Then, bearing bar 120 is with immersed tube 100 Continue to sink.
Step 3, when bearing bar 120 sinks to the column bottom elevation location of engineering pile 20 with immersed tube 100, with immersed tube It is pulled out on 100, bearing bar 120 moves to oblique cunning under the gravity of 20 pile body of the soil body and engineering pile from the top of oblique sliding slot 110 The bottom of slot 110.During bearing bar 120 is close to the lateral wall of engineering pile 20 and sinks with immersed tube 100, in engineering pile Under 20 extruding, bearing bar 120 is located at the top (as shown in Figure 4 b) of oblique sliding slot 110.And when bearing bar 120 sinks to engineering When the position of 20 bottom absolute altitudes of stake, bearing bar 120 loses the extruding of engineering pile 20, and with being pulled out on immersed tube 100, load-bearing Bar 120 is moved downward to the bottom (as illustrated in fig. 4 c) of oblique sliding slot 110 under the gravity of itself.Also, due to engineering Bearing bar 120, is extruded in the bottom of oblique sliding slot 110 by 20 gravity of itself of stake.
Step 4, as shown in figure 4d, when pulling out on immersed tube 100 continues, bearing bar 120 holds the bottom of engineering pile 20, into And complete pulling out for engineering pile 20.Bearing bar 120 holds engineering pile 20, pulls out engineering pile 20 with the promotion of immersed tube 100.
Above-mentioned pile pulling device 10 coordinates common immersed tube technique, and bearing bar 120 is because soil body resistance is along tiltedly during immersed tube It is moved up to sliding slot 110, and then automatically opens the bottom of immersed tube 100;When bearing bar 120 is sent to engineering pile 20 by immersed tube 100 Stake bottom when, the gravity of utilizing works stake 20 itself and bearing bar 120 gravity of itself make diagonally sliding slot 110 of bearing bar 120 It moves down, holds engineering pile 20.That is, pile pulling load-bearing is collectively formed in the bottom of engineering pile 20 with immersed tube 100 in bearing bar 120 Force mechanism pulls out engineering pile 20 with the promotion of immersed tube 100.
Above-mentioned pile pulling device 10 can reduce pile pulling in the process to the breadth and depth of the disturbing influence of Pile side soil body, compare General pile pulling is removed obstacles technology, and above-mentioned pile pulling device 10 can reduce the expenditure of soil disturbance post-reinforcing cost.Meanwhile using stake Form is pulled out in collet stake, and the danger of broken pile can be not only also easy to produce to avoid end pile pulling, while can increase substantially pile pulling Power expands the application range of pile pulling device 10.In addition, the application process step of above-mentioned pile pulling device 10 is simple, operation is easy, just In popularization and application.
Each technical characteristic of embodiment described above can be combined arbitrarily, to keep description succinct, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, it is all considered to be the range of this specification record.
Several embodiments of the invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention Range.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (7)

1. a kind of pile pulling device, which is characterized in that including:
Immersed tube, including the first end and second end that is oppositely arranged;
Two oblique sliding slots are symmetrically opened in the inner wall of the immersed tube, and the oblique sliding slot is from close to the position of the second end Extend towards the direction far from the second end;
Bearing bar is located inside the immersed tube, and the both ends of the bearing bar are located in two oblique sliding slots and along institute State oblique sliding slot sliding.
2. pile pulling device according to claim 1, which is characterized in that further include banking stop, the banking stop is sheathed on institute State the end of bearing bar.
3. pile pulling device according to claim 1, which is characterized in that the shape of the cross section of the immersed tube is round, and two Maximum distance between oblique sliding slot described in item is equal to the internal diameter of the immersed tube.
4. pile pulling device according to claim 1, which is characterized in that the shape of the cross section of the immersed tube be rectangle, two Distance between oblique sliding slot described in item is equal to the side length of the rectangle.
5. pile pulling device according to claim 1, which is characterized in that the company between the bottom and top of the oblique sliding slot Angle between line and the cross section of the immersed tube is 40 ° -50 °.
6. pile pulling device according to claim 1, which is characterized in that the bearing bar is steel pin.
7. according to the application process of claim 1-6 any one of them pile pulling devices, which is characterized in that include the following steps:
The position for determining the quasi- engineering pile pulled out, the immersed tube is sunk;
When the second end of the immersed tube touches the engineering pile, continue to sink with the immersed tube, the bearing bar exists The soil body squeezes the top that oblique sliding slot described in lower edge is moved upward to the oblique sliding slot;
When the bearing bar sinks to the column bottom elevation location of the engineering pile with the immersed tube, on the immersed tube Pull out, the bearing bar moved to from the top of the oblique sliding slot under the soil body and the gravity of the engineering stake body it is described tiltedly To the bottom of sliding slot;
When pulling out on the immersed tube continues, the bearing bar holds the bottom of the engineering pile, and then completes the engineering pile It pulls out.
CN201810437148.XA 2018-05-09 2018-05-09 Pile pulling device and application method thereof Active CN108425361B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810437148.XA CN108425361B (en) 2018-05-09 2018-05-09 Pile pulling device and application method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810437148.XA CN108425361B (en) 2018-05-09 2018-05-09 Pile pulling device and application method thereof

Publications (2)

Publication Number Publication Date
CN108425361A true CN108425361A (en) 2018-08-21
CN108425361B CN108425361B (en) 2023-09-22

Family

ID=63162529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810437148.XA Active CN108425361B (en) 2018-05-09 2018-05-09 Pile pulling device and application method thereof

Country Status (1)

Country Link
CN (1) CN108425361B (en)

Citations (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB191022695A (en) * 1910-09-30 1911-05-25 Moritz Kahn Improved Shoe for Piles Made of Concrete or other Plastic Material.
CH122301A (en) * 1926-11-25 1927-09-16 Fuerst Max Device for ramming into the ground, respectively. for digging piles, poles, etc.
DE569085C (en) * 1931-05-20 1933-01-27 Hermann E Mueller Dr Extension tube, especially for tripods
JPH09163876A (en) * 1995-12-15 1997-06-24 Yamaguchi Kaki Engei:Kk Pile pulling device
JPH11172674A (en) * 1997-12-15 1999-06-29 Maeda Corp Pile extraction jig and pile extraction method
JP3082129U (en) * 2001-05-24 2001-11-30 和弘 田阪 Pile remover
JP2004239041A (en) * 2003-02-07 2004-08-26 Maruyama Komuten:Kk Pull-out device for pile
WO2006041154A1 (en) * 2004-10-15 2006-04-20 Hirofumi Kataoka Device for removing underground obstacle, digging unit, and method of removing underground obstacle by using the device
CN1963044A (en) * 2006-12-06 2007-05-16 南京路鼎搅拌桩特种技术有限公司 Construction method for withdrawal of waste pile
JP2008106480A (en) * 2006-10-24 2008-05-08 Nissaku:Kk Spear for pulling out steel pipe and method for pulling out steel pipe
JP2008266928A (en) * 2007-04-18 2008-11-06 Kenji Kaga Existing pile extractor and existing pile extracting method
JP2009156010A (en) * 2007-12-27 2009-07-16 Chowa Kogyo Kk Pile punching machine alignment method and device
JP2009203768A (en) * 2008-02-29 2009-09-10 Hiroshi Onodera Wooden pile extractor
CN101736746A (en) * 2009-12-04 2010-06-16 上海智平基础工程有限公司 Construction method for vibrator pipe sinking high-pressure grouting underpinning pile extracting
CN203270577U (en) * 2013-06-05 2013-11-06 中铁四局集团有限公司 Underground pile removing apparatus with door plate clamp
CN203846496U (en) * 2014-05-09 2014-09-24 江苏省华建建设股份有限公司 Self-lock device for pulling timber piles
KR20140122552A (en) * 2013-04-10 2014-10-20 신성컨트롤(주) Stake drawing out aparatus
CN104141306A (en) * 2013-05-07 2014-11-12 上海建工五建集团有限公司 Semi-casing-pipe vibrating pile pulling device and use method thereof
CN106320340A (en) * 2016-10-12 2017-01-11 中建港务建设有限公司 Vibrating sleeve for pile extracting and high-pressure water-jetting and pile-extracting process
JP2017075445A (en) * 2015-10-13 2017-04-20 株式会社エーコー Existing pile removal system
CN107338795A (en) * 2017-06-09 2017-11-10 中铁建大桥工程局集团第五工程有限公司 A kind of full-sleeve pulls out post row's formula bored pile construction method
CN107882033A (en) * 2018-01-08 2018-04-06 贾羽威 One kind can multiple pile pulling device
CN207295711U (en) * 2017-09-21 2018-05-01 姜延洋 A kind of portable pile-drawing machine for building
JP6320606B1 (en) * 2017-07-03 2018-05-09 藤井 健之 Pile removal device and pile removal method
CN208415255U (en) * 2018-05-09 2019-01-22 上海建工四建集团有限公司 Pile pulling device

Patent Citations (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB191022695A (en) * 1910-09-30 1911-05-25 Moritz Kahn Improved Shoe for Piles Made of Concrete or other Plastic Material.
CH122301A (en) * 1926-11-25 1927-09-16 Fuerst Max Device for ramming into the ground, respectively. for digging piles, poles, etc.
DE569085C (en) * 1931-05-20 1933-01-27 Hermann E Mueller Dr Extension tube, especially for tripods
JPH09163876A (en) * 1995-12-15 1997-06-24 Yamaguchi Kaki Engei:Kk Pile pulling device
JPH11172674A (en) * 1997-12-15 1999-06-29 Maeda Corp Pile extraction jig and pile extraction method
JP3082129U (en) * 2001-05-24 2001-11-30 和弘 田阪 Pile remover
JP2004239041A (en) * 2003-02-07 2004-08-26 Maruyama Komuten:Kk Pull-out device for pile
WO2006041154A1 (en) * 2004-10-15 2006-04-20 Hirofumi Kataoka Device for removing underground obstacle, digging unit, and method of removing underground obstacle by using the device
JP2008106480A (en) * 2006-10-24 2008-05-08 Nissaku:Kk Spear for pulling out steel pipe and method for pulling out steel pipe
CN1963044A (en) * 2006-12-06 2007-05-16 南京路鼎搅拌桩特种技术有限公司 Construction method for withdrawal of waste pile
JP2008266928A (en) * 2007-04-18 2008-11-06 Kenji Kaga Existing pile extractor and existing pile extracting method
JP2009156010A (en) * 2007-12-27 2009-07-16 Chowa Kogyo Kk Pile punching machine alignment method and device
JP2009203768A (en) * 2008-02-29 2009-09-10 Hiroshi Onodera Wooden pile extractor
CN101736746A (en) * 2009-12-04 2010-06-16 上海智平基础工程有限公司 Construction method for vibrator pipe sinking high-pressure grouting underpinning pile extracting
KR20140122552A (en) * 2013-04-10 2014-10-20 신성컨트롤(주) Stake drawing out aparatus
CN104141306A (en) * 2013-05-07 2014-11-12 上海建工五建集团有限公司 Semi-casing-pipe vibrating pile pulling device and use method thereof
CN203270577U (en) * 2013-06-05 2013-11-06 中铁四局集团有限公司 Underground pile removing apparatus with door plate clamp
CN203846496U (en) * 2014-05-09 2014-09-24 江苏省华建建设股份有限公司 Self-lock device for pulling timber piles
JP2017075445A (en) * 2015-10-13 2017-04-20 株式会社エーコー Existing pile removal system
CN106320340A (en) * 2016-10-12 2017-01-11 中建港务建设有限公司 Vibrating sleeve for pile extracting and high-pressure water-jetting and pile-extracting process
CN107338795A (en) * 2017-06-09 2017-11-10 中铁建大桥工程局集团第五工程有限公司 A kind of full-sleeve pulls out post row's formula bored pile construction method
JP6320606B1 (en) * 2017-07-03 2018-05-09 藤井 健之 Pile removal device and pile removal method
CN207295711U (en) * 2017-09-21 2018-05-01 姜延洋 A kind of portable pile-drawing machine for building
CN107882033A (en) * 2018-01-08 2018-04-06 贾羽威 One kind can multiple pile pulling device
CN208415255U (en) * 2018-05-09 2019-01-22 上海建工四建集团有限公司 Pile pulling device

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
吴林峰等: "预应力钢筋混凝土管桩拔桩机研制", 工程建设与管理, pages 48 - 50 *
孙立宝;王云春;: "套管钻进拔桩法及其工程应用", 探矿工程(岩土钻掘工程), no. 09, pages 65 - 69 *
尹晓洁: "紧邻历史保护建筑的深基坑施工技术", 地基基础, pages 940 - 942 *
李震宇: "一种往复式液压驱动套管拔管机", vol. 40, no. 9, pages 40 - 44 *

Also Published As

Publication number Publication date
CN108425361B (en) 2023-09-22

Similar Documents

Publication Publication Date Title
CN204185874U (en) A kind of high gradient slope base configuration
CN103742157A (en) Method of newly building underground space under ground by pipe jacking method
CN208415255U (en) Pile pulling device
CN204000840U (en) Concrete floral tube slip casting uplift pile
CN104975611B (en) The heavy of the well-points dewatering pipe of liquid soil layer sets device and heavy equipment, method
CN204252164U (en) A kind of Submersed type active well
CN203625883U (en) Steel sheet support pile with pipes for foundation pit construction
CN108425361A (en) Pile pulling device and its application process
CN204753581U (en) Stake end enlarged footing precast pile
CN205024719U (en) Pile foundation and integrated reverse construction vertical braces system of underground continuous wall
CN106013096A (en) Construction method of building foundation
CN206775005U (en) The temporary cable bracket that can be had enough to meet the need
CN206830213U (en) A kind of soft rock tunnel anti-collapse monitoring device
CN109137901A (en) A kind of dedicated adjustable rise buildings tubular pole of building engineering construction
CN202706049U (en) Reinforced concrete basin open caisson
CN205587568U (en) It is manual with curved reinforcing bar device
CN205804365U (en) A kind of cap excavation method top board node structure
CN103556629A (en) Construction method of special-shaped pile
CN211849527U (en) High water pressure drop well combination plugging device
CN104153372B (en) A kind of vertical support unit of foundation ditch doubles as bearing pile method
CN103321261A (en) Construction method for directional expansion-rise deviation rectification
CN203977418U (en) Prevent cast-in-place pile concrete loss device
CN204080807U (en) A kind of major diameter drilling follow pile tube Pile feeder
CN103498467B (en) High-bearing-capacity foundation pile and processing method for high-bearing-capacity foundation pile and foundation
CN205259175U (en) Lower part enlarges compound foundation pile of diameter section

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant