CN204021982U - A kind of freight container shipment harbour - Google Patents
A kind of freight container shipment harbour Download PDFInfo
- Publication number
- CN204021982U CN204021982U CN201420468265.XU CN201420468265U CN204021982U CN 204021982 U CN204021982 U CN 204021982U CN 201420468265 U CN201420468265 U CN 201420468265U CN 204021982 U CN204021982 U CN 204021982U
- Authority
- CN
- China
- Prior art keywords
- drain hose
- collecting channel
- freight container
- pier body
- steelframe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Leg Units, Guards, And Driving Tracks Of Cranes (AREA)
- Ship Loading And Unloading (AREA)
Abstract
The utility model discloses a kind of freight container shipment harbour, comprise pier body, it is characterized in that: above described pier body, be provided with track, traveling gear is arranged in orbit, steelframe is arranged on above traveling gear, Crane Rail is arranged on above steelframe, described Crane Rail is provided with the hanging box slidably reciprocated; Be provided with collecting channel between described track, drain hose one tilts to be connected between collecting channel and drain hose one, is also connected with the drain hose two through pier body bottom described collecting channel.Compared with prior art, it is low that the utility model has laid down cost, reasonable in design and overhaul advantage easily, has wide market outlook.
Description
Technical field
The utility model belongs to port and pier technical field, is specifically related to a kind of freight container shipment harbour.
Background technology
Harbour is seashore, rivers limit specialize in passenger up and down, the building of cargo handing.Usually the commercial city of land and water transportation prosperity is seen.Human use's harbour, secondly the use of fall on anchoring alongside the shore as ferry boat passenger and goods may be also attract visitor, and the terrestrial reference of appointment set.Cruise, ferry boat, container ship, warehouse, customs, pontoon bridge, sea-gull, fish market, beach gallery, station, dining room or market etc. are had in the common building of harbour periphery or facility.
Container wharf is mainly used to larger cargo ships loading container, mostly existing container handling equipment is directly to build in water, the driving of long-distance is led to by above the container transshipment above harbour to freighter during loading, this building technology is higher, cost is larger, and fixed installation, can not move, can not meet reality need.
Summary of the invention
The utility model is for above shortcoming, and high based on the shipment equipment laid down cost in water solving existing freight container shipment harbour, equipment fixes irremovable problem.Devise a kind of freight container shipment harbour, the shipment equipment of this shipment harbour is built on the bank, by being provided with the traveling gear that can drive whole equipment moving, can meeting the loading demand in different place, decreasing the laid down cost of harbour.
For realizing the purpose of this utility model, the technical solution adopted in the utility model is:
A kind of freight container shipment harbour, comprises pier body, it is characterized in that: be provided with track above described pier body, traveling gear is arranged in orbit, steelframe is arranged on above traveling gear, and Crane Rail is arranged on above steelframe, described Crane Rail is provided with the hanging box slidably reciprocated; Be provided with collecting channel between described track, drain hose one tilts to be connected between collecting channel and drain hose one, is also connected with the drain hose two through pier body bottom described collecting channel.
Preferentially, traveling gear comprises two or more wheel group, and each wheel group comprises four points of wheels, and each point of wheels comprise two wheels, and motor is arranged on the wheel on the most both sides of wheel group.
Preferentially, is provided with diagonal brace in the middle of steelframe, is installed with removable pin, is provided with expansion link above it in the middle of Crane Rail, Crane Rail can be turned up from removable pin and be convenient to maintenance by such expansion link.
The utility model has the advantages that: by being built on the bank by shipment equipment, the traveling gear that can drive whole equipment moving is installed simultaneously, the loading demand in different place can be met, decrease the laid down cost of harbour.Compared with prior art, it is low that the utility model has laid down cost, reasonable in design and overhaul advantage easily, has wide market outlook.
Accompanying drawing explanation
The following accompanying drawing by means of embodiment carries out brief description to the utility model now.In accompanying drawing:
Fig. 1 shows the structural representation of the utility model freight container shipment harbour;
Fig. 2 shows the structural representation of the utility model traveling gear.
In figure: 1, Crane Rail, 2, removable pin, 3, diagonal brace, 4, steelframe, 5, play hanging box, 6, traveling gear, 601, wheel group, 602, motor, 603, wheel, 604, wheels are divided, 7, collecting channel, 9, drain hose one, 11, expansion link, 12, drain hose two, 13, pier body, 14, track.
Detailed description of the invention
Below in conjunction with specific embodiment, the utility model is described in detail.Following examples will contribute to those skilled in the art and understand the utility model further, but not limit the utility model in any form.It should be pointed out that to those skilled in the art, without departing from the concept of the premise utility, some distortion and improvement can also be made.These all belong to protection domain of the present utility model.
Please consult Fig. 1 by emphasis, a kind of freight container shipment harbour, comprise pier body 13, described pier body 13 is provided with track 14 above, traveling gear 6 is arranged in track 14, steelframe 4 is arranged on above traveling gear 6, and Crane Rail 1 is arranged on above steelframe 4, described Crane Rail 1 is provided with the hanging box 5 slidably reciprocated; Be provided with collecting channel 7 between described track 14, drain hose 1 tilts to be connected between collecting channel 7 and drain hose 1, is also connected with the drain hose 2 12 through pier body 13 bottom described collecting channel 7.
Is provided with diagonal brace 3 in the middle of steelframe 4, is installed with removable pin 2, is provided with expansion link 11 above it in the middle of Crane Rail 1, Crane Rail 1 can be turned up from removable pin 2 and be convenient to maintenance by such expansion link 11.
Please consult Fig. 2 by emphasis, traveling gear 6 comprises two or more wheel group 601, and each wheel group 601 comprises four points of wheels 604, and each point of wheels 604 comprise two wheels 603, and motor 602 is arranged on the wheel on the most both sides of wheel group 601.
This freight container shipment harbour disclosed in the utility model, principle of work is such, play hanging box 5 to be used for capturing freight container and being transported in freighter by Crane Rail 1, when other region needs shipment, starter motor 602 makes whole traveling gear 6 move, and whole like this lifting appliance can move at track 14 and arrive designated area.
When having ponding with track 14 above pier body 13, by the domatic and drain hose 1 tilted, ponding is drained in collecting channel 7, and by drain hose 2 12 drainageway water channel.
Claims (3)
1. a freight container shipment harbour, comprise pier body (13), it is characterized in that: described pier body (13) is provided with track (14) above, traveling gear (6) is arranged in track (14), steelframe (4) is arranged on above traveling gear (6), Crane Rail (1) is arranged on above steelframe (4), described Crane Rail (1) is provided with the hanging box (5) slidably reciprocated; Be provided with collecting channel (7) between described track (14), drain hose one (9) tilts to be connected between collecting channel (7) and drain hose one (9), and described collecting channel (7) bottom is also connected with the drain hose two (12) through pier body (13).
2. freight container shipment harbour according to claim 1, it is characterized in that, described traveling gear (6) comprises two or more wheel group (601), each wheel group (601) comprises four points of wheels (604), each point of wheels (604) comprises two wheels (603), and motor (602) is arranged on the wheel on the most both sides of wheel group (601).
3. freight container shipment harbour according to claim 1, is characterized in that, be provided with diagonal brace (3) in the middle of described steelframe (4), be installed with removable pin (2), be provided with expansion link (11) above it in the middle of Crane Rail (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420468265.XU CN204021982U (en) | 2014-08-19 | 2014-08-19 | A kind of freight container shipment harbour |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420468265.XU CN204021982U (en) | 2014-08-19 | 2014-08-19 | A kind of freight container shipment harbour |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204021982U true CN204021982U (en) | 2014-12-17 |
Family
ID=52061876
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420468265.XU Expired - Fee Related CN204021982U (en) | 2014-08-19 | 2014-08-19 | A kind of freight container shipment harbour |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204021982U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104627856A (en) * | 2014-12-26 | 2015-05-20 | 江苏振东港口机械制造有限公司 | Multifunctional floating type crane |
CN108016888A (en) * | 2017-12-29 | 2018-05-11 | 逸盛大化石化有限公司 | A kind of container lifting device with inner lining bag for PTA |
-
2014
- 2014-08-19 CN CN201420468265.XU patent/CN204021982U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104627856A (en) * | 2014-12-26 | 2015-05-20 | 江苏振东港口机械制造有限公司 | Multifunctional floating type crane |
CN108016888A (en) * | 2017-12-29 | 2018-05-11 | 逸盛大化石化有限公司 | A kind of container lifting device with inner lining bag for PTA |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102424277B (en) | Assembling and disassembling system for port container and assembling and disassembling technology thereoffor | |
CN101279640B (en) | Ship-shore double supporting type cargo handling machine | |
CN106542054A (en) | LNG tank formula container loading and unloading ship | |
CN106218827A (en) | Offshore wind farm O&M supports platform | |
CN208683973U (en) | A kind of general layout of three-dimensional automated container terminal and its handling system | |
CN203866772U (en) | Multipurpose shipping dock capable of being adapted to tidal level change | |
CN204021982U (en) | A kind of freight container shipment harbour | |
SG2013066857A (en) | Shore crane with three trolleys | |
CN206288202U (en) | LNG tank formula container loading and unloading ship | |
CN101767634A (en) | Self-chambering self-discharging container ship | |
KR101713500B1 (en) | Integrated multi-modal transportation floating terminal | |
JP2009073455A (en) | New method of ocean current power generation by genbu ship | |
CN103640909B (en) | Large component roll-roll shipment | |
CN104340336B (en) | A kind of overweight sectional turn-over method of ship | |
CN210339608U (en) | Automatic change handling system of container terminal | |
CN204979163U (en) | A overhang slope multilane rolls adorns landing stage for inland river | |
CN203568520U (en) | Ship-shore material transshipping transport device | |
CN206878513U (en) | A kind of inland river feeder vessel | |
Trojanowski et al. | Analysis of Szczecin waterways in terms of their use to handle freight transport in urban areas | |
CN107215439A (en) | A kind of modularization floating dock and its installation method | |
CN204847999U (en) | Dual -purpose portal crane for transporting ship | |
CN102837978A (en) | Shipment method combining large constructional element rolling and floating crane | |
CN204674790U (en) | A kind of floating type harbour | |
CN205222160U (en) | A double -deck handling system of height for stake industry pier | |
CN104590501A (en) | Method based on material storing and transporting platform to develop and construct island environment and platform thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141217 Termination date: 20150819 |
|
EXPY | Termination of patent right or utility model |