CN204343641U - Furred ceiling dedicated foot hand cradle - Google Patents

Furred ceiling dedicated foot hand cradle Download PDF

Info

Publication number
CN204343641U
CN204343641U CN201420856519.5U CN201420856519U CN204343641U CN 204343641 U CN204343641 U CN 204343641U CN 201420856519 U CN201420856519 U CN 201420856519U CN 204343641 U CN204343641 U CN 204343641U
Authority
CN
China
Prior art keywords
ramp
furred ceiling
framework
scaffold
hand cradle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420856519.5U
Other languages
Chinese (zh)
Inventor
何鹏
任元健
李定剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Bureau Decoration Engineering Co Ltd
Original Assignee
China Construction Eighth Engineering Division Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Decoration Co Ltd filed Critical China Construction Eighth Engineering Division Decoration Co Ltd
Priority to CN201420856519.5U priority Critical patent/CN204343641U/en
Application granted granted Critical
Publication of CN204343641U publication Critical patent/CN204343641U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of furred ceiling dedicated foot hand cradle, for carrying out follow-up furred ceiling operation on main layer Steel Structure, it is characterized in that, comprise: many cross one another packways, is set up on described main layer Steel Structure; And at least one pedestrian ramp; be arranged at the infall of two described packways; wherein, described pedestrian ramp has ramp, ramp framework; bridging and protection hurdle; ramp framework is formed by the steel pipe interconnection of many horizontal and verticals, and bridging interconnection is on the framework of ramp, and ramp has multistage; the two ends in every section of ramp are connected on the steel pipe of ramp framework, are provided with protection hurdle above the left and right sides in every section of ramp.Because the utility model adopts the mode of packway set up, avoid and set up full hall scaffold or completely spread the problem that single-row of scaffold brings, provide more favourable execution conditions.

Description

Furred ceiling dedicated foot hand cradle
Technical field
The utility model provides a kind of furred ceiling dedicated foot hand cradle, belongs to building engineering field.
Background technology
For meeting the growing material and cultural needs of people, roof structure is that the public building of the furred ceiling forms such as steel structure net rack, single-curved surface or many curved surfaces arises at the historic moment, when setting up this kind of furred ceiling, often select to set up full hall scaffold or completely spread single-row of scaffold in furred ceiling.Set up full hall scaffold to there is interspersed operation complexity, take extensive work face, delay the problems such as engineering construction progress; Completely spread single-row of scaffold and be unfavorable for workman's operation back and forth in furred ceiling.
Utility model content
For solving the problem, the utility model have employed following technical scheme:
The utility model provides a kind of furred ceiling dedicated foot hand cradle, for carrying out follow-up furred ceiling operation on main layer Steel Structure, it is characterized in that, comprise: many cross one another packways, is set up on described main layer Steel Structure; And at least one pedestrian ramp; be arranged at the infall of two described packways; wherein, described pedestrian ramp has ramp, ramp framework; bridging and protection hurdle; ramp framework is formed by the steel pipe interconnection of many horizontal and verticals, and bridging interconnection is on the framework of ramp, and ramp has multistage; the two ends in every section of ramp are connected on the steel pipe of ramp framework, are provided with protection hurdle above the left and right sides in every section of ramp.
In addition, furred ceiling dedicated foot hand cradle of the present utility model, can also have such feature: wherein, the facade of described framework is also provided with Dense mesh screen.
In addition, furred ceiling dedicated foot hand cradle of the present utility model, can also have such feature: also comprise:
Single-row of scaffold, is laid in the region with predetermined subsequent corrosion of described main layer Steel Structure.
In addition, furred ceiling dedicated foot hand cradle of the present utility model, such feature can also be had: wherein, described packway comprises vertical rod, cross bar, guardrail, support bar and scaffold floor, two outer vertical rods are connected with cross bar, support bar is connected to the junction of cross bar and outer vertical rod, and the two ends of scaffold floor are set up on two cross bars.
The beneficial effects of the utility model:
Adopt and set up packway, completely spread the mode of blanket net, metal binding wire rope, avoid and set up full hall scaffold or completely spread the problem that single-row of scaffold brings, provide more favourable execution conditions.
Set up packway in steel structure net rack encrypted area, decrease full hall scaffold or completely spread the use of single-row of scaffold steel pipe and accessory, save labor hour and material hiring cost, there is obvious economic benefit;
Avoid and set up full hall scaffold, for ground construction provides enough work planes, ground and furred ceiling can be constructed simultaneously, shorten the duration, have obvious economic benefit;
Metal binding wire rope, completely spreads the safety that blanket net further ensures ceiling construction personnel.
Accompanying drawing explanation
Fig. 1 is the top view of furred ceiling dedicated foot hand cradle of the present utility model;
Fig. 2 is the structural representation of the pedestrian ramp of furred ceiling dedicated foot hand cradle of the present utility model;
Fig. 3 is the schematic diagram hanging with Dense mesh screen on the facade of pedestrian ramp;
Fig. 4 is the structural representation of packway;
Fig. 5 is the scaffold floor lapped layup figure in guardrail;
Fig. 6 is the single-row of scaffold laying work area schematic diagram of furred ceiling dedicated foot hand cradle of the present utility model;
Fig. 7 is the structural representation of single-row of scaffold;
Fig. 8 is the position relationship schematic diagram of single-row of scaffold and roofing steel frame.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is further described.
Furred ceiling dedicated foot hand cradle, utilizes the original steel work of main roofing, sets up, and carries out follow-up furred ceiling operation for construction personnel.In order to ensure the safety of construction operation personnel and reduce scaffold building task difficulty, scaffold building is in main layer Steel Structure rack encrypted area, and construction operation is convenient, fast.
Furred ceiling dedicated foot hand cradle 11 comprises: be set up in the packway that the many Tiao Zong Transverse on main layer Steel Structure intersects; And be arranged at least one pedestrian ramp of infall of Zong Transverse two packways.Pedestrian ramp has the ramp of spiraling and rising, and supports the framework in ramp.
Fig. 1 is the top view of furred ceiling dedicated foot hand cradle of the present utility model, as shown in Figure 1, furred ceiling dedicated foot hand cradle 11 of the present utility model has San Tiao Transverse to packway 14 and 11 longitudinal packways 13, and the Yi Tiao Transverse in centre is provided with pedestrian ramp 12 to packway 14 and the infall of horizontal packway 13.
As shown in Figure 2, pedestrian ramp 12 has the ramp 122 for constructor's walking to the structure of pedestrian ramp 12, ramp framework 125, bridging 123 and protection hurdle 121.Ramp framework 125 is formed by the steel pipe interconnection of many horizontal and verticals.Bridging 123 interconnection on ramp framework 125, further firm pedestrian ramp.Ramp 122 has multistage, and the two ends of every section are connected on the steel pipe of ramp framework 125.Above every section of ramp 122, the left and right sides is provided with protection hurdle 121.
As shown in Figure 3, the facade of ramp framework 125 is also provided with Dense mesh screen 124, plays the effect of protection further.
Horizontal packway 13 is identical with longitudinal packway 14 structure.As shown in Figure 4, longitudinal packway 14 comprises vertical rod 144, cross bar 147, guardrail 141, support bar 143 and scaffold floor 146 to berm structure.Two outer vertical rods 144 are connected with cross bar 147, and support bar 143 is connected to cross bar 147 and the junction of outer vertical rod 144, plays further supporting role.The two ends of scaffold floor 146 are set up on two cross bars 147, walk for constructor.Guardrail 141 comprises railing 141-1 and middle railing 142-2, the distance L of upper railing 141-1 distance scaffold floor 146 1for 1200mm.
The left and right sides of scaffold floor 146 is also provided with foot guard plate 145, the height L of foot guard plate 145 2be not less than 180mm.
Fig. 5 is the scaffold floor lapped layup figure in guardrail, and in Fig. 5, there are two kinds of modes the joint of scaffold floor, and in Fig. 5 A, there is the spacing L between two cross bars, 147, two cross bars 147 joint of two panels scaffold floor 146 4will, at about 300mm, scaffold floor 146 be made to stretch out the length L of cross bar 147 3be not less than 100mm, the L in the present embodiment Fig. 5 A 3between 130mm to 150mm.Another kind of overlapping mode is as shown in Figure 5 B, overlapping between two panels scaffold floor 146, the length L of lap 5200mm should not be less than, that is, the distance L from the axis of cross bar 147 to the edge of scaffold floor 146 6100mm should not be less than.
When the former roof structure rack of constructing has the less region of subsequent corrosion, the rack namely when some regions of the former roof structure of job site is relatively steeper, sets up packway when being unfavorable for construction, just adopts single-row of scaffold.Subsequent corrosion can rule of thumb be preset before construction.In this region, adopt single-row of scaffold to arrange.Fig. 6 is the single-row of scaffold laying work area schematic diagram of furred ceiling dedicated foot hand cradle of the present utility model, and the a-quadrant at the two ends, left and right of figure Central Plains roof structure rack 15 is the less region of subsequent corrosion.This region needs lay single-row of scaffold.Fig. 7 is the structural representation of single-row of scaffold, and as shown in Figure 7, single-row of scaffold 17, in latticed, is intersected to form by horizontal and vertical steel pipe.As shown in Figure 8, single-row of scaffold 17 is erected at above the bottom support of former roof structure rack 15.
For ensureing construction safety further, also lay blanket net 18 in the below of whole operation side, the height distance sphere nodes 1.0m ~ 1.2m of blanket net 18.Need after setting up to do impact test qualified after, just can use.
In addition, former roof structure space truss structure is also provided with the safety rope of two ends colligation on main layer Steel Structure.Adopt the wire rope of φ 8, through steel structure net rack sphere nodes operation side, height 1.2m ~ 1.5m, two ends colligation is on steel structure net rack.Can safety effect be played in order to what ensure wire rope, wire rope horizontal direction must be in certain stress.

Claims (4)

1. a furred ceiling dedicated foot hand cradle, for carrying out follow-up furred ceiling operation on main layer Steel Structure, is characterized in that, comprise:
Many cross one another packways, are set up on described main layer Steel Structure; And
At least one pedestrian ramp, is arranged at the infall of two described packways,
Wherein, described pedestrian ramp has ramp, ramp framework, bridging and protection hurdle,
Ramp framework is formed by the steel pipe interconnection of many horizontal and verticals; bridging interconnection is on the framework of ramp; ramp has multistage, and the two ends in every section of ramp are connected on the steel pipe of ramp framework, are provided with protection hurdle above the left and right sides in every section of ramp.
2. furred ceiling dedicated foot hand cradle according to claim 1, is characterized in that:
Wherein, the facade of described framework is also provided with Dense mesh screen.
3. furred ceiling dedicated foot hand cradle according to claim 1, is characterized in that, also comprise:
Single-row of scaffold, is laid in the region with predetermined subsequent corrosion of described main layer Steel Structure.
4. furred ceiling dedicated foot hand cradle according to claim 1, is characterized in that:
Wherein, described packway comprises vertical rod, cross bar, guardrail, support bar and scaffold floor,
Two outer vertical rods are connected with cross bar, and support bar is connected to the junction of cross bar and outer vertical rod, and the two ends of scaffold floor are set up on two cross bars.
CN201420856519.5U 2014-12-24 2014-12-24 Furred ceiling dedicated foot hand cradle Active CN204343641U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420856519.5U CN204343641U (en) 2014-12-24 2014-12-24 Furred ceiling dedicated foot hand cradle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420856519.5U CN204343641U (en) 2014-12-24 2014-12-24 Furred ceiling dedicated foot hand cradle

Publications (1)

Publication Number Publication Date
CN204343641U true CN204343641U (en) 2015-05-20

Family

ID=53226918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420856519.5U Active CN204343641U (en) 2014-12-24 2014-12-24 Furred ceiling dedicated foot hand cradle

Country Status (1)

Country Link
CN (1) CN204343641U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612389A (en) * 2014-12-24 2015-05-13 上海中建八局装饰有限责任公司 Scaffold special for suspended ceiling

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612389A (en) * 2014-12-24 2015-05-13 上海中建八局装饰有限责任公司 Scaffold special for suspended ceiling

Similar Documents

Publication Publication Date Title
CN203867216U (en) Detachable steel frame supporting structure for ultra-high-rise building cantilevered plate
CN206053274U (en) The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose
CN102733606A (en) Construction method of high large cantilever structure
CN105544873A (en) Wavy hollow roof and construction method thereof
CN203834926U (en) Formwork erecting structure for bare concrete basement exterior wall
CN204343641U (en) Furred ceiling dedicated foot hand cradle
CN204040515U (en) Cat ladder
CN103147573B (en) Natatorium roof beam slab high formwork construction method
CN204059420U (en) Late poured band support structure
CN111005547A (en) Construction method of external scaffold with two-way twist staggered floor vertical face
CN208363666U (en) It is a kind of for build face side construction safety protection frame
CN104612389B (en) Furred ceiling dedicated foot hand cradle
CN104533092A (en) Truss roof ceiling construction method
CN102787717B (en) Self-supporting combined steel template construction method
WO2018126950A1 (en) Modular stairway
CN204781872U (en) Regularization post reinforcement operation platform
CN202214976U (en) Steel wire rope support device
CN203961300U (en) Tool-type passage
CN202788017U (en) Horizontally-overhung rigid hermetic section steel protective shed for high-rise buildings
CN203856096U (en) Novel free stone masonry building structure
CN203452388U (en) Movable type concrete casting operation platform
CN205206351U (en) Special split heads of big terrace
CN205955150U (en) Instrument formula windrow operation integration platform
CN203701627U (en) Shaped spliceable protective shed
CN102852334B (en) Construction technology for high-rise anti-slippage scaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 200120 unit 06, 07, No. 28, No. 1568, Century Avenue, free trade test area, Pudong New Area, Shanghai, China (Shanghai)

Patentee after: Zhongjian eight bureau Decoration Engineering Co., Ltd.

Address before: 200122 Pudong New Area Century Avenue, No. 28, building 06, unit 1568, 07

Patentee before: China Construction Eight Engineering Division Decoration Co., Ltd.