CN102535452A - Novel engineering pile - Google Patents
Novel engineering pile Download PDFInfo
- Publication number
- CN102535452A CN102535452A CN2010105891606A CN201010589160A CN102535452A CN 102535452 A CN102535452 A CN 102535452A CN 2010105891606 A CN2010105891606 A CN 2010105891606A CN 201010589160 A CN201010589160 A CN 201010589160A CN 102535452 A CN102535452 A CN 102535452A
- Authority
- CN
- China
- Prior art keywords
- stake
- pile
- hole
- pipe
- bearing capacity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 claims abstract description 11
- 239000002002 slurry Substances 0.000 claims abstract description 5
- 239000004567 concrete Substances 0.000 claims abstract description 3
- 238000005553 drilling Methods 0.000 claims abstract description 3
- 238000005516 engineering process Methods 0.000 claims description 16
- 239000011440 grout Substances 0.000 claims description 12
- 230000000996 additive Effects 0.000 claims description 4
- 239000000654 additive Substances 0.000 claims description 4
- 239000002689 soil Substances 0.000 claims description 3
- 241000893018 Armeria Species 0.000 claims description 2
- 241000196324 Embryophyta Species 0.000 claims description 2
- 210000004080 Milk Anatomy 0.000 claims description 2
- 229910000831 Steel Inorganic materials 0.000 claims description 2
- 239000004568 cement Substances 0.000 claims description 2
- 239000004927 clay Substances 0.000 claims description 2
- 229910052570 clay Inorganic materials 0.000 claims description 2
- 230000000694 effects Effects 0.000 claims description 2
- 239000010881 fly ash Substances 0.000 claims description 2
- 239000000463 material Substances 0.000 claims description 2
- 238000000034 method Methods 0.000 claims description 2
- 239000008267 milk Substances 0.000 claims description 2
- 235000013336 milk Nutrition 0.000 claims description 2
- 239000000203 mixture Substances 0.000 claims description 2
- 239000004576 sand Substances 0.000 claims description 2
- 239000010959 steel Substances 0.000 claims description 2
- 210000001503 Joints Anatomy 0.000 abstract 1
- 238000005086 pumping Methods 0.000 abstract 1
- 238000004080 punching Methods 0.000 abstract 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 210000002381 Plasma Anatomy 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
Abstract
The invention relates to a novel engineering pile, which belongs to the technical field of buildings and pile foundations of structures. As a result, a new pile type, a new structure and an innovative construction method are adopted for improving single-pile bearing capacity, ensuring pile quality, avoiding pile scrappage during construction, accelerating construction progress and the like against the pile foundation being in line with the result. The technical scheme of the result comprises the following steps of: mechanical equipment is used for punching and drilling a pile hole till a supporting course, pumping slurry out of the hole without pouring concrete, hoisting a preformed pile into the hole till the lower end part of the pile reaches the supporting course, and sinking the preformed pile through a vibration method or a hammering method or other methods so as to insert the end of the pile into the supporting course by a certain scale; and filling up a gap between the preformed pile and the pile hole by pressure grouting so as to improve friction force in the lateral direction of the pile. When the preformed pile which is driven into the pile hole comprises multiple joints, the pile needs to be connected; and due to the particularity produced by implementation of the result, when the pile is connected, a fixer is required, and the structure and a using method of the fixer are of one part of contents of the result.
Description
Affiliated technical field, background technology
Affiliated technical field: building, structure pile foundation technology field
Background technology: the existing technology that improves bearing capacity of single pile has stake end enlarged footing technology, two road enlarged footing technology (on pile body, doing enlarged footing).
Precast reinforced concrete piles buries behind the pile sinking, and bearing capacity of pile tip and pile body frictional resistance are all big, by the stake type of extensive employing, when ground has hard soil layer to penetrate, then should adopt other type.Long spiral shell is exerted pressure and irritated castinplace pile is new science and technology stake type, advantage many (short etc.) like the duration, and if its drill bit is the sharp subdrilling head of employing and on cutting edge, weld carbide bit; Then can bore hardpan; The length of this stake can reach 30m, when surpassing situation such as this length, also should adopt other types.The stake type of existing engineering piles has multiple, and various stake types are applicable to the situation that it is suitable for, and wants plasma discharge when multiple stake type is constructed, and can not the mud in the stake hole be drained entirely, and sediment can reduce the bearing capacity of stake at the bottom of the hole.
Many engineering piles might produce the situation that broken pile etc. is scrapped stake in construction.The books that reflect this achievement figure viewed from behind technology: " ground foundation engineering " (second edition), Chinese Water Conservancy water power publishing house 2010.3 second editions; " Foundation Design " China Electric Power Publishing House 2009.2 publishes; " ground and basis " BJ University Press 2010.10 publishes
Summary of the invention
The present invention adopts the job practices of new stake type, new construction and innovation, makes to be fit to use the pile foundation of this achievement to improve bearing capacity of single pile, to ensure quality of pile, to avoid constructing that king-pile is scrapped and accelerating construction progress etc., and this achievement technical scheme is:
1, dash, bore the stake hole to bearing stratum with plant equipment, after mud is extracted out in the hole, placing of concrete not; But will give in system stake lifting goes into, the through bearing stratum of stake end, a dimensioning bassets on the stake top; Then make and give the system stake and sink to some extent, make the stake end insert bearing stratum one dimensioning, thereby improve bearing capacity of pile tip with vibratory drilling method or hammering method or additive method; The space of giving between system stake and the stake hole is filled up with pressure grouting, thereby improves the frictional resistance of stake side direction.
2, for pressure grouting, the system of the giving stake of going into the post hole has two kinds of special constructions, and the first is equipped with grout pipe in the inboard of stake outer surface; It two is equipped with grout pipe in stake inside; The grout pipe of both of these case has many pulp holes on the side of stake external surface; This hole small pipeline outer with passing to stake is connected, and during pressure grouting, the pressure slurry gets into grout pipe and flows into the space between stake and the stake hole through the slurry outlet on its side, small pipeline; If also will be in the milk to the stake bottom, then grout pipe should extend the absolute altitude of stake bottom.
3, for a certain reason, the grouting that can take in addition has two kinds, and the first is by existing technology grouting, and it also is conventional giving the system pilework; It two is to make a grouting pipeline with giving system stake hollow part, and the horizontal small pipeline of hollow part and its side UNICOM is to an outer wall.
When 4, going into the giving system stake more piece is arranged an of hole, carry out will using a kind of fixator in the stake connection, its base plate is processed by steel plate; The centre is great circle hole Q, and Q is slightly little for the stake boring ratio, and fixator is placed on the aperture in a hole when using; The Q center overlaps with stake center, hole, and when two joint stakes were connected, joint stake A up grasped its position by lifting machine; Another joint below stake B insert among the Q and the certain size that bassets, pass the horizontal hole G of B stake upper end section with a pipe P, the P two ends are by two bearing supports on the fixator; This two bearing is positioned on the base plate at Q diameter line two ends, after connection A, the B two joint stakes; Mobile P pipe makes its disengaging B stake and operates lifting machine and lets two of A, B having connected move down, and the operating process of connection more piece stake by that analogy.
5, P pipe can a pipe; But also 2-section pipe, if adopt 2-section pipe, this 2-section pipe inserts the two ends of G hole respectively during use.
6, insert bearing stratum one dimensioning in the end of below pile cutoff in order to yield system stake, this pile cutoff lower end should be pointed metalwork.
7, to the stake hole and give the space between the system stake; Adopt the used material of slip casing by pressure; The additive etc. that research is used cement, clay, swell soil, flyash, fine sand and can be produced certain effect; Its blend proportion according to project situation experimentize select excellent, thereby ensure the quality of products and practice thrift engineering cost.
8, give employed innovation utensil in innovation structure and the construction of system stake; All to calculate, confirm size, grasp the principle of not only safety but also joint money with principles such as structural mechanics; Size is neither less than normal not bigger than normal yet, according to the engineering actual conditions confirm the calculated data that will use.
Description of drawings
Fig. 1 is the preformed pile constructional drawing that is equipped with grout pipe, and a. component is an elevation; B, c component are section legends.Each symbolic representation: 1-preformed pile; 2-pulp hole; The pointed metalwork in 3-stake bottom; The 4-grout pipe; 5-pulp small pipeline; 6-hollow preformed pile hollow part.
Fig. 2 is the fixator constructional drawing, comprises plan view and lateral view, each symbolic representation:
The 1-base plate; Da Yuan hole, 2-centre; The 3-bearing; The 4-bolt hole; 5-timber hole.
The specific embodiment
Be fit to use the pile foundation engineering of this achievement, its Construction unit and this achievement patentee implement this patent achievement in signatory back.
Claims (8)
1. the present invention adopts the job practices of new stake type, new construction and innovation, makes to be fit to use the pile foundation of this achievement to improve bearing capacity of single pile, to ensure quality of pile, to avoid constructing that king-pile is scrapped and accelerating construction progress etc., and this achievement characteristic is:
Dash, bore the stake hole to bearing stratum with plant equipment, after mud is extracted out in the hole, placing of concrete not; But will give in system stake lifting goes into, the through bearing stratum of stake end, a dimensioning bassets on the stake top; Then make and give the system stake and sink to some extent, make the stake end insert bearing stratum one dimensioning, thereby improve bearing capacity of pile tip with vibratory drilling method or hammering method or additive method; The space of giving between system stake and the stake hole is filled up with pressure grouting, thereby improves the frictional resistance of stake side direction.
2. the new technology of raising bearing capacity of single pile according to claim 1 is characterized in that: for pressure grouting, the system of the giving stake of going into the post hole has two kinds of special constructions, and the first is equipped with grout pipe in the inboard of stake outer surface; It two is equipped with grout pipe in stake inside; The grout pipe of both of these case has many pulp holes on the side of stake external surface; This hole small pipeline outer with passing to stake is connected, and during pressure grouting, the pressure slurry gets into grout pipe and flows into the space between stake and the stake hole through the slurry outlet on its side, small pipeline; If also will be in the milk to the stake bottom, then grout pipe should extend the absolute altitude of stake bottom.
3. the new technology of raising bearing capacity of single pile according to claim 1 is characterized in that: for a certain reason, the grouting that can take in addition has two kinds, and the first is by existing technology grouting, and it also is conventional giving the system pilework; It two is to make a grouting pipeline with giving system stake hollow part, and the horizontal small pipeline of hollow part and its side UNICOM is to an outer wall.
4. the new technology of raising bearing capacity of single pile according to claim 1 is characterized in that: when going into the giving system stake more piece is arranged an of hole, carry out will using a kind of fixator in the stake connection; Its base plate is processed by steel plate, and the centre is great circle hole Q, and Q is slightly little for the stake boring ratio; Fixator is placed on the aperture in a hole when using, and the Q center overlaps with stake center, hole, when two joint stakes are connected; One joint stake A up grasps its position by lifting machine, another joint below stake B insert among the Q and the certain size that bassets, pass the horizontal hole G of B stake upper end section with a pipe P; The P two ends are by two bearing supports on the fixator, and this two bearing is positioned on the base plate at Q diameter line two ends, after connection A, the B two joint stakes;, mobile P pipe makes its disengaging B stake and operates lifting machine and lets two of A, B having connected move down, and the operating process of connection more piece stake is by that analogy.
5. fixator according to claim 4 is characterized in that: P pipe can a pipe; But also 2-section pipe, if adopt 2-section pipe, this 2-section pipe inserts the two ends of G hole respectively during use.
6. the new technology of raising bearing capacity of single pile according to claim 1 is characterized in that: insert bearing stratum one dimensioning in the end of below pile cutoff in order to yield system stake, this pile cutoff lower end should be pointed metalwork.
7. the new technology of raising bearing capacity of single pile according to claim 1; It is characterized in that: to the stake hole and give the space between the system stake; Adopt the used material of slip casing by pressure; The additive etc. that research is used cement, clay, swell soil, flyash, fine sand and can be produced certain effect, its blend proportion according to project situation experimentize select excellent, thereby ensure the quality of products and practice thrift engineering cost.
8. the new technology of raising bearing capacity of single pile according to claim 1; It is characterized in that: give employed innovation utensil in innovation structure and the construction of system stake; All to calculate, confirm size, grasp the principle of not only safety but also joint money with the structural mechanics principle; Size is neither less than normal not bigger than normal yet, according to the engineering actual conditions confirm the calculated data that will use.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105891606A CN102535452A (en) | 2010-12-15 | 2010-12-15 | Novel engineering pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105891606A CN102535452A (en) | 2010-12-15 | 2010-12-15 | Novel engineering pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102535452A true CN102535452A (en) | 2012-07-04 |
Family
ID=46343357
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010105891606A Pending CN102535452A (en) | 2010-12-15 | 2010-12-15 | Novel engineering pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102535452A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103015414A (en) * | 2012-12-31 | 2013-04-03 | 建华建材(中国)投资有限公司 | Precast concrete post grouting pile and grouting process |
CN103498467A (en) * | 2013-10-14 | 2014-01-08 | 成军 | High-bearing-capacity foundation pile and processing method for high-bearing-capacity foundation pile and foundation |
CN104110031A (en) * | 2013-04-22 | 2014-10-22 | 南通市常青建筑安装工程有限公司 | High-bearing-capacity foundation pile and method for processing same and foundation |
CN104894936A (en) * | 2015-04-07 | 2015-09-09 | 陈运辉 | Lateral-piling soil-squeezing grouting method for repairing settling roadbeds, and precast pile |
CN106223341A (en) * | 2016-07-25 | 2016-12-14 | 东南大学 | Marine large diameter steel pipe pile slip casting around pile device and construction method thereof |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2158493A (en) * | 1984-03-16 | 1985-11-13 | Earl & Wright Ltd | Method of installing a pile |
FR2634804A1 (en) * | 1988-07-28 | 1990-02-02 | Soletanche | Method of inserting a prefabricated post in a very deep bore and post for the use of this method. |
JPH02125016A (en) * | 1988-11-02 | 1990-05-14 | Ishizue Kensetsu:Kk | Hollow drilling grouting method |
KR0136958B1 (en) * | 1994-10-28 | 1998-05-15 | 임성철 | Piles comprising both precast concrete portions and concrete portions cast in situ |
CN1912253A (en) * | 2006-06-21 | 2007-02-14 | 闫雪晖 | Construction method of prestressed tubular pile |
CN101148874A (en) * | 2007-10-11 | 2008-03-26 | 李树源 | Construction method for increasing dry auger boring pouring pile bearing capacity |
CN101182716A (en) * | 2007-12-05 | 2008-05-21 | 中北大学 | Pile sinking method of Synchronization grouting static pressure precast pile |
CN101333812A (en) * | 2008-08-04 | 2008-12-31 | 上海市基础工程公司 | Grouter for back side grouting and its construction method |
-
2010
- 2010-12-15 CN CN2010105891606A patent/CN102535452A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2158493A (en) * | 1984-03-16 | 1985-11-13 | Earl & Wright Ltd | Method of installing a pile |
FR2634804A1 (en) * | 1988-07-28 | 1990-02-02 | Soletanche | Method of inserting a prefabricated post in a very deep bore and post for the use of this method. |
JPH02125016A (en) * | 1988-11-02 | 1990-05-14 | Ishizue Kensetsu:Kk | Hollow drilling grouting method |
KR0136958B1 (en) * | 1994-10-28 | 1998-05-15 | 임성철 | Piles comprising both precast concrete portions and concrete portions cast in situ |
CN1912253A (en) * | 2006-06-21 | 2007-02-14 | 闫雪晖 | Construction method of prestressed tubular pile |
CN101148874A (en) * | 2007-10-11 | 2008-03-26 | 李树源 | Construction method for increasing dry auger boring pouring pile bearing capacity |
CN101182716A (en) * | 2007-12-05 | 2008-05-21 | 中北大学 | Pile sinking method of Synchronization grouting static pressure precast pile |
CN101333812A (en) * | 2008-08-04 | 2008-12-31 | 上海市基础工程公司 | Grouter for back side grouting and its construction method |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103015414A (en) * | 2012-12-31 | 2013-04-03 | 建华建材(中国)投资有限公司 | Precast concrete post grouting pile and grouting process |
CN103015414B (en) * | 2012-12-31 | 2016-04-13 | 建华建材投资有限公司 | A kind of precast concrete post grouting pile and grouting process |
CN104110031A (en) * | 2013-04-22 | 2014-10-22 | 南通市常青建筑安装工程有限公司 | High-bearing-capacity foundation pile and method for processing same and foundation |
CN104110031B (en) * | 2013-04-22 | 2017-12-26 | 南通市常青建筑安装工程有限公司 | High-bearing capacity foundation pile and its processing method with basis |
CN103498467A (en) * | 2013-10-14 | 2014-01-08 | 成军 | High-bearing-capacity foundation pile and processing method for high-bearing-capacity foundation pile and foundation |
CN103498467B (en) * | 2013-10-14 | 2015-07-22 | 江苏溧阳城建集团有限公司 | High-bearing-capacity foundation pile and processing method for high-bearing-capacity foundation pile and foundation |
CN104894936A (en) * | 2015-04-07 | 2015-09-09 | 陈运辉 | Lateral-piling soil-squeezing grouting method for repairing settling roadbeds, and precast pile |
CN106223341A (en) * | 2016-07-25 | 2016-12-14 | 东南大学 | Marine large diameter steel pipe pile slip casting around pile device and construction method thereof |
CN106223341B (en) * | 2016-07-25 | 2018-03-20 | 东南大学 | Marine large diameter steel pipe pile slip casting around pile device and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100572683C (en) | The large-diameter ultra-deep rock borehole bottom-expanding filling pile job practices | |
CN102011399B (en) | PHC pile-based multiple high jet pedestal pile construction method | |
CN103321244B (en) | Sand foundation existing building sets up the construction method of basement | |
CN104863131A (en) | Polygonal cement-soil stirring pile and formation method thereof | |
CN203808822U (en) | Full-hydraulic double power head device of rotary drilling rig | |
CN105780763B (en) | Mesoporous vibrates the construction method of casing retaining wall long auger guncreting pile | |
CN109024651B (en) | Steel pipe concrete mixed pile foundation and construction method | |
CN102535452A (en) | Novel engineering pile | |
CN104863132A (en) | Bougainvillea spectabilis willd-shaped cement-soil mixing pile and shaping method thereof | |
CN108824471A (en) | A kind of deep water drift net multi-column pier foundation and its construction method | |
CN1206419C (en) | Combined rock-embedding pile and its construction method | |
CN206752454U (en) | One kind perfusion embedded pile | |
CN105297710A (en) | High-pressure-jetting cement soil twist drill and reamed reinforced concrete grouting combined pile and manufacturing method | |
CN102587372A (en) | Construction method for burying pile by under reaming and grouting | |
CN109339044A (en) | A kind of concrete pipe pile construction equipment | |
CN202247910U (en) | Soil retaining structure with different inclination angles of anti-skid cement soil pile | |
CN202187335U (en) | Novel engineering pile | |
JP4645091B2 (en) | Expanded pile and construction method of the expanded pile | |
CN209339143U (en) | A kind of concrete pipe pile construction equipment | |
CN102493439A (en) | Building fundamental pile constructional element | |
CN203129143U (en) | Static pressure jet flow piling wall forming equipment | |
CN109667266A (en) | From construction method, device and its matched dedicated tubular pole for boring large-diameter tubular pile | |
CN201087402Y (en) | High bearing ability filling pile | |
CN104863123B (en) | Drilling bearing pile and forming method thereof | |
CN212670554U (en) | Full-casing hydraulic hammering soil-squeezing cast-in-place pile device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
DD01 | Delivery of document by public notice |
Addressee: Wang Yunting Document name: the First Notification of an Office Action |
|
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120704 |
|
RJ01 | Rejection of invention patent application after publication |