CN205243069U - Simply connect bridge - Google Patents

Simply connect bridge Download PDF

Info

Publication number
CN205243069U
CN205243069U CN201521045439.2U CN201521045439U CN205243069U CN 205243069 U CN205243069 U CN 205243069U CN 201521045439 U CN201521045439 U CN 201521045439U CN 205243069 U CN205243069 U CN 205243069U
Authority
CN
China
Prior art keywords
bearing
bailey bracket
pier
load
bailey
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521045439.2U
Other languages
Chinese (zh)
Inventor
沈黎兴
沈丽萍
梅伶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUAYU CONSTRUCTION GROUP CO Ltd
Original Assignee
HUAYU CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUAYU CONSTRUCTION GROUP CO Ltd filed Critical HUAYU CONSTRUCTION GROUP CO Ltd
Priority to CN201521045439.2U priority Critical patent/CN205243069U/en
Application granted granted Critical
Publication of CN205243069U publication Critical patent/CN205243069U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a simply connect bridge, the utility model discloses a plurality of bearing mounds that are used for providing the bearing support, a road deck for setting up the bailey frame of pontic and be used for laying road surface usefulness, a plurality of bailey frame connect into the pontic and erect on the bearing mound through the concatenation, the road deck is laid on bailey frame, concatenation department between a plurality of bailey frame sets up on the top of bearing mound, and the top water plane of bearing mound reduces in proper order, the straight line of the top line of centres formation of a plurality of adjacent bearing mounds in proper order forms the alpha contained angle with bailey frame's concatenation direction, the alpha contained angle 90-32. The utility model discloses the construction is simple, only need with the stand of architectural equipment according to demand construction height, then directly use bailey frame erect the pontic lay the road surface can, demolish bailey frame after accomplishing the construction then utilize predetermined counter bore again with the bearing mound resume to the stand height of drawing demand can, so there is not unnecessary waste, demolish moreover simply.

Description

A kind of simple connection bridge
Technical field
The utility model belongs to building materials field, relates in particular to a kind of simple connection bridge.
Background technology
In building the underground installations such as underground garage, underground supermarket, need to build the transport of a temporary road for construction equipment and construction material, prior art is to adopt the mode of building directly to set up a connecting bridge, construction after directly by whole this connecting bridge dismounting, although this mode has solved the problem of setting up of temporary road, but construction and the dismounting in later stage in early stage are all extremely loaded down with trivial details, strengthen construction intensity, slowed down speed of application.
Utility model content
For the weak point of existing scheme, the utility model provides a kind of simple connection bridge design, by utilizing the building vertical column of Architectural Equipment itself to be used as load-bearing pier, utilizes Bailey bracket to set up simple connection bridge.
The technical solution of the utility model is to provide a kind of simple connection bridge, multiple load-bearing piers for providing load-bearing to support are provided, for the road deck that sets up the Bailey bracket of pontic and use for road surface pavement, multiple described Bailey brackets connect into pontic by splicing and are erected on described load-bearing pier, described road deck is laid in described Bailey bracket, stitching portion between multiple described Bailey brackets is arranged on the top of described load-bearing pier, and the top levels of described load-bearing pier reduces successively, the straight line that the top center line of multiple adjacent described load-bearing piers successively forms and the stitching direction of described Bailey bracket form α angle, 90 ° ~ 32 ° of described α angles.
As of the present utility model preferred, described load-bearing pier comprises Liang Gai and pilum, and the Bailey bracket of telling is connected by built-in connection with described Liang Gai.
As of the present utility model preferred, a part for described built-in connection forms preburying part with building in described beam lid, other parts that are not cast in described beam lid upwards arrange shape connecting portion perpendicular to described beam cap surface, and described connecting portion both sides are provided with the block for reinforcing described connecting portion intensity.
As of the present utility model preferably, described load-bearing pier be divided into for the ladder pier of large drop section, be arranged on described Bailey bracket termination carry out barrier effect stop pier and for set up the common pier of described Bailey bracket as load-bearing main body.
Preferably the honest described beam of described ladder covers and is provided with at least one ladder end face as of the present utility model, and the eminence of ladder end face forms level sets up the horizontal end of described Bailey bracket, and lower forms the drop end that tilts to set up described Bailey bracket.
Preferably the described described beam that stops pier covers the barrier being provided with for stopping that described Bailey bracket glides as of the present utility model, and the thickness of described barrier is greater than 1.2 times of thickness of described Bailey bracket.
As of the present utility model preferred, buffer unit is put in the construction of described road deck and described Bailey bracket.
As of the present utility model preferred, described buffer unit is rubber absorbers.
As of the present utility model preferred, described road deck is steel plate.
As of the present utility model preferred, described beam cover be provided with multiple extend to described pilum bottom for removing the counterbore that installs stiffener additional after described Bailey bracket and build by laying bricks or stones building bearing post, the degree of depth of described counterbore be greater than described pilum height 2/3, and described counterbore is according to nine palace fonts or concentric round distribution setting.
The utlity model has following beneficial effect:
The utility model construction is simple, only need to be by the column of Architectural Equipment according to demand construction height, then directly use Bailey bracket to set up pontic in road surface pavement, complete build after remove Bailey bracket then utilize default counterbore again load-bearing pier to be returned to the column height of drawing demand, so there is no unnecessary waste, and remove simple.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is built-in connection structural representation of the present utility model;
In figure, 1-load-bearing pier; 2-Bailey bracket; 3-road deck; 4-built-in connection; 5-buffer unit; 6-counterbore; 1A-ladder pier; 1B-stops pier; The common pier of 1C-; 1A1-horizontal end; 1A2-drop end; 1B1-barrier; 101-Liang Gai; 102-pilum; 401-preburying part; 402-connecting portion; 403-block.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
As shown in Figure 1 to Figure 2, multiple load-bearing piers 1 for providing load-bearing to support are provided the utility model embodiment, for setting up the Bailey bracket 2 of pontic and the road deck 3 of using for road surface pavement, multiple Bailey brackets 2 connect into pontic by splicing and are erected on load-bearing pier 1, road deck 3 is laid in Bailey bracket 2, stitching portion between multiple Bailey brackets 2 is arranged on the top of load-bearing pier 1, and the top levels of load-bearing pier 1 reduces successively, the straight line that the top center line of multiple adjacent load-bearing piers 1 successively forms and the stitching direction of Bailey bracket 2 form α angle, 90 ° ~ 32 ° of α angles. road deck 3 is put buffer unit 5 with the construction of Bailey bracket 2. buffer unit 5 is rubber absorbers. road deck 3 is steel plate.
As shown in Figure 1 to Figure 2, the utility model embodiment load-bearing pier 1 comprises beam lid 101 and pilum 102, and the Bailey bracket 2 of telling is connected by built-in connection 4 with beam lid 101. A part for built-in connection 4 with build in the interior formation preburying part 401 of beam lid 101, other parts that are not cast in beam lid 101 upwards arrange shape connecting portion 402 perpendicular to beam lid 101 surfaces, and connecting portion 402 both sides are provided with the block 403 for the portion's of reinforcing the connection 402 intensity.
As shown in Figure 1 to Figure 2, the utility model embodiment load-bearing pier 1 be divided into for the ladder pier 1A of large drop section, be arranged on Bailey bracket 2 terminations carry out barrier effect stop pier 1B and for set up the common pier 1C of Bailey bracket 2 as load-bearing main body. On the honest beam lid 101 of ladder, be provided with at least one ladder end face, the eminence of ladder end face forms level sets up the horizontal end 1A1 of Bailey bracket 2, and lower forms the drop end 1A2 that tilts to set up Bailey bracket 2. Stop on the beam lid 101 of pier 1B and be provided with the barrier 1B1 for stopping that Bailey bracket 2 glides, the thickness of barrier 1B1 is greater than 1.2 times of thickness of Bailey bracket 2.
As shown in Figure 1 to Figure 2, on the utility model embodiment beam lid 101, be provided with multiple extend to pilum 102 bottoms for removing the counterbore 6 that installs stiffener additional after Bailey bracket 2 and build by laying bricks or stones building bearing post, the degree of depth of counterbore 6 be greater than pilum 102 height 2/3, and counterbore 6 is according to nine palace fonts or concentric round distribution setting.
Embodiment recited above is described preferred embodiment of the present utility model, not design of the present utility model and scope is limited. Do not departing under the prerequisite of the utility model design concept; various modification and improvement that this area ordinary person makes the technical solution of the utility model; all should drop into protection domain of the present utility model; the technology contents of the utility model request protection, has all been documented in claims.

Claims (10)

