CN204040496U CN201420358481.9U CN201420358481U CN204040496U CN 204040496 U CN204040496 U CN 204040496U CN 201420358481 U CN201420358481 U CN 201420358481U CN 204040496 U CN204040496 U CN 204040496U
Authority
CN
China
Prior art keywords
plate
hoop
steel column
junction
hoop plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420358481.9U
Other languages
Chinese (zh)
Inventor
李林海
魏广忠
曹海良
李景林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201420358481.9U priority Critical patent/CN204040496U/en
Application granted granted Critical
Publication of CN204040496U publication Critical patent/CN204040496U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of steel column temporary fixing structure, comprise shape adaptation and bind round plate and one second hoop plate at least one first of described steel column outer cylinder, first hoop plate and the second both sides of binding round plate are respectively equipped with the first junction plate, and make the first hoop plate and the second hoop plate hoop be located on steel column outer cylinder by being fixedly connected with the first junction plate, first hoop plate and the second bottom of binding round plate are respectively equipped with the second junction plate, second junction plate is fixedly connected on architecture basics, thus by the first hoop plate, the steel column that second hoop plate and hoop are located in the first hoop plate and the second hoop plate is fixed on architecture basics.Adopt the first hoop plate and the second hoop plate banding steel column, then fixed by the second junction plate bottom the first hoop plate and the second hoop plate and architecture basics, thus steel column is fixed on architecture basics firmly, replace earth anchor and cable rope, simple to operate, sound construction.

