CN104612389B - Furred ceiling dedicated foot hand cradle - Google Patents

Furred ceiling dedicated foot hand cradle Download PDF

Info

Publication number
CN104612389B
CN104612389B CN201410837636.1A CN201410837636A CN104612389B CN 104612389 B CN104612389 B CN 104612389B CN 201410837636 A CN201410837636 A CN 201410837636A CN 104612389 B CN104612389 B CN 104612389B
Authority
CN
China
Prior art keywords
ramp
framework
furred ceiling
scaffold
packway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410837636.1A
Other languages
Chinese (zh)
Other versions
CN104612389A (en
Inventor
何鹏
任元健
李定剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Bureau Decoration Engineering Co Ltd
Original Assignee
China Construction Eighth Engineering Division Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Decoration Co Ltd filed Critical China Construction Eighth Engineering Division Decoration Co Ltd
Priority to CN201410837636.1A priority Critical patent/CN104612389B/en
Publication of CN104612389A publication Critical patent/CN104612389A/en
Application granted granted Critical
Publication of CN104612389B publication Critical patent/CN104612389B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The present invention provides a kind of furred ceiling dedicated foot hand cradle, for carrying out follow-up furred ceiling operation on main layer Steel Structure, it is characterised in that including: a plurality of cross one another packway, be set up on described main layer Steel Structure;And at least one pedestrian ramp; it is arranged at the infall of two described packways; wherein, described pedestrian ramp has ramp, ramp framework; bridging and protection hurdle; ramp framework is formed by the steel pipe interconnection of many horizontal and verticals, and bridging interconnection is on the framework of ramp, and ramp has multistage; the two ends in every section of ramp are connected on the steel pipe of ramp framework, every section of ramp the left and right sides be provided above protected hurdle.Owing to the present invention uses the mode of packway set up, it is to avoid set up full hall scaffold or problem that completely paving single-row of scaffold brings, it is provided that more favourable execution conditions.

Description

Furred ceiling dedicated foot hand cradle
Technical field
The present invention provides a kind of furred ceiling dedicated foot hand cradle, belongs to building engineering field.
Background technology
The material and cultural needs growing for meeting people, roof structure is steel structure net rack, list The public building of the furred ceiling form such as curved surface or many curved surfaces arises at the historic moment, when setting up this kind of furred ceiling, past Set up full hall scaffold or in furred ceiling, completely spread single-row of scaffold toward can select.Set up full hall scaffold There is interspersed operation complexity, take extensive work face, delay the problems such as engineering construction progress;Full paving Single-row of scaffold is unfavorable for workman's operation back and forth in furred ceiling.
Summary of the invention
For solving the problems referred to above, present invention employs following technical scheme:
The present invention provides a kind of furred ceiling dedicated foot hand cradle, follow-up for carrying out on main layer Steel Structure Furred ceiling operation, it is characterised in that including: a plurality of cross one another packway, is set up in described main room On the steel construction of face;And at least one pedestrian ramp, it is arranged at the infall of two described packways, Wherein, described pedestrian ramp has ramp, ramp framework, bridging and protection hurdle, ramp frame Frame is formed by the steel pipe interconnection of many horizontal and verticals, and bridging interconnection is in ramp framework On, ramp has multistage, and the two ends in every section of ramp are connected on the steel pipe of ramp framework, at every section The left and right sides in ramp be provided above protected hurdle.
It addition, the furred ceiling dedicated foot hand cradle of the present invention, it is also possible to have a feature in that wherein, institute State and on the facade of framework, be additionally provided with Dense mesh screen.
It addition, the furred ceiling dedicated foot hand cradle of the present invention, it is also possible to have a feature in that and also include: Single-row of scaffold, is laid in the region with predetermined subsequent corrosion of described main layer Steel Structure.
It addition, the furred ceiling dedicated foot hand cradle of the present invention, it is also possible to have a feature in that wherein, Described packway includes vertical rod, cross bar, guardrail, support bar and scaffold board, two outer vertical rods and cross bar Connecting, support bar is connected to the junction of cross bar and outer vertical rod, and the two ends of scaffold board ride upon two On cross bar.
Beneficial effects of the present invention:
Use and set up packway, completely spread blanket net, the mode of metal binding wire rope, it is to avoid set up full hall foot Hand cradle or the problem that completely paving single-row of scaffold brings, it is provided that more favourable execution conditions.
Set up packway in steel structure net rack encrypted area, decrease full hall scaffold or completely spread single foot hands Frame steel pipe and the use of accessory, save labor hour and material hiring cost, have obvious warp Ji benefit.
Avoid and set up full hall scaffold, provide enough work surfaces for ground construction, ground with Furred ceiling can be constructed simultaneously, shortens the duration, has obvious economic benefit.
Metal binding wire rope, completely paving blanket net further ensure the safety of ceiling construction personnel.
Accompanying drawing explanation
Fig. 1 is the top view of the furred ceiling dedicated foot hand cradle of the present invention;
Fig. 2 is the structural representation of the pedestrian ramp of the furred ceiling dedicated foot hand cradle of the present invention;
Fig. 3 is the schematic diagram hanging with Dense mesh screen on the facade of pedestrian ramp;
Fig. 4 is the structural representation of packway;
Fig. 5 is the scaffold board lapped layup figure in guardrail;
Fig. 6 is the single-row of scaffold laying work area schematic diagram of the furred ceiling dedicated foot hand cradle of the present invention;
Fig. 7 is the structural representation of single-row of scaffold;
Fig. 8 is the position relationship schematic diagram of single-row of scaffold and roofing steel skeleton.
Detailed description of the invention
The present invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
Furred ceiling dedicated foot hand cradle, utilizes the original steel construction of main roofing, sets up, for building people Member uses and carries out follow-up furred ceiling operation.In order to ensure the safety of construction operation personnel and reduce foot Hand cradle sets up task difficulty, and scaffold building is at main layer Steel Structure rack encrypted area, construction operation Convenient, fast.
Furred ceiling dedicated foot hand cradle 11 includes: a plurality of vertical intersection being set up on main layer Steel Structure Packway;And it is arranged at least one pedestrian ramp of the infall of vertical two packways.People's Bank of China slope Road has the ramp risen of spiraling, and supports the framework in ramp.
Fig. 1 is the top view of the furred ceiling dedicated foot hand cradle of the present invention, as it is shown in figure 1, the present invention Furred ceiling dedicated foot hand cradle 11 have three to the longitudinal packway 13 of packway 14 and 11, in centre An infall to packway 14 with horizontal packway 13 be provided with pedestrian ramp 12.
The structure of pedestrian ramp 12 is as in figure 2 it is shown, pedestrian ramp 12 has for workmen's walking Ramp 122, ramp framework 125, bridging 123 and protection hurdle 121.Ramp framework 125 Formed by the steel pipe interconnection of many horizontal and verticals.Bridging 123 interconnection is in ramp frame On frame 125, consolidate pedestrian ramp further.Ramp 122 has multistage, and the two ends of every section connect On the steel pipe of ramp framework 125.Above every section of ramp 122, the left and right sides is provided with protection Hurdle 121.
As it is shown on figure 3, be additionally provided with Dense mesh screen 124 on the facade of ramp framework 125, play into The effect of one step protection.
Laterally packway 13 is identical with longitudinal packway 14 structure.Berm structure is as shown in Figure 4, longitudinal Packway 14 includes vertical rod 144, cross bar 147, guardrail 141, support bar 143 and scaffold board 146. Two outer vertical rods 144 are connected with cross bar 147, and support bar 143 is connected to cross bar 147 and outer vertical rod The junction of 144, plays further supporting role.The two ends of scaffold board 146 ride upon two cross bars On 147, walk for workmen.Guardrail 141 includes railing 141-1 and middle railing 142-2, Distance L of upper railing 141-1 distance scaffold board 1461For 1200mm.
The left and right sides of scaffold board 146 is additionally provided with foot guard plate 145, the height L of foot guard plate 1452 Not less than 180mm.
Fig. 5 is the scaffold board lapped layup figure in guardrail, and in Fig. 5, the joint of scaffold board has two kinds Mode, in Fig. 5 A, there are two cross bars 147, two cross bars in the joint of two panels scaffold board 146 Spacing L between 1474Will be at about 300mm so that scaffold board 146 stretches out cross bar 147 Length L3Not less than 100mm, the L in the present embodiment Fig. 5 A3At 130mm to 150mm Between.Another kind of overlapping mode is as shown in Figure 5 B, overlapping between two panels scaffold board 146, overlapping Length L of part5It is no less than 200mm, i.e. from the axis of cross bar 147 to scaffold board 146 Distance L at edge6It is no less than 100mm.
When the former roof structure rack of construction has the less region of subsequent corrosion, i.e. existing when construction The rack in some regions of former roof structure relatively steep, set up packway when be unfavorable for construction, Just use single-row of scaffold.Subsequent corrosion can rule of thumb be preset before construction.In this region Employing single-row of scaffold is arranged.Fig. 6 is the single-row of scaffold paving of the furred ceiling dedicated foot hand cradle of the present invention If area schematic, the a-quadrant at the two ends, left and right of figure Central Plains roof structure rack 15 is curved surface The region that radius is less.This region needs lay single-row of scaffold.Fig. 7 is single-row of scaffold Structural representation, as it is shown in fig. 7, single-row of scaffold 17 is in latticed, by horizontal and vertical Steel pipe intersects to form.As shown in Figure 8, single-row of scaffold 17 is erected at former roof structure rack 15 Bottom support above.
For being further ensured that construction safety, also lay blanket net 18 in the lower section of whole operation side, Height distance sphere nodes 1.0m of blanket net 18~1.2m.Need after setting up to do impact test After qualified, just can use.
Additionally, be additionally provided with two ends colligation at main layer Steel Structure in former roof structure grid structure On safety rope.The steel wire rope of employing φ 8, through steel structure net rack sphere nodes operation side, Highly 1.2m~1.5m, two ends colligation is on steel structure net rack.In order to ensure playing of steel wire rope Safety effect, steel wire rope horizontal direction necessarily be in certain stress.

Claims (2)

1. a furred ceiling dedicated foot hand cradle, for carrying out follow-up furred ceiling operation on main layer Steel Structure, It is characterized in that, including:
A plurality of cross one another packway, is set up on described main layer Steel Structure;And
At least one pedestrian ramp, is arranged at the infall of two described packways,
Wherein, described pedestrian ramp has ramp, ramp framework, bridging and protection hurdle,
Ramp framework is formed by the steel pipe interconnection of many horizontal and verticals, and bridging intersects even Being connected on the framework of ramp, ramp has multistage, and the two ends in every section of ramp are connected to ramp framework On steel pipe, every section of ramp the left and right sides be provided above protected hurdle;
Wherein, the facade of described framework is additionally provided with Dense mesh screen;
Described packway includes outer vertical rod, cross bar, guardrail, support bar and scaffold board,
Two outer vertical rods are connected with cross bar, and support bar is connected to the junction of cross bar and outer vertical rod, The two ends of scaffold board ride upon on two cross bars.
Furred ceiling dedicated foot hand cradle the most according to claim 1, it is characterised in that also include:
Single-row of scaffold, is laid in the district with predetermined subsequent corrosion of described main layer Steel Structure Territory.
CN201410837636.1A 2014-12-24 2014-12-24 Furred ceiling dedicated foot hand cradle Active CN104612389B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410837636.1A CN104612389B (en) 2014-12-24 2014-12-24 Furred ceiling dedicated foot hand cradle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410837636.1A CN104612389B (en) 2014-12-24 2014-12-24 Furred ceiling dedicated foot hand cradle

Publications (2)

Publication Number Publication Date
CN104612389A CN104612389A (en) 2015-05-13
CN104612389B true CN104612389B (en) 2016-08-31

Family

ID=53147016

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410837636.1A Active CN104612389B (en) 2014-12-24 2014-12-24 Furred ceiling dedicated foot hand cradle

Country Status (1)

Country Link
CN (1) CN104612389B (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3802617B2 (en) * 1996-07-30 2006-07-26 株式会社フジタ Moving scaffold
CN101525921A (en) * 2009-04-15 2009-09-09 上海中建八局装饰有限责任公司 Construction method of reverse operation type metal suspended ceiling of autonomous platform
CN202672762U (en) * 2012-06-14 2013-01-16 中建四局第六建筑工程有限公司 Truss-type security channel for building construction
CN203783098U (en) * 2014-04-21 2014-08-20 北京市政建设集团有限责任公司 Operating platform supporting tower
CN204343641U (en) * 2014-12-24 2015-05-20 上海中建八局装饰有限责任公司 Furred ceiling dedicated foot hand cradle

Also Published As

Publication number Publication date
CN104612389A (en) 2015-05-13

Similar Documents

Publication Publication Date Title
CN202324571U (en) Overhanging type double-row scaffold
CN206053274U (en) The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose
CN105544873B (en) A kind of construction method of the hollow roofing of waveform
CN105155428B (en) Across railway in operation large-scale prefabricated PC concrete continuous T beam construction method
CN103276886A (en) Overhanging frame at position of high-rise building sloping roof outer eave window and construction method thereof
CN202451040U (en) Perpendicular high-altitude crawling ladder
CN212507296U (en) High formwork system
CN204040515U (en) Cat ladder
CN204343641U (en) Furred ceiling dedicated foot hand cradle
CN104612389B (en) Furred ceiling dedicated foot hand cradle
CN204570491U (en) A kind of bridge deck construction hanging basket device
CN104533092B (en) The construction method of rack roofing furred ceiling
CN111005547A (en) Construction method of external scaffold with two-way twist staggered floor vertical face
CN204059420U (en) Late poured band support structure
CN206722361U (en) A kind of scaffold of architectural engineering
CN102787717B (en) Self-supporting combined steel template construction method
CN102418414A (en) Long-slab-span prefabricated beam floor formwork system
CN104831928A (en) Construction method for high-altitude large-span concrete connected structure formwork supporting steel platform
CN202788017U (en) Horizontally-overhung rigid hermetic section steel protective shed for high-rise buildings
CN202214976U (en) Steel wire rope support device
CN203531349U (en) Novel high-bearing easily-dismantled overhanging type scaffold
CN203701627U (en) Shaped spliceable protective shed
CN205243069U (en) Simply connect bridge
CN204781872U (en) Regularization post reinforcement operation platform
CN205206351U (en) Special split heads of big terrace

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 200120 unit 06, 07, No. 28, No. 1568, Century Avenue, free trade test area, Pudong New Area, Shanghai, China (Shanghai)

Patentee after: Zhongjian eight bureau Decoration Engineering Co., Ltd.

Address before: 200122 Pudong New Area Century Avenue, No. 28, building 06, unit 1568, 07

Patentee before: China Construction Eight Engineering Division Decoration Co., Ltd.