1. a simple connection bridge, it is characterized in that: multiple load-bearing piers (1) for providing load-bearing to support are provided, for setting up the Bailey bracket (2) of pontic and the road deck (3) of using for road surface pavement, multiple described Bailey brackets (2) connect into pontic by splicing and are erected on described load-bearing pier (1), described road deck (3) is laid in described Bailey bracket (2), stitching portion between multiple described Bailey brackets (2) is arranged on the top of described load-bearing pier (1), and the top levels of described load-bearing pier (1) reduces successively, the straight line that the top center line of multiple adjacent described load-bearing piers (1) successively forms and the stitching direction of described Bailey bracket (2) form α angle, 90 ° ~ 32 ° of described α angles.
2. a kind of simple connection bridge according to claim 1, is characterized in that: described load-bearing pier (1) comprises Liang Gai (101) and pilum (102), and the Bailey bracket of telling (2) is connected by built-in connection (4) with described Liang Gai (101).
3. a kind of simple connection bridge according to claim 2, it is characterized in that: a part for described built-in connection (4) with build in described Liang Gai (101) in formation preburying part (401), other parts that are not cast in described Liang Gai (101) upwards arrange shape connecting portion (402) perpendicular to described Liang Gai (101) surface, and described connecting portion (402) both sides are provided with the block (403) for reinforcing described connecting portion (402) intensity.
4. a kind of simple connection bridge according to claim 2, is characterized in that: described load-bearing pier (1) be divided into for the ladder pier (1A) of large drop section, be arranged on described Bailey bracket (2) termination carry out barrier effect stop pier (1B) and for set up the common pier (1C) of described Bailey bracket (2) as load-bearing main body.
5. a kind of simple connection bridge according to claim 4, it is characterized in that: on the honest described Liang Gai (101) of described ladder, be provided with at least one ladder end face, the eminence of ladder end face forms level and sets up the horizontal end of described Bailey bracket (2) (1A1), and lower forms the drop end (1A2) that tilts to set up described Bailey bracket (2).
6. a kind of simple connection bridge according to claim 4, it is characterized in that: on the described described Liang Gai (101) that stops pier (1B), be provided with the barrier (1B1) for stopping that described Bailey bracket (2) glides, the thickness of described barrier (1B1) is greater than 1.2 times of thickness of described Bailey bracket (2).
7. a kind of simple connection bridge according to claim 1, is characterized in that: described road deck (3) is put buffer unit (5) with the construction of described Bailey bracket (2).
8. a kind of simple connection bridge according to claim 7, is characterized in that: described buffer unit (5) is rubber absorbers.
9. a kind of simple connection bridge according to claim 1, is characterized in that: described road deck (3) is steel plate.
10. a kind of simple connection bridge according to claim 2, it is characterized in that: on described Liang Gai (101), be provided with multiple extend to described pilum (102) bottom for installing stiffener additional after described Bailey bracket (2) and build the counterbore of building bearing post (6) by laying bricks or stones removing, the degree of depth of described counterbore (6) be greater than described pilum (102) height 2/3, and described counterbore (6) is according to nine palace fonts or concentric round distribution setting.
CN201521045439.2U 2015-12-16 2015-12-16 Simply connect bridge Expired - Fee Related CN205243069U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521045439.2U CN205243069U (en) 2015-12-16 2015-12-16 Simply connect bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521045439.2U CN205243069U (en) 2015-12-16 2015-12-16 Simply connect bridge

Publications (1)

Publication Number Publication Date
CN205243069U true CN205243069U (en) 2016-05-18

Family

ID=55942150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521045439.2U Expired - Fee Related CN205243069U (en) 2015-12-16 2015-12-16 Simply connect bridge

Country Status (1)

Country Link
CN (1) CN205243069U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105464403A (en) * 2015-12-16 2016-04-06 华煜建设集团有限公司 Simple connecting bridge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105464403A (en) * 2015-12-16 2016-04-06 华煜建设集团有限公司 Simple connecting bridge
CN105464403B (en) * 2015-12-16 2018-02-16 华煜建设集团有限公司 A kind of simple connection bridge

Similar Documents

Publication Publication Date Title
CN102839601A (en) Fixed connection structure for steel pier column and cushion cap of portal rigid frame overbridge and construction method of fixed connection structure
CN105113540A (en) Construction method for newly-built large deep foundation pit basements under protection building
CN104532749A (en) Support used for construction of upper beam of main tower of suspension bridge
CN102296843A (en) Multi-arch multilayer plant-separation type parking device
CN102383371B (en) Overpass concrete outside-hanged cantilever type flower bed and construction method thereof
CN204212450U (en) A kind of tool-type safe and convenient passage
CN204385629U (en) A kind of support for the construction of suspension bridge king-tower top rail
CN205243069U (en) Simply connect bridge
CN103967332B (en) The construction method of a kind of building site enclosing
CN103578346B (en) A kind of simply supported girder bridge teaching simulation structure
CN211621782U (en) Roof support of ultra-deep large-span circular water taking pump house
CN210263929U (en) A preformed hole template for building civil engineering
CN205024719U (en) Pile foundation and integrated reverse construction vertical braces system of underground continuous wall
CN203782544U (en) Combined bracket for river-crossing section of elevated bridge
CN208056519U (en) A kind of detachable edge protection column
CN202416156U (en) Concrete external-mounted cantilever type parterre of flyover
CN205314601U (en) A scalable instrument for protection of tower crane entrance to a cave
CN201891268U (en) Movable assembled construction wall
CN211228109U (en) External-wrapping anti-collision guardrail for highway bridge
CN203769130U (en) Novel substation wall structure with parts prefabricated
CN107217685A (en) A kind of Portable piping lane side wall formwork jumbo
CN203588579U (en) Teaching simulation structural body of simply supported beam bridge
CN206736743U (en) Lay the easy structure of mountable steel bridge
CN203429557U (en) Anchor pole back beam applied to underpass bridge jacking construction
CN105464403A (en) Simple connecting bridge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160518

Termination date: 20181216

CF01 Termination of patent right due to non-payment of annual fee