CN204435330U - The interim ecological bleeder pipe plugging system of a kind of water power hydraulic engineering - Google Patents
The interim ecological bleeder pipe plugging system of a kind of water power hydraulic engineering Download PDFInfo
- Publication number
- CN204435330U CN204435330U CN201420868222.0U CN201420868222U CN204435330U CN 204435330 U CN204435330 U CN 204435330U CN 201420868222 U CN201420868222 U CN 201420868222U CN 204435330 U CN204435330 U CN 204435330U
- Authority
- CN
- China
- Prior art keywords
- pipe
- hammer
- plugging
- ecological
- vertical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Pipe Accessories (AREA)
Abstract
本实用新型公开了一种水电水利工程临时生态泄放管封堵系统,主要包括生态泄放管、锥形管、三通管、进口水平管、垂直管及封堵锤等。在生态泄放管竖直段的顶端连接有直径渐变增大的锥形管,在锥形管的顶端连接三通管,三通管与进口水平管和垂直管连通,生态泄放管、锥形管、三通管、进口水平管和垂直管预埋于建筑物内,垂直管通至建筑物顶,垂直管上部管口内通过牵引索悬挂有封堵锤,封堵锤的下半部与锥形管的形状相匹配,封堵锤的上半部与垂直管的内径相匹配,封堵锤在重力的作用下下半部能沉至锥形管中,密封生态泄放管的顶部。所述封堵锤为金属锤,外部包裹有一层止水橡胶。本实用新型利用封堵锤自重及水压力实现封堵,不需要额外动力。造价便宜,施工方便,操作简单,封堵安全性较高。
The utility model discloses a temporary ecological discharge pipe sealing system for hydropower and water conservancy projects, which mainly includes an ecological discharge pipe, a tapered pipe, a three-way pipe, an imported horizontal pipe, a vertical pipe, a sealing hammer and the like. A tapered pipe with gradually increasing diameter is connected to the top of the vertical section of the ecological discharge pipe, and a three-way pipe is connected to the top of the tapered pipe. The three-way pipe is connected with the inlet horizontal pipe and the vertical pipe. Shaped pipes, three-way pipes, imported horizontal pipes and vertical pipes are pre-buried in the building, the vertical pipes lead to the top of the building, and the upper part of the vertical pipes is hung with a plugging hammer through the traction cable. The lower part of the plugging hammer is connected to the The shape of the tapered pipe matches, the upper half of the plugging hammer matches the inner diameter of the vertical pipe, and the lower half of the plugging hammer can sink into the tapered pipe under the action of gravity to seal the top of the ecological discharge pipe. The plugging hammer is a metal hammer wrapped with a layer of water-stop rubber. The utility model utilizes the self-weight of the plugging hammer and the water pressure to realize the plugging without extra power. The cost is cheap, the construction is convenient, the operation is simple, and the plugging safety is high.
Description
技术领域technical field
本实用新型涉及水电水利工程临时生态泄放管封堵工程,具体说,是一种应用在水电水利工程下闸蓄水期临时生态泄放管上的封堵系统。The utility model relates to a plugging project for a temporary ecological discharge pipe of a hydropower and water conservancy project, in particular to a plugging system applied to a temporary ecological discharge pipe during the water storage period of a lower sluice of a hydropower and water conservancy project.
背景技术Background technique
水电水利工程下闸蓄水期生态泄放管为临时下泄生态流量设施,具有过流流量大,运行时间短,封堵水头高的特点,目前现有的生态泄放管封堵方法主要是通过预埋电缆远程操作电动阀门进行封堵,这种方法存在以下几个问题。The ecological discharge pipe during the water storage period of the lower sluice of the hydropower and water conservancy project is a temporary discharge ecological flow facility, which has the characteristics of large flow rate, short operation time and high sealing head. At present, the existing ecological discharge pipe sealing method is mainly through The pre-embedded cable remotely operates the electric valve for plugging. This method has the following problems.
(1)由于临时生态泄放管过流流量大,封堵水头高,满足设计要求的电动阀门较少,阀门选型困难,且电动阀门需铺设通气管道及电缆至水面以上,施工程序复杂、工程量较大。(1) Due to the large flow rate of the temporary ecological discharge pipe and the high plugging head, there are few electric valves that meet the design requirements, and the selection of valves is difficult, and the electric valves need to lay ventilation pipes and cables above the water surface, and the construction procedures are complicated. The amount of work is large.
(2)电动阀门阀体及电缆均埋设在混凝土结构或围岩中,一般在安装完成后2-4年后运行,由于不具备检修条件,受所处的环境影响,易发生损坏,操作的可靠性及保证率低。(2) The valve body and cables of the electric valve are buried in the concrete structure or surrounding rock, and generally run 2-4 years after the installation is completed. Due to the lack of maintenance conditions and the influence of the environment, they are prone to damage. Low reliability and guarantee rate.
(3)阀门关闭时,水流携带的石渣存在卡住阀门设备的可能性,影响临时生态泄放管封堵。(3) When the valve is closed, the gravel carried by the water may block the valve equipment, which will affect the sealing of the temporary ecological discharge pipe.
实用新型内容Utility model content
本实用新型所要解决的技术问题是,提供一种不需要额外动力,施工方便,操作简单,封堵安全性较高的水电水利工程临时生态泄放管封堵系统。The technical problem to be solved by the utility model is to provide a temporary ecological discharge pipe plugging system for hydropower and water conservancy projects that does not require additional power, is convenient in construction, simple in operation, and high in plugging safety.
为了解决上述技术问题,本实用新型采用的技术方案是:一种水电水利工程临时生态泄放管封堵系统,在生态泄放管竖直段的顶端连接有直径渐变增大的锥形管,在锥形管的顶端连接三通管,三通管与进口水平管和垂直管连通,生态泄放管、锥形管、三通管、进口水平管和垂直管预埋于建筑物内,垂直管通至建筑物顶,垂直管上部管口内通过牵引索悬挂有封堵锤,封堵锤的下半部与锥形管的形状相匹配,封堵锤的上半部与垂直管的内径相匹配,封堵锤在重力的作用下下半部能沉至锥形管中,密封生态泄放管的顶部。In order to solve the above technical problems, the technical solution adopted by the utility model is: a temporary ecological discharge pipe sealing system for hydropower and water conservancy projects, a tapered pipe with gradually increasing diameter is connected to the top of the vertical section of the ecological discharge pipe, Connect the tee pipe to the top of the conical pipe, the tee pipe is connected with the imported horizontal pipe and vertical pipe, the ecological discharge pipe, the tapered pipe, the tee pipe, the imported horizontal pipe and the vertical pipe are embedded in the building, and the vertical The pipe leads to the top of the building, and a plugging hammer is suspended in the upper nozzle of the vertical pipe through a traction cable. Matching, the lower half of the plugging hammer can sink into the conical pipe under the action of gravity to seal the top of the ecological discharge pipe.
所述封堵锤为金属锤,外部包裹有一层止水橡胶。The plugging hammer is a metal hammer wrapped with a layer of water-stop rubber.
所述封堵锤的止水橡胶锚固在金属锤顶。The water-stop rubber of the plugging hammer is anchored on the top of the metal hammer.
本实用新型的有益效果是:利用封堵锤自重及水压力实现封堵,不需要额外动力。造价便宜,施工方便,操作简单,封堵安全性较高。The beneficial effect of the utility model is that: the self-weight of the plugging hammer and the water pressure are used to realize the plugging without extra power. The cost is cheap, the construction is convenient, the operation is simple, and the plugging safety is high.
附图说明Description of drawings
图1是本实用新型水电水利工程临时生态泄放管封堵系统的结构示意图。Fig. 1 is a structural schematic diagram of a temporary ecological release pipe plugging system for a hydropower and water conservancy project of the present invention.
图2是本实用新型的封堵锤剖面图。Fig. 2 is a sectional view of the plugging hammer of the present utility model.
图3是本实用新型封堵后示意图。Fig. 3 is a schematic diagram of the utility model after plugging.
具体实施方式Detailed ways
下面结合附图和具体实施方式对本实用新型作进一步详细说明:Below in conjunction with accompanying drawing and specific embodiment the utility model is described in further detail:
如图1所示,本实用新型的水电水利工程临时生态泄放管封堵系统,在生态泄放管1竖直段的顶端连接有直径渐变增大的锥形管2,在锥形管2的顶端连接三通管8,三通管8与进口水平管3和垂直管4连通,生态泄放管1、锥形管2、三通管8、进口水平管3和垂直管4预埋于建筑物7内,垂直管4通至建筑物顶,垂直管4上部管口内通过牵引索6悬挂有封堵锤5,封堵锤5的下半部与锥形管2的形状相匹配,封堵锤的上半部与垂直管4的内径相匹配,封堵锤5在重力的作用下下半部能沉至锥形管2中,密封生态泄放管1的顶部。As shown in Figure 1, the temporary ecological discharge pipe plugging system of the hydropower and water conservancy project of the present utility model is connected with a tapered pipe 2 with a gradually increasing diameter at the top of the vertical section of the ecological discharge pipe 1, and the taper pipe 2 The top of the top is connected with the tee pipe 8, the tee pipe 8 is connected with the inlet horizontal pipe 3 and the vertical pipe 4, the ecological discharge pipe 1, the tapered pipe 2, the tee pipe 8, the inlet horizontal pipe 3 and the vertical pipe 4 are pre-buried in In the building 7, the vertical pipe 4 leads to the top of the building, and a sealing hammer 5 is suspended in the upper nozzle of the vertical pipe 4 by a traction cable 6. The lower half of the sealing hammer 5 matches the shape of the tapered pipe 2, and the sealing The upper half of the plugging hammer matches the inner diameter of the vertical pipe 4, and the lower half of the plugging hammer 5 can sink into the conical pipe 2 under the action of gravity to seal the top of the ecological discharge pipe 1.
如图2所示,所述封堵锤5为金属锤,外部包裹有一层止水橡胶9。所述封堵锤5的止水橡胶9锚固在金属锤顶。As shown in FIG. 2 , the plugging hammer 5 is a metal hammer wrapped with a layer of water-stop rubber 9 . The water-stop rubber 9 of the plugging hammer 5 is anchored on the top of the metal hammer.
如图1、3所示,生态泄放管1封堵前,封堵锤5由牵引索6悬挂于垂直管上部管口内,牵引索上端固定于封堵水位以上;生态泄放管1封堵时,松开牵引索6,封堵锤5在重力的作用下沉至锥形管2,在重力和水压力的作用下与管壁挤压密实,实现生态泄放管封堵。As shown in Figures 1 and 3, before the ecological discharge pipe 1 is blocked, the plugging hammer 5 is suspended in the upper nozzle of the vertical pipe by the traction cable 6, and the upper end of the traction cable is fixed above the plugging water level; the ecological discharge pipe 1 is blocked , loosen the traction cable 6, and the plugging hammer 5 sinks to the conical pipe 2 under the action of gravity, and squeezes and compacts with the pipe wall under the action of gravity and water pressure, so as to realize the plugging of the ecological discharge pipe.
以上所述的实施例仅用于说明本实用新型的技术思想及特点,其目的在于使本领域内的技术人员能够理解本实用新型的内容并据以实施,不能仅以本实施例来限定本实用新型的专利范围,即凡本实用新型所揭示的精神所作的同等变化或修饰,仍落在本实用新型的专利范围内。The embodiments described above are only used to illustrate the technical ideas and characteristics of the present utility model, and its purpose is to enable those skilled in the art to understand the content of the present utility model and implement it accordingly, and the present utility model cannot be limited only by this embodiment. The patent scope of the utility model, that is, all equivalent changes or modifications made to the spirit disclosed in the utility model still fall within the patent scope of the utility model.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420868222.0U CN204435330U (en) | 2014-12-31 | 2014-12-31 | The interim ecological bleeder pipe plugging system of a kind of water power hydraulic engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420868222.0U CN204435330U (en) | 2014-12-31 | 2014-12-31 | The interim ecological bleeder pipe plugging system of a kind of water power hydraulic engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204435330U true CN204435330U (en) | 2015-07-01 |
Family
ID=53603217
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420868222.0U Expired - Fee Related CN204435330U (en) | 2014-12-31 | 2014-12-31 | The interim ecological bleeder pipe plugging system of a kind of water power hydraulic engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204435330U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109440744A (en) * | 2018-12-24 | 2019-03-08 | 中国三峡建设管理有限公司 | A kind of fast and safely self-stabilization type diversion tunnel temporary plugging structures and methods |
CN113005996A (en) * | 2021-02-25 | 2021-06-22 | 中国电建集团北京勘测设计研究院有限公司 | Plugging structure of temporary ecological flow tube of hydraulic and hydroelectric engineering |
-
2014
- 2014-12-31 CN CN201420868222.0U patent/CN204435330U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109440744A (en) * | 2018-12-24 | 2019-03-08 | 中国三峡建设管理有限公司 | A kind of fast and safely self-stabilization type diversion tunnel temporary plugging structures and methods |
CN109440744B (en) * | 2018-12-24 | 2023-12-19 | 中国三峡建工(集团)有限公司 | Quick and safe temporary plugging structure and method for self-stabilizing diversion tunnel |
CN113005996A (en) * | 2021-02-25 | 2021-06-22 | 中国电建集团北京勘测设计研究院有限公司 | Plugging structure of temporary ecological flow tube of hydraulic and hydroelectric engineering |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205314107U (en) | Sectional type slip casting pipe device that foundation stabilization used | |
CN103866762A (en) | Pile body longitudinal multipoint grouting device | |
CN201129184Y (en) | One-way step-back grouting device with small conduit outer valve | |
CN105297755A (en) | High-pressure water aid-sinking type construction device of open caisson | |
CN204435330U (en) | The interim ecological bleeder pipe plugging system of a kind of water power hydraulic engineering | |
CN204225064U (en) | For the pressure pipeline structure of undergroundhydropower station diversion | |
CN204551481U (en) | For the segmenting slip casting pipe that soft soil layer is reinforced | |
CN103993901B (en) | A kind of projecting coal bed drilling waterpower is handled up anti-reflection method | |
CN206233204U (en) | Buried pressure steel pipe contact grouting hole sealing structure | |
CN207419484U (en) | Pressure steel pipe contact grouting embedded pipe arrangement structure | |
CN206785350U (en) | A kind of water burst drilling holes plugging device | |
CN104018475B (en) | A kind of embedded penstock backfill grouting structure and grouting process thereof | |
CN205259200U (en) | Foundation ditch confined aquifer precipitation well plugging device | |
CN104533448A (en) | Construction method for stopping water and reinforcing end of shield tunnel in lithosphere | |
CN205277356U (en) | Drill way tubular construction and prevent orifice device | |
CN104213628B (en) | Jacking mechanism for underground pipe culvert engineering | |
CN203878568U (en) | Longitudinal multi-point pile body grouting device | |
CN203823346U (en) | Plugging device for high-strength steel penstock hole | |
CN203716155U (en) | Pneumatic anchor rod grouter | |
CN104294827B (en) | Major diameter high pressure duct grouting structure and grouting method | |
CN202989929U (en) | Underwater concrete guide pipe bottom sealing device | |
CN203890980U (en) | Backfilling and grouting structure for buried pressure pipe | |
CN203977439U (en) | Prevent the filling system that Urban Underground water level declines | |
CN202731832U (en) | Grouting pipe for underground water plugging | |
CN207660625U (en) | The quick protrusion-dispelling water installations of the big water burst of high pressure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150701 |
|
CF01 | Termination of patent right due to non-payment of annual fee |