CN106013096A - Construction method of building foundation - Google Patents
Construction method of building foundation Download PDFInfo
- Publication number
- CN106013096A CN106013096A CN201610508563.0A CN201610508563A CN106013096A CN 106013096 A CN106013096 A CN 106013096A CN 201610508563 A CN201610508563 A CN 201610508563A CN 106013096 A CN106013096 A CN 106013096A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- casing
- impact cone
- diameter
- coalition
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 37
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 70
- 239000010959 steel Substances 0.000 claims abstract description 70
- 238000000034 method Methods 0.000 claims description 11
- 239000002689 soil Substances 0.000 claims description 5
- 238000005516 engineering process Methods 0.000 description 4
- 238000005266 casting Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000010412 perfusion Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610508563.0A CN106013096B (en) | 2016-07-02 | 2016-07-02 | A kind of construction foundation working method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610508563.0A CN106013096B (en) | 2016-07-02 | 2016-07-02 | A kind of construction foundation working method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106013096A true CN106013096A (en) | 2016-10-12 |
CN106013096B CN106013096B (en) | 2017-11-10 |
Family
ID=57104853
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610508563.0A Active CN106013096B (en) | 2016-07-02 | 2016-07-02 | A kind of construction foundation working method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106013096B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108265694A (en) * | 2018-02-01 | 2018-07-10 | 温州市腾圣建设有限公司 | A kind of construction method of deep foundation base |
CN112065816A (en) * | 2020-09-16 | 2020-12-11 | 中机锻压江苏股份有限公司 | Length-variable full-built-in hydraulic ramming hammer |
CN115031058A (en) * | 2022-06-08 | 2022-09-09 | 中国建筑土木建设有限公司 | Short-distance excavation-free sleeve pre-embedding device and method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2312968Y (en) * | 1997-10-13 | 1999-04-07 | 李训华 | Quick-acting pile driver |
CN101245598A (en) * | 2007-02-16 | 2008-08-20 | 夏传清 | Combined construction technique for driven cast-in-place pile and driven pile tip and driven pipe |
JP2010236323A (en) * | 2009-03-31 | 2010-10-21 | Mitani Sekisan Co Ltd | Foundation pile structure for on-site formation, and construction method of foundation pile |
CN104060604A (en) * | 2014-05-29 | 2014-09-24 | 国鼎(南通)管桩有限公司 | Construction method for bored pile |
CN104074186A (en) * | 2014-07-22 | 2014-10-01 | 王继忠 | Pile casing device for hole formation in building foundation and construction method of building foundation |
CN105178290A (en) * | 2015-08-14 | 2015-12-23 | 太原理工大学 | Steel tube pile with blast expanding device |
-
2016
- 2016-07-02 CN CN201610508563.0A patent/CN106013096B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2312968Y (en) * | 1997-10-13 | 1999-04-07 | 李训华 | Quick-acting pile driver |
CN101245598A (en) * | 2007-02-16 | 2008-08-20 | 夏传清 | Combined construction technique for driven cast-in-place pile and driven pile tip and driven pipe |
JP2010236323A (en) * | 2009-03-31 | 2010-10-21 | Mitani Sekisan Co Ltd | Foundation pile structure for on-site formation, and construction method of foundation pile |
CN104060604A (en) * | 2014-05-29 | 2014-09-24 | 国鼎(南通)管桩有限公司 | Construction method for bored pile |
CN104074186A (en) * | 2014-07-22 | 2014-10-01 | 王继忠 | Pile casing device for hole formation in building foundation and construction method of building foundation |
CN105178290A (en) * | 2015-08-14 | 2015-12-23 | 太原理工大学 | Steel tube pile with blast expanding device |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108265694A (en) * | 2018-02-01 | 2018-07-10 | 温州市腾圣建设有限公司 | A kind of construction method of deep foundation base |
CN112065816A (en) * | 2020-09-16 | 2020-12-11 | 中机锻压江苏股份有限公司 | Length-variable full-built-in hydraulic ramming hammer |
CN115031058A (en) * | 2022-06-08 | 2022-09-09 | 中国建筑土木建设有限公司 | Short-distance excavation-free sleeve pre-embedding device and method |
CN115031058B (en) * | 2022-06-08 | 2023-06-09 | 中国建筑土木建设有限公司 | Short-distance excavation-free sleeve embedding device and method |
Also Published As
Publication number | Publication date |
---|---|
CN106013096B (en) | 2017-11-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105780763B (en) | Mesoporous vibrates the construction method of casing retaining wall long auger guncreting pile | |
CN203808822U (en) | Full-hydraulic double power head device of rotary drilling rig | |
CN102383431B (en) | Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof | |
CN105569560A (en) | Full casing long-spiral bored pile machine and method of using same for construction | |
CN106149684A (en) | A kind of full-sleeve long screw auger drilling deposited pile construction method | |
CN103835287B (en) | A kind of construction method of compacted diameter-variable pile | |
CN102409667B (en) | Construction device and construction process of extruded and expanded cast-in-place pile | |
CN106013096A (en) | Construction method of building foundation | |
CN102635110B (en) | Construction method for concrete pile | |
CN206681671U (en) | A kind of jackstone stratigraphical drilling device | |
CN102808407A (en) | Construction method of soft-foundation reinforced concrete cast-in-place pile | |
CN207260151U (en) | Drill bit is pulled out in a kind of rotation of the long casing of rotary drilling rig pulling bored concrete pile | |
CN101135157A (en) | Static pressure pipe pile settling construction technique | |
CN109853534B (en) | Construction method of stiffening core pedestal pile | |
CN102535452A (en) | Novel engineering pile | |
CN104264679A (en) | Construction method of tower transmission iron tower foundation large-diameter underwater cast-in-place piles | |
CN103572760A (en) | Bored grouting pile whole pile length vibrating construction method and device | |
CN106703023B (en) | A kind of four wing prefabricated pile of hydraulic paddle type mill and its construction method | |
CN106120720B (en) | A kind of construction foundation working equipment and construction method | |
CN201746830U (en) | Long screw bored concrete pile post-inserted cage tool | |
CN110258504B (en) | Immersed tube compaction pile construction process for bottom tamping by utilizing built-in rammer | |
CN205501998U (en) | Expand end combination end -bearing pile basis | |
CN201459734U (en) | Dry bored pile tamper | |
CN103590394A (en) | Construction method of original-state soil-taking pouring pile | |
CN110206012B (en) | Connectable spiral plate deep dynamic compaction device and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhu Xiaodong Inventor after: Cheng Zhang Jianing Inventor after: Zhou Zhifeng Inventor after: Ge Chenhua Inventor after: Cao Yanwu Inventor after: Chen Miaozhi Inventor after: Shi Ganhua Inventor after: Yu Qinan Inventor after: Yin Xiaowei Inventor before: Han Shaopeng |
|
CB03 | Change of inventor or designer information | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20171012 Address after: 226019 Jiangsu Province, Nantong City Chongchuan District No. 27 south south century department room 3301 Applicant after: Nantong the Great Wall Construction Group Co., Ltd. Address before: 054000 Xingtai Province, Gao Qiao Road, No. 79, Hebei Applicant before: Han Shaopeng |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |