CN107215439A - A kind of modularization floating dock and its installation method - Google Patents

A kind of modularization floating dock and its installation method Download PDF

Info

Publication number
CN107215439A
CN107215439A CN201710427786.9A CN201710427786A CN107215439A CN 107215439 A CN107215439 A CN 107215439A CN 201710427786 A CN201710427786 A CN 201710427786A CN 107215439 A CN107215439 A CN 107215439A
Authority
CN
China
Prior art keywords
buoyancy tank
box
box beam
floating dock
blocking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710427786.9A
Other languages
Chinese (zh)
Inventor
徐立人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Nippon Engineering Co Ltd
Original Assignee
Jiangsu Nippon Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Nippon Engineering Co Ltd filed Critical Jiangsu Nippon Engineering Co Ltd
Priority to CN201710427786.9A priority Critical patent/CN107215439A/en
Publication of CN107215439A publication Critical patent/CN107215439A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C1/00Dry-docking of vessels or flying-boats
    • B63C1/02Floating docks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/40Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for for transporting marine vessels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms

Abstract

The invention discloses a kind of modularization floating dock, including floating dock body, floating dock body is made up of buoyancy tank body, carrying deck and external structure framework, the buoyancy tank body is made up of the box buoyancy tank of several blocking, buoyancy tank body both sides are fixed by external structure framework, buoyancy tank body upper surface is provided with carrying deck, and the carrying deck is made up of some module unit decks.Wherein installation method step is:1st, box beam under box beam under box beam, middle part under bow connector, stern connector, bow and stern is connected on land;2nd, the box buoyancy tank of blocking is hung in order and the composition buoyancy tank body that is connected, box beam on bow is installed, box beam on box beam and stern on middle part;3rd, laying carrying deck lifts rane trolley steel structure frame again.The present invention has mobility good, transhipment, easy for installation, it is possible to achieve water, land communications and transportation, the characteristics of work such as ship, extra large construction equipment maintenance, rescue can be carried out with inland lake and off-lying sea transition in certain circumstances.

Description

A kind of modularization floating dock and its installation method
Technical field
The invention belongs to ship domain, more particularly to a kind of modularization floating dock and its installation method.
Background technology
Existing traditional floating dock production technology:Shipyard workshop is segmented (block) processing → paint → short distance transport → ship Close up assembling → entirety fitting-out → in depressed place and treat that appropriate tide descends water again.
Under floating dock after water, indivisible huge monster is become, secondary maintenance somewhat expensive, the time is long, and occupancy has The bank base dock resource of limit, and the time restriction in tidal period need to be regarded;It is undecomposable to transport transition for unit piece.If meeting special dislike Bad weather, sea situation cause damage loss huge;If self maintained is limited when repairing by various conditions.
The content of the invention
Goal of the invention:The defect existed for prior art, transhipment, installation side good the invention provides a kind of mobility Just, it is possible to achieve water, land communications and transportation, self maintained maintenance is not limited by conditions such as weather, sea situations, in certain circumstances can be with Inland lake carries out modularization floating dock and its installation method of the work such as maintenance of the vessel, rescue with off-lying sea transition.
Technical scheme:The present invention provides a kind of modularization floating dock, including floating dock body, and floating dock body is by buoyancy tank sheet Body, carrying deck and external structure framework are constituted, and the buoyancy tank body is made up of the box buoyancy tank of several blocking, buoyancy tank body two Side is fixed by external structure framework, and buoyancy tank body upper surface is provided with carrying deck, and the carrying deck is by some module units Deck is constituted.By the way that the main element buoyancy tank body at floating dock is used deck use is constituted and carries by the box buoyancy tank of blocking By some module unit decks, it is possible to achieve long-distance transport, and types of transportation is not limited to, land and water can be transported, and transport Can be with Assembling behind ground to using, and assembling speed is fast, it is more convenient.And for being completed after floating dock Size is not limited, and can be floated using the box buoyancy tank of blocking of varying number with blocking deck integration into the various sizes of of needs Dock, can further improve efficiency, save production and deadline.Inland lake can be met in certain circumstances with off-lying sea to turn The work such as field maintenance, rescue.If finding under special circumstances, the box buoyancy tank of one of blocking is damaged or blocking Deck is damaged, and can will not be occurred overall dock with general quick replacement and surprisingly sink or tumble;At floating dock when assembling, partition Without lower water operation, not by season, temperature limiting.
Further, the buoyancy tank body is box floating by a box buoyancy tank of stem blocking, several middle cellizations Case and a box buoyancy tank of tail unitsization are sequentially connected fixation and formed, and the box buoyancy tank bottom right side of stem blocking is set There is cell body, the box buoyancy tank left bottom of tail unitsization is provided with coupler body, and the box buoyancy tank left bottom of middle cellization is provided with Coupler body bottom right side is provided with cell body.Set coupler body opposite side that cell body is set by the bottom side in the box buoyancy tank of blocking, The bottom of two box buoyancy tanks of adjacent blocking can be caused to be fixed, it is convenient to install and practical.Wherein cell body can be L Type groove body, coupler body can be corresponding L-type coupler body, and such fixed effect more preferably, send out by the more preferable box buoyancy tank of prevention unit shape Raw left and right relative movement.
Further, the external structure framework is passed through by bow connector, upper box beam, stern connector and lower box beam successively Preventing water leakage fixture is connected and composed, and the upper box beam is on box beam, several middle parts on a bow above box beam and a stern Box beam is constituted, and lower box beam box beam under box beam, the lower box beam in several middle parts and a stern under a bow is constituted.Pass through External structure framework is divided into bow connector, upper box beam, four parts of stern connector and lower box beam, and upper box beam is divided into one Box beam on box beam on individual bow, several upper box beams in middle part and a stern, lower box beam be divided into box beam under a bow, several Box beam under box beam and a stern under middle part, it is possible to achieve more preferable long-distance transport and assembling effect, equivalent to external structure framework Also achieve blocking assembled, can be with to different sizes by using box beam under box beam on the middle part of varying number and middle part Buoyancy tank body be fixed, fixed effect more preferably, using more convenient.
It is preferred that, the top and two ends of the box buoyancy tank of the adjacent blocking of each two are solid by preventing water leakage fixture It is fixed.It is fixed by top and two ends to two adjacent box buoyancy tanks of blocking, realizes the top to blocking buoyancy tank With the fixation of middle part, with reference to the fixed effect for bottom said above, it is achieved thereby that three-point mount, fixed effect is more It is good so that the service life of buoyancy tank body is longer, and ensure that the rigidity at modularization floating dock after connection.
It is preferred that, the side of the bow connector is provided with slope, and the slope bottom is provided with changeover portion.By inciting somebody to action The side of bow connector sets slope and changeover portion, and riverbank upward slope of more being fitted when disembarkation can be needed at floating dock Radian, faster disembarkation, and can also realize more preferable one's water breaks effect in the process of moving.
It is preferred that, the box buoyancy tank of blocking is shaped as cuboid or cylinder.By by the box buoyancy tank of blocking Cuboid or cylinder are shaped to, can preferably prevent that buoyancy tank body is relatively moved in use, is protected The overall service life of stability and floating dock for having demonstrate,proved buoyancy tank body is longer.
It is preferred that, the box length of buoyancy tank 10-25m of blocking, wide 2-5m, high 1-2m or (Φ 0.8m-2.2m).By inciting somebody to action The dimension limitation of the box buoyancy tank of blocking is long 10-25m, and wide 2-5m, high 1-2m or (Φ 0.8m-2.2m) can meet transport On the premise of preferably improve assembling efficiency, save the time.
It is preferred that, the preventing water leakage fixture is preventing water leakage nut and preventing water leakage screw, the bolt of the preventing water leakage screw Position is provided with red copper pad or aluminium backing.Being used as preventing water leakage fixture by using waterproof screw can preferably prevent Water body enters inside floating dock, then using red copper pad or aluminium backing, is more improved while preventing and meeting water oxygen anti- Water effect.
Further, carrying deck upper surface is provided with several bollards.By setting system on carrying deck Checking bollard, can need to stop or when drag at floating dock, can more facilitate stop, drag and be also prevented from as current are produced It is mobile.
Further, rane trolley steel structure frame, the rane trolley steel knot are provided with above the floating dock body It is provided with structure framework at the top of water level depth mark, the rane trolley steel structure frame and is provided with electric block.By setting Rane trolley steel structure frame and electric block, can more preferably the need for the article that lifts be placed on floating dock or repair body On, and sounding mark is set on rane trolley steel structure frame, the depth of pontoon dive can be recorded at any time more accurately Convenient use.
A kind of installation method at modularization floating dock, comprises the following steps:
Step 1: first connect box beam under box beam under box beam, middle part under the bow in external structure framework and stern on land, Bow connector is connected with box beam under bow again, stern connector is connected with box beam under stern, it is basic that formation one is open Framework, hangs in water;
Step 2: hanging in the box buoyancy tank of blocking in order and the composition buoyancy tank body that is connected, installed after the completion of lifting External structure framework includes box beam on bow, box beam on box beam and stern on middle part so that external structure framework integrally fixes buoyancy tank Body;
Step 3: carrying deck in fixed constitute in buoyancy tank bodies top laying unit deck and assembly assembled, so Bollard is installed on carrying deck afterwards, rane trolley steel structure frame is finally lifted.
Using this installation method, not only efficient and convenient efficiency high, and being built not for different movement requirements With the modularization floating dock of size.
It is preferred that, the tool of the box buoyancy tank of blocking and the composition buoyancy tank body that is connected is hung in the step 2 in order Body step is:The box buoyancy tank of stem blocking and the box buoyancy tank of tail unitsization are first arranged on bow connector and stern is connected On the inside of part, the box buoyancy tank of middle cellization progressively then is fixedly mounted until the basic framework of the opening in step one is filled, Buoyancy tank body is eventually formed.Installed, buoyancy tank body can be assembled successively from two by using this mode, Two groups of workmans are carried out simultaneously, are not only more saved the time and are improved efficiency, and also ensure that and ensure whole in installation process The balance of body device.
It is preferred that, the tool of the box buoyancy tank of blocking and the composition buoyancy tank body that is connected is hung in the step 2 in order Body step is:A box buoyancy tank of middle cellization first is placed in the basic framework medium position of step one split shed, and from two While being sequentially placed the box buoyancy tank of middle cellization carries out installation fixation, when finally reaching on the inside of bow connector and stern connector Place the corresponding box buoyancy tank of stem blocking and the box buoyancy tank of tail unitsization and finally fixed, finally constitute buoyancy tank Body.Installed, buoyancy tank body can be assembled successively toward two from middle, two groups of workmans by using this mode Carry out simultaneously, not only more the saving time improves efficiency, and also ensure that the guarantee single unit system in installation process Balance, prevents from toppling, also further ensure that the safety of staff in installation process.
Beneficial effect:Mobility of the present invention is good, transhipment, it is convenient for installation and maintenance, it is possible to achieve water, land communications and transportation, in spy Determining can be with work such as inland lake and off-lying sea transition maintenance, rescues under environment.Damage of components is found under special circumstances, can be with General quick replacement, will not occur overall dock and surprisingly sink or tumble;In overall package, partition without lower water operation, Not by season, temperature limiting.
The present invention can have salvaging, rescue function in water, adapt to outer sea situation operation, it may be necessary to install at any time high-power Propeller.Rational in infrastructure of the present invention, maintenance, it is simple to operate, it is safe and reliable.Lower water transition, the assembling of the present invention is not made moist Nighttide periodic restrictions, no Haihe River environmental pollution.
The present invention is transported to only needs that overall package debugging can be completed within 5~8 days behind scene, can enter work completely in 12 days State, greatly shortens the time, improves operating efficiency.
Brief description of the drawings
Fig. 1 is structural representation of the invention;
Fig. 2 is the enlarged drawing in I portions of the present invention.
1st, floating dock body, 2, carrying deck, 3, blocking deck, 4, electric block, 5, rane trolley steel structure frame, 6th, bollard, 7, upper box beam, 8, stern connector, 9, buoyancy tank body, 10, external structure framework, 11, the box blocking of afterbody it is box Buoyancy tank, 12, lower box beam, 13, box beam under stern, 14, box beam on stern, 15, box beam under middle part, 16, box beam on middle part, 17, in The box buoyancy tank of portion's blocking, 18, box beam under bow, 19, box beam on bow, 20, the box buoyancy tank of stem blocking, 21, bow connects Fitting, 22, changeover portion, 23, slope, 24, preventing water leakage fixture, 25, coupler body, 26, cell body.
Embodiment
Technical solution of the present invention is described in detail below, but protection scope of the present invention is not limited to the implementation Example.
Embodiment one:As shown in Figure 1-2, a kind of modularization floating dock of the present invention, including floating dock body 1, is floated Dock body 1 is made up of buoyancy tank body 9, carrying deck 2 and external structure framework 10, and the buoyancy tank body 9 is by several blocking Box buoyancy tank is constituted, and the both sides of buoyancy tank body 9 are fixed by external structure framework 10, and the upper surface of buoyancy tank body 9 is provided with carrying deck 2, the carrying deck 2 is made up of some module unit decks 3.By by the main element buoyancy tank body 9 at floating dock using by The box buoyancy tank of blocking is constituted and carrying deck 2 is using by some module unit decks 3, it is possible to achieve long-distance transport, and not It is limited to types of transportation, land and water can be transported, and transports using can be with Assembling behind ground, and assembling speed is fast, more It is convenient and swift.And for being completed after floating dock size do not limit, can use varying number the box buoyancy tank of blocking The various sizes of floating dock of needs is assembled into blocking deck 3, efficiency can be further improved, production is saved and completes Time.The work such as inland lake and off-lying sea transition maintenance, rescue can be met in certain circumstances.Find it under special circumstances In the box buoyancy tank of a blocking damage or blocking deck 3 is damaged, can will not occur overall dock with general quick replacement Surprisingly sink or tumble;At floating dock without lower water operation when assembling, partition, not by season, temperature limiting.
Buoyancy tank body 9 is by the box buoyancy tank 20 of a stem blocking, the box buoyancy tank 17 of several middle cellizations and one The box buoyancy tank of tail unitsization is sequentially connected fixation and formed, and the box bottom right side of buoyancy tank 20 of stem blocking is provided with cell body 26, the box buoyancy tank left bottom of tail unitsization is provided with coupler body 25, and the box left bottom of buoyancy tank 17 of middle cellization is provided with The bottom right side of coupler body 25 is provided with cell body 26.The opposite side of coupler body 25 is set to set by the bottom side in the box buoyancy tank of blocking Cell body 26, can cause the bottom of two box buoyancy tanks of adjacent blocking to be fixed, convenient to install and practical.Wherein cell body 26 can be L-type cell body 26, and coupler body 25 can be corresponding L-type coupler body 25, and such fixed effect more preferably, preferably prevents list Left and right relative movement occurs for first box buoyancy tank of shape.
External structure framework 10 passes through leakproof by bow connector 21, upper box beam 7, stern connector 8 and lower box beam 12 successively Hydropexis part 24 is connected and composed, the upper box beam 7 box beam 19, several upper box beams 16 in middle part and stern on a bow Upper box beam 14 is constituted, the lower box beam 12 box beam 18, the lower box beam 15 in several middle parts and stern nowel under a bow Beam 13 is constituted.It is bow connector 21, upper box beam 7, stern connector 8 and lower box beam 12 4 by 10 points by external structure framework Part, and 7 points of upper box beam goes up box beam 14 on box beams 16 and a stern for box beam 19, several middle parts on a bow, under 12 points of box beam is box beam 13 under box beam 18, several lower box beams 15 in middle part and a stern under a bow, it is possible to achieve more preferably Long-distance transport and assembling effect, blocking is also achieved equivalent to external structure framework 10 assembled, by using varying number Box beam 15 under box beam 16 and middle part on middle part, can with various sizes of buoyancy tank body 9 is fixed, fixed effect more preferably, Using more convenient.
Embodiment two:A kind of modularization floating dock of the present invention, including floating dock body 1, floating dock body 1 is by floating Case body 9, carrying deck 2 and external structure framework 10 are constituted, and the buoyancy tank body 9 is made up of the box buoyancy tank of several blocking, The both sides of buoyancy tank body 9 are fixed by external structure framework 10, and the upper surface of buoyancy tank body 9 is provided with carrying deck 2, the carrying deck 2 are made up of some module unit decks 3.By the way that the main element buoyancy tank body 9 at floating dock is used by the box buoyancy tank of blocking Constitute and carrying deck 2 is using by some module unit decks 3, it is possible to achieve long-distance transport, and be not limited to types of transportation, water Lu Jun can be transported, and be transported using can be with Assembling behind ground, and assembling speed is fast, more convenient.And it is right Floating dock size after being completed is not limited, 3 groups of the box buoyancy tank of blocking that can be using varying number and blocking deck The various sizes of floating dock of needs is dressed up, efficiency can be further improved, production and deadline is saved.In specific environment Under can meet the work such as inland lake and off-lying sea transition maintenance, rescue.One of blocking case is found under special circumstances Formula buoyancy tank is damaged or blocking deck 3 is damaged, and can will not be occurred overall dock with general quick replacement and surprisingly sink or incline Turn over;At floating dock without lower water operation when assembling, partition, not by season, temperature limiting.The adjacent blocking of each two is box floating The top and two ends of case are fixed by preventing water leakage fixture 24.By the top to two adjacent box buoyancy tanks of blocking and Two ends are fixed, and the fixation to the top and middle part of blocking buoyancy tank are realized, with reference to the consolidating for bottom said above Effect is determined, it is achieved thereby that three-point mount, fixed effect is more preferable so that the service life of buoyancy tank body 9 is longer, and can protected The rigidity at modularization floating dock after card connection.
Buoyancy tank body 9 is by the box buoyancy tank 20 of a stem blocking, the box buoyancy tank 17 of several middle cellizations and one The box buoyancy tank of tail unitsization is sequentially connected fixation and formed, and the box bottom right side of buoyancy tank 20 of stem blocking is provided with cell body 26, the box buoyancy tank left bottom of tail unitsization is provided with coupler body 25, and the box left bottom of buoyancy tank 17 of middle cellization is provided with The bottom right side of coupler body 25 is provided with cell body 26.The opposite side of coupler body 25 is set to set by the bottom side in the box buoyancy tank of blocking Cell body 26, can cause the bottom of two box buoyancy tanks of adjacent blocking to be fixed, convenient to install and practical.Wherein cell body 26 can be L-type cell body 26, and coupler body 25 can be corresponding L-type coupler body 25, and such fixed effect more preferably, preferably prevents list Left and right relative movement occurs for first box buoyancy tank of shape.
External structure framework 10 passes through leakproof by bow connector 21, upper box beam 7, stern connector 8 and lower box beam 12 successively Hydropexis part 24 is connected and composed, the upper box beam 7 box beam 19, several upper box beams 16 in middle part and stern on a bow Upper box beam 14 is constituted, the lower box beam 12 box beam 18, the lower box beam 15 in several middle parts and stern nowel under a bow Beam 13 is constituted.It is bow connector 21, upper box beam 7, stern connector 8 and lower box beam 12 4 by 10 points by external structure framework Part, and 7 points of upper box beam goes up box beam 14 on box beams 16 and a stern for box beam 19, several middle parts on a bow, under 12 points of box beam is box beam 13 under box beam 18, several lower box beams 15 in middle part and a stern under a bow, it is possible to achieve more preferably Long-distance transport and assembling effect, blocking is also achieved equivalent to external structure framework 10 assembled, by using varying number Box beam 15 under box beam 16 and middle part on middle part, can with various sizes of buoyancy tank body 9 is fixed, fixed effect more preferably, Using more convenient.
The side of bow connector 21 is provided with slope 23, and the bottom of slope 23 is provided with changeover portion 22.By by bow The side of portion's connector 21 sets slope 23 and changeover portion 22, can need more to fit on riverbank when disembarkation at floating dock The radian on slope, faster disembarkation, and can also realize more preferable one's water breaks effect in the process of moving.The box buoyancy tank of blocking It is shaped as cuboid.By the way that the box buoyancy tank of blocking is shaped into cuboid, it can preferably prevent from using process Middle buoyancy tank body 9 is relatively moved, it is ensured that the overall service life of the stability of buoyancy tank body 9 and floating dock is more It is long.
Embodiment three:A kind of modularization floating dock of the present invention, including floating dock body 1, floating dock body 1 is by floating Case body 9, carrying deck 2 and external structure framework 10 are constituted, and the buoyancy tank body 9 is made up of the box buoyancy tank of several blocking, The both sides of buoyancy tank body 9 are fixed by external structure framework 10, and the upper surface of buoyancy tank body 9 is provided with carrying deck 2, the carrying deck 2 are made up of some module unit decks 3.By the way that the main element buoyancy tank body 9 at floating dock is used by the box buoyancy tank of blocking Constitute and carrying deck 2 is using by some module unit decks 3, it is possible to achieve long-distance transport, and be not limited to types of transportation, water Lu Jun can be transported, and be transported using can be with Assembling behind ground, and assembling speed is fast, more convenient.And it is right Floating dock size after being completed is not limited, 3 groups of the box buoyancy tank of blocking that can be using varying number and blocking deck The various sizes of floating dock of needs is dressed up, efficiency can be further improved, production and deadline is saved.In specific environment Under can meet the work such as inland lake and off-lying sea transition maintenance, rescue.One of blocking case is found under special circumstances Formula buoyancy tank is damaged or blocking deck 3 is damaged, and can will not be occurred overall dock with general quick replacement and surprisingly sink or incline Turn over;At floating dock without lower water operation when assembling, partition, not by season, temperature limiting.The adjacent blocking of each two is box floating The top and two ends of case are fixed by preventing water leakage fixture 24.By the top to two adjacent box buoyancy tanks of blocking and Two ends are fixed, and the fixation to the top and middle part of blocking buoyancy tank are realized, with reference to the consolidating for bottom said above Effect is determined, it is achieved thereby that three-point mount, fixed effect is more preferable so that the service life of buoyancy tank body 9 is longer, and can protected The rigidity at modularization floating dock after card connection.
Buoyancy tank body 9 is by the box buoyancy tank 20 of a stem blocking, the box buoyancy tank 17 of several middle cellizations and one The box buoyancy tank of tail unitsization is sequentially connected fixation and formed, and the box bottom right side of buoyancy tank 20 of stem blocking is provided with cell body 26, the box buoyancy tank left bottom of tail unitsization is provided with coupler body 25, and the box left bottom of buoyancy tank 17 of middle cellization is provided with The bottom right side of coupler body 25 is provided with cell body 26.The opposite side of coupler body 25 is set to set by the bottom side in the box buoyancy tank of blocking Cell body 26, can cause the bottom of two box buoyancy tanks of adjacent blocking to be fixed, convenient to install and practical.Wherein cell body 26 can be L-type cell body 26, and coupler body 25 can be corresponding L-type coupler body 25, and such fixed effect more preferably, preferably prevents list Left and right relative movement occurs for first box buoyancy tank of shape.
External structure framework 10 passes through leakproof by bow connector 21, upper box beam 7, stern connector 8 and lower box beam 12 successively Hydropexis part 24 is connected and composed, the upper box beam 7 box beam 19, several upper box beams 16 in middle part and stern on a bow Upper box beam 14 is constituted, the lower box beam 12 box beam 18, the lower box beam 15 in several middle parts and stern nowel under a bow Beam 13 is constituted.It is bow connector 21, upper box beam 7, stern connector 8 and lower box beam 12 4 by 10 points by external structure framework Part, and 7 points of upper box beam goes up box beam 14 on box beams 16 and a stern for box beam 19, several middle parts on a bow, under 12 points of box beam is box beam 13 under box beam 18, several lower box beams 15 in middle part and a stern under a bow, it is possible to achieve more preferably Long-distance transport and assembling effect, blocking is also achieved equivalent to external structure framework 10 assembled, by using varying number Box beam 15 under box beam 16 and middle part on middle part, can with various sizes of buoyancy tank body 9 is fixed, fixed effect more preferably, Using more convenient.
The side of bow connector 21 is provided with slope 23, and the bottom of slope 23 is provided with changeover portion 22.By by bow The side of portion's connector 21 sets slope 23 and changeover portion 22, can need more to fit on riverbank when disembarkation at floating dock The radian on slope, faster disembarkation, and can also realize more preferable one's water breaks effect in the process of moving.The box buoyancy tank of blocking It is shaped as cuboid.By the way that the box buoyancy tank of blocking is shaped into cuboid, it can preferably prevent from using process Middle buoyancy tank body 9 is relatively moved, it is ensured that the overall service life of the stability of buoyancy tank body 9 and floating dock is more It is long.
Blocking box length of buoyancy tank 10-25m, wide 2-5m, high 1-2m or (Φ 0.8m-2.2m) cylinder buoyancy tank.By inciting somebody to action The dimension limitation of the box buoyancy tank of blocking is long 10-25m, wide 2-5m, and high 1-2m or (Φ 0.8m-2.2m) cylinder buoyancy tank can be with The efficiency of assembling is preferably improved on the premise of transport is met, the time is saved.Preventing water leakage fixture 24 be preventing water leakage nut and Preventing water leakage screw, the bolt position of the preventing water leakage screw is provided with red copper pad or aluminium backing to be come by using waterproof screw Preferably anti-water-stop body it can enter as preventing water leakage fixture 24 inside floating dock, then using red copper pad or aluminium backing, Waterproof effect is more improved while preventing and meeting water oxygen.
The carrying upper surface of deck 2 is provided with several bollards 6., can be with by setting bollard 6 on carrying deck 2 When needing to stop at floating dock, stop can be more facilitated to prevent as current produce movement.The top of floating dock body 1 is set It is equipped with rane trolley steel structure frame 5, the rane trolley steel structure frame 5 and is provided with sounding mark, the rane trolley The top of steel structure frame 5 is provided with electric block 4.By setting rane trolley steel structure frame 5 and electric block 4, Ke Yigeng The article transported the need for good is placed on floating dock, and sets on rane trolley steel structure frame 5 sounding mark, can be with The depth more accurately convenient use of record pontoon dive at any time.
A kind of installation method at modularization floating dock, comprises the following steps:
Step 1: first on land by box beam 15 under box beam 18, middle part under the bow in external structure framework 10 and stern nowel Beam 13 is connected, then bow connector 21 is connected with box beam under bow 18, and stern connector 8 is connected with box beam under stern 13, shape Into the basic framework of an opening, hang in water;
Step 2: hanging in the box buoyancy tank of blocking in order and the composition buoyancy tank body 9 that is connected, installed after the completion of lifting External structure framework 10 includes box beam 19 on bow, box beam 14 on box beam 16 and stern on middle part so that external structure framework 10 is overall Fix buoyancy tank body 9;
Step 3: on the top laying unit deck 3 of buoyancy tank body 9 and assembled fixed composition carrying deck 2 that assemble, Then bollard 6 is installed on carrying deck 2, finally lifts rane trolley steel structure frame 5.
Using this installation method, not only efficient and convenient efficiency high, and being built not for different movement requirements With the modularization floating dock of size.
The box buoyancy tank of blocking is wherein hung in step 2 in order and is connected and constitutes the specific steps of buoyancy tank body 9 For:The box buoyancy tank 20 of stem blocking and the box buoyancy tank of tail unitsization are first arranged on bow connector 21 and stern connector 8 inner sides, are then progressively fixedly mounted the box buoyancy tank 17 of middle cellization until the basic framework of opening in step one is filled, Buoyancy tank body 9 is eventually formed.Installed by using this mode, can be from two successively to the carry out group of buoyancy tank body 9 Dress, two groups of workmans are carried out simultaneously, and not only more the saving time improves efficiency, and also ensure that the guarantee in installation process The balance of single unit system.
Also another installation method, for hanging in the box buoyancy tank of blocking in step 2 in order and the composition that is connected Buoyancy tank body 9 is concretely comprised the following steps:First a middle cell case is placed in the basic framework medium position of step one split shed Formula buoyancy tank 17, and the box progress of the buoyancy tank 17 installation fixation of middle cellization is sequentially placed from both sides, finally reach bow connector 21 and place the corresponding box buoyancy tank 20 of stem blocking and the box buoyancy tank of tail unitsization and carry out during stern 8 inner side of connector It is final fixed, finally constitute buoyancy tank body 9.Installed by using this mode, can be right successively from middle past two Buoyancy tank body 9 is assembled, and two groups of workmans are carried out simultaneously, and not only more the saving time improves efficiency, and also ensure that Ensure the balance of single unit system in installation process, prevent from toppling, also further ensure that staff in installation process Safety.
Embodiments of the invention is the foregoing is only, is not intended to limit the invention.All principles in the present invention Within, the equivalent substitution made should be included in the scope of the protection.The content category that the present invention is not elaborated In prior art known to this professional domain technical staff.

Claims (10)

1. a kind of modularization floating dock, including floating dock body, it is characterised in that:Floating dock body is by buoyancy tank body, carrying first Plate and external structure framework are constituted, and the buoyancy tank body is made up of the box buoyancy tank of several blocking, and buoyancy tank body both sides pass through outer Structural framing is fixed, and buoyancy tank body upper surface is provided with carrying deck, and the carrying deck is made up of some module unit decks.
2. a kind of modularization floating dock according to claim 1, it is characterised in that:The buoyancy tank body is by a stem list The box buoyancy tank of memberization, the box buoyancy tank of several middle cellizations and a box buoyancy tank of tail unitsization be sequentially connected it is fixed and Into the box buoyancy tank bottom right side of stem blocking is provided with cell body, and the box buoyancy tank left bottom of tail unitsization is provided with Coupler body, the box buoyancy tank left bottom of middle cellization is provided with coupler body bottom right side and is provided with cell body.
3. a kind of modularization floating dock according to claim 1, it is characterised in that:The external structure framework is successively by bow Connector, upper box beam, stern connector and lower box beam are connected and composed by preventing water leakage fixture, and the upper box beam is by a bow Box beam is constituted on upper box beam, several upper box beams in middle part and a stern, the lower box beam under a bow box beam, several Box beam is constituted under box beam and a stern under middle part.
4. a kind of modularization floating dock according to claim 1, it is characterised in that:The adjacent blocking case of each two The top and two ends of formula buoyancy tank are fixed by preventing water leakage fixture, and the preventing water leakage fixture is preventing water leakage nut and preventing water leakage Screw, the bolt position of the preventing water leakage screw is provided with red copper pad or aluminium backing.
5. a kind of modularization floating dock according to one of Claims 1-4, it is characterised in that:The bow connector Side is provided with slope, and the slope bottom is provided with changeover portion.
6. a kind of modularization floating dock according to claim 1, it is characterised in that:Carrying deck upper surface is provided with Several bollards.
7. a kind of modularization floating dock according to claim 1, it is characterised in that:It is provided with above the floating dock body Water level depth mark, the rane trolley steel are provided with rane trolley steel structure frame, the rane trolley steel structure frame Electric block and hydraulic type walking trolley are provided with the top of structural framing.
8. a kind of installation method at modularization floating dock as claimed in claim 1, it is characterised in that comprise the following steps:
Step 1: first connect box beam under box beam under box beam, middle part under the bow in external structure framework and stern on land, then will Bow connector is connected with box beam under bow, and stern connector is connected with box beam under stern, forms the basic framework of an opening, Hang in water;
Step 2: hanging in the box buoyancy tank of blocking in order and the composition buoyancy tank body that is connected, outer tie is installed after the completion of lifting Structure framework includes box beam on bow, box beam on box beam and stern on middle part so that external structure framework integrally fixes buoyancy tank body;
Step 3: on the buoyancy tank bodies top laying unit deck assembled and assembled fixed composition carrying deck, Ran Hou Carrying installs bollard on deck, finally lifts rane trolley steel structure frame.
9. the installation method at a kind of modularization floating dock according to claim 8, it is characterised in that pressed in the step 2 Order, which hangs in the box buoyancy tank of blocking and is connected, constitutes concretely comprising the following steps for buoyancy tank body:It is first that stem blocking is box floating Case and the box buoyancy tank of tail unitsization are arranged on the inside of bow connector and stern connector, middle part are then progressively fixedly mounted single The box buoyancy tank of memberization is filled up to the basic framework of the opening in step one, has eventually formed buoyancy tank body.
10. the installation method at a kind of modularization floating dock according to claim 8, it is characterised in that in the step 2 The box buoyancy tank of blocking is hung in order and is connected constitutes concretely comprising the following steps for buoyancy tank body:First in step one split shed Basic framework medium position places a box buoyancy tank of middle cellization, and is sequentially placed the box buoyancy tank of middle cellization from both sides Installation fixation is carried out, the corresponding box buoyancy tank of stem blocking is placed when finally reaching on the inside of bow connector and stern connector With the box buoyancy tank of tail unitsization and finally fixed, finally constituted buoyancy tank body.
CN201710427786.9A 2017-06-08 2017-06-08 A kind of modularization floating dock and its installation method Withdrawn CN107215439A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710427786.9A CN107215439A (en) 2017-06-08 2017-06-08 A kind of modularization floating dock and its installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710427786.9A CN107215439A (en) 2017-06-08 2017-06-08 A kind of modularization floating dock and its installation method

Publications (1)

Publication Number Publication Date
CN107215439A true CN107215439A (en) 2017-09-29

Family

ID=59947216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710427786.9A Withdrawn CN107215439A (en) 2017-06-08 2017-06-08 A kind of modularization floating dock and its installation method

Country Status (1)

Country Link
CN (1) CN107215439A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108583810A (en) * 2018-04-16 2018-09-28 上海海洋大学 A kind of Portable unmanned ship movement dock
CN109131776A (en) * 2018-10-26 2019-01-04 上海船舶研究设计院(中国船舶工业集团公司第六0四研究院) Modularization floating dock

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108583810A (en) * 2018-04-16 2018-09-28 上海海洋大学 A kind of Portable unmanned ship movement dock
CN108583810B (en) * 2018-04-16 2019-10-29 上海海洋大学 A kind of mobile dock of Portable unmanned ship
CN109131776A (en) * 2018-10-26 2019-01-04 上海船舶研究设计院(中国船舶工业集团公司第六0四研究院) Modularization floating dock

Similar Documents

Publication Publication Date Title
CN103112553B (en) The latent maintenance and repair ship of self-propulsion type half and using method
CN103452742B (en) A kind of Semi-submersible type multi-floater wave energy conversion device
CN107620298A (en) Ultra-large type water-power plant
CN107215439A (en) A kind of modularization floating dock and its installation method
CN104816795A (en) One-base multi-body floating type wave-energy converting device
CN104002923A (en) Combined semi-submersible transport ship and working method thereof
CN114030570B (en) Self-elevating offshore wind power operation and maintenance mother ship
CN108385626A (en) Ultra-large type water-power plant
CN104554639A (en) Installation equipment for large offshore wind power equipment
CN103195039A (en) Artificial island construction method for self-elevating straight-through deck platform
CN107399412B (en) The method of construction of MOPU
CN202847985U (en) Rounded angle reversed-truncated-pyramid-shaped floating production storage unit
CN206954469U (en) A kind of modularization floating dock
CN110104133A (en) Pontoon docking Multifunctional floating harbour
CN204510149U (en) A kind of bollard being applicable to night safe mooring
CN206766292U (en) Middle-size and small-size submarine handling torpedo new exclusive landing stage
CN205632948U (en) Artificial floating island structure
CN110466694B (en) Submersible offshore energy storage device and power transmission method
CN213784866U (en) Polyethylene fiber air bag for assisting marine culture net cage towing
CN205034309U (en) Dock
CN103074879A (en) Artificial island manufacture method
CN109237124B (en) Sand bag piling construction device for seabed suspended pipeline treatment
CN218622153U (en) Sit at end formula marine high voltage direct current conversion platform
CN110616667A (en) Wave preventing device suitable for installation of offshore floating type fan and method for installing offshore floating type fan
CN215475616U (en) General anticollision of four seasons leads ice lantern buoy

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20170929

WW01 Invention patent application withdrawn after publication