Description

A kind of steel column temporary fixing structure
Technical field
The utility model relates to the realm of building construction, particularly relates to a kind of steel column temporary fixing structure.
Background technology
In steel work band slippage installing engineering, as individual layer large-span steel coal canopy, construction process is the installation first carrying out steel column and roof structure in lifting region, after sliding element has lifted, adopts sliding technology to complete the installation of structure.But in the structure hoisting stage, need between steel column and basis to take temporary fixed measure.
Traditional method of temporarily fixing is: after steel column hoisted in position, by establishing earth anchor to add cable rope, it is temporary fixed, and it is manually more that this method amount of high-altitude operation expends greatly, and it is low that earth anchor and cable rope have enough to meet the need utilization rate, therefore uneconomical practicality.Particularly conventional method is higher to site requirements, and as constructed existing railway line, high-voltage line, temporary fixed the causing in the environment of difficulty of periphery obstruction to structure, conventional method even cannot be implemented.
Utility model content
Technical problem to be solved in the utility model be to provide a kind of make simple, peace is torn open conveniently, economical and practical, low to site requirements steel column temporary fixing structure.
For realizing above-mentioned technique effect, the utility model discloses a kind of steel column temporary fixing structure, for described steel column is fixed on architecture basics, described temporary fixing structure comprises shape adaptation and binds round plate and one second hoop plate at least one first of described steel column outer cylinder, described first hoop plate and the described second both sides of binding round plate are respectively equipped with the first junction plate, and make described first hoop plate and described second hoop plate hoop be located on described steel column outer cylinder by being fixedly connected with described first junction plate, described first hoop plate and the described second bottom of binding round plate are respectively equipped with the second junction plate, described second junction plate is fixedly connected on described architecture basics, thus by described first hoop plate, the steel column that described second hoop plate and hoop are located in described first hoop plate and described second hoop plate is fixed on described architecture basics.
The utility model is owing to have employed above technical scheme, making it have following beneficial effect is: adopt the first hoop plate and the second hoop plate banding steel column, fixed by the second junction plate bottom the first hoop plate and the second hoop plate and architecture basics again, thus steel column is fixed on architecture basics firmly, replace earth anchor and cable rope, simple to operate, sound construction.Whole post boots adopt assembling syndeton, and can have enough to meet the need use, post boots simple installation, Stability Analysis of Structures, substantially increases the efficiency of construction that steel column is temporary fixed.
The utility model further improves and is, described second junction plate is secured by bolts on a support baseboard, and described support baseboard is fixed on described architecture basics by stone bolt, and is provided with cushion block between described architecture basics and described support baseboard.Support baseboard is adopted to connect temperature pier structure, the bottom stationarity of temperature pier structure can be improved, not only increase bonding strength between support baseboard and architecture basics by erection cushion block, can also be used for regulating the height of support baseboard, and then the height of adjustment steel column.
The utility model further improves and is, described second junction plate and described first binds round plate and described second and binds round between plate and be provided with multiple tracks first gusset plate, improves bonding strength.
The utility model further improves and is, is bolted to connection between described first junction plate, and binds round plate and described second at described first junction plate and described first and bind round between plate and be provided with multiple tracks second gusset plate, improves bonding strength.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model steel column temporary fixing structure.
Fig. 2 is the perspective view of a preferred embodiment of the utility model steel column temporary fixing structure.
Fig. 3 is the plane structure schematic diagram of a preferred embodiment of the utility model steel column temporary fixing structure.
Fig. 4 is the A-A generalized section of Fig. 3.
Fig. 5 is the floor map of the second junction plate.
Detailed description of the invention
Below in conjunction with accompanying drawing and detailed description of the invention, the utility model is described in further detail.
First consult shown in Fig. 1, a kind of steel column temporary fixing structure 10 of the present utility model, be mainly used in the rack steel structure hoisting stage in rack steel work band slippage installing engineering, temporary fixed to carrying out between the steel column 11 below rack steel work and architecture basics 12.Coordinate shown in Fig. 2 ~ Fig. 4, steel column 11 adopts common circular columns structure, temporary fixing structure 10 is formed in the semicircular one first hoop plate 131 of steel column 11 outer cylinder and one second hoop plate 132 primarily of shape adaptation, first hoop plate 131 and the second both sides of binding round plate 132 are respectively equipped with one first junction plate 15, along short transverse uniform pore openings on the first junction plate 15 of steel column, and connected by bolt 16, make the first hoop plate 131 and second bind round plate 132 bind round tightly be located at steel column 11 suspension column outer cylinder on.First hoop plate 131 and the second bottom of binding round plate 132 are respectively equipped with the second junction plate 14, shown in composition graphs 5, second junction plate 14 offers two semienclosed adjustable bar holes 140, opening outwardly, connected by bolt 18, second junction plate 14 is fixed on a support baseboard 122, adopt semienclosed adjustable bar hole 140 can so that regulate the link position of the second junction plate 14 and bolt 19, the horizontal level of adjustment steel column 11, support baseboard 122 is fixed on architecture basics 12 further by stone bolt 121, thus by the first hoop plate 131, the steel column 11 that second hoop plate 132 and hoop are located in the first hoop plate 131 and the second hoop plate 132 is fixed on architecture basics 12, earth anchor and cable rope is replaced to carry out the temporary fixed of steel column foot.Wherein stone bolt 121 is pre-buried in advance when architecture basics 12 is constructed, and to be coordinated with stone bolt 121 by nut support baseboard 122 is fixed on stone bolt 121, cushion block 123 is provided with between the bottom of support baseboard 122 and architecture basics 12, regulate the height of support baseboard 122, and the bonding strength strengthened between support baseboard 122 and architecture basics 12, adopt support baseboard 122 to connect temperature pier structure, the bottom stationarity of temperature pier structure can be improved.
Further, bind round plate 131 and second at the second junction plate 132 and first to bind round between plate 132 and be welded with multiple tracks first gusset plate 171, strengthen the second junction plate 132 and first to bind round plate 131 and second and bind round bonding strength between plate 132, wherein the first gusset plate 171 is welded in the position, left, center, right of the second junction plate 132 respectively, and each welding together.
Same, bind round plate 131 and second at the first junction plate 131 and first to bind round between plate 132 and be welded with multiple tracks second gusset plate 172, strengthen the first junction plate 131 and first to bind round plate 131 and second and bind round bonding strength between plate 132, wherein the second gusset plate 172 is welded in the upper, middle and lower position of the first junction plate 131 respectively, and each welding together.
Steel column temporary fixing structure 10 of the present utility model can by arranging the first hoop plate 131 and the second hoop height of plate 132 and the quantity of thickness and the first gusset plate 171 and the second gusset plate 172 and thickness, temporary fixing structure 10 can be made to meet different stressing conditions, the temporary fixed installation that plate 132 size can meet the steel column of different cross section size is bound round by arranging the first hoop plate 131 and second, simple to operate, Stability Analysis of Structures.
The Specific construction step utilizing steel column temporary fixing structure 10 of the present utility model to carry out steel column temporary fixed is as follows:
The concrete structure on constructing structure basis 12, and upwards reserve vertically foot bolt 121 in the top of concrete structure;
Horizontal fixed support base plate 122 on stone bolt 121, and cushion block 123 is set bottom support baseboard 122 and between architecture basics 12, adjust height and the planeness of support baseboard 122;
By steel column 11 hoisted in position on support baseboard 122;
Accurate elements of a fix position, guarantee errorless after, at the suspension column outer cylinder of steel column 11, first hoop plate 131 and the second hoop plate 132 is installed, and adopt bolt 16 to be fixedly connected with the first junction plate 15 of the first hoop plate 131 and the second hoop plate 132 both sides, steel column 11 suspension column is bound round tightly and is located in the first hoop plate 131 and the second hoop plate 132;
Bolt 18 is adopted to be fixed on support baseboard 122 the second junction plate 14 bottom first hoop plate 131 and the second hoop plate 132, make the first hoop plate 131, second bind round plate 132 and bind round the steel column 11 be located in the first hoop plate 131 and the second hoop plate 132 to be fixed on support baseboard 122, and then be fixed on architecture basics 12.
The utility model is drawn materials easily, cheap, is convenient to operative, can improve work task efficiency.Can guarantee that in construction quality steel column is accurately located and forms systems stabilisation, and then eliminate engineering safety hidden danger.
Below embodiment has been described in detail the utility model by reference to the accompanying drawings, and those skilled in the art can make many variations example to the utility model according to the above description.Thus, some details in embodiment should not formed restriction of the present utility model, the utility model by the scope that defines using appended claims as protection domain of the present utility model.

Claims (4)

1. a steel column temporary fixing structure, for described steel column is fixed on architecture basics, it is characterized in that: described temporary fixing structure comprises shape adaptation and binds round plate and one second hoop plate at least one first of described steel column outer cylinder, described first hoop plate and the described second both sides of binding round plate are respectively equipped with the first junction plate, and make described first hoop plate and described second hoop plate hoop be located on described steel column outer cylinder by being fixedly connected with described first junction plate, described first hoop plate and the described second bottom of binding round plate are respectively equipped with the second junction plate, described second junction plate is fixedly connected on described architecture basics, thus by described first hoop plate, the steel column that described second hoop plate and hoop are located in described first hoop plate and described second hoop plate is fixed on described architecture basics.
2. steel column temporary fixing structure as claimed in claim 1, it is characterized in that: described second junction plate is secured by bolts on a support baseboard, described support baseboard is fixed on described architecture basics by stone bolt, and is provided with cushion block between described architecture basics and described support baseboard.
3. steel column temporary fixing structure as claimed in claim 1 or 2, is characterized in that: described second junction plate and described first binds round plate and described second and binds round between plate and be provided with multiple tracks first gusset plate.
4. steel column temporary fixing structure as claimed in claim 3, is characterized in that: be bolted to connection between described first junction plate, and binds round plate and described second at described first junction plate and described first and bind round between plate and be provided with multiple tracks second gusset plate.
CN201420358481.9U 2014-06-30 2014-06-30 A kind of steel column temporary fixing structure Expired - Fee Related CN204040496U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420358481.9U CN204040496U (en) 2014-06-30 2014-06-30 A kind of steel column temporary fixing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420358481.9U CN204040496U (en) 2014-06-30 2014-06-30 A kind of steel column temporary fixing structure

Publications (1)

Publication Number Publication Date
CN204040496U true CN204040496U (en) 2014-12-24

Family

ID=52241179

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420358481.9U Expired - Fee Related CN204040496U (en) 2014-06-30 2014-06-30 A kind of steel column temporary fixing structure

Country Status (1)

Country Link
CN (1) CN204040496U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060845A (en) * 2014-06-30 2014-09-24 中国建筑第八工程局有限公司 Temporary fixing structure for steel column and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060845A (en) * 2014-06-30 2014-09-24 中国建筑第八工程局有限公司 Temporary fixing structure for steel column and construction method thereof

Similar Documents

Publication Publication Date Title
CN103114681B (en) High-altitude long-span reinforced concrete beam treat pouring structure
CN203640309U (en) Adjustable pipe carrier used on large-span steel structure roof primary truss general assembly jig frame
CN203296361U (en) Long-span steel structure cross assembling hoisting platform
CN207143708U (en) Hoisting type foundation pit-crossing comprehensive steel trestle
CN103469735A (en) Method for mounting curve ultrahigh hollow column plate type pier top solid section template
CN105040591A (en) Positioning device for waveform steel web and positioning method thereof
CN204385629U (en) A kind of support for the construction of suspension bridge king-tower top rail
CN204174785U (en) The upper and lower syndeton of a kind of precast shear wall
CN204040496U (en) A kind of steel column temporary fixing structure
CN204418510U (en) Floor support plate steel bar girder structure
CN103882808B (en) Ramp bridge and main line bridge join the construction method across erecting beam support system
CN103967332B (en) The construction method of a kind of building site enclosing
CN205894711U (en) Pier stud activity reinforcement support
CN206616765U (en) Large span is without depending on huge bandy truss pull bar
CN209194354U (en) High-altitude long-span binder base-supporting shellfish thunder support construction
CN104060845A (en) Temporary fixing structure for steel column and construction method thereof
CN203795459U (en) Foundation structure of tower crane for high-altitude roofs
CN204000885U (en) Metro Deep Excavation concrete support hangs mould mould
CN201024388Y (en) Hybrid type row-frame for city trestle construction
CN203684102U (en) Supporting system for precast beam formed by connecting span erection of ramp bridge and main line bridge
CN202925975U (en) Steel funnel for coal blending bunker
CN102817376B (en) Settlement joint construction method for big-volume slabstone concrete
CN206846097U (en) A kind of Men Gangyu frameworks separately-loaded pipeline support structure
CN204960324U (en) Suspension type floor formwork support device
CN204225503U (en) Large span steel truss high altitude bulk conversion beam moulding bed

